Bath Project General Services GC/PS Worksheet

Size: px
Start display at page:

Download "Bath Project General Services GC/PS Worksheet"

Transcription

1 Client Information Client Name Bath Project General Services GC/PS Worksheet PSI Name Fixtures to be removed (check those being removed): Tub/Tub Door Shower/Shower Door Vanity/VanityTop/Sink/Faucet Stand Alone Sink/Faucet Toilet Carpet Laminate Floor Wood Floor Tile Floor Demolition Includes Haul Away and Disposal Full Bath (remove fixtures, walls to the studs and floor to subfloor): Remove Cast Iron Tub (do not use with full bath demo above): ONLY SECTION FOR DEMOLITION Half Bath (remove Enter total sq. ft of bathroom fixtures, walls to the studs (sq ft greater than 40 will and floor to subfloor): incur a per sq ft upcharge) Total sqft: Remove Non Cast Iron Tub (do not use with full bath demo above): Fixture Removal Only (walls and flooring untouched) (FIXED RATE PER FIXTURE): Number of Fixtures to be Removed: (do not use with full or half bath demo lines) Remove existing tile or wood flooring (do not use with full or half demo above): Total Sqft: Additional Demolition Charges (not covered above): Describe Additional Demo Charges: Structural Use grid to draw measurements for any structural changes Construct non-load bearing wall/knee wall: Total sqft: (incl. framing, sheetrock, prepped to paint ready condition incl. blocking for shower doors and grab bars) Additional Structural Work (walls, soffits, etc.) Tub Rough-in Framing (standard or drop-in): Describe Additional Structural Charges: Apply Structural Job Minimum (should only be used for small structural work jobs) (cost) Dry Wall Install drywall to prime ready condition (include blocking for shower doors or grab bars if necessary): Total sq ft: Insulation Install insulation: Total sq ft: Special Services Professional Cleaning (as requested by customer) Mold Remediation Charges: Permit Fee Charges Apply Drywall Job Minimum (should only be used for small drywall jobs) Apply Insulation Job Minimum (should only be used for small insulation jobs) Professional Cleaning Comments: Describe Mold RemediationCharges: Describe Permit Fee Charges: Additional Drywall Comments: Additional Insulation Comments:

2 Bath Project General Services GC/PS Worksheet Lead Safe Practices Charges: Describe Lead Safe Practice Charges: Additional Scope Beyond current service levels to be entered as a separate price or estimate (at ): Services Additional Charge: Describe Additional Customer Purchased Materials Detailed Scope of Work Additional Services (not captured above) Additional Services (not captured above) RETURN THIS SHEET TO STORE WITHIN 2 BUSINESS DAY OF DETAIL APPT. ALL ESTIMATED WORK IS TO BE QUOTED AT GC COST. Bathroom Drawing Room Layout Structural Drawings Room A B C (Product One) (Product Two) Size/Material (Square Feet) Comments:

3 Date: Bath Project Plumbing GC/PS Worksheet Client Name Additional blocking may be required for shower doors & grab bars Fixture Removal All Demolition Charges to be Captured on the General Services Worksheet Tile Showers and Walls to be Measured on Flooring Worksheet incl. shower pans Vanity / Cabinets - Includes Vanity top installation (Including integrated sinks, faucets and plumbing) Single vanity s and tops up to 60 inches: Double Vanity and top / single greater than 60 inches: Number: Number: Number: Additional Vanity/Cabinet Work (not Describe Additional Vanity/Cabinet Work: covered above): Finish Plumbing Use grid to draw detailed measurements for proper ordering of product Fixtures to be installed: Toilet Pedestal Sink Mounted Sink Faucets/Shower Head Accessories to be installed: Surface Mirrors & Cabs Large Mirrors Accessories Tubs/Showers to be installed: Tub/Tub Enclosure Shower/Shower Enclosure Number of Mounted Sinks: Do not double count if included with vanity install Number of surface mount mirrors, medicine cabinets, and over-thetoilet cabinets: Mirrors up to 9 sqft Number of Tubs with Surrounds to install: Size: INSTALL IN EXISTING LOCATION Number of Pedestal Sinks: Additional cabinets (not for surface mount medicine cabinets or over-the-toilet cabinets): Number of Faucets/Shower Heads: Do not double count if included with vanity/shower install Wall Mirror > 9 sqft: Number of Accessories: Total sqft: Number of Tubs to install (no surround): Size: Number of Shower Base/Surround: Acrylic: Number of Toilets: Towel bars, toilet paper holder, grab bars, towel rings, robe hook, etc. Number of Shower Base/Surround: Composite (i.e. Solid Surface) Shower Doors to be installed: Shower/Tub Doors Shower Door Number of Standard Shower/Tub Doors to install: Rough Plumbing Plumbing relocations fixture to new location (GC quote): Custom Shower Door: Type 2 Custom Shower Door Install Charge: cost (Do not use if Type 2 install - sold separately) Describe plumbing relocation charge: Additional Blocking may be required for shower doors and grab bars. cost Bring up to Code Charge (GC Quote): Describe code work to be completed:

4 Date: Bath Project Plumbing GC/PS Worksheet Cutting concrete charges: Describe cutting concrete work to be completed: Additional Scope beyond current service levels to be entered as a separate price or estimate Additional Charge: Describe Additional Detailed Scope of Work Customer Purchased Materials Additional Plumbing Work Additional Plumbing Work Additional Plumbing Work Additional Plumbing Work RETURN THIS SHEET TO STORE WITHIN 2 BUSINESS DAY OF DETAIL APPT. ALL ESTIMATED WORK IS TO BE QUOTED AT COST. Bathroom Drawing Bathroom Layout and Measurements Shower Door Configuration Room A B C D (Product One) (Product Two) Size/Material (Square Feet) Comments:

5 Date: Customer Information Customer Name Bath Project Cab/C-top GC/PS Worksheet This sheet is to be used when a bath project will include Kitchen cabinet and/or countertop installs. Vanity installs should be captured on the plumbing worksheet. Cabinets Base Cabinets Wall Cabinets Pantry Install base cabinets Install wall cabinets Number of pantry s to Install: Provide detailed drawing and measurements to ensure accurate product configuration. Cabinet Details Basic Molding Complex Crown Cabinet Skins Install cabinet basic crown molding and other moldings Install cabinet skins Install complex crown molding (complex, stacked, custom cut) (incl. toe kicks, quarter round, light rails, etc.) # of skins: Notate location: Linear foot of finished molding: (Do not count individual layers) Countertops Granite/Solid Surface Laminate Granite & solid surface type 2 program sold separately Install countertop - laminate (type 1) (GC Quote): Comments Additional Cabinet/C-top Installation Comments: Additional Scope beyond current service levels to be entered as a separate price or estimate Services Additional Charge: Describe Additional Detailed Scope of Work Additional cabinet / c-top work Customer Purchased Materials RETURN THIS SHEET TO STORE WITHIN 1 BUSINESS DAY OF DETAIL APPT. ALL ESTIMATED WORK IS TO BE QUOTED AT COST.

6 Customer Information Customer Name Date: Bath Project Flooring GC/PS Worksheet Flooring Use grid to draw floor layout and seam placement (if necessary) Carpet to be sold following current process in ISST. Flooring to be installed: Vinyl Laminate Wood Ceramic Tile Natural Stone ft of flooring material to be ordered (incl. 10% excess) Flooring to be ordered: Vinyl Flooring (sheet or tile) Total sq ft to install: Ceramic/Porcelain Floor Tile Sq. ft to install: Pattern: (Diag./Custom incurs up charge) Straight Diagonal Ceramic/Porcelain Wall Tile (shower walls to be captured in separate section) Laminate Flooring Total sq ft to install: (Customer to purchase underlayment) Wood Flooring: Total sq ft to install: Pattern: Standard Non Ceramic or Porcelain Floor Tile (i.e. slate, marble, glass, etc) Sq. ft to install: Pattern: (Diag./Custom incurs up charge) Straight Diagonal Non Ceramic or Porcelain Wall Tile (i.e. slate, marble, glass, etc) (shower walls to be captured in separate section) Sq. ft to install: Pattern: (Diag./Custom incurs up charge) Straight Diagonal Subfloor replacement: Sq. ft to install: Pattern: (Diag./Custom incurs up charge) Straight Diagonal Subfloor comments: Total sq ft to install: Tile Shower/Tub Floors and Walls Use grid to draw measurements for tile shower and tub surround List total sq ft of Shower Floor Tile Tile Pattern(Diag./Custom incurs up charge) shower/tub tile to be ordered (incl. 10% Sq ft to install: Straight Diagonal excess): Shower/Tub Wall Tile Tile Pattern(Diag./Custom incurs up charge) Install Shower Pan: Sq ft to install: Straight Diagonal Shower pan shape: Shower pan size: Install Shower Seat: Number of insets and shelves to be installed: To ensure Lifetime Warranty on Mapei shower pan customer must purchase Mapei Mapelastic AquaDefense waterproofing and Kerabond/Keralastic System mortar, and waterproof Mapei Grout Sq. ft of glass block to install: Additional Tile Shower/Tub comments: Cement Board Total sq ft of cement board to install: Additional Comments: (include blocking for shower doors and grab bars if necessary) Additional Scope beyond current service levels to be entered as a separate price or estimate (at ) Seal tile and/or grout (GC Quote): Describe Areas to be sealed: Additional Flooring Charges: Describe Additional Flooring Charges:

7 e Customer Information Customer Name Date: Bath Project Electric GC/PS Worksheet Finish Electrical Finish Electrical Lights Fans Outlets Switches Number of light fixtures to install (existing locations): REMOVE AND REPLACE IN SAME LOCATION Number of vent fans or fan/light Number of switches and outlets to be replaced combos to install (Installation includes GFI & covers): (existing locations): Rough Electrical New exhaust fans to install (GC quote): Describe work: cost New or relocate electric fixture locations (GC quote): Describe work: cost Install electric for jetted tub (GC quote): Describe jetted tub requirements: cost Bring up to code charge (GC quote): Describe bring up to code charges: cost Cutting concrete charge Describe cutting concrete charges: cost Additional Scope beyond current service levels to be entered as a separate price or estimate (at ) Services Additional Charge: Describe Additional Detailed Scope of Work Customer Purchased Materials Additional Electrical Work Additional Electrical Work Additional Electrical Work Additional Electrical Work RETURN THIS SHEET TO STORE WITHIN 1 BUSINESS DAY OF DETAIL APPT. ALL ESTIMATED WORK IS TO BE QUOTED AT COST. 1

8 Customer Information Customer Name Date: Bath Project Paint/Millwork GC/PS Worksheet Paint Walls, Ceilings & Molding: Molding/Trim: (no walls/ceilings) Total sq ft to be painted: Total linear ft to be painted: Additional Paint Charges : Painting Comments: Describe Additional Paint Charges: Apply Paint Job Minimum (should only be used for small paint jobs) Millwork Molding Crown Molding Doors Windows Install (or remove/replace) base molding (Excl. crown molding) Remove /replace window # of Windows: Install Crown Molding: Install pre-hung /slab door # of Doors: Provide detailed drawing and measurements to ensure accurate product configuration (Standard single/ double hung) (Incl. door cut and mortise) Comments Additional Millwork Comments: Additional Scope beyond current service levels to be entered as a separate price or estimate (at ) Services Additional Charge: Describe Additional Detailed Scope of Work Customer Purchased Materials Additional Millwork (Wainscoting, etc.) Additional Home Décor Work (Blinds, shutters, wallpaper, etc.) RETURN THIS SHEET TO STORE WITHIN 1 BUSINESS DAY OF DETAIL APPT. ALL ESTIMATED WORK IS TO BE QUOTED AT COST.

9 oom Drawing Room Layout for Molding/Crown Molding Date: Bath Project Paint/Millwork GC/PS Worksheet Doors / Windows Configuration Room A B C D E F G H (Product One) (Product Two) Size/Material (Square Feet) Comments: