1 4918 HOVENKAMP DRIVE DALLAS, TEXAS PRESENTATION JANUARY 24, 2017 RGM ARCHITECTS OCTOBER 25,

2 2 COMMUNITY INPUT DESIGN DOCUMENT PROCUREMENT CONSTRUCTION PD SD DD CD BD CA PROJECT PROCESS

3 3 Construction Phase 1 Summer 2017 Construction Phase 2 Fall 2017 Construction Phase 3 Winter 2017 Construction Phase 4 Spring 2018 Construction Phase 5 Spring 2018 Summer 2017 Fall 2017 Winter 2018 Spring 2018 Summer REWORK SITE GRADING FOR DRAINAGE NEW FIRE LANE UPGRADE THE MAIN BUILDING FAÇADE NEW ACCESSIBLE RAMPS REPLACE THE BUILDING WINDOWS REPLACE ROOF NEW CEILING, LIGHTING, AND DIFFUSERS IN AUDITORIUM UPGRADE RESTROOMS EXPAND CAFETERIA TECHNOLOGY, LIFE SAFETY, LIGHTING, AND SECURITY UPGRADES UPGRADE THE MAIN BUILDING FAÇADE REPLACE THE BUILDING WINDOWS NEW WALL FURR OUTS TO ALL CORE CLASSROOMS NEW FLOOR, WALL, AND CEILING FINISHES PROVIDE DOOR FRAMES AND DOOR HARDWARE UPGRADE RESTROOMS TECHNOLOGY, LIFE SAFETY, LIGHTING, AND SECURITY UPGRADES UPGRADE THE MAIN BUILDING FAÇADE PROVIDE ENCLOSED WALKWAY REPLACE THE BUILDING WINDOWS NEW WALL FURR OUTS TO ALL CORE CLASSROOMS NEW FLOOR, WALL, AND CEILING FINISHES PROVIDE DOOR FRAMES AND DOOR HARDWARE RELOCATE EXISTING MEDIA CENTER TO FIRST FLOOR UPGRADE RESTROOMS TECHNOLOGY, LIFE SAFETY, LIGHTING, AND SECURITY UPGRADES REPLACE THE BUILDING WINDOWS REPAIR / RESURFACE THE EXISTING PARKING LOT NEW BUS DROP OFF CANOPY RECONFIGURE ADMINSTRATION AND NURSE OFFICES NEW WALL FURR OUTS TO ALL CORE CLASSROOMS NEW FLOOR, WALL, AND CEILING FINISHES PROVIDE DOOR FRAMES AND DOOR HARDWARE UPGRADE RESTROOMS TECHNOLOGY, LIFE SAFETY, LIGHTING, AND SECURITY UPGRADES RENOVATE THE MAIN ENTRANCE NEW LANDSCAPE AT MAIN ENTRANCE REPLACE THE BUILDING WINDOWS REPAIR / RESURFACE THE EXISTING PARKING LOT NEW BUS DROP OFF CANOPY RECONFIGURE ADMINSTRATION AND NURSE OFFICES NEW WALL FURR OUTS TO ALL CORE CLASSROOMS NEW FLOOR, WALL, AND CEILING FINISHES PROVIDE DOOR FRAMES AND DOOR HARDWARE TECHNOLOGY, LIFE SAFETY, LIGHTING, AND SECURITY UPGRADES PROJECT CONSTRUCTION SCHEDULE / PHASING (TENTATIVE)

4 4 BENEFIT OF CHANGES COST OF CHANGES PRE DESIGN DESIGN DOCUMENT PROCUREMENT CONSTRUCTION SCOPE BENEFIT

5 EXTERIOR IMPROVEMENTS RENOVATE THE MAIN ENTRANCE OF THE MAIN BUILDING WITH A NEW COVER PORCH, STAIRS, AND FINISHES. UPGRADE THE EXISTING MAIN BUILDING PERIMETER EXTERIOR FACADE WITH STONE AND FIBER CEMENT BOARD CLADING. PROVIDE NEW LANDSCAPE ENHANCEMENTS FEATURES AT THE MAIN ENTRANCE TO THE BUILDING PROVIDE CONDITION ENCLOSURE FROM THE MAIN BUILDING TO THE EXISTING MODULAR BUILDING REPLACE THE MAIN BUILDING WINDOWS REPLACE THE MAIN EXISTING BUILDING ROOF SYSTEM AND ACCESSORIES REPAIR AND RESURFACE THE EXISTING ASPHALT PARKING LOT PROVIDE NEW ADA COMPLIANT RAMPS TO ALL EXITS FOR BOTH THE MAIN BUILDING AND THE MODULAR BUILDING PROVIDE NEW BUS DROP OFF CANOPY ON THE SOUTH ENTRANCE TO THE MAIN PARKING LOT PROVIDE NEW FIRE LANE ACCESS TO THE MODULAR BUILDING 5 INTERIOR IMPROVEMENTS RECONFIGURE THE ADMINSTRATION AND NURSE OFFICES PROVIDE NEW WALL FURR OUTS TO ALL CORE CLASSROOMS PROVIDE NEW FLOOR, AND WALL FINISHES TECHNOLOGY, LIFE SAFETY, LIGHTING, AND SECURITY UPGRADES PROVIDE DOOR FRAMES AND DOOR HARDWARE PROVIDE NEW ACOUSTICAL CEILING SYSTEM, LIGHTING, AND DIFFUSERS RELOCATE THE EXISTING MEDIA CENTER FROM THE SECOND FLOOR AND WILL BE LOCATED ON THE FIRST FLOOR ADJACENT TO THE MUSIC AND ART ROOMS UPGRADE THE RESTROOMS TO MEET THE ADA REQUIREMENTS CAFETERIA DINING ROOM EXPANSION WITH NEW DINING AREA SEATING/TABLES UPGRADE THE EXISTING HVAC UNITS PROPOSED SCOPE

6 6 RELOCATED MEDIA CENTER FRONT ENTRANCE AND ADMINISTRATION RENOVATION LIGHT RENOVATION MEDIUM RENOVATION HEAVY RENOVATION NO WORK TO BE PERFORMED RELOCATED MEDIA CENTER PRE K RENOVATION PRE K RENOVATION CAFETERIA EXPANSION NO WORK NEW BUS DROP CANOPY AND SIDE ENTRANCE FLOOR PLAN / DIAGRAM

7 7 LIGHT RENOVATION MEDIUM RENOVATION HEAVY RENOVATION NO WORK TO BE PERFORMED RELOCATED MEDIA CENTER FLOOR PLAN / DIAGRAM

8 8 PAINT THE EXTERIOR FACADE MINOR ROOF REPAIR PROVIDE NEW CONDITION COVER WALKWAY SITE / FLOOR PLAN / DIAGRAM

9 9 MINOR ROOF REPAIR TOTAL ROOF REPLACEMENT SITE / FLOOR PLAN / DIAGRAM

10 10 NEW DETENTION PONDS NEW FRONT ENTRANCE HOVENKAMP DRIVE NEW FIRE LANE SWING SPACE AREA PHASE 1 SUMMER 2017 PHASE 2 EARLY FALL 2017 PHASE 2A LATE FALL 2017 PHASE 3 EARLY SPRING 2018 PHASE 3A LATE SPRING 2018 PHASE 4 SUMMER 2018 PHASE 5 WINTER 2018 NO WORK TO BE PERFORMED SITE PHASING PLAN (TENTATIVE) PARKING LOT AND NEW BUS DROP OFF LANE

11 11 SWING SPACE AREA PHASE 1 SUMMER 2017 PHASE 2 EARLY FALL 2017 PHASE 2A LATE FALL 2017 PHASE 3 EARLY SPRING 2018 PHASE 3A LATE SPRING 2018 PHASE 4 SUMMER 2018 PHASE 5 WINTER 2018 NO WORK TO BE PERFORMED PHASING PLAN (TENTATIVE)

12 12 SWING SPACE AREA PHASE 1 SUMMER 2017 PHASE 2 EARLY FALL 2017 PHASE 2A LATE FALL 2017 PHASE 3 EARLY SPRING 2018 PHASE 3A LATE SPRING 2018 PHASE 4 SUMMER 2018 PHASE 5 WINTER 2018 NO WORK TO BE PERFORMED FLOOR PHASING PLAN (TENTATIVE)

13 13 EXAMPLE OF RENOVATION OF TYPICAL CLASSROOM EXISTING CLASSROOM RENOVATED CLASSROOM IMAGES / RENDERINGS

14 14 JANUARY 24, 2017 EXAMPLE OF RENOVATION OF TYPICAL CLASSROOM RENOVATED CLASSROOM CEILING IMAGES / RENDERINGS RENOVATED CLASSROOM FLOOR

15 16 IMAGES / RENDERINGS PRELIMINARY FRONT ENTRANCE ENHANCEMENT

16 17 IMAGES / RENDERINGS PRELIMINARY FRONT ENTRANCE ENHANCEMENT

17 18 IMAGES / RENDERINGS PRELIMINARY FRONT ENTRANCE ENHANCEMENT

18 19 IMAGES / RENDERINGS PRELIMINARY COVERED BUS DROP OFF ENTRANCE

19 20 IMAGES / RENDERINGS NEW LOBBY ENTRANCE

20 21 PROPOSED CONDITION CONNECTOR FROM MAIN BUILDING TO THE MODULAR BUILDING IMAGES / RENDERINGS

21 22 PROPOSED CONDITION CONNECTOR FROM MAIN BUILDING TO THE MODULAR BUILDING IMAGES / RENDERINGS

22 23 IMAGES / RENDERINGS PROPOSED SCHOOL NAME LOCATION AT THE GYM EXTERIOR WALL

23 4918 HOVENKAMP DRIVE DALLAS, TEXAS PRESENTATION JANUARY 24, 2017 RGM ARCHITECTS THANK YOU!