1 Request for Proposal (RFP) Tribune Building Project Incourage Community Foundation, Inc. ( Incourage ) located in rural central Wisconsin, invites proposals from interested firms for Construction Management services on the Tribune Building Project (located at 220 First Avenue South, Wisconsin Rapids). Submission Deadline: Friday, February 13, 2015 at 4:00 p.m. CST TABLE OF CONTENTS 1 Project Information 2 Scope of Services Construction Manager s Responsibilities 3 Owner s Responsibilities 4 Insurance and Bonds 5 Proposal Format 6 Proposal Submittal 7 Proposer s Site Visit & Q&A Session 8 Final Selection 9 Additional Information Requests 1. PROJECT INFORMATION 1.1 ABOUT INCOURAGE Established in 1994, Incourage Community Foundation is a nationally recognized leader in place-based philanthropy and community change efforts. Incourage operates with a vision of a community that works well for all people. To achieve this vision, values of equity, inclusion and opportunity are applied to all work, and to the relationships Incourage fosters to accomplish its work. To this end, Incourage strives to work with vendors and subcontractors who: Are located in the local community or within a 200-mile radius; Hire qualified, diverse talent, who are equitably paid for their work; Value learning opportunities or practices, and building capacity of their team or others involved in the work; Can demonstrate a connection to place; Have an eye on sustainability (of environment and business) and have demonstrated a commitment to corporate social responsibility. Incourage is seeking proposals to provide Construction Management services under an AIA A133 contract structure with a guaranteed maximum price on the major renovation of the Tribune Building, as described in this RFP (the Project and sometimes the Tribune Building Project ). The selected Proposer will become the Construction Manager (CM). 1.2 DELIVERY METHOD The delivery method for the Project is Construction Manager at Risk (CMAR), which consists of an AIA A133 based contract covering the pre-construction and construction phase. 1.3 PROJECT BACKGROUND The Project (tribunebuilding.org) began when Incourage Community Foundation (incouragecf.org) purchased the historic Tribune Building along the Wisconsin River with the intent that residents would decide its future use. To date, over 750 community members have invested more than 4,400 hours in this resident-led decision making process. As determined through this process, the Tribune Building is a social enterprise helping to shape a new economy and community that works well for all.
2 Page 2 To that end, the space will include a number of local entrepreneurial operations with benefit to the local economy, including a culinary kitchen, microbrewery, cafe/brewpub, creative workshop, and recreational rentals. Further, as Incourage is committed to investing in the people who will inhabit the space as much as the functional space needed for production of their goods and services, the Tribune Building will effectively grow human talent simultaneous to the local economy. The Tribune Building s operational model is currently being developed to fully realize a space that advances the value and importance of relationships and human potential; an environment that fosters and accepts failure; creativity and innovation; and entrepreneurship. 1.4 COMMUNITY CONTEXT In 2000, the south Wood County area was devastated by economic hardships brought about by the sale of Consolidated Papers Inc. a Fortune 500 paper company that had been headquartered in Wood County for more than a century. At its operating peak, the mill employed almost half of the region s workforce. The dramatic economic shift compelled a shift in community thinking and, in response, residents realized that complacency would not serve their changed circumstances. The Tribune Building Project seeks to support residents in determining their own identity. By reimagining the building s future, residents are collectively shaping the community s future. 1.5 PROPERTY SIGNIFICANCE The Tribune Building is centrally located downtown, beside the Wisconsin River and other community assets. Both the site and the 20,000 square foot building leverage historic, local significance and distinctiveness that are already meaningful and iconic for the south Wood County area. The Tribune Building is former home to the local newspaper and radio station offices and embodies a unique mid-century modern round structure design. The building s close proximity to the Wisconsin River is also significant. The revitalization will undoubtedly alter the deeply rooted historical perspective of the river as a working asset positioned to serve the local paper industry. Once complete, the re-envisioned site will serve as a gateway for residents to experience the river as an accessible and cherished natural resource, public recreation place, and destination location for travelers. The Tribune Building s transformation is paramount to Wisconsin Rapids downtown and riverfront renaissance. The Project site address is 220 First Avenue South, Wisconsin Rapids. The Project Design Documents are provided in Exhibit A. An Estimate of Probable Costs is provided in Exhibit B. A Project Timeline is provided in Exhibit C. All Exhibits are attached to and made part of this RFP. 1.6 CONSTRUCTION MANAGEMENT AT RISK PROJECT DELIVERY BACKGROUND INFORMATION (Source: The American Institute of Architects) Construction Management at-risk is a process that allows the Owner of a Project to choose the Construction Manager before the design stage is complete. The Construction Manager is chosen based on qualifications, and then the entire operation is centralized under a single contract. The Architect and Construction Manager work together in order to cultivate and assay the design. Then, the Construction Manager gives the client a Guaranteed Maximum Price, and coordinates all subcontract work. The Architect/Engineer is hired separately from the Construction Manager at-risk and the traditional client Architect/Engineer relationship is maintained. 2. SCOPE OF SERVICES CONSTRUCTION MANAGER S RESPONSIBILITIES The Construction Manager s Preconstruction Phase responsibilities are set forth in Section 2.1. The Construction Manager s Construction Phase responsibilities are set forth in Section 2.2. The Owner and Construction Manager may agree, in consultation with the Architect, for the Construction Phase to commence prior to completion of the Preconstruction Phase, in which case, both phases will proceed concurrently. The Construction Manager shall identify a representative authorized to act on behalf of the Construction Manager with respect to the Project.
3 Page 3 The Construction Manager will be required to hold a Construction Managers license (or applicable license) valid for the State of Wisconsin. 2.1 PRECONSTRUCTION PHASE Consultation The Construction Manager shall meet with the Architect and Owner to discuss such matters as procedures, progress, coordination, and scheduling of the work. The Construction Manager shall advise the Owner and the Architect on proposed site use and improvements, selection of materials, and building systems and equipment. The Construction Manager shall also provide recommendations consistent with the Project requirements to the Owner and Architect on constructability; availability of materials and labor; time requirements for procurement, installation and construction; and factors related to construction cost including, but not limited to: costs of alternative designs or materials, preliminary budgets, life-cycle data, and possible cost reductions. The Construction Manager shall provide recommendations with regard to accelerated or fast-track scheduling, procurement, or phased construction. The Construction Manager shall take into consideration cost reductions, cost information, constructability, provisions for temporary facilities and procurement and construction scheduling issues. Preliminary Cost Estimates Based on the preliminary design and other design criteria, the Architect has prepared an Estimate of Probable Cost (Exhibit B). If the Architect or Construction Manager suggests alternative materials and systems, the Construction Manager shall provide cost evaluations of those alternative materials and systems. As the Architect progresses with the preparation of the Design Documents, the Construction Manager shall prepare estimates of the Cost of the Work of increasing detail and refinement and allowing for the further development of the design until such time as the Owner and Construction Manager agree on a Guaranteed Maximum Price for the Work. Such estimates shall be provided for the Architect s review and the Owner s approval prior to the completion of each phase. The Construction Manager shall inform the Owner and Architect when estimates of the Cost of the Work exceed the latest approved Project budget and make recommendations for corrective action. Guaranteed Maximum Price Proposal and Contract Time At a time to be mutually agreed upon by the Owner and the Construction Manager and in consultation with the Architect, the Construction Manager shall prepare a detailed line item Guaranteed Maximum Price Proposal for the Owner s review and acceptance. The Guaranteed Maximum Price in the proposal shall be the sum of the Construction Manager s estimate of the Cost of the Work and the Construction Manager s Fee for the Construction Phase as quoted in the Proposer s response to this RFP. The Construction Manager shall include with the Guaranteed Maximum Price proposal a written statement of its basis, which shall include the following: 1. A list of the Drawings and Specifications, including all Addenda thereto, and the Conditions of the Contract; 2. A list of the clarifications and assumptions made by the Construction Manager in the preparation of the Guaranteed Maximum Price proposal, 3. A statement of the proposed Guaranteed Maximum Price, including a statement of the estimated Cost of the Work organized by trade categories or systems, allowances, contingency, and the Construction Manager s Fee; 4. A schedule of milestones for the completion and the anticipated date of Substantial Completion upon which the proposed Guaranteed Maximum Price is based; 5. A Schedule of Value for each component of work to be undertaken; and 6. A date by which the Owner must accept the Guaranteed Maximum Price. The Construction Manager shall meet with the Owner and Architect to review the Guaranteed Maximum Price proposal. Once a Guaranteed Maximum Price has been agreed upon by all parties, the Owner and Construction Manager shall execute the Guaranteed Maximum Price Amendment to the Contract. The Guaranteed Maximum
4 Page 4 Price Amendment shall set forth the agreed upon Guaranteed Maximum Price with the information and assumptions upon which it is based and shall include a Schedule of Values. The Construction Manager shall guarantee that the Contract Sum shall not exceed the Guaranteed Maximum Price set forth in the Guaranteed Maximum Price Amendment, as it is amended from time to time. To the extent the Cost of the Work exceeds the Guaranteed Maximum Price, the Construction Manager shall bear such costs in excess of the Guaranteed Maximum Price without reimbursement or additional compensation from the Owner. The Construction Manager will acknowledge that the Construction Manager is an experienced contractor and that (subject to Acts of God) the Project can be completed for Guaranteed Maximum Price. Subcontractors and Suppliers Those portions of the Work that the Construction Manager does not customarily perform with the Construction Manager s own personnel shall be performed under subcontracts or by other appropriate agreements with the Construction Manager. The Owner may designate specific persons from whom, or entities from which, the Construction Manager shall obtain bids. Subcontractors must be located 50 miles or less from the Project site, unless a greater distance is approved by the Owner. The Construction Manager shall obtain at least three proposals from Subcontractors and from suppliers of materials or equipment fabricated especially for the Work and shall deliver such proposals to the Owner. The Owner shall then determine, with the advice of the Construction Manager and the Architect, which bids will be accepted. The Construction Manager shall not be required to contract with anyone to whom the Construction Manager has reasonable objection. If the Guaranteed Maximum Price has been established and a specific subcontractor or supplier (1) is recommended to the Owner by the Construction Manager, (2) is qualified to perform that portion of the Work, and (3) has submitted a proposal that conforms to the requirements of the Contract Documents without reservations or exceptions, but the Owner requires that another proposal be accepted, then the Construction Manager may require that a Change Order be issued to adjust the Guaranteed Maximum Price by the difference between the bid of the person or entity recommended to the Owner by the Construction Manager and the proposal of the person or entity designated by the Owner. 2.2 CONSTRUCTION PHASE The Construction Phase shall commence upon the execution of the Guaranteed Maximum Price Amendment or the Owner s issuance of a Notice to Proceed, whichever occurs earlier. Changes in the Work The Owner may, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions. The Architect shall issue such changes in writing and all change orders will be signed and acknowledged by Owner and Construction Manager. The Construction Manager shall be entitled to an equitable adjustment in the Contract Time as a result of changes in the Work. Change orders issued by the Owner subsequent to the execution of the Guaranteed Maximum Price Amendment shall constitute adjustments to the Guaranteed Maximum Price. Administration Upon the execution of the Guaranteed Maximum Price Amendment, the Construction Manager shall prepare and submit to the Owner and Architect a construction schedule for the Work. The Construction Manager shall update the Owner in writing on the progress of the Project on a monthly basis indicating the percentages of completion and other information required by the Owner. The Construction Manager shall develop a system of cost control for the Work, including regular monitoring of actual costs for activities in progress (compared to the Schedule of Values) and estimates for uncompleted tasks and proposed changes. The Construction Manager shall identify variances between actual and estimated costs and report the variances to the Owner and Architect and shall provide this information in its monthly reports to the Owner and Architect.
5 Page 5 The Construction Manager shall comply with applicable laws, statutes, ordinances, codes, rules and regulations, and lawful orders of public authorities applicable to its performance under this Contract, and with equal employment opportunity programs, and other programs as may be required by governmental and quasigovernmental authorities for inclusion in the Contract Documents. 3. OWNER S RESPONSIBILITIES Architect The Owner shall retain an Architect to provide Program Verification, Criteria Design, Detailed Design, and Implementation Documents related to the Project. Architect and Engineering fees will be the responsibility of the Owner and not included in the Guaranteed Maximum Price. Environmental Tests, Surveys and Reports The Owner shall be responsible for costs related to environmental studies, survey, and geotechnical services related to the Project. The Owner shall make all studies, survey data, and results available to the Construction Manager. Owner s Designated Representative The Owner has engaged an Owner s Representative to assist Owner in decision making. When the Owner is required to act, any such action will be undertaken by the Owner s authorized representative with advice from the Owner s Representative. The Owner s representative shall render decisions promptly and furnish information expeditiously, so as to avoid unreasonable delay in the services or Work of the Construction Manager. 4. INSURANCE AND BONDS For all phases of the Project, the Construction Manager shall purchase and maintain the insurance required by the Owner and to be set forth in the Construction Contract. 5. PROPOSAL FORMAT The proposal shall include the following information in the order indicated: a) Proposer Information: Identify the firm s name and the address of its principal office and any branch offices, as well as telephone number, address and website. Identify the single contact who is the authorized representative of the Proposer. Include a brief history of the firm, number of full-time and part-time employees, and how you heard about/your interest in the Tribune Building Project. b) Organization: Provide an organizational chart graphically indicating how the firm would structure and staff the proposed team. Include delegation of responsibility and assignment of authority. c) Personnel: List specific management and supervisory personnel proposed for the project team. Indicate the project assignment and responsibilities of each of the management and supervisory individuals. Provide a resume for each proposed team member, specifically stating his or her experience and qualifications. State the current and anticipated work assignments for each individual. Include at least three client references, including contact information, for each individual listed. d) Hiring Practices: Provide example(s) of your commitment to hiring and retaining a diverse workforce and creating equitable working conditions. Describe an employment practice that supports the growth of your staff. Explain how you determine equitable compensation for your staff. e) Qualifications and Experience: Provide summaries of three projects the Proposer has delivered. Include the name of the Owner or Developer of the project, its location, approximate budget, and the Proposer s specific role in the project. Also provide the name and contact information of a representative of the Owner or Developer from whom a reference can be obtained. f) Sustainability Experience: Provide example(s) of advanced sustainability projects the Proposer has been a part of. Include the name of the Owner or Developer of the project, its location, approximate budget, and the Proposer s specific role in the project. Also provide the name and contact information of a representative of the Owner or Developer from whom a reference can be obtained. g) Connection to Place: Provide example(s) of your demonstrated connection to place. If not situated in the local community, it is especially important to be able to demonstrate in recent work examples a connection and commitment to the place and people in which your work was completed. h) Self-Performed Work: Indicate and clearly define which elements of work your firm would propose to selfperform with its own forces. Describe your experience at performing this trade work.
6 Page 6 i) Subcontracted Work: Include names, addresses and descriptions of key subcontractors which your firm would employ and a description of their relevant experience and past performance. Any subcontractors must be identified in the proposal. Please remember that after contract signing, Incourage Community Foundation reserves the right to approve all subcontractors that were not approved during the RFP process. j) Ability to Meet Timelines: Provide a detailed summary of your current workload and future commitments over the proposed timeline assuming a two-week turnaround from the submission of this proposal to the commencement of services. Submit your expected duration in days for each phase of the project. k) Tax-Exempt Status: Describe how your firm will manage material purchases to take advantage of the tax exempt status of the Owner. l) Fees: Pre-Construction Phase: Provide the amount of, or basis for, compensation for the Pre Construction Phase. Include a list of reimbursable cost items, as applicable. Construction Phase: Provide the amount of, or basis for, compensation IN ADDITION to the cost listed in the Estimate of Probable Cost (Exhibit B). The Proposer will guarantee to construct the Project as described in the Project design documents for the amount specified in the Guaranteed Maximum Price Proposal and the fees quoted in this proposal subject to change orders mutually agreed upon by the Proposer and the Owner. Note: the Kitchen Equipment (line 11300) and the Brewery Equipment (line 11900) may be purchased directly by the Owner from an equipment vendor who will work collaboratively with the Construction Manager to coordinate installation. m) Optional Additional Information: Include additional information that may help the Owner more fully understand the qualifications. 6. PROPOSAL SUBMITTAL Proposals must be submitted and received by Incourage no later than 4:00 p.m. on Friday, February 13, Proposals may be submitted by or hard copy. Proposals should be submitted to: Incourage Community Foundation Inc. 478 E. Grand Avenue Wisconsin Rapids WI Attention: Chelsey Mazurek tribunebuilding@incouragecf.org If only hard copy is delivered, Proposer should secure a receipt signed and time stamped by a member of the Incourage Community Foundation staff. If your proposal is ed, note that all proposals received by the deadline will be acknowledged via an confirmation receipt. If you do not receive an ed confirmation receipt, it is the Proposer s responsibility to ensure successful transmission and delivery via PROPOSERS SITE VISIT AND Q&A SESSION There will be an opportunity for prospective Proposers to participate in a site visit to examine the building and the site on Wednesday, January 28, 2015 from 10:00 a.m. to 12:00 p.m. CST. Please RSVP for the site visit by contacting Chelsey Mazurek at cmazurek@incouragecf.org or There will also be an opportunity for prospective Proposers to participate in a Q&A webinar on Tuesday, February 3, 2015 at 2:00 p.m. CST. The purpose of the webinar is to give Proposers the opportunity to ask questions regarding the Project, as well as the RFP submission requirements. Please RSVP for the webinar by contacting Chelsey Mazurek at cmazurek@incouragecf.org or Chelsey will the log-in information to the key points of contact at each firm who have RSVP d for the webinar. Proposers may also submit questions concerning the Project in written form via or fax to the Owner with a copy to the Architect until 4:30 p.m. CST on Tuesday, February 10, Proposers will receive a reply no later than 4:30 p.m. on Thursday, February 12, FINAL SELECTION The proposals will be reviewed by a committee established by Incourage Community Foundation. Selection will be based on the qualifications and experience of the Proposer; its ability to meet project timelines; the level of understanding of and commitment to achieve the Project s principles and objectives; and proposed fees. Successful
7 Page 7 proposals will also demonstrate: Prior experience with Integrated Project / Construction Management-at-risk delivery methods (completion of at least one project over $8M in construction costs); Prior experience with delivering projects that have achieved sustainability benchmarks (e.g. LEED, Living Building Challenge); Qualified personnel with experience collaborating with Architects and Engineers during Design Phases; Qualified Cost Estimators on staff. All Proposers will be notified of their selection for interviews no later than February 27, This Request for Proposal does not commit Incourage Community Foundation to award a contract, to pay any costs incurred in the preparation of a proposal or to contract for the goods and/or services offered. Incourage Community Foundation reserves the right to accept or reject any or all proposals received as a result of this request, to negotiate with all qualified Proposers or to cancel this Request for Proposals, if it is in the best interests of Incourage Community Foundation to do so. After the selection of a Construction Manager, the schedule should include a period of collaboration between Incourage Community Foundation and the Construction Manager to better define, elaborate upon and fix the Construction Manager s exact and final scope of Work (the Final Scope ). The successful Proposer should be available to begin work, and should be prepared for project activities to commence, immediately upon selection. Please refer to Exhibit C Project Timeline. Your submission of a proposal to this RFP acknowledges your ability to work within this timeline but also acknowledges that there may be adjustments to the timeline as the Project evolves. Proposers are asked to carefully review and note all construction start dates, completion dates, and other notable objectives outlined in the attached timeline. Please note: non-selection as the Construction Manager under this RFP does not impact the Proposer s opportunity to participate in the Project as a sub-contractor. 9. ADDITIONAL INFORMATION REQUESTS Questions regarding the design elements of the Project should be directed to: Graham Hill, Architect Concordia LLC ghill@concordia.com Questions regarding the proposal or other general questions about the Project should be directed to: Chelsey Mazurek, Tribune Building Project Manager Incourage Community Foundation Inc cmazurek@incouragecf.org
REQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services
REQUEST FOR PROPOSALS Construction Manager CM Services Pre-Construction and Construction Services Big Sky Fire Department Station 1 Project Big Sky Fire District OWNER Big Sky, Montana November 2016 Request
More informationREQUEST FOR QUALIFICATIONS AND PROPOSALS
REQUEST FOR QUALIFICATIONS AND PROPOSALS CONSTRUCTION MANAGER AT RISK SERVICES Preconstruction Phase Services and Construction Phase Services Sheridan Economic and Educational Development Authority Sheridan
More informationDocument B252TM 2007
Document B252TM 2007 Standard Form of Architect s Services: Architectural Interior Design for the following PROJECT: (Name and location or address) This document has important legal consequences. Consultation
More informationREQUEST FOR PROPOSAL. Construction Management Services Not at Risk
REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk
More information2. Clarification: The building address is 801 Henderson Street.
East Energy Structural Steel Painting University of South Carolina Project Number H27-Z037 Addendum One October 19, 2015 NOTE: The following amendments, additions, and deletions shall be made to the Construction
More informationDocument B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition
Document B132 2009 Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN
More informationREQUEST FOR PROPOSALS AND STATEMENT OF QUALIFICATIONS IMPACT FEE STUDY
REQUEST FOR PROPOSALS AND STATEMENT OF QUALIFICATIONS IMPACT FEE STUDY June 1, 2018 The City of Rhome is now accepting sealed Request for Proposals and Statement of Qualifications (RFQ) for New Water &
More information1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES
TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING
More informationREQUEST FOR COMPETITIVE PROPOSALS FOR ARCHITECTURAL SERVICES CITY OF PERRIS
REQUEST FOR COMPETITIVE PROPOSALS FOR ARCHITECTURAL SERVICES BY CITY OF PERRIS Perris, California December 4 th, 2018 City of Perris is requesting Competitive Proposals from licensed architectural firms
More informationAmity School District 4J
Amity School District 4J Code: DJCA-AR Adopted: 10/11/00 Revised/Readopted: 06/22/05 Personal Services Contracts I. Personal Services Contracts Defined A. Personal services contracts include, but are not
More informationREQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District
REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September
More informationComplying with Ohio s. Qualifications-Based Selection Law. (Ohio Revised Code ) A Guide for Public Authorities
Complying with Ohio s Qualifications-Based Selection Law for Professional Engineers, Architects & Surveyors (Ohio Revised Code 153.65-.73) A Guide for Public Authorities American Council of Engineering
More informationVillage of Algonquin Request for Proposals Accounting Services
Village of Algonquin Request for Proposals Accounting Services Issue Date: February 1, 2018 Submission Deadline: March 2, 2018 5:00 p.m. CST PROPOSALS RECEIVED AFTER THE SUBMISSION DEADLINE WILL BE RETURNED
More informationREQUEST FOR QUALIFICATIONS (RFQ-18084) CONSTRUCTION MANAGEMENT AT RISK (CMAR) SERVICES STATEMENT OF QUALIFICATIONS (SOQ)
REQUEST FOR QUALIFICATIONS (RFQ-18084) CONSTRUCTION MANAGEMENT AT RISK (CMAR) SERVICES STATEMENT OF QUALIFICATIONS (SOQ) Project: Ludden Library Renovation & Expansion By Laramie County Community College
More informationTOWN OF WINTER PARK REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER / GENERAL CONTRACTOR
February 5, 2018 SUMMARY OF CM/GC SELECTION PROCESS FOR DIMMIT II APARTMENT BUILDING The Town of Winter Park requests proposals from qualified Construction Manager / General Contractor (CM/GC) firms for
More informationProposals must be received in the Office of the City Manager no later than 2:00 p.m. on December 3, 2018.
REQUEST FOR PROPOSAL Proposals are now being accepted in the Office of the City Manager, 745 Forest Parkway, Forest Park, Georgia 30297 for: COMPREHENSIVE CLASSIFICATION & COMPENSATION STUDY FOR THE CITY
More informationTHE NUCLEUS INNOVATION AND RESEARCH PARK PARKING GARAGE
REQUEST FOR DESIGN-BUILD PROPOSALS THE NUCLEUS INNOVATION AND RESEARCH PARK PARKING GARAGE Lump Sum Proposal ISSUED TUESDAY, JUNE 10, 2014 RESPONSES DUE WEDNESDAY, JULY 2, 2014 BY 4:00 PM EDT TABLE OF
More informationForsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101
Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101 Request for Qualifications Construction Manager at Risk (CMAR) INSTRUCTIONS
More informationTEXAS TECH UNIVERSITY HEALTH SCIENCES CENTER MEDICAL SCIENCE BUILDING II EARLY GMP SUB SELECTION REQUEST FOR PROPOSAL
TEXAS TECH UNIVERSITY HEALTH SCIENCES CENTER MEDICAL SCIENCE BUILDING II El Paso, Texas EARLY GMP SUB SELECTION REQUEST FOR PROPOSAL for the BUILDING CONCRETE GLASS AND GLAZING FIRE SPRINKLER MECHANICAL
More informationProfessional Practice 544
February 22, 2016 February 29, 2016 Professional Practice 544 AIA-B101 Owner - Architect Agreement Michael J. Hanahan Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com
More informationDRAFT. Request for Proposal for Construction Manager at Risk Services ASHRAE. New Headquarters Building. Peachtree Corners, GA
DRAFT Request for Proposal for Construction Manager at Risk Services ASHRAE New Headquarters Building Peachtree Corners, GA 1. INTRODUCTION AND PROJECT DESCRIPTION A. Introduction On behalf of ASHRAE,
More informationRFQ. Request for Qualifications Phase One. Renovation of City Owned Homes CITY OF BEREA, OHIO. Mayor Cyril Kleem
RFQ Request for Qualifications Phase One Renovation of City Owned Homes CITY OF BEREA, OHIO Mayor Cyril Kleem City of Berea, Ohio Project: Renovation of City Owned Homes Criteria Engineer: Antonio C. Armagno,
More informationDate: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Authorized Signature:
SUBMISSION INFORMATION Kenton County Fiscal Court P.O. Box 792 303 Court Street, Room 207 Covington, Kentucky 41012-0792 QUALIFICATION: Radio Project Phase II RFQ OPENING DATE: December 7, 2015 TIME: 2:00
More informationTownship of Severn REQUEST FOR PROPOSAL. Architectural & Professional Services Fire Station Replacement
Township of Severn REQUEST FOR PROPOSAL Architectural & Professional Services Fire Station Replacement Deadline for proposal submission is June 15, 2017 at 2:00 p.m. Contact Person: Tim Cranney Director
More informationThis is EXHIBIT A, consisting of [ ] pages, referred to in and part of the Task Order dated [ ]. Engineer's Services for Task Order
This is EXHIBIT A, consisting of [ ] pages, referred to in and part of the Task Order dated [ ]. Engineer's Services for Task Order [Introductory Note to User: The following text as published describes
More informationOhio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011)
Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011) Sec. 153.65. As used in sections 153.65 to 153.73 of the Revised Code: (A)(1)
More informationREQUEST FOR QUALIFICATIONS STATEMENT (RFQ) CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE GREENWOOD HIGH SCHOOL GYMNASIUM GREENWOOD, SOUTH CAROLINA
REQUEST FOR QUALIFICATIONS STATEMENT (RFQ) CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE GREENWOOD HIGH SCHOOL GYMNASIUM GREENWOOD, SOUTH CAROLINA GENERAL INFORMATION Greenwood School District 50 is
More informationCONSTRUCTION MANAGEMENT SERVICES
DrAFTDRAFTdd EXHIBIT 1 CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR QUALIFICATIONS () SELECTION PROCESS School District of Lee County, Florida TABLE OF CONTENTS 1. INTRODUCTION 1 Lobbying 2 2. REQUEST
More informationRequest for Proposals for Enterprise Resource Planning System Replacement Consultants Mariposa County, CA
I. Introduction Request for Proposals for Enterprise Resource Planning A. Purpose Mariposa County ( County ) is requesting proposals from qualified and experienced firms or individuals to provide consulting
More informationJanuary 22, Table of Contents
January 22, 2014 PROCEDURES SINGLE SELECTION PROCUREMENT OF DESIGN AND CONSTRUCTION MANAGEMENT SERVICES (Section 30 of Chapter 193 of the Acts of 2004) Table of Contents 1.0 Introduction...3 1.1 Purpose
More informationREQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR CITY OF NANTICOKE
REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR CITY OF NANTICOKE Proposals Solicited by: City of Nanticoke 15 East Ridge Street Nanticoke, PA 18634 C:\Users\jim\Desktop\Nanticoke City\07222013professionalengservices\Engineer
More informationREQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER SERVICES AT RISK WITH GUARANTEED MAXIMUM PRICE
REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER SERVICES AT RISK WITH GUARANTEED MAXIMUM PRICE Memphis Cook Convention Center Renovation City of Memphis, Department of Housing and Community Development
More informationREQUEST FOR QUALIFICATIONS
1.0. Invitation Capital Region Water (CRW) owns and operates the drinking water, wastewater and stormwater facilities and infrastructure for the city of Harrisburg, PA and portions of surrounding communities
More informationDocument B101 TM. Standard Form of Agreement Between Owner and Architect
Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Architect s client identified
More informationCONSTRUCTION DOCUMENTS Part 1
Audio Presentation Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT) Preparatory Course 2011 The Construction Specifications Institute www.csinet.org
More informationRequest for Proposal for Annual Financial Audit Services
Request for Proposal for Annual Financial Audit Services RFP # 19_001 Jan 10, 2019 Page 1 I. RFP Timeline The following Timeline has been defined to efficiently solicit multiple competitive proposals,
More informationVILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES. Part I: Proposal Information
VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES Part I: Proposal Information A General Information The Village of Vernon Hills is soliciting proposals for construction
More informationOhio Public Employees Retirement System. Request for Proposal
Ohio Public Employees Retirement System For: Consulting Services for Development of the Business Intelligence & Analytics Office Date: 9/11/2017 Project Name: Business Intelligence & Analytics Program
More informationLincoln City Visitor and Convention Bureau. City of Lincoln City REQUEST FOR QUALIFICATIONS
Lincoln City Visitor and Convention Bureau City of Lincoln City REQUEST FOR QUALIFICATIONS Visitor Center Concept Development and Designs Architectural Services Lincoln City, Oregon April 20, 2018 RFQ
More informationThe Home Depot U.S.A., Inc. Instructions to Bidders
The Home Depot U.S.A., Inc. Instructions to Bidders Home Depot Page 1 of 5 Article 1 Definitions 1.1 Bidding Documents include the Bidding Requirements and the proposed Contract Documents. The Bidding
More informationLa Grange Public Library Request for Proposal Executive Search Firm
La Grange Public Library Request for Proposal Executive Search Firm Please return all Proposals by January 19, 2018 4:30 pm CST to: La Grange Public Library Personnel Committee 10 West Cossitt Ave. La
More informationADDENDUM #2. Design/Build Contractor RFP Bid # for the. Joint-Use 21 st Century Post-Century Education Center.
ADDENDUM #2 Design/Build Contractor RFP Bid #0606-14 for the Joint-Use 21 st Century Post-Century Education Center SJECCD California July 7, 2014 SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT 4750 San
More informationREQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS
REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS 1. REQUEST FOR PROPOSALS. Clearwater Public Schools, Ewing Public Schools,
More informationRequest For Proposal Of Printing and Design Services. Marketing Department
Request For Proposal Of Printing and Design Services Marketing Department Released on June 3, 2016 Mosaic Youth Theatre of Detroit Printing and Design Services REQUEST FOR PROPOSAL (RFP) BACKGROUND Mosaic
More informationRequest for Proposals
Request for Proposals Comprehensive Parks, Trails, & Recreation Master Plan Services Section 1 Proposal Guidelines PURPOSE This RFP is soliciting proposals for a Professional Planning Consultant Service
More informationThere are Four areas in the systems transformation process (1) assessment, (2) planning, (3) implementation, and (4) evaluation.
Request for Proposal: Subject Matter Experts (SME) in the area of Transformation Release Date: Wednesday, February 8, 2017 Deadline: Friday, March 3, 2017 Overview Who Are We? The Ohio Center for Autism
More informationRequest for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION
Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION May 19, 2015 The Addison Public Library invites you to submit a reply to this Request for
More informationADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW
January 31, 2018 To Whom It May Concern: I. INSTRUCTIONS ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project 18-0018PW A. The following additions, deletions, revisions, and/or
More informationRequest for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents
Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Agency Project Name Stadium Project Response Deadline 1/9/14 12 pm local time
More informationEAST AFRICA TRADE AND INVESTMENT HUB REQUEST FOR PROPOSALS (RFP) RFP-NAI Payroll & Employee Benefits Management Services
EAST AFRICA TRADE AND INVESTMENT HUB REQUEST FOR PROPOSALS (RFP) RFP-NAI-0049 Payroll & Employee Benefits Management Services Issue Date: February 02, 2017 WARNING: Prospective Offerors who have received
More informationOrganizational and Compensation Review Project (RFP No. CO ADMIN-01-19)
REQUEST FOR PROPOSAL ISSUE DATE: January 9 th, 2019 Organizational and Compensation Review Project (RFP No. CO ADMIN-01-19) for the MUNICIPALITY OF SHUNIAH CLOSING: February 5, 2019 at noon EST At the
More informationInvitation to Negotiate
Invitation to Negotiate Programming, Design, and Consulting Services Lisa Daws 4/3/2012 CLERKS OF COURT OPERATIONS CORPORATION Table of Contents Agency Background... 3 Statement of Purpose... 3 Scope of
More informationREQUEST FOR PROPOSAL EXECUTIVE SEARCH FIRM
Town of Holly Springs REQUEST FOR PROPOSAL EXECUTIVE SEARCH FIRM 128 South Main Street Holly Springs, North Carolina 27540 Proposals due March 9, 2018 February 21, 2018 REQUEST FOR PROPOSAL FOR RECRUITING
More informationChapter 4 State Requirements for Educational Facilities Section 4.1
providential cause, other impending danger to life safety, or pursuant to Section 1013.46(1)(b), F.S., the board can declare an emergency, can negotiate a contract with a design-build firm, design professional,
More informationDepartment of Public Works Division of Engineering. Nassau County, New York
TOWN OF OYSTER BAY Department of Public Works Division of Engineering Nassau County, New York REQUEST FOR PROPOSALS FOR CONSULTANT SERVICES SOLICITATION NO. 2017-12 NOTES: 1. ISSUANCE DATE: Thursday, October
More informationMay 17, 2017 REQUEST FOR PROPOSALS for SECURITY SERVICES ATTENTION RESPONDENTS
May 17, 2017 REQUEST FOR PROPOSALS for SECURITY SERVICES ATTENTION RESPONDENTS You are hereby invited to submit a proposal to the McPherson Implementing Local Redevelopment Authority (hereafter referred
More informationDocument Synopses by Series
Document Synopses by Series AIA Contract Documents are divided into six alphanumeric series by document use or purpose: A Series: Owner/Contractor Agreements B Series: Owner/Architect Agreements (p. 13)
More informationCONSTRUCTION MANAGEMENT REQUEST FOR PROPOSAL EAST RUTHERFORD PUBLIC SCHOOLS
CONSTRUCTION MANAGEMENT REQUEST FOR PROPOSAL EAST RUTHERFORD PUBLIC SCHOOLS I. INTRODUCTION The East Rutherford School District is planning to hold a referendum on December 12, 2017 that incorporates facility
More informationREQUEST FOR PROPOSALS YORK COUNTY, PENNSYLVANIA TABLE OF CONTENTS
REQUEST FOR PROPOSALS GUTHRIE MEMORIAL LIBRARY ENVELOPE REHABILITATION YORK COUNTY, PENNSYLVANIA TABLE OF CONTENTS Table of Contents Section 1: Background...... 2 Section 2: Scope of Services... 2 Section
More informationREQUEST FOR OFFER RFO: For: Business Continuity Program Development Consultant Services. For: Covered California
REQUEST FOR OFFER RFO: 2017-04 For: Business Continuity Program Development Consultant Services For: Covered California Date: Tuesday, September 19, 2017 You are invited to review and respond to this Request
More informationRequest for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents
Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Bishop Woods Landscape Restoration Response
More informationREQUEST FOR PROPOSALS For AUDIT SERVICES
REQUEST FOR PROPOSALS For AUDIT SERVICES The Assumption Parish Police Jury will be accepting proposals from qualified firms of certified public accountants to audit the financial statements for the period
More informationBoth envelopes must have the following information in the lower left hand corner:
SECTION 001116 INVITATION TO BID The City of Morgantown is requesting a bid for masonry restoration for the City Hall Building in Morgantown, WV. The Project is for building envelope rehabilitation including
More informationCITY OF WAUSAU REQUEST FOR PROPOSALS SALARY (PAY RANGE MATURATION) STUDY
CITY OF WAUSAU REQUEST FOR PROPOSALS The City of Wausau is requesting proposals from consultants to review current pay ranges to determine if the current level of compensation for employees not represented
More informationRequest for Qualifications Statements
Request for Qualifications Statements BND WATER DISTRIBUTION AND WASTEWATER TREATMENT ENGINEERING STATEMENTS ENGINEERING DESIGN SERVICES FOR BND WATER DISTRIBUTION AND WASTEWATER TREATMENT The Brownsville
More informationADDENDUM ITEMS: This addendum consists of 2 pages and the following attachments: Pre-Bid Conference Sign-in Sheets, and SE-330, Lump Sum Bid Form.
1330 Lady St., Suite 500 (29201) P.O. Box 5695 Columbia, SC 29250 803 799 0247 p 803 771-6844 f Addendum No. 1 Project: Coastal Carolina University - University Place Dining Hall Project No.: C-805-15
More informationSUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY
SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS Professional Construction Management Services Harrisburg International Airport Rehabilitate Runway 13-31 Susquehanna Area Regional
More informationRequest for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents
Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Harshman Demolition Response Deadline 3/28/18
More informationOhio Public Employees Retirement System. Request for Proposal
Ohio Public Employees Retirement System For: Application Performance Monitoring Software Date: March 23, 2018 277 East Town Street Columbus, Ohio 43215 1-800-222-PERS (7377) www.opers.org PLEASE NOTE:
More informationRequest for Proposal Human Resources Consultant
Request for Proposal June 6, 2017 401 West Main Street, Suite 2300 Louisville, Kentucky 40202 Request for Proposal P a g e 2 Introduction Purpose The Louisville & Jefferson County Visitors & Convention
More informationPUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT)
PUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT) The Greenville City School District (the "District") invites interested parties to submit
More informationTransit Return on Investment (ROI) Study Request for Proposals (RFP)
Transit Return on Investment (ROI) Study Request for Proposals (RFP) Table of Contents 1. Introduction... 1 2. Scope of Services... 1 3. Project Schedule... 5 4. Evaluation Criteria... 5 5. Submission
More informationEducational Use Only S A M P L E S A M P L E
CONSENSUSDOCS 240 STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER This document was developed through a collaborative effort of entities representing a wide cross-section of the construction
More information[JURISDICTION] S AMENDMENTS TO AIA DOCUMENT B , STANDARD FORM OF ARCHITECT S SERVICES: DESIGN AND CONTRACT ADMINISTRATION
[JURISDICTION] S AMENDMENTS TO AIA DOCUMENT B141-1997, STANDARD FORM OF ARCHITECT S SERVICES: DESIGN AND CONTRACT ADMINISTRATION ARTICLE 2.1. PROJECT ADMINISTRATION SERVICES. Paragraph 2.1.2. Paragraph
More informationREQUEST FOR PROPOSAL For Comprehensive Compensation and Job Analysis Study for
United Nations Road P.O. Box 2651, Dar es Salaam, Tanzania Phone: (+255 22) 684 228882/3 REQUEST FOR PROPOSAL For Comprehensive Compensation and Job Analysis Study for International School of Tanganyika
More informationDocument B105. Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project
TM Document B105 2007 Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project AGREEMENT made as of the in the year (In words, indicate day, month and year.)
More informationREQUEST FOR PROPOSAL/QUALIFICATIONS FOR MUNICIPAL PROFESSIONALS
REQUEST FOR PROPOSAL/QUALIFICATIONS FOR MUNICIPAL PROFESSIONALS Issued by the BOROUGH OF STRATFORD Date Issued: November 16, 2018 Responses Due: December 07, 2018 REQUEST FOR PROPOSAL & QUALIFICATIONS
More informationREQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN
REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN Introduction Becker County is issuing a RFQ for Construction Management at Risk Services
More informationREQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: December 11, DUE DATE: December 28, 2017
REQUEST FOR QUALIFICATIONS FOR THE PROVISION OF LEGAL SERVICES General Counsel ISSUE DATE: December 11, 2017 DUE DATE: December 28, 2017 Issued by: Rahway Parking Authority NOTE: In the event an interested
More informationAppendix D University of Maine System. Supplementary Requirements to AIA Document B Standard Form of Architect s Services
Appendix D University of Maine System Supplementary Requirements to AIA Document B201-2007 Standard Form of Architect s Services This document provides the Architect s scope of services only and must be
More informationREQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components
REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility RFP Components CLIENT: TradePort International Corporation, Operators of John C. Munro
More informationCity Of Hammond Purchasing Department PROVIDE A COMPREHENSIVE CLASSIFICATION AND COMPENSATION STUDY FOR THE CITY OF HAMMOND RFP 17-06
1 City Of Hammond Purchasing Department PROVIDE A COMPREHENSIVE CLASSIFICATION AND COMPENSATION STUDY FOR THE CITY OF HAMMOND RFP # 17-06 Proposals Shall Be Received by the Purchasing Department, 310 East
More information6494 Latcha Rd. Walbridge, Ohio v: f: Table of Contents
Document (00 21 13) Rudolph/Libbe Inc. www.rlcos.com 6494 Latcha Rd. Walbridge, Ohio 43465 v: 419.241-5000 f: 419.837.9373 Table of Contents 1.0 General Instructions 1.1 Document Hierarchy 1.2 Safety 1.3
More informationBidding Conditions. March 22, (Project# 0192) at the. Fresno Chaffee Zoo. Project : Warthog Exhibit. Located at. 894 West Belmont Avenue
Bidding Conditions March 22, 2018 (Project# 0192) at the Fresno Chaffee Zoo Project : Warthog Exhibit Located at 894 West Belmont Avenue Fresno, CA 93728 Page 1 of 8 DEFINITIONS Addendum - A document issued
More informationSTATEMENTS OF QUALIFICATIONS ARE DUE NO LATER THAN 5:00 P.M. FRIDAY, JUNE 23, 2017
RFQ 13-2017-01 REQUEST FOR QUALIFICATIONS FOR A CRITERIA ENGINEER TO PERFORM CERTAIN PROFESSIONAL SERVICES IN THE REPAIR AND/OR REPLACEMENT OF THE LOWER LAKE DAM AND POTENTIAL REPAIRS TO THE UPPER LAKE
More informationLEVEL I PREQUALIFICATION DOCUMENTS OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA
Project No. 4484/A4L-379/964840 LEVEL I PREQUALIFICATION DOCUMENTS for OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North
More informationBIDDING INFORMATION FOR HOLLY HILL ADMINISTRATION COMPLEX RENOVATION AND ADDITION. for the COUNTY OF ORANGEBURG. Project Number: FY
BIDDING INFORMATION FOR HOLLY HILL ADMINISTRATION COMPLEX RENOVATION AND ADDITION for the COUNTY OF ORANGEBURG Project Number: FY13-1206 October 18, 2012 1180 Columbia Avenue Suite 201 29063 (803) 781-1451
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES OCTOBER 09, 2014 EAST BAY REGIONAL PARK DISTRICT Atlas Road Extension Improvements POINT PINOLE REGIONAL SHORELINE PROPOSALS DUE: 2:00PM, NOVEMBER
More informationRFP NO REQUEST FOR PROPOSALS FOR CITY ATTORNEY SERVICES
CITY OF ROLLINGWOOD 403 Nixon Drive Rollingwood, Texas 78746 (512) 327-1838 Fax (512) 327-1869 RFP NO. 2018-02 REQUEST FOR PROPOSALS FOR CITY ATTORNEY SERVICES Respondents to this RFP shall submit completed
More informationRequest for Qualifications Construction Manager at Risk (CMAR) Forsyth County Kaleideum Children s Museum and Science Center
Request for Qualifications Construction Manager at Risk (CMAR) Forsyth County Kaleideum Children s Museum and Science Center Forsyth County, a North Carolina Local Government, ( Owner ) is seeking qualifications
More informationConstruction Manager as Constructor (CMc) Manual
Construction Manager as Constructor (CMc) Manual Manual Courtesy of Purdue University Presented By Table of Contents 1.0 Executive Summary 2.1 House Bill 1196 2.2 Analysis of House Bill 1196 and Requirements
More informationINVITATION TO BID (Request for Proposal)
INVITATION TO BID (Request for Proposal) February 16, 2017 PROJECT Facilities Master Plan - Phase 1 Interior Renovations PROJECT DESCRIPTION The Topeka and Shawnee County Public Library is a 21st-century,
More informationIf you are downloading the RFQ from the website, continue to monitor the website for addenda. Failure to incorporate any addenda into your submittal
If you are downloading the RFQ from the website, continue to monitor the website for addenda. Failure to incorporate any addenda into your submittal may cause your submittal to be considered non-responsive.
More informationRequest for Proposals Triennial Performance Audit of Public Transit Systems and The Council of Governments in San Joaquin County
Request for Proposals Triennial Performance Audit of Public Transit Systems and The Council of Governments in San Joaquin County April 09, 2018 Responses Due Date/Time April 30, 2018 before 4:00 PM Pacific
More informationRequest for Quote Professionalizing Procurement Practices and Procedures February 11, 2014 Florida Department of Children and Families
Request for Quote Professionalizing Procurement Practices and Procedures February 11, 2014 Florida Department of Children and Families Purpose The Florida Department of Children and Families (the Department
More informationEXHIBIT A. 1) General:
1) General: EXHIBIT A FINDINGS OF FACT FOR EXEMPTION FROM COMPETITIVE BIDDING AND USE OF THE CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) METHOD OF CONTRACTING FOR TILLAMOOK PUD OPERATIONS CENTER AND
More informationSubject: Statement of Qualifications for Public Safety Building Design
March 5, 2010 Subject: Statement of Qualifications for Public Safety Building Design The City of Porterville seeks Statements of Qualification (SOQ) from qualified architectural and engineering firms for
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS UTILITY BILLING SOFTWARE DUE DATE: NO LATER THAN 5:00 PM EASTERN TIME, MARCH 11, 2016 QUESTIONS: JESSICA MARTIN-LANE JESSICA@MARTIN-MCGILL.COM NOTE: THE COUNTY OF HARNETT RESERVES
More informationARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES Section I Application (These procedures do not apply to Design-Build Contracts.)
More informationWEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES
1. Introduction WEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES The Town of West Yellowstone (Town) is seeking a qualified
More information