1 Standard Specifications and Details for Street and Utility Construction 2013 Edition City of Sheridan 55 Grinnell Plaza PO Box 848 Sheridan, WY (307)

2

3 TABLE OF CONTENTS

4

5 TABLE OF CONTENTS STANDARD SPECIFICATIONS AND DETAILS FOR STREET AND UTILITY CONSTRUCTION CITY OF SHERIDAN Section Pages DIVISION 0 BIDDING AND CONTRACT REQUIREMENTS Advertisement for Bids to 02 Instructions to Bidders to 09 Bid Form to 06 Bid Bond to 02 Agreement to 05 Performance Bond to 02 Labor and Materials Payment Bond to 02 General Conditions to 41 Supplementary Conditions to the General Conditions to 18 DIVISION 1 - GENERAL REQUIREMENTS Summary of Work to 05 Coordination to 02 Field Engineering to 02 Permits to 01 References to 02 Method of Measurement and Basis of Payment to 03 Submittals to 05 Quality Control to 01 Temporary Facilities to 01 Security to 01 Parking Areas to 01 Temporary Controls to 06 Field Offices and Sheds to 01 Material and Equipment to 01 Contract Closeout to 03 Operation and Maintenance to 02 Special Provisions to 01 DIVISION 2 - SITE WORK Mobilization to 01 Temporary Traffic Control to 03 Clearing and Grubbing to 02 Trenching, Backfilling and Compacting to 12 Flowable Fill to 05 Watering to 02 Dewatering to 02 Demolition of Existing Surfacing to 02 Grading to 08 Topsoil to 02 Reclamation to 12 Crushed Aggregate Base Course to 07 Asphalt Pavement to 19 Paint Striping to 09 Adjusting Street Fixtures to 03 Underground Utilities to 04 i

6 TABLE OF CONTENTS STANDARD SPECIFICATIONS AND DETAILS FOR STREET AND UTILITY CONSTRUCTION CITY OF SHERIDAN Section Pages DIVISION 2 - SITE WORK (continued) Street Signs, Utility Poles and Mailboxes to 07 Relocate Fence to 02 Valves and Valve Boxes to 11 Fire Hydrants to 05 Water Service Lines and Appurtenances to 07 Water Main to 11 Sanitary Sewer to 11 Storm Drain Pipe and Fittings to 09 Storm Drain Inlets to 04 Manholes to 08 Steel Encased Railroad and Highway Crossing to 04 Testing, Cleaning and Sterilizing Waterline Systems to 06 Culverts to 03 Engineering Fabric to 04 DIVISION 3 - CONCRETE Concrete Work to 17 Concrete Curb and Gutter to 06 Concrete Sidewalks, Approaches, Fillets and Double Gutters to 07 Portland Cement Concrete Pavement to 25 DIVISION 13 CORROSION PROTECTION Corrosion Protection of Plastic Pipe Systems to 36 Applicable Section(s) Pages DETAILS Temporary Erosion Control to 02 Temporary Traffic Control to 05 Trenches and Surface Reclamation to 07 Erosion Control Blanket to 01 Typical Street Section , to 01 Water Valve and Manhole Adjustments to 02 Mail Boxes and Sign Installation to 03 Flasher Assembly and Pedestrian Signal to 02 Water Main Valves to 09 Hydrants and Guard Posts to 04 Water Service Lines to 05 Water Quality Sampling Station to 01 Insulation Board to 01 Water Line/Sewer Separation to 01 ii

7 TABLE OF CONTENTS STANDARD SPECIFICATIONS AND DETAILS FOR STREET AND UTILITY CONSTRUCTION CITY OF SHERIDAN Section Pages DETAILS (continued) Thrust Blocking for Water Line Fittings to 02 Sanitary Sewer Services and Cleanouts to 03 Bridging at Sewer Crossings to 01 Storm Drain Inlets to 04 Sidewalk / Curb Grate to 01 Manholes to 05 Manhole and Valve Boxout to 01 Boring and Casing to 02 Curb & Gutter and Sidewalks , to 06 Street Intersections, Approaches, Double Gutter, ADA Ramps to 09 Concrete Joints and Concrete Paving to 04 Cathodic Protection to 21 Pages GENERAL FORMS Request to Revise Standard Specifications... 1 AWARD FORMS Notice of Award... 1 Notice to Proceed... 1 Retainage Forms for Escrow Account... 1 to 05 Retainage Certification... 2 Retainage Interest Bearing Deposit Agreement... 3 Retainage Assignment... 4 Retainage Release... 5 CONSTRUCTION FORMS Engineer s Field Order... 1 Engineer s Field Order Force Account... 1 Work Change Directive... 1 Suspend Work Notice... 1 Resume Work Order... 1 Change Order... 1 to 02 Periodic Application for Progress Payment to Contractor...1 Water Line Test Report... 1 Sanitary Sewer Inspection Report... 1 Storm Drain Inspection Report... 1 Street Surfacing Testing Report... 1 to 02 iii

8 TABLE OF CONTENTS STANDARD SPECIFICATIONS AND DETAILS FOR STREET AND UTILITY CONSTRUCTION CITY OF SHERIDAN Pages CLOSEOUT FORMS Final Waiver of Lien... 1 Affidavit on Behalf of Contractor... 1 Affidavit of Release of Liens... 1 Consent of Surety... 1 Certificate of Substantial Completion... 1 to 02 Punch List... 1 to 02 Certificate of Final Completion... 1 Warranty... 1 to 02 Public Notice Notice of Acceptance and Final Payment and Settlement... 1 iv

9 DIVISION 0 BIDDING & CONTRACT REQUIREMENTS

10

11 ADVERTISEMENT FOR BIDS The City of Sheridan, Wyoming will receive sealed bids for. These improvements are generally described as follows: (DESCRIPTION OF WORK) Sealed bids will be received at City Hall, to the Clerk s office on the 1 st floor, until :00.m. local time on. The bids will then be opened and read aloud at the Council Chambers on 3 rd floor of City Hall. All bids shall be submitted in accordance with and on the forms included in the Project Manual. Bids shall be submitted in a sealed envelope addressed to: City of Sheridan Attn:(City Clerk) Project Name 55 Grinnell Plaza Sheridan, Wyoming Electronic or hard copy Contract Documents, including proposal bid forms, drawings and Project Manual, have been placed on file and may be examined at the office of, and Engineering Department in City Hall, Sheridan, Wyoming as well as the following plan rooms: Billings Builder s Exchange, Billings, Montana Northeast Wyoming Contractors and Plan, Gillette, Wyoming The Bid Center, Casper, Wyoming Wyoming Plan Service, Casper, Wyoming Cheyenne Plan Service, Cheyenne, Wyoming Construction Industry Center, Rapid City, South Dakota Contract Documents may be obtained on or after at the office of, at the non-refundable cost of $ per set. A (MANDATORY) PRE-BID CONFERENCE will be held on at local time, beginning in the Council Chambers on 3 rd floor of City Hall, Sheridan, Wyoming. Contractors, in submitting their respective bids, acknowledge that such bids conform to all requirements of Wyoming State Statute. Each bidder must include a bid security with the bid, payable to the City of Sheridan, in accordance with the Instruction to Bidders.

12 No bidder may withdraw its bid after the scheduled time of the bid opening. Bids are to remain open for 60 days after the bid opening. The Owner reserves the right to reject any and all bids or parts thereof, and to waive any irregularities of any bid. The Owner also reserves the right to award the contract to such responsible bidders as may be determined by the Owner. City of Sheridan, Wyoming By: Public Works Director Publish Dates:

13 PROJECT NAME DIVISION 0 BIDDING AND CONTRACT REQUIREMENTS SECTION INSTRUCTIONS TO BIDDERS 1.0 DEFINED TERMS. Terms used in these Instructions to Bidders which are defined in the General Conditions of the Construction Contract, have the meanings assigned to them in the General Conditions. The term "BIDDER" means one who submits a Bid directly to the OWNER, as distinct from a sub-bidder, who submits a bid to a BIDDER. The term "Successful BIDDER" means the lowest, qualified, responsible and responsive BIDDER to whom the OWNER (on the basis of the OWNER's evaluation as hereinafter provided) makes an award. The term "Bidding Documents" includes the Advertisement for Bids, Instructions to Bidders, the Bid Form, Statement of Qualifications, Anticipated Subcontractors, and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids). In this section on "Instructions to Bidders", the term BIDDER is used to describe a prospective CONTRACTOR. When the term BIDDER is used, it refers to the company that could become the CONTRACTOR; therefore all requirements of the CONTRACTOR also pertain to the BIDDER, and vice versa. The OWNER as defined in the General Conditions is the City of Sheridan. The ENGINEER as defined in the General Conditions is identified in the Project Manual. 2.0 COPIES OF BIDDING DOCUMENTS. 2.1 Complete sets of the Bidding Documents in the number and for the purchase sum may be obtained as stated in the "Advertisement for Bids". 2.2 Complete sets of Bidding Documents must be used in preparing Bids. Neither the OWNER nor ENGINEER assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. 2.3 OWNER and ENGINEER, in making copies of Bidding Documents available on the above terms, does so only for the purpose of obtaining Bids on the Work, and does not confer a license or grant for any other use. 3.0 QUALIFICATIONS OF BIDDERS. To demonstrate qualifications to perform the Work, each BIDDER must submit with the Bid (or within 48 hours of the Bid, if allowed by the Project Manual) written evidence, such as financial data, previous experience, record of performance on previous projects, plant and equipment, information on their permanent place of business, technical expertise, present commitments, and other such data as may be called for on the Statement of Qualifications contained in the Bidding Documents. Each BIDDER must be prepared to submit evidence of the BIDDER's qualifications to do business in Wyoming, prior to the Notice of Award. BIDDERS must be properly licensed as a General or Excavator Contractor, and Utility Contractor if utility work is involved in the project, according to Sheridan City Code. This licensing must either be current at the time of the Bid Opening, or be obtained prior to the Notice of Award. SECTION INSTRUCTIONS TO BIDDERS Page 1 of 9

14 PROJECT NAME 4.0 LIST OF SUBCONTRACTORS. Each BIDDER shall submit a list of subcontractors on the form included in the Project Manual with his or her Bid. Prior to the award of Contract, the OWNER shall notify the BIDDER if the OWNER, after due investigation, has reasonable objection to any Subcontractor listed and does not accept them. Acceptance of any or all listed Subcontractors by the OWNER does not relieve the CONTRACTOR from any responsibility for its Subcontractors. 5.0 PREFERENCE TO WYOMING CONTRACTORS, LABORERS AND MATERIALS. Preference shall be given to responsible Wyoming Contractors, Laborers and Materials as required by Wyoming Statutes. Preference is hereby given to materials, supplies, equipment, machinery and provisions produced, manufactured, supplied or grown in Wyoming, quality being equal to articles offered by the competitors outside of the state. Therefore, a 5% preference shall be given to Wyoming state resident bidders over nonresidents. This applies to all subcontractors, suppliers and general contractors. The 5% state preference takes effect whenever any Wyoming BIDDER is in direct competition with a non-wyoming BIDDER. Under the guidelines noted above, the Contract shall be awarded to the responsible resident making the lowest bid if the resident's bid is not more than 5% higher than that of the lowest responsible non-resident BIDDER. The Contractors, in submitting their respective bids, acknowledge that such bids conform to all Wyoming State Statute requirements. In accordance with State Statute , successful resident Bidders shall limit subcontracts to non-resident contractors to thirty percent (30%) of the work. 6.0 QUESTIONS. Questions regarding this project should be addressed to. 7.0 EXAMINATION OF CONTRACT DOCUMENTS AND SITE. 7.1 It is the responsibility of each BIDDER, before submitting a Bid, to (a) examine the Contract Documents thoroughly, (b) visit the site to become familiar with local conditions that may affect cost, progress, performance or furnishing of the Work, (c) consider federal, state and local laws and regulations that may affect cost, progress, performance or furnishing of the Work, (d) study and carefully correlate BIDDER's observations with the Contract Documents, and (e) notify ENGINEER of all conflicts, errors or discrepancies in the Contract Documents. 7.2 Information and data reflected in the Contract Documents, with respect to Underground Facilities at or contiguous to the site, is based upon information and data furnished to the OWNER and ENGINEER by owners of such Underground Facilities or others, and the OWNER and ENGINEER do not assume responsibility SECTION INSTRUCTIONS TO BIDDERS Page 2 of 9

15 PROJECT NAME for the accuracy or completeness thereof, unless it is expressly provided otherwise in the Supplementary Conditions. 7.3 Provisions concerning responsibilities for the adequacy of data furnished to prospective BIDDERS on subsurface conditions, Underground Facilities and other physical conditions, and possible changes in the Contract Documents, due to differing conditions, appear in the General Conditions and Supplemental General Conditions. 7.4 Before submitting a Bid, each BIDDER will, at the BIDDER's own expense, make or obtain any additional examinations, investigations, explorations, tests and studies, and obtain any additional information and data which pertain to the physical conditions (surface, subsurface and Underground Facilities), at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing of the Work, and which the BIDDER deems necessary to determine its Bid for performing and furnishing the Work in accordance with the time, price, and other terms and conditions of the Contract Documents. A copy of the Geotechnical Study/Report (if one was prepared), is a part of the Contract Documents for this project. 7.5 On request, in advance, OWNER will provide each BIDDER access to the site to conduct such explorations and tests as each BIDDER deems necessary for submission of a Bid. BIDDER shall fill all holes, clean up, and restore the site to its former condition upon completion of such explorations. 7.6 The lands upon which the Work is to be performed, rights-of-way and easements for access thereto, and other lands designated for use by the CONTRACTOR in performing the Work are identified in the Contract Documents. All additional lands, and access thereto, required for temporary construction facilities or storage of materials and equipment are to be provided by the CONTRACTOR. Easements for permanent structures or permanent changes in existing structures are to be obtained and paid for by the OWNER, unless otherwise provided in the Contract Documents. 7.7 The submission of a Bid will constitute an incontrovertible representation by the BIDDER that the BIDDER has complied with every requirement of this Article 7, and that without exception, the Bid is premised upon performing and furnishing the Work required by the Contract Documents, and such means, methods, techniques, sequences or procedures of construction, as may be indicated in or required by the Contract Documents and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 8.0 INTERPRETATIONS AND ADDENDA. 8.1 All questions about the meaning or intent of the Contract Documents are to be directed to the ENGINEER. Interpretations or clarifications considered necessary by the ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by the ENGINEER as having received the Bidding Documents. Questions received within five days prior to the date for opening of Bids or as stated in the Pre-bid meeting will not be answered. Only questions answered SECTION INSTRUCTIONS TO BIDDERS Page 3 of 9

16 PROJECT NAME by formal written Addenda will be binding. clarifications will be without legal effect. Oral and other interpretations or 8.2 Addenda may also be issued to modify the Bidding Documents, as deemed advisable by the OWNER or ENGINEER. 9.0 BID SECURITY. 9.1 Each BIDDER must deposit bid security with the bid, payable to the OWNER, which deposit shall be one of the following: 1. Certified check, cashier's check or draft drawn on a State or National Bank in the amount of five percent (5%) of the total bid. 2. Bid Bond, prepared on the form provided in the Project Manual, issued by a Surety authorized to do business in the State of Wyoming and acceptable to the OWNER in the amount of five percent (5%) of the total bid. 9.2 The Bid Security of the successful BIDDER will be retained until such BIDDER has executed the Agreement and furnished the required contract security, whereupon the Bid Security will be returned. If the Successful BIDDER fails to execute and deliver the Agreement and furnish the required contract security within ten (10) days after the Notice of Award, OWNER may annul the Notice of Award, and the Bid Security of that BIDDER will be forfeited. The Bid Security of other bidders whom the OWNER believes to have a reasonable chance of receiving the award may be retained by the OWNER, until the earlier of the seventh day after the effective date of the Agreement, or the sixty-first (61st) day after the Bid Opening, whereupon Bid Security furnished by such Bidders will be returned. Bid Security with Bids which are not competitive will be returned within seven days after the Bid Opening CONTRACT TIME. Substantial Completion of the Work is to be completed within calendar days from the issuance of the Notice to Proceed. Final completion is to be reached within days of Substantial Completion. Final Payment will not be made until Final Completion is reached and all closeout documents acceptably submitted LIQUIDATED DAMAGES. Provisions for liquidated damages are set forth in the Agreement SUBSTITUTE OR "OR-EQUAL" ITEMS. The Contract, if awarded, will be on the basis of materials and equipment described in the Drawings or specified in the Specifications. A substitute or "or-equal" item of material or equipment may be furnished or used by the CONTRACTOR, if acceptable to the ENGINEER. Application for such acceptance will not be considered by the ENGINEER until after the effective date of the Agreement. The procedure for submission of any such application by the CONTRACTOR, and consideration by the ENGINEER, is set forth in paragraph 6.05 of the General Conditions, and may be supplemented in the Special Provisions. SECTION INSTRUCTIONS TO BIDDERS Page 4 of 9

17 PROJECT NAME 13.0 SUBCONTRACTORS, SUPPLIERS, AND OTHERS If requested by the ENGINEER, the BIDDER shall provide information on the qualifications, experience and financial or other data of any Subcontractors or suppliers proposed on this project. If OWNER or ENGINEER, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, other person or organization, they may, before the Notice of Award is given, require the apparent Successful BIDDER to submit an acceptable substitute without an increase in Bid price. If apparent Successful BIDDER declines to make any such substitution, OWNER may award the contract to the next lowest BIDDER that proposes to use acceptable Subcontractors, Suppliers and other persons and organizations. The declining to make requested substitutions will not constitute grounds for sacrificing the Bid security of any BIDDER. Any Subcontractor, Supplier, or other person or organization listed and to whom the OWNER or ENGINEER does not make written objection prior to giving of the Notice of Award will be deemed acceptable to the OWNER and ENGINEER, subject to revocation of such acceptance after the Effective Date of the Agreement as provided in Paragraph 6.06 of the General Conditions. Operational maintenance issues may be considered in this evaluation to help determine what is deemed acceptable No CONTRACTOR shall be required to employ any Subcontractor, Supplier, other person or organization against whom CONTRACTOR has reasonable objection BID FORM The Bid Form is included with the Bidding Documents; additional copies may be obtained from the ENGINEER. Bids must be submitted on the forms requested All blanks on the Bid Form must be completed in ink or by typewriter. The Bidder must include both unit prices and extended prices. In case of a difference between the unit price and the extended price, the unit price shall be used in computing the total amount of the bid. In case of a difference between the total bid price and the sum of the extended prices, the sum of the extended prices shall govern Bids by corporations must be executed in the corporate name by the president or vice president (or other corporate officer accompanied by evidence of authority to sign), and the corporate seal must be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation must be shown below the signature Bids by partnerships must be executed in the partnership name and signed by a partner, whose title must appear under the signature, and the official address of the partnership must be shown below the signature All names must be typed or printed below the signature The Bid shall contain an acknowledgement of receipt of all Addenda (the numbers of which must be filled in on the Bid Form) The address, telephone, address and fax numbers for communications regarding the Bid must be shown. SECTION INSTRUCTIONS TO BIDDERS Page 5 of 9

18 PROJECT NAME 14.8 Work included in each Bid Item is as covered in Section and the Project Manual SUBMISSION OF BIDS. Bids shall be submitted at the time and place indicated in the "Advertisement for Bids", and shall be enclosed in an opaque, sealed envelope, marked with the project title, name and address of the BIDDER, and accompanied by the Bid Security and other required documents. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope, with the notation "BID ENCLOSED" on the face of the separate envelope MODIFICATION AND WITHDRAWAL OF BIDS. Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed), and delivered to the place where Bids are to be submitted at any time prior to the time of opening of Bids, as called for in the Advertisement for Bids. No BIDDER may withdraw their Bid for a period as specified in the Invitation for Bids after the date and hour set for the opening declared therein OPENING OF BIDS. Bids will be opened and read aloud publicly. An abstract of the amounts of the base Bids and major alternates (if any), will be made available to BIDDERS within one week after the opening of Bids BIDS TO REMAIN SUBJECT TO ACCEPTANCE. All bids will remain subject to acceptance for sixty days (60) after the day of the Bid Opening, but the OWNER may, in its sole discretion, release any Bid, and return the Bid Security prior to that date AWARD OF CONTRACT Owner reserves the right to reject any and all Bids, including without limitations, nonconforming, non-responsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder. Owner may also reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder. Owner also reserves the right to waive all informalities not involving price, time, or change in the Work and to negotiate contract terms with the Successful Bidder More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award. The Owner will consider SECTION INSTRUCTIONS TO BIDDERS Page 6 of 9

19 PROJECT NAME Bids irregular, and intends to reject them for any of the following substantial reasons: A. Bid Proposal not received prior to the specified deadline. B. Unsigned Bid Proposals. C. Bid Proposals which have items omitted by the Bidder. D. Post Bid monetary modification of Bid Proposals due to provable mistakes of fact. E. Post bid refusal to submit to specified bidding requirements, such as: MBE requirements, Subcontractor listing, etc. F. Altering a Bid as to specified time of commencement or completion of Work. G. Bid Proposal not accompanied by a security of character indicated or of an amount less than indicated. H. If the Bid Proposal is on a form other than that furnished by the Owner, or if the form is altered. I. If there are unauthorized additions, conditional, or alternate Bids, or discrepancies of any kind which may tend to make the Bid Proposal incomplete, indefinite, or ambiguous as to its meaning. J. If the Bidder adds any provisions, reserving the right to accept or reject an award, or to enter into a Contract pursuant to an award. K. If the Bid Proposal does not contain a unit price for each pay item listed. L. If the Bid Proposal contains any erasure of alteration of written words or figures of unit prices not initialed in ink by the Bidder. M. Submitting more than one Bid. The Owner will consider Bids informal, but does not intend to reject them for the following minor reasons: A. Omission of dates when signed, or title of person signing. B. Failure to acknowledge an addendum, which does not affect quantity, quality, time, or price. C. Submission of a Bid in an unsealed envelope. D. Unit price Bid Proposals that include reconcilable arithmetic errors may be corrected if it does not change the unit price. E. Lump sum Bid Proposals which include reconcilable arithmetic errors may be corrected, if it does not change the amount on which the award will be based In evaluating Bidders, Owner may consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and other individuals or entities must be submitted as provided in the Supplementary Conditions. The Owner also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications and financial ability of Bidders, proposed Subcontractors, Suppliers, and other individuals or entities to perform Work in accordance with the Contract Documents If the Contract is to be awarded, Owner will award to Bidder whose bid is in the best interests of the Project. SECTION INSTRUCTIONS TO BIDDERS Page 7 of 9

20 PROJECT NAME 19.7 The award of contract will be to one CONTRACTOR and will be based on the lowest Total bid for the award options selected by the OWNER as required to meet available funding or other criteria CONTRACT SECURITY. The successful BIDDER shall be required to furnish a contract performance bond, and a labor and materials payment bond, each in the amount of one hundred percent (100%) of the contract price as originally bid or subsequently modified. The surety company shall be authorized to do business in the State of Wyoming. The cost of the bonds shall be included in the Contractor's Bid Proposal. When the successful BIDDER delivers the executed Agreement to the OWNER, it must be accompanied by the required Construction Performance Bond and Construction Payment Bond on the forms included in this Project Manual. No exceptions will be made INSURANCE CERTIFICATES. The successful BIDDER shall be required to furnish, with the executed Agreement, Insurance Certificates called for in the Supplementary Conditions SIGNING OF AGREEMENT. When the OWNER gives a Notice of Award to the successful BIDDER, it will be accompanied by the required number of unsigned counterparts of the Agreement with all other written Contract Documents attached. Within ten (10) days thereafter the CONTRACTOR shall sign and deliver the required number of counterparts of the Agreement and attached documents to the OWNER with the required Bonds. Within ten days thereafter, the OWNER shall deliver one fully signed counterpart to the CONTRACTOR and ENGINEER. No contract shall be considered as effective until it has been fully executed by all parties. If the BIDDER to whom the Notice of Award is given does not properly execute the Agreement within the time allowed, the OWNER may withdraw the Notice of Award and the BIDDER will forfeit Bid Security. Following the execution of the Contract by the OWNER and the CONTRACTOR, written Notice to Proceed with the Work shall be given by the OWNER to the CONTRACTOR. The Contract Time will commence to run with the Notice to Proceed. A Notice to Proceed may be given at any time within thirty days after the effective date of the Agreement PREBID CONFERENCE. A prebid conference will be held at on the day of, 20 in the Council Chambers, City Hall, Sheridan, Wyoming (unless another location is stated in the Special Provisions). Representatives of OWNER and ENGINEER will be present to discuss the project. The ENGINEER will transmit to all prospective Bidders of record, such Addenda as the ENGINEER considers necessary in response to questions arising at the conference. SECTION INSTRUCTIONS TO BIDDERS Page 8 of 9

21 PROJECT NAME 24.0 SALES AND USE TAXES. The CONTRACTOR must pay all State Sales and Use Tax on materials and equipment to be incorporated in the Work RETAINAGE. Provisions concerning retainage are set forth in the Agreement STATE LAWS AND REGULATIONS. All applicable laws, ordinances and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout. 1. The Bidder's attention is directed to Wyoming Statutes Annotated, 1977 republished edition, as amended to date, except on federally funded projects, or when in conflict with any Federal statutes, rules or regulations: a. Section , defining a resident contractor. b. Section , providing a preference of not more than five percent (5%) to the lowest responsible resident (Wyoming) Bidder (resident bidder s bid is not more than 5% higher than the lowest non-resident s bid). c. Section , limiting subcontractors to non-resident contractors by a successful resident Bidder to thirty percent (30%) of the work. d. Section , requiring preferences to Wyoming labor whenever possible, and Wyoming materials whenever of equal quality. e. Section , limiting the employment of labor to eight hours in any calendar day or forty hours in any one week unless overtime is paid at the rate of one and one half times the hourly rate. f. Section through 206, the "Wyoming Preference Act of 1971", relating to the requirements and failure to employ state employees on public construction contracts, and providing a penalty for violation. 2. The BIDDER's attention is directed to Wyoming Statute , which requires CONTRACTOR and all Subcontractors to maintain accurate records of employee names, occupations and wages paid to employees. These records shall be sent to the Deputy Commissioner of Labor: 122 West 25th Street; Herschler Building; Cheyenne, Wyoming 82002, no later than thirty days after each pay period. Failure to comply with this section may result in the OWNER suspending all further payments until compliance is achieved. Violation of this section is subject to criminal sanctions. END OF SECTION SECTION INSTRUCTIONS TO BIDDERS Page 9 of 9

22

23 PROJECT NAME DIVISION 0 - BIDDING AND CONTRACT REQUIREMENTS SECTION BID FORM Project Identification: CITY OF SHERIDAN, WYOMING This Bid is submitted to: CITY OF SHERIDAN 55 GRINNELL PLAZA SHERIDAN, WYOMING The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an Agreement with the OWNER, in the form included in the Contract Documents, to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price, and within the Contract Time indicated in this Bid, and in accordance with the other terms and conditions of the Contract Documents. 2. The BIDDER accepts all of the terms and conditions of the Advertisement for Bids, and Instructions to Bidders, including without limitation, those dealing with the disposition of Bid Security. This Bid will remain subject to acceptance for sixty (60) days after the day of the Bid Opening. The BIDDER will sign and submit the Agreement with the Construction Performance Bond and Payment Bond on the forms provided in this Project Manual, and other documents required by the Bidding Requirements, within fifteen days after the date of the OWNER'S Notice of Award. 3. In submitting this BID, BIDDER represents, as more fully set forth in the Agreement, that: (a) BIDDER has examined copies of all the Bidding Documents, and of the following Addenda (receipt of all which is hereby acknowledged): NUMBER DATE (b) (c) (d) BIDDER has familiarized itself with the nature and extent of the Contract Documents, work, work site, locality, and all local conditions and Laws, Regulations, local laws or ordinances that in any manner may affect cost, progress, performance, or furnishing of the Work. BIDDER has given the ENGINEER written notice of all conflicts, errors, or discrepancies that it has discovered in the Contract Documents, and the written resolution thereof by the ENGINEER is acceptable to the BIDDER. This Bid is genuine and not made in the interest of, or on behalf of any undisclosed person, firm, or corporation, and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; the BIDDER has not directly or indirectly induced or solicited any other BIDDER to submit a false or sham Bid; the BIDDER has not solicited or SECTION BID FORM Page 1 of 6

24 PROJECT NAME induced any person, firm or corporation to refrain from bidding; and the BIDDER has not sought, by collusion, to obtain for itself any advantage over any other BIDDER or over the OWNER. 4. The BIDDER agrees to perform all the Work described in the Contract Documents and on the following Bid Schedule. The Method of Measurement and Basis of Payment shall be as specified in Section and the Project Manual. 5. The BIDDER hereby agrees to accept an award of a contract for the Bid Schedules as determined under Section 00100, paragraph The BIDDER agrees that the unit prices shall govern in checking the bid, and should a discrepancy exist in the sum of extended prices and Total Amount of Bid after extensions are checked and corrections made, if any, the sum of extended prices shall be used in considering the award of this Contract. 7. The BIDDER will complete the Work for the following unit or lump sum prices(s): (insert bid schedule) 8. The BIDDER understands that the OWNER reserves the right to reject any or all bids or to waive any informality or technicality in any proposal in the interest of the OWNER. If an award is made, it will be made to the lowest bidder that is determined qualified and responsible at the sole discretion of the OWNER. 9. BIDDER agrees that the Work for CITY OF SHERIDAN, WYOMING, will be substantially complete in accordance with paragraph 3.1 of the Agreement. BIDDER accepts the provisions of the Agreement as to liquidated damages, in the event of failure to complete the Work on time. 10. The following documents are attached to and made a condition of this bid: (a) (b) (c) Required Bid Security in the form of i. For bids less than $100,000, a certified check, cashier s check or draft drawn on a State or National Bank in the amount of five percent (5%) of the total bid may be utilized. ii. For bids greater than $100,000, a Bid Bond, prepared on the form provided in the Project Manual, issued by a Surety authorized to do business in the State of Wyoming and acceptable to the OWNER in the amount of five percent (5%) of the total bid must be utilized. BIDDER S list of construction equipment with hourly rates, owned or rented, that will be used in the performance of the Work. BIDDER S list of hourly labor rates for construction personnel that will be in place during the performance of the Work. 11. Communications concerning this Bid shall be addressed to: Contractor Address City/State/Zip Phone SECTION BID FORM Page 2 of 6

25 PROJECT NAME Fax 12. The terms used in this Bid, which are defined in the General Conditions of the Construction Contract included as part of the Contract Documents, have the meanings assigned to them in the General Conditions. SUBMITTED ON, 20 BY Name (Individual, Partnership, Corporation, or Joint Venture) (State of Residency) BY (Name of Person Authorized to Sign) (Signature and Printed) (Title) Corporate Seal (If Applicable) Attest (Secretary) Business Address: Phone No.: Fax No. License No.: Address: SECTION BID FORM Page 3 of 6

26 PROJECT NAME 1. Type of Work to be Sublet ANTICIPATED SUBCONTRACTORS Approximate Dollar Amount of Subcontract $ Probable Subcontractor Address 2. Type of Work to be Sublet Approximate Dollar Amount of Subcontract $ Probable Subcontractor Address 3. Type of Work to be Sublet Approximate Dollar Amount of Subcontract $ Probable Subcontractor Address Statement of Qualifications: The CONTRACTOR shall submit a statement of each subcontractor's qualifications and shall obtain written permission from the OWNER prior to the actual subletting or assignment of any portion of the contract as per Section 6.06 of the General Conditions. SECTION BID FORM Page 4 of 6

27 PROJECT NAME PREVIOUS EXPERIENCE OF BIDDER SIMILAR PROJECTS COMPLETED (List at least three) 1. DATE VALUE Name of Project, Address, Type of Improvement Name/Phone of Owner Name/Phone of Engineer 2. DATE VALUE Name of Project, Address, Type of Improvement Name/Phone of Owner Name/Phone of Engineer 3. DATE VALUE Name of Project, Address, Type of Improvement Name/Phone of Owner Name/Phone of Engineer SECTION BID FORM Page 5 of 6

28 PROJECT NAME SIMILAR PROJECTS UNDER CONTRACT (List at least one) DATE VALUE Name of Project, Address, Type of Improvement Name/Phone of Owner Name/Phone of Engineer END OF SECTION SECTION BID FORM Page 6 of 6

29 PROJECT NAME DIVISION 0 - BIDDING AND CONTRACT REQUIREMENTS SECTION BID BOND KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned, as BIDDER, and as Surety, are hereby held and firmly bound unto CITY OF SHERIDAN, WYOMING, as OWNER, in the penal sum for payment of which, well and truly to be made, we hereby jointly and severely bind ourselves, successors and assigns. The Condition of the above obligation is such that whereas the BIDDER has submitted to CITY OF SHERIDAN, WYOMING a certain BID, attached hereto, and hereby made a part hereof, to enter into a Contract in writing, for the construction of the CITY OF SHERIDAN, WYOMING, (Project). NOW, THEREFORE, (a) If said BID shall be rejected, or (b) If said BID shall be accepted, and the BIDDER shall execute and deliver a Contract in the Form of Contract attached hereto (properly completed in accordance with said BID), and shall furnish a BOND for his or her faithful performance of said Contract, and furnish a BOND for the payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the agreement created by the acceptance of said BID, Then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Bond shall be forfeited as liquidated damages, if the Bidder, upon the award of the Contract to them, fails to enter into the Contract within 15 (fifteen) days after it is presented to them for that purpose, or fails to proceed with the performance of the Contract. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such BID; and said Surety does hereby waive notice of any such extension. IN WITNESS WHEREOF, the BIDDER and the Surety have hereunto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers. Signed and sealed this day of, 20. SECTION BID FORM Page 1 of 2

30 PROJECT NAME DIVISION 0 - BIDDING AND CONTRACT REQUIREMENTS SECTION BID BOND BY: (BIDDER) (Title) (Witness) (SEAL) BY: (Surety) (Attorney-in-Fact) END OF SECTION SECTION BID FORM Page 2 of 2

31 PROJECT NAME DIVISION 0 - BIDDING AND CONTRACT REQUIREMENTS SECTION AGREEMENT THIS AGREEMENT is dated as of the day of in the year 20, by and between the City of Sheridan (hereinafter called OWNER), and (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1. WORK. CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: ARTICLE 2. ENGINEER. The Project has been designed by: who is hereinafter called ENGINEER, and who is to act as the OWNER's representative, assume all duties and responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. ARTICLE 3. CONTRACT TIME. 3.1 Substantial Completion of the Work will be completed within calendar days after the Notice to Proceed. Final payment will be withheld until final completion and acceptance of the Work as stipulated in paragraph 5.2 of the Agreement and all project closeout paperwork is completed. Final completion is to be within days of Substantial Completion. 3.2 Liquidated Damages. The OWNER and CONTRACTOR recognize that time is of the essence of this Agreement, and that the OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1 above, plus any extensions thereof allowed, in accordance with Article 12 of the General Conditions. They also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration preceding the actual loss suffered by the OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, the OWNER and CONTRACTOR agree that, as liquidated damages for delay, (but not as a penalty), the CONTRACTOR shall pay the OWNER, for each calendar day that expires after the time specified in paragraph 3.1 for Substantial Completion, until the Work is substantially complete. After Substantial Completion, if the CONTRACTOR shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by the OWNER, the CONTRACTOR shall pay the OWNER $,for each calendar day that expires after the time specified in paragraph 3.1 for final completion and readiness for final payment of all work. SECTION AGREEMENT Page 1 of 5

32 PROJECT NAME CONTRACTOR ARTICLE 4. CONTRACT PRICE. The OWNER shall pay the CONTRACTOR for completion of the Work, in accordance with the Contract Documents according to the Bid, which is attached as an Exhibit. The total awarded sum is $. The total price can vary due to the actual quantities of the unit price items installed, or due to Change Orders. Measurement and payment for bid items shall be per section and the Project Manual. ARTICLE 5. PAYMENT PROCEDURES. The CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by the ENGINEER, as provided in the General Conditions. 5.1 Progress Payments. OWNER will make progress payments based on the CONTRACTOR'S Applications for Payment as prepared by CONTRACTOR and recommended by the ENGINEER, based on work completed through the 20th (twentieth) day of each month during construction as provided below. All progress payments will be on the basis of the progress of the Work measured by the number of units of each bid item completed times the unit price bid in the Unit Price Schedule for that item. The number of units completed shall be measured in accordance with Section of the Contract Documents. The schedule of values is provided for in article 14 of the General Conditions and Section 01300, in accordance with W.S Payments will be made according to the General Conditions and Supplemental General Conditions The OWNER shall retain ten (10) percent of the amount of each payment until final completion and acceptance of all Work covered by the Contract Documents. The OWNER at any time, however, after fifty (50) percent of the Work has been completed, may eliminate retainage on the remaining estimates, as long as the character and progress of the work is satisfactory to the OWNER and ENGINEER. The OWNER also retains the right to reinstate 10% withholding Upon Substantial Completion, progress payments will be made in an amount sufficient to increase total payments to the CONTRACTOR to 95% of the Contract Price or actual work completed (if less than contract price) or as long as there are no outstanding change orders (not resolved), less such amounts as the ENGINEER shall determine, or the OWNER may withhold, in accordance with the General Conditions. 5.2 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraph of the General Conditions and Special Conditions and the completion of all closeout paperwork, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in in accordance with W.S and ARTICLE 6. INTEREST. All moneys not paid when due, as provided in Article 14 of the General Conditions, shall bear interest at a maximum rate allowed by law, not to exceed 1% per month. SECTION AGREEMENT Page 2 of 5

33 PROJECT NAME CONTRACTOR ARTICLE 7. CONTRACTOR'S REPRESENTATIVES. In order to induce the OWNER to enter into this Agreement, the CONTRACTOR makes the following representations: 7.1 CONTRACTOR has familiarized itself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. 7.2 CONTRACTOR has studied carefully all reports of investigations and tests of latent physical conditions at the site or otherwise affecting cost, progress or performance of the Work which were relied upon by ENGINEER in the preparation of the Drawings and Specifications and which have been identified in the Contract Documents. 7.3 CONTRACTOR has made or caused to be made examinations, investigations and tests and studies of such reports and related data in addition to those referred to above as he or she deems necessary for the performance of the Work at the Contract Price, within the Contract Time, and in accordance with the other terms and conditions of the Contract Documents; and no additional examinations, investigations, tests, reports or similar data are or will be required by CONTRACTOR for such purposes. 7.4 CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents. 7.5 CONTRACTOR has carefully reviewed and checked all information and data shown or indicated on the Contract Documents, with respect to existing Underground Facilities at or contiguous to the site, and assumes responsibility for the accurate location of said Underground Facilities. 7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors, or discrepancies that he or she has discovered in the Contract Documents, and the written resolution thereof by the ENGINEER is acceptable to the CONTRACTOR. ARTICLE 8. CONTRACT DOCUMENTS. The Contract Documents, which comprise the entire agreement between the OWNER and the CONTRACTOR concerning the Work, consists of the following: 8.1 This Agreement. 8.2 Performance Bond and Labor and Materials Payment Bond. 8.3 Notice of Award. 8.4 General Conditions and Modifications to General Conditions. 8.5 Technical Specifications, as listed in table of contents thereof, including Division 1, General Requirements. 8.6 Plans. SECTION AGREEMENT Page 3 of 5