Let s Make a Difference. Presented by: Samuel Tran, P.E.
|
|
- Gervase Osborne
- 5 years ago
- Views:
Transcription
1 Let s Make a Difference Presented by: Samuel Tran, P.E. October 22, 2015
2 OVERVIEW o Importance of Geotechnical Engineering o Geotechnical Foundation Recommendations o Geotechnical Construction Specifications Let s Make a Difference
3 GEOTECHNICAL ENGINEERING o Surface and Subsurface Construction o Tunneling, Structural Foundation, Earthwork o Soil Mechanics o Plasticity Index, Moisture, Consolidation, Swell Potential o Ground Improvement o Lime / Cement Stabilization o Vibro Compaction o Band Drains
4 GEOTECHNICAL ENGINEERING o Slope Stabilization o Albert Atterberg, Henry Darcy, Joseph Boussinesq, William Rankine, Karl Terzaghi o Atterberg Limits Test, Permeability, Stress Distribution, Earth Pressure, Bearing Capacity for foundations
5 FOUNDATION RECOMMENDATIONS o Shallow Foundation o Spread Footing o Slab-On-Grade o Mat Foundation
6 FOOTING CONSTRUCTION During design the foundation plan and the utility plan should be cross checked to verify that no utility line excavation (existing and/or proposed) extends beneath the bearing influence of any footing.
7 FOOTING CONSTRUCTION Measurements Verify proper dimensions of the footings (height, width, depth, etc.) Verify proper rebar sizes and placements Verify proper reinforcing overlaps Verify proper clearance and that chairs are used Verify vapor barrier placement
8 FOOTING CONSTRUCTION Prior to Concrete Placement Verify that the base is free of loose soil and debris Verify that there is no ponding water Verify that the subgrade has not softened due to being saturated by rain
9 FOUNDATION RECOMMENDATIONS o Deep Foundation o Straight Shaft Piers o Structural Floor over crawl space or void space o Pier Foundation with slab-on-grade o Piles o Micropiles, Sheet Piles, Soldier Piles o Timber, Steel, Composite Piles Prestressed Concrete Piles,
10 FOUNDATION RECOMMENDATIONS Straight Shaft Piers Founded in Rock Skin Friction End Bearing Bell Piers (Under-reamed) Founded in Clay End Bearing
11 PIER DRILLING INSPECTION Engineering staff reviews the approved structural drawings and geotechnical report Verify Foundation Type, Penetration, Bearing Stratum Identify the pier types and locations Pre-meeting with the Geotechnical Engineer, Driller, & Engineering Technician
12 PIER DRILLING INSPECTION
13 PIER DRILLING INSPECTION Engineering Technician Verify Technician has updated structural plans Verify Diameter and Penetration Drilling Contractor Required to have a straddle bar, plumb bob and pier tape Follow direction of the engineering technician
14 PIER DRILLING INSPECTION
15 PIER DRILLING INSPECTION
16 PIER DRILLING INSPECTION Excessive water seepage or cave in will require steel casing The casing diameter and length needs to be recorded Each Steel Casing should be properly identified
17 PIER DRILLING INSPECTION
18 PIER DRILLING INSPECTION Extremely important to maintain a sufficient head of concrete during casing extraction.
19 PIER DRILLING INSPECTION Bell Piers (Under-reamed) A straight shaft is drilled to the respective depth determined by the engineer. The depth of the pier is measured before and after the belling process. Verify there are no soil build-up at the bottom of the pier.
20 PIER DRILLING INSPECTION Bell Piers (Under-reamed) will require a bell checker
21 FOUNDATION ISSUES Sulfate induced heaves Expansive Clay Austin Chalk, Eagle Ford Shale, Woodbine Moisture Conditioning, Water Injection, Chemical Injection
22 CONSTRUCTION SPECIFICATIONS Excavation Limits beyond building limits/sidewalks Bait and Switch on Select Fill PI verification per 5,000 sq/lift
23 CONSTRUCTION SPECIFICATIONS Excavation Limits beyond building limits/sidewalks Make sure correct proctors are being used. Percent Compaction per ASTM D698 or Modified Proctor D1557
24
25 Typical Moisture and % Compaction Comparison Versus Hand Penetrometer Readings Pocket Pen High PI Clay Sandy Clay (PI=25) Readings (tsf) Mc % Compaction Mc % Compaction % +5 90% % +3 95% 3.0 opt % opt % % % % %
26 o Refer to a Geotechnical Engineer for foundation issues o Plan Ahead Make sure everyone is on the same page during the construction phase o Have qualified and certified inspectors o There are no dumb questions
27 THANK YOU
GEOTECHNICAL ENGINEERING STUDY Urban Reserve Development White Rock Creek at DART Railway Dallas, Texas CTL Job No. DA6526
GEOTECHNICAL ENGINEERING STUDY Urban Reserve Development White Rock Creek at DART Railway Dallas, Texas CTL Job No. DA6526 October 13, 2004 Urban Edge Developers Ltd P.O. Box 191166 Dallas, Texas 75219
More informationGEOTECHNICAL INVESTIGATION. Proposed WONDERLAND MONTESSORI ACADEMY Legacy Drive Prosper, Texas PROJECT NO. 18-DG9174.
GEOTECHNICAL INVESTIGATION Proposed WONDERLAND MONTESSORI ACADEMY PROJECT NO. 18-DG9174 Prepared for: Mr. SANJAY JOSHI Flower Mound, Texas Prepared by: GEOSCIENCE ENGINEERING & TESTING, INC. Dallas, Texas
More informationGEOTECHNICAL INVESTIGATION. Proposed RETAIL DEVELOPEMNT 1300 W. Pflugerville Parkway Pflugerville, Texas PROJECT NO. 17-DG8780.
GEOTECHNICAL INVESTIGATION PROJECT NO. 17-DG8780 Prepared for: PROFESSIONAL STRUCIVIL ENGINEERS, INC Austin, Texas Prepared by: GEOSCIENCE ENGINEERING & TESTING, INC. Dallas, Texas October, 2017 2712 Satsuma
More informationSECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL
SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division
More informationBrooks/Cole Thomson LearningiM. Fundamentals of Geotechnical Engineering. Braja M. Das. California State University, Sacramento
Fundamentals of Geotechnical Engineering Braja M. Das California State University, Sacramento Brooks/Cole Thomson LearningiM Australia Canada Mexico Singapore Spain United Kingdom United States CHAPTER
More informationSECTION XXXXX STONE COLUMNS PART 1 - GENERAL
SECTION XXXXX STONE COLUMNS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division 01
More informationgeotechnical and construction materials consultants
geotechnical and construction materials consultants City of Dallas Public Works and Transportation Department 320 E. Jefferson Blvd, Room 307 Dallas, Texas 75203 ATTN: Mr. Vincent Lewis, P.E. Email: Vincent.lewis@dallascityhall.com
More informationSOIL AND FOUNDATION INVESTIGATION PROPOSED DUPLEX 3966 VRAIN STREET DENVER, COLORADO
SOIL AND FOUNDATION INVESTIGATION PROPOSED DUPLEX 3966 VRAIN STREET DENVER, COLORADO Prepared for: G.J. GARDNER HOMES ATTN: DAVE PAGANO 7660 RALEIGH STREET WESTMINSTER, COLORADO 80030 PROJECT NO. 1090
More informationSUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464
SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 PREPARED FOR: AAA DEVELOPMENT AND CONSULTING, INC GREENFIELD, INDIANA
More informationRIGID INCLUSIONS. Rigid Inclusions offer an economical approach for building on sites underlain by soft soil.
H A Y W A R D B A K E R I N C. RIGID INCLUSIONS Rigid Inclusions offer an economical approach for building on sites underlain by soft soil. Above: HBI installed Rigid Inclusions on a congested downtown
More informationSLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu
INSTALLATION INSTRUCTIONS Note: The following installation instructions are based off of ASTM E 1643 (Standard Practice for Installation of Water Vapor Retarders Used in Contact with Earth or Granular
More informationSECTION SOILS REPORT
SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.
More informationDeep Foundations By. J. Paul Guyer, P.E., R.A. PDHLibrary Course No PDH HOURS
Deep Foundations By J. Paul Guyer, P.E., R.A. PDHLibrary Course No 0010051 3 PDH HOURS An Introduction to Deep Foundations Guyer Partners 44240 Clubhouse Drive El Macero, CA 95618 (530) 758-6637 jpguyer@pacbell.net
More informationGEOTECHNICAL EXPLORATION. TWO MEDICAL OFFICE BUILDINGS N. Beach Street and Heritage Glen Drive Fort Worth, Texas ALPHA Report No.
GEOTECHNICAL EXPLORATION on TWO MEDICAL OFFICE BUILDINGS N. Beach Street and Heritage Glen Drive Fort Worth, Texas ALPHA Report No. G152751 Prepared for: CASTLE DEVELOPMENT GROUP P. O. Box 96255 Southlake,
More informationDIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012
2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include
More informationFOUNDATIONS. Foundations Copyright G G Schierle, 2006 Press Esc to end, for next, for previous slide 1
FOUNDATIONS Foundations Copyright G G Schierle, 2006 Press Esc to end, for next, for previous slide 1 Liquefaction reduced the soil strength under these apartment buildings in Niigata (Japan) 1964. Liquefaction
More informationGEOTECHNICAL INVESTIGATION
GEOTECHNICAL INVESTIGATION 1 08 Railway Avenue South Milo, AB Prepared for: 108 Railway Avenue South Milo, Alberta TOL 1LO Date: File: 216-2883-001 GEOTECHNICAL INVESTIGATION 108 Railway Avenue South,
More informationGeotechnical Engineering
Geotechnical Engineering Part of a diversified family of solutions www.jmt.com An Employee Owned Company Geotechnical Engineering JMT s very experienced staff in design and construction testing services
More informationGEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO
GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST
More informationWELCOME TO THE PILE DRIVING INSPECTOR COURSE
Lesson 1 WELCOME TO THE PILE DRIVING INSPECTOR COURSE 1-1 Welcome to the Pile Driving Inspector Course. This is a course designed to assist students to understand the specifications and inspection practices
More informationTABLE OF CONTENTS 1.0 INTRODUCTION SCOPE OF WORK SUBSURFACE EXPLORATION Sampling Techniques Sample Disposal...
TABLE OF CONTENTS Page No 1.0 INTRODUCTION... 1 2.0 SCOPE OF WORK... 1 3.0 SUBSURFACE EXPLORATION... 2 3.1 Sampling Techniques... 2 3.2 Sample Disposal... 2 4.0 LABORATORY TESTING... 3 5.0 SUBSURFACE STRATIGRAPHY...
More informationPROPOSED CONSTRUCTION
February 19, 2014 Colorado State University Pueblo 2200 Bonforte Boulevard Pueblo, CO, 81003 Attention John Barnosky, Director Subject: Geotechnical Investigation Soccer/Lacrosse Field Modifications Colorado
More informationMinimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08
Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Table of Contents 1. Title 2. Designation 3. List of Figures 4. Scope 5. Referenced
More informationETTAMAR, INC. Engineers and Consultants TBPE # Joe DiMaggio Blvd. Suite 28, Bldg. 300 Round Rock, TX (512) (512) FAX
RETAINING WALL CROSS-SECTION WALLS A & F ONLY N.T.S MAX HEIGHT 4"x4"x48" FULL BENCH ADJUST THE BOTTOM (OR TOP) OF WALL LOCATION TO ACCOUNT FOR WALL BATTER. OWNER SHOULD REVIEW AND APPROVE BOTTOM OF WALL
More informationB. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.
SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.
More informationGEOTECHNICAL EXPLORATION. DENTAL DEPOT 5014 Main Street The Colony, Texas ALPHA Report No. G Prepared for:
GEOTECHNICAL EXPLORATION on DENTAL DEPOT 5014 Main Street The Colony, Texas ALPHA Report No. G151847 Prepared for: FITZGERALD & ASSOCIATES 3900 N. Santa Fe Avenue Oklahoma City, Oklahoma 73118 Attention:
More informationSPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division. Project Address:
SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division Permit Application #: Project Address: Purpose: To meet the requirements of City of Walnut Creek Municipal Code Section
More informationmtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida
mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,
More informationSECTION STRUCTURAL EXCAVATION FOR STRUCTURES
1 1 1 0 1 0 1 0 1 SECTION 1. STRUCTURAL EXCAVATION FOR STRUCTURES BASED ON DFD MASTER SPECIFICATION DATED /1/1 P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all
More informationFOUNDATION ENGINEERING HANDBOOK
FOUNDATION ENGINEERING HANDBOOK Design and Construction with the 2009 International Building Code Robert W. Day Principal Engineer American Geotechnical San Diego, California Second Edition Mc Graw Hill
More informationSECTION BUILDING EARTHWORK
Conditions of Use/ Responsibility of Data Montgomery County Public Schools Facilities Guide DIVISION 2 - SITE WORK These guideline specifications are to be used by the A/E as a base document in the development
More informationGEOTECHNICAL STUDY PROPOSED PRE-OWNED FACILITY TO AN EXISTING DEALERSHIP AT MASON ROAD AND KATY FREEWAY KATY, TEXAS PROJECT NO.
GEOTECHNICAL STUDY PROPOSED PRE-OWNED FACILITY TO AN EXISTING DEALERSHIP AT MASON ROAD AND KATY FREEWAY KATY, TEXAS PROJECT NO. 15-290E TO CWA CONSTRUCTION, INC. WOODWAY, TEXAS BY SERVICING TEXAS, LOUISIANA,
More informationSPECIAL INSPECTION AND TESTING AGREEMENT
COUNTY OF MENDOCINO DEPARTMENT OF PLANNING AND BUILDING SERVICES 860 NORTH BUSH STREET UKIAH CALIFORNIA 95482 120 WEST FIR STREET FT. BRAGG CALIFORNIA 95437 STEVE DUNNICLIFF, DIRECTOR PHONE: 707-234-6650
More informationMechanical Engineer of Record: (Smoke Control Systems Only) Name & License Company. Others: Responsible Party Name & License Company
PRINCE WILLIAM COUNTY Department Development Services Building Development Division STATEMENT OF SPECIAL INSPECTIONS (Building/Other Structures other than Retaining Walls) Version 2015-12-31 Building Permit
More informationCivil Geotechnical Surveying
Civil Geotechnical Surveying Mr. David Burnett Cabarrus County Schools 4425 Old Airport Road Charlotte, North Carolina 28025 May 16, 2017 Reference: Geotechnical Engineering Evaluation Future PLC Site
More informationStatement of Special Inspections Michigan Building Code 2012 (MBC 2012)
Gaines Charter Township 8555 Kalamazoo Ave SE Caledonia MI 49316 PH: 616 698-6640 Fax: 616 698-2490 www.gainestownship.org Building Department Statement of Special Inspections Michigan Building Code 2012
More informationModule 6: Problem soils
Module 6: Problem soils Module Objectives: By the end of this session, participants will understand: 1. Why different types of ground (soils) found in South Africa is problematic for builders. 2. How different
More informationCompaction and Jet Grouting
Compaction and Jet Grouting Alan Ringen, PE Senior Vice President Breakthroughs in Tunneling Short Course August 16, 2017 Grouting Principles Geotechnical Grouting: The injection of pumpable fluid materials
More informationLantz-Boggio Architects, P.C LBA Project No
SECTION 313430- PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all equipment, material, labor and supervision to design and install Engineered Aggregate Piers for the soil reinforcement. Design shall rely
More informationEXECUTIVE SUMMARY. The soil conditions at the location of the proposed LaQuinta Inn and Suites on Medical
EXECUTIVE SUMMARY The soil conditions at the location of the proposed LaQuinta Inn and Suites on Medical Drive in Pearsall, Texas were explored by drilling 5 borings to depths of 7 to 30 feet. Laboratory
More informationPROJECT: TULSA COMMUNITY COLLEGE BOOKSTORE RENOVATION PROJECT NUMBER: ISSUE: CONSULTANT: SEAL: SHEET NUMBER: GENERAL NOTES
GENERAL NOTES TYPICAL DETAILS REQUIRED VERIFICATION & INSPECTION OF CONCRETE CONSTRUCTION VERIFICATION AND INSPECTION 1. Inspection of reinforcing steel, including prestressing tendons and placement. 2.
More informationSECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)
PART 1 GENERAL 1.01 WORK INCLUDED SECTION 02360 / 31 34 30.13 ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) A. Provide all equipment, material, labor and supervision to design and
More informationSECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...
SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...
More informationSOIL DATA: Centennial Montessori. in McKinney, TX
SOIL DATA: Centennial Montessori in McKinney, TX REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES CENTENNIAL MONTESSORI ACADEMY ELDORADO PARKWAY AT ALMA ROAD MCKINNEY, TEXAS FOR CENTENNIAL
More informationStructural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)
Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction
More informationSPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION. Project Address:
SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION Permit Application #: Project Address: Purpose: To meet the requirements of CBC Section 1704.3 this form may be used as a statement
More informationA&L ENGINEERING AND CONSULTING, INC.
GEOTECHNICAL SUBSURFACE INVESTIGATION Proposed Marriott Courtyard Hotel to be located at the Nortwest Corner of Graham Drive and Loy Lake Road in Sherman, Grayson County, Texas (Lot 2, Ameristate Plaza)
More informationPROJECT: SLAB DESIGN SITE ADDRESS LOT 36, HAMISH ROAD, DARLEY VICTORIA 3340
SITE ADDRESS LOT 36, HAMISH ROAD, DARLEY VICTORIA 3340 ABN: 84119322438, EC 19060 9 NUMERING COURT, MELTON 3337 PHONE: 03 9746 0089 MOBILE: 0401023328 EMAIL: priyan@wbcse.com.au NOTE: SETTING-OUT OF ANY
More informationApplied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois
AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West
More informationCONCRETE SLABS Job Ready Checklist
CONCRETE SLABS Job Ready Checklist This list is to be reviewed by the Builder/Superintendent to verify that the job site is ready for the Trade Contractor to arrive and begin work. Check box when complete
More informationFOR. by The Structural Committee of The Foundation Performance Association Houston, Texas. Document # FPA-SC-04-0
Issued for Website Publishing Foundation Performance Association Structural Committee Page 1 of 9 RECOMMENDED PRACTICE FOR GEOTECHNICAL EXPLORATIONS AND REPORTS by The Structural Committee of The Foundation
More informationC. Installers licensed by the Geopier Foundation Company, Inc. (www.geopier.com) will be accepted as approved installer.
SPECIFICATION FOR RAMMED AGGREGATE PIER SYSTEMS AND RIGID INCLUSION FOUNDATION PART 1: GENERAL REQUIREMENTS 1.01 Description Work shall consist of designing, furnishing and installing Rammed Aggregate
More informationFoundation Engineering and Design. ground
Foundation Engineering and Design ground Typical Geotechnical Project Geo-Laboratory ~ for testing soil properties Design Office ~ for design & analysis construction site Shallow Foundations ~ for transferring
More informationGEOTECHNICAL/GEOPHYSICAL INVESTIGATION
GEOTECHNICAL/GEOPHYSICAL INVESTIGATION at PROPOSED GLASS RESIDENCE HOUSTON, TEXAS Prepared for Mr. Joe Glass 9215 Hilldale Houston, TX by BRYANT CONSULTANTS, INC. GEOTECHNICAL AND FORENSIC ENGINEERING
More informationAppendix 3-G SWM AND BMP CONSTRUCTION INSPECTIONS
Appendix 3-G SWM AND BMP CONSTRUCTION INSPECTIONS Table of Contents APPENDIX SECTION HEADINGS 3-G.1.0 INTRODUCTION 3-G-2 3-G.1.1 Construction Inspections 3-G-2 3-G.1.2. As-Built Survey and Plan 3-G-2 3-G.1.2.1
More informationNovember 2, Job Number: Mr. Bob Gibson Warrior Golf Assets 151 Clubhouse Drive New Castle, CO Dear Mr.
November 2, 2015 Subject: Interim Materials Testing Summary, Lakota Canyon Ranch Golf Course Clubhouse - Materials Testing Special Inspections, Garfield County, Colorado Job Number: 15-6582 Mr. Bob Gibson
More informationIn preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER
CHAPTER 3 Site Preparation In preparation for constructing buildings on a property, the builder must consider a number of factors related to code requirements. The buildings must be located according to
More informationGEOTECHNICAL SUBSURFACE INVESTIGATION RECOMMENDATIONS FOR THE TAMUCC MOMENTUM FIELD LIGHT POLES NILE DRIVE CORPUS CHRISTI, TEXAS
GEOTECHNICAL ENGINEERING MATERIALS ENGINEERING & TESTING SOILS ASPHALT CONCRETE GEOTECHNICAL SUBSURFACE INVESTIGATION RECOMMENDATIONS FOR THE NILE DRIVE CORPUS CHRISTI, TEXAS RETL REPORT NUMBER: G118442
More informationThe Addendum supersedes all previous Drawings, Specifications, Addendum and instructions pertaining to these items.
ADDENDUM NO. TWO 30 August 2016 Dudycha Shell Office Buildings Park Hudson Bryan, Texas R.L. Payne & Associates, Inc. 1509 Emerald Parkway, Suite 104 College Station, Texas 77845 NOTICE TO ALL BIDDERS:
More informationGEOTECHNICAL ENGINEERING INVESTIGATION PROPOSED CITY OF GREENCASTLE PARKING GARAGE WALNUT STREET AND INDIANA STREET GREENCASTLE, INDIANA
GEOTECHNICAL ENGINEERING INVESTIGATION PROPOSED CITY OF GREENCASTLE PARKING GARAGE WALNUT STREET AND INDIANA STREET GREENCASTLE, INDIANA CARDNO ATC PROJECT NO. 86.25278.0003 (REVISED) NOVEMBER 30, 2012
More informationREPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES STEPHENVILLE RETAIL HIGHWAY 377 NEAR WOLFE NURSERY ROAD STEPHENVILLE, TEXAS FOR
REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES STEPHENVILLE RETAIL HIGHWAY 377 NEAR WOLFE NURSERY ROAD STEPHENVILLE, TEXAS FOR CROESUS STEPHENVILLE, L.P. OCTOBER 10, 2006 GEOTECHNICAL
More informationUPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04
UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 1. Description This work shall consist of the design, manufacture and construction of a T-WALL structure
More informationSECTION TRENCHING
SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.
More information.1 Furnish all labor, material and equipment necessary to complete all Site Work as shown on the Drawings and Specifications.
SECTION 31 22 00- GRADING 1.0 GENERAL.1 Furnish all labor, material and equipment necessary to complete all Site Work as shown on the Drawings and Specifications.. 2 Excavate to exact line and grade as
More informationWHICH WAY IS IT MOVING?
WHICH WAY IS IT MOVING? Guidelines for Diagnosing Heave, Subsidence and Settlement Authors: Presented by: Presented to : Ron Kelm, P.E., and Nicole Wylie, P.E. Forensic Engineers Inc. Ron Kelm, P.E. Presented
More informationZ Z X X. Installation Instructions Bulletin Revision E Foundation Specifications. For 4.0 Meter Earth Station Antenna
Installation Instructions Bulletin 7547321 Revision E Foundation Specifications For 4.0 Meter Earth Station Antenna Y Y Z Z X X ASC Signal Corporation Earth Station Antennas www.ascsignal.com 1 of 18 Copyright
More informationCOMPACTED CLAY LINERS
Technical Reference Document for Liquid Manure Storage Structures COMPACTED CLAY LINERS Table of Contents SECTION 1 - PURPOSE AND SCOPE 1.1. Purpose of the Technical Reference Document 1.2. Requirement
More information2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS
2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS HECO-6 GENERAL Pre-construction conference Preconstruction meeting Scheduled by SI with the Contractor, UBO, A/E, and relevant subs prior to commencement
More informationSparks Engineering, Inc. S T R U C T U R A L E V A L U A T I O N, D E S I G N A N D T E S T I N G
Sparks Engineering, Inc. S T R U C T U R A L E V A L U A T I O N, D E S I G N A N D T E S T I N G February 29, 2008 Ms. Leslie Wolfenden Save Austin's Cemeteries PO Box 41814 Austin, TX 78704 (512) 917-1666
More informationGeotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS
Highway 99 and Kelly Street TABLE OF CONTENTS PROJECT INFORMATION... 1 FIELD EXPLORATION... 1 SITE CONDITIONS... 2 Surface Conditions:... 2 Subsurface Conditions:... 2 FILL.... 2 Topsoil.... 2 Clay Alluvium....
More informationPHASE 1 Foundation & Drainage New Construction Phased Inspection Report John & Mary Doe 5237 Clinton Street, Denver, CO 80238
PHASE 1 Foundation & Drainage New Construction Phased Inspection Report John & Mary Doe 5237 Clinton Street, Denver, CO 80238 PHASE 1 Foundation & Drainage New Construction Phased Inspection Report Buyers
More informationGeotechnical Engineering Report
Circle K Veterans Memorial Veterans Memorial Drive and Spears Road Houston, Texas July 31, 2013 Terracon Project No. 92135247 Prepared for: Circle K Tempe, Arizona Prepared by: Terracon Consultants, Inc.
More informationSPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular
More informationSTATEMENT OF SPECIAL INSPECTION FORM
Project Title: Permit #: Project Address: STATEMENT OF SPECIAL INSPECTION FORM This Statement of Special Inspections is submitted in fulfillment of the requirements of CBC Sections 1704 and 1705. Special
More informationB. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.
SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution
More informationFoundation/Site Work Code Requirements
Q: What is a Foundation Only permit and why did I receive one when I filed for a full Building Permit? All Building Permits for new construction and additions are reviewed for zoning compliance. This review
More informationA Case Study: Foundation Design in Liquefiable Site
RESEARCH ARTICLE OPEN ACCESS A Case Study: Foundation Design in Liquefiable Site Tahar Ayadat* *(Department of Civil Engineering, College of Engineering, PMU University, P.O. Box 1664, Al-Khobar, 31952,
More informationFoundation Engineering CE Introduction. Prof. H. Alawaji. Room No. 2A- 47/1, Tel
Foundation Engineering CE 483 1. Introduction Prof. H. Alawaji Email: alawaji@ksu.edu.sa Room No. 2A- 47/1, Tel. 01-46- Contents Introduction Course General Information Prior Knowledge required for the
More informationTHE CUPOLEX SOLUTION EXPANSIVE SOILS. www. cupolex.ca
THE CUPOLEX SOLUTION EXPANSIVE SOILS www. cupolex.ca EXPANSIVE SOILS IDENTIFYING THE PROBLEM The problem of expansive soils is well known to engineers and builders. It affects construction sites throughout
More informationCASE STUDY: How Comal County Saved Local Taxpayers Nearly $1M
CASE STUDY: How Comal County Saved Local Taxpayers Nearly $1M COMAL COUNTY NEW JAIL FOUNDATION DESIGN AND COST CASE STUDY In November 2015, Comal County residents approved the issuance of $76 million in
More informationSECTION AGGREGATES
SECTION 32 05 00 AGGREGATES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Aggregate base 2. Engineered fill 3. Backfill 4. Fine filter aggregate (non-frost susceptible fill) 5. Riprap 6. Recreational
More informationStatement of Special Inspection Requirements
Statement of Special Inspection Requirements California Building Code Chapter 17 Construction plans shall include a statement of special inspection in accordance with CBC chapter 17. The statement of special
More informationINSPECTION REQUIREMENTS: FOUNDATIONS
Foundations Page 1 of 9 Revision Date: 1/2/2018 DEVELOPMENT SERVICES BUILDING INSPECTION INSPECTION REQUIREMENTS: FOUNDATIONS INSPECTION CODE: 204 SCOPE: RESIDENTIAL APPLICABLE CODES: 2016 CBC, CRC, CPC,
More informationSECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING
PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels
More informationGEOTECHNICAL ENGINEERING REPORT
GEOTECHNICAL ENGINEERING REPORT GRAND AVENUE PEDESTRIAN BRIDGE RELOCATION ROARING FORK RIVER GLENWOOD SPRINGS, COLORADO April 18, 2016 Prepared By: Prepared For: Mr. Bob Pattillo, P.E. Pattillo Associates
More informationGEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E
GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO. 15-945E TO VILLAGE OF TIKI ISLAND TIKI ISLAND, TEXAS BY SERVICING TEXAS, LOUISIANA, NEW MEXICO, OKLAHOMA
More informationGEOTECHNICAL ENGINEERING REPORT SUBSTATION NO. 3 PRYOR, OKLAHOMA. Prepared for: FINLEY ENGINEERING P.O. Box 148 Lamar, Missouri
GEOTECHNICAL ENGINEERING REPORT SUBSTATION NO. 3 PRYOR, OKLAHOMA Prepared for: FINLEY ENGINEERING P.O. Box 148 Lamar, Missouri 64759 Prepared by: Geotechnical Services Environmental Services Material Testing
More informationInstallation Guidelines
815 NE 172 nd Avenue Vancouver, WA 98684 877-694-0141 Installation Guidelines Installation steps include job planning, layout, excavating and preparing the soil subgrade, applying geotextiles (optional),
More informationProject Address: Name of Person Completing Form:
Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties
More informationSECTION DRILLED CONCRETE PIERS AND SHAFTS
1 PART ONE - GENERAL 1.1 COORDINATION SECTION 02466 DRILLED CONCRETE PIERS AND SHAFTS A. The General, Supplementary, and Special Conditions of these specifications shall all be considered as a part of
More informationWHY USING A SOIL CAP ON EXPANSIVE SOIL IS NOT ALWAYS THE SOLUTION
WHY USING A SOIL CAP ON EXPANSIVE SOIL IS NOT ALWAYS THE SOLUTION Authors: John L. Maier, PE Purcell, Rhoades & Associates, Inc. Gregory L. Carr, PE Consulting Engineer 1 CONTENT 1. THE POTENTIAL PROBLEM
More information204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)
SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the
More informationExcavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.
Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet
More informationGEOTECHNICAL INVESTIGATION PROPOSED STORAGE BUILDING AND FUELING FACILTIY WARD ALTERNATIVE ENERGY 614 EAST VINE FORT COLLINS, COLORADO
GEOTECHNICAL INVESTIGATION PROPOSED STORAGE BUILDING AND FUELING FACILTIY 614 EAST VINE FORT COLLINS, COLORADO 3436 New Castle Drive Loveland, Colorado 80538 Attention: Corey Stinar Project No. FC07179-125
More informationDHANALAKSHMI COLLEGE OF ENGINEERING, CHENNAI DEPARTMENT OF CIVIL ENGINEERING 2 MARK QUESTIONS WITH ANSWERS CE FOUNDATION ENGINEERING UNIT 1
DHANALAKSHMI COLLEGE OF ENGINEERING, CHENNAI DEPARTMENT OF CIVIL ENGINEERING 2 MARK QUESTIONS WITH ANSWERS CE6502 - FOUNDATION ENGINEERING Subject Code: CE6502 UNIT 1 1. What are the informations obtained
More informationSection CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.
PART 1 GENERAL 1.01 SUMMARY A. This Section includes the following: Section 02775 1. Reinforced concrete sidewalks. 2. Wheelchair Ramps. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment for concrete
More informationApril 21, Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912
April 21, 2016 Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912 Re: GEOTECHNICAL ENGINEERING REPORT Proposed San Elizario Retail Center Socorro Road & Chicken
More informationGEOTECHNICAL INVESTIGATION MDACC GUHN ROAD FLOOD MITIGATION PROJECT 5610 GUHN ROAD HOUSTON, TEXAS REPORT NO
GEOTECHNICAL INVESTIGATION MDACC GUHN ROAD FLOOD MITIGATION PROJECT 5610 GUHN ROAD HOUSTON, TEXAS REPORT NO. 1140189301 Reported to: URS CORPORATION Houston, Texas Reported by: GEOTEST ENGINEERING, INC.
More informationGEOTECHNICAL EXPLORATION. JA-LU PARK RENOVATIONS 4807 Stonewall Street Greenville, Texas ALPHA Report No. G Prepared for:
GEOTECHNICAL EXPLORATION on JA-LU PARK RENOVATIONS 4807 Stonewall Street Greenville, Texas ALPHA Report No. G161511 Prepared for: CITY OF GREENVILLE 2821 Washington Street, P.O. Box 1049 Greenville, Texas
More informationSTANDARD SPECIFICATION Section Auger-Grout Injected Piles Civil Engineering Group Revised: August, 2000
DIVISION 2: SITE WORK SECTION 02320 AUGER-GROUT INJECTED PILES STANDARD SPECIFICATION PART 1 GENERAL 1.0 DESCRIPTION OF WORK This work shall include all excavation, concrete, equipment and accessories
More information