Seattle Public Schools Building Excellence IV Projects Under Construction

Size: px
Start display at page:

Download "Seattle Public Schools Building Excellence IV Projects Under Construction"

Transcription

1 Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee Hill Elementary School 24 Hazel Wolf K-8 at Pinehurst 35 Olympic Hills Elementary School 45 Seattle New World School at TT Minor 51 New Thornton Creek Building 63 November 20, 2015

2 Arbor Heights Elementary School Elementary School Site: Canopy column footings are being backfilled at the south side of North Building. Asphalt demolition and grading for landscaping and playfield is underway at the west side of the site. South Building: Exterior sheathing is ongoing at floor 1. Light-gauge metal framing continues at the exterior and interior walls at floors 2 and 3. Roofing installation is ongoing. Mechanical, plumbing, fire-sprinkler and electrical rough-in are ongoing at floors 1 and 2. North Building: Structural steel welding is ongoing. Roof joists installation is on-going. Arbor: Structural Glu-Lam columns/beams are getting erected.

3 Arbor Heights Elementary School Site Plan July 1, 2015 July 10, 2015

4 Arbor Heights Elementary School Aerial View from the South November 3, 2015

5 Arbor Heights Elementary School South Building First Floor Insulation November 12, 2015

6 Arbor Heights Elementary School South Building Third Floor Exterior Wall Framing November 12, 2015

7 Arbor Heights Elementary School South Building Third Floor Interior Wall Framing November 16, 2015

8 Arbor Heights Elementary School North Building Vapor Barrier at Gymnasium and Cafeteria November 16, 2015

9 Arbor Heights Elementary School North Building Mechanical Mezzanine November 12, 2015

10 Arbor Heights Elementary School North Building Roof Joists November 12, 2015

11 Arbor Heights Elementary School North Building Roof Joist Welding November 12, 2015

12 Arbor Heights Elementary School Arbor Glu-Lam Columns November 16, 2015

13 Cascadia Elementary School & Robert Eagle Staff Middle School Site: Pouring concrete curbs at parking lots and prepping for placement of asphalt. ES: Pouring concrete slab on grade; re-installed 2nd and 3rd murals at permanent locations; concrete footings complete. MS: Pouring concrete footings and concrete stem walls. SPU Licton Springs Flood Reduction Project: Successfully completed neighborhood streets are no longer flooding during 25 year storm events.

14 Cascadia Elementary School & Robert Eagle Staff Middle School Site Plan

15 Cascadia Elementary School & Robert Eagle Staff Middle School Aerial Photo November 3, 2015

16 Cascadia Elementary School & Robert Eagle Staff Middle School 2nd Mural Being Relocated to Permanent Location at Elementary School November 10, 2015

17 Cascadia Elementary School & Robert Eagle Staff Middle School 3rd Mural Being Set at Permanent Location at Elementary School November 12, 2015

18 Cascadia Elementary School & Robert Eagle Staff Middle School Elementary School Concrete Slab on Grade with Mural Placed on South Side November 13, 2015

19 Cascadia Elementary School & Robert Eagle Staff Middle School Middle School Concrete Brace Footings, Looking North November 12, 2015

20 Cascadia Elementary School & Robert Eagle Staff Middle School Middle School Parking Lot Subgrade Prep, Looking West November 12, 2015

21 Cascadia Elementary School & Robert Eagle Staff Middle School Middle School Underground Utilities, Looking East November 12, 2015

22 Cascadia Elementary School & Robert Eagle Staff Middle School New Stormwater Intake Structure at Licton Springs Park November 9, 2015

23 Cascadia Elementary School & Robert Eagle Staff Middle School SPU Licton Springs Stormwater Improvements and Street Restoration November 12, 2015

24 Genesee Hill Elementary School Site: Began forming curbs at play equipment area. Area 1: Installation of GWB at level 1 and 2 stairwell is ongoing; GWB finish process is ongoing. Area 2: Interior framing is ongoing at level 2; CMU veneer installation ongoing; MEP is ongoing. Area 3: Interior framing ongoing; installation of sound insulation at level 1 ongoing; CMU veneer installation ongoing; installation of flashings in window openings on going; installation of GWB on going; performing prep work at covered play area for exterior painting; MEP is ongoing. Area 4: Forming stairs at loading dock; exterior painting prep work for exposed roof at loading dock; Installation of sprinkler system is ongoing; MEP is ongoing.

25 Genesee Hill Elementary School Site Plan 4

26 Genesee Hill Elementary School Aerial View November 15, 2015

27 Genesee Hill Elementary School Site - Forming Curbs at Play Equipment Area

28 Genesee Hill Elementary School Area 1 Level 2 GWB Finish Process

29 Genesee Hill Elementary School Area 2 Level 1 Electrical Rough-In

30 Genesee Hill Elementary School Area 2 Mechanical Mezzanine Installing Ductwork

31 Genesee Hill Elementary School Area 3 Installing CMU Veneer

32 Genesee Hill Elementary School Area 3 Prepping Covered Play Area for Painting

33 Genesee Hill Elementary School Area 3 Level 1 Installing Flashing at Windows

34 Genesee Hill Elementary School Area 3 Level 1 Installing GWB

35 Hazel Wolf K-8 at Pinehurst Site: Deep sewer install continues, backfill around foundations, general clean up. Erosion measures in place and functioning properly. Building A: Area (A1) Roofing ongoing membrane installed. Electrical equipment /conduit install continues. Area (A2) metal stud framing continues on all three floors. Drywall and exterior sheeting continue. Mechanical ducting, electrical equipment /conduit and plumbing install continues. (A3) Structural steel nearly completed. final stem wall waterproofing ongoing and under slab utilities completed. Slab area prepared for concrete. Building B: Floor slab concrete pour pending good weather. Structural steel for the outside play area completed. Roofing to start. Building C: Concrete slab continues to be covered and protected. Metal roof decking installation completed. Roof Insulation and roofing material to continue next week weather permitting.

36 Hazel Wolf K-8 at Pinehurst Site Plan

37 Hazel Wolf K-8 at Pinehurst Aerial View

38 Hazel Wolf K-8 at Pinehurst Area A1-A2 Looking West November 13, 2015

39 Hazel Wolf K-8 at Pinehurst Area A2 Kindergarten Exterior Sheathing November 11, 2015

40 Hazel Wolf K-8 at Pinehurst Area A2 Structural Steel November 11, 2015

41 Hazel Wolf K-8 at Pinehurst Area A3 Structural Steel / Waterproofing November 11, 2015

42 Hazel Wolf K-8 at Pinehurst Area A3 Administration Waterproofing November 12, 2015

43 Hazel Wolf K-8 at Pinehurst Area C and A1 looking South November 11, 2015

44 Hazel Wolf K-8 at Pinehurst Area C Roofing November 11, 2015

45 Olympic Hills Elementary School Site: Continuing installation of geothermal wells. Reviewing bids for Phase 2 GC/CM trade subcontractors.

46 Olympic Hills Elementary School Site Plan

47 Olympic Hills Elementary School Aerial Photo November 4, 2015

48 Olympic Hills Elementary School Base Course, Looking SW November 11, 2015

49 Olympic Hills Elementary School Geothermal Well Drilling, Looking West November 11, 2015

50 Olympic Hills Elementary School Site TESC, Looking East November 11, 2015

51 Seattle World School at T.T. Minor Area A Administration Office, Student Services, Health Clinic and Library: Administration office addition capillary break material, concrete pour scheduled for 11/19, structural steel and glue lam delivery. Health Clinic concrete slab pour complete. Library demolition complete. Area B Multipurpose, Kitchen, Boiler Room: Steel erection ongoing, structural wood delivery and framing ongoing, boiler pad demolition complete. Installation of electrical conduit and plumbing in crawl space ongoing. Area C Classrooms: New electrical service conduit installation ongoing, underground utility complete, CMU grade beams complete, CMU block wall installation ongoing.

52 Seattle World School at T.T. Minor Site Plan

53 Seattle World School at T.T. Minor Area A New Administration Addition Capillary Break Installed November 13, 2015

54 Seattle World School at T.T. Minor Area A New Administration Addition Erosion Control November 13, 2015

55 Seattle World School at T.T. Minor Area A and B Structural Glue-Lam Delivery November 13, 2015

56 Seattle World School at T.T. Minor Area B New Commons Addition Wood Framing November 13, 2015

57 Seattle World School at T.T. Minor Area B New Commons Addition Wood Framing November 16, 2015

58 Seattle World School at T.T. Minor Area B Electrical Conduit Installation November 16, 2015

59 Seattle World School at T.T. Minor Area B New Commons SIP Roof Panel Delivery November 16, 2015

60 Seattle World School at T.T. Minor Area C CMU Block Wall Installation November 16, 2015

61 Seattle World School at T.T. Minor Area C CMU Block Wall Installation November 16, 2015

62 Seattle World School at T.T. Minor Area B Wood Framing November 16, 2015

63 New Thornton Creek Building Site: Continued installing footing drainage piping and downspouts. Continued Phase II geothermal well drilling in playfield north of the parking lot. Building A: Continued with interior backfill around footings. Set subgrade for remaining concrete slab-on-grade. Continued installing underground plumbing and electrical including drains. Building B: Continued edge form for slab-on-deck. Continued erecting structural steel in both library and two story academic wing. Continued placing decking in first story of two story wing. Building C: Continued interior framing on classrooms. Continued installing interior hollow metal window frames in hallway for classrooms. Began installing gypsum wall board (GWB) above hallway ceiling. Continued installing HVAC ductwork and above ceiling plumbing and electrical. Continued with plumbing and electrical rough-in in classroom walls. Building D: Continued excavation of footings for Covered Play Area.

64 New Thornton Creek Building Key Plan

65 New Thornton Creek Building Aerial Photo October 15, 2015

66 New Thornton Creek Building Building A Underground Electrical and Plumbing Rough-in

67 New Thornton Creek Building Building A Geothermal Header Piping to Main Mechanical Room

68 New Thornton Creek Building Building A Geothermal Header Piping to Main Mechanical Room

69 New Thornton Creek Building Building B Structural Steel Erection

70 New Thornton Creek Building Building B Structural Steel Erection

71 New Thornton Creek Building Building B Structural Steel Erection

72 New Thornton Creek Building Building B Structural Steel for Mechanical Penthouse

73 New Thornton Creek Building Building B Drain Installed in Slab-on-Deck

74 New Thornton Creek Building Building C Cold Fluid Applied Air Barrier on Exterior Wall

75 New Thornton Creek Building Building C Cold Fluid Applied Air Barrier on Exterior Wall

76 New Thornton Creek Building Building C GWB Installed above Ceiling

77 New Thornton Creek Building Building D Footing for Covered Play Area

78 New Thornton Creek Building Building D Footing for Covered Play Area