1 UPCOMING DESIGN & CONSTRUCTION PROJECTS 3 rd Quarter 2018 Rev 2 (Project & Construction Management)

2 DESIGN PHASE PROJECTS

3 BCT - Building Program Development and Design for Maintenance and Administration Buildings Complex EXISTING ADMIN BUILDING EXISTING M&R BUILDING Development of a building program for the future Administration and Maintenance Buildings Complex at Barbours Cut Terminal. Design Time Frame NIGP Codes Small Business Opportunities PHA Contact 4th Qtr st Qtr Consultants Contractors Utility Systems Electrical Work Plumbing HVAC Building Fixtures & Finishes Photography Jessica Shambra jshambra@poha.com

4 CONSTRUCTION PHASE PROJECTS

5 Barbours Cut - Expansion of Gate Facilities This design objective is to increase the gate capacity to handle anticipated future growth at this terminal. 4th Quarter Site Preparation Demolition Earthwork Rohit Saxena rsaxena@poha.com

6 Barbours Cut - Rehabilitation of Wharf 3 The wharf will be upgraded in order to support 100 feet gauge dock cranes and to accommodate larger ships. This project consists of the upgrade of 1000 feet of wharf, a new stevedore support building, structural elements, high mast pole lighting, and electrical infrastructure required to power three new dock cranes. 4th Qtr st Qtr Material Testing Surveying Storm Water Controls Photography Chain Link Fence Security Electrical Signs and Paint Striping Bill Aguirre baguirre@poha.com

7 Barbours Cut - Construct Electrical and Telecommunications Infrastructure in Container Yards 4, 5 and 6 The project consists of the installation of concrete duct banks, high voltage and fiber optics cables and equipment from the kv switchyard on the west end of the terminal along the container yards 4, 5 and 6 to the C6 Admin building and ending at wharf 3. 1st Qtr st Qtr Concrete work 15 kv cables Storm Water Controls Fiber optics cables Security Electrical Telecomm equipment Bill Aguirre baguirre@poha.com

8 BCT - Rehabilitation of Container Yard C1N and C2N The scope of work includes the construction of approximately 20 acres of concrete pavement for storage of containers as well as traffic lanes to maintain circulation into and around storage areas. 1st Qtr nd Qtr Demolition Concrete Grading Excavation Ural Thompson uthompson@poha.com

9 Bayport and Barbours Cut - Annual Pavement Replacement 2019 This is a one year contract concrete and asphaltic replacement at two Terminals, Barbours Cut and Bayport. The work will consist of removing damaged and or deteriorating pavement in st Qtr th. Qtr Concrete placement Saw-cutting Excavation Concrete Traffic Barriers Barbara H. Smith bhsmith@poha.com

10 Bayport and Barbours Cut - Annual Wharf Crane & RTG Crane Painting This project will consist of blasting, priming and painting the wharf cranes and RTG cranes on an "as needed" basis. 1st Qtr th. Qtr Photography Fuel Supplier Portable Toilets Ural Thompson uthompson@poha.com

11 Barbours Cut and Bayport - Annual Fender System Maintenance This project includes surface preparation, repair and replacement of various fender system elements at Barbours Cut and Bayport Terminals in st Qtr th Qtr Metal Fabrication Storm Water Controls Photography Barbara H. Smith bhsmith@poha.com

12 Bayport - Construct Rail Spur ( PTRA Track South Bayport) Construction of approximately 6500 track feet of rail at the Bayport Terminal. This rail will cross State Highway (SH) 146 and connect the existing rail from Strang Rail line to within 900 feet of the Container Freight Station (CFS) Road in the Bayport Intermodal Facility. This project will also include clearing, grubbing, drainage, rail crossings, signalization, and perhaps a sound wall, if required. 4th Qtr th Qtr Clearing Brush Storm Water Controls Flagman Traffic Controls Surveying Photography Material Testing Rail Roads Barbara H. Smith bhsmith@poha.com

13 Bayport - Construct Electrical and Telecommunication Infrastructure under Port Road and ExxonMobil Corridor Install 600 LF Electrical Duct Bank under Port Road 1st Qtr nd Qtr Site Preparation Power and Communication Line Construction Electrical Apparatus and Equipment Barbara H. Smith bhsmith@poha.com

14 Bayport - 138Kv Substation Security The project includes the installation of five surveillance cameras, 300 feet of new fencing, underground conduits, two poles, two manual gates and access control equipment for doors. 1st Qtr nd Qtr Surveillance cameras Network Switches UPS Card access Fencing Bill Aguirre baguirre@poha.com

15 Install Fender System at Wharf Nos. 1 & 2 at CARE Terminal Project will remove the existing fenders and install new fenders at Wharf 1 & 2 at the CARE Terminal. 2nd Qtr rd Qtr Fender Replacement Pile Diving Jessica Shambra jshambra@poha.com

16 Industrial Park East - Annual Pavement, Drainage and Dust Control 2019 Dust Suppression, road patching and paving 1st Qtr th Qtr Highway, Street, Bridge Construction Site Clearing Ural Thompson uthompson@poha.com

17 JacintoPort Repair of Deck & Back Up Pavement on Wharf Nos. 1, 2 & 3 This project consists of repairing existing holes in the deck at JacintoPort Terminal. 4th Qtr st Qtr Structural Concrete Repair Steel Rebar Concrete Forming Jessica Shambra jshambra@poha.com

18 Manchester - Rehabilitation and Repair of Wharf 2 Structural concrete repair, fender replacement, pile replacement, and geotechnical rehabilitation. Design Time Frame NIGP Codes Small Business Opportunities PHA Contact 2nd Qtr nd Qtr Consultants Contractors Structural Concrete Repair Fender Replacement Pile Driving Steel Rebar Concrete forming Striping Photography Eddy Kharrazi ekharrazi@poha.com

19 Rehabilitation of Transit Shed Floor at Wharf No. 46 at Turning Basin Terminal Repair of top floor slab of the transit shed. 4th Qtr nd Qtr Concrete and Rebar Excavation Barbara H. Smith

20 Drainage System at Volkswagen Yard at Turning Basin Terminal PROJECT 2 PROJECT 1 Improvement of existing drainage system tied to IH-610 feeder road at the Volkswagen yard at the Turning Basin terminal. Project 1: TxDot construction of drainage improvements to the 610 feeder road. (Procured by TxDot) Project 2: PHA construction of drainage improvements to the Volkswagen Yard. Project 2 Construction Time Frame Project 2 NIGP Codes Project 2 Small Business Opportunities PHA Contact 4th Qtr st Qtr Storm Drainage Structures Grading Concrete Barbara H. Smith bhsmith@poha.com

21 Turning Basin North - Wharf 11, 12 and 13 Damage Repair This project consists of repairing damage to piles, shear walls and structural members of the wharfs. 4th Qtr st Qtr Structural Concrete repair Steel Rebar Concrete forming Striping Photography Eddy Kharrazi ekharrazi@poha.com

22 Turning Basin North - Splash Zone Painting 2018 Painting and preservation of splash zone area. 4th Qtr Water blasting Painting Sandblasting Ural Thompson uthompson@poha.com

23 Turning Basin - Transit Sheds Roof Repair Roof removal and replacement for Transit Sheds 30/31 1st Qtr nd Qtr Roofing Site Clearing Waste and Remediation Ural Thompson uthompson@poha.com

24 Turning Basin - Bi-Annual Rail and Switch Replacement Repairs or replaces rail and rail switches throughout the Turning Basin Terminal 1st Qtr th Qtr Rail and Ballast Concrete and Rebar Rail Switches Drainage Barbara H. Smith bhsmith@poha.com

25 Turning Basin - Rehabilitation and Repair of Wharf 9 Structural concrete repair, fender replacement, and geotechnical rehabilitation. 1st Qtr st Qtr Structural Concrete Repair Fender Replacement Pile Driving Steel Rebar Concrete forming Striping Photography Eddy Kharrazi ekharrazi@poha.com

26 Turning Basin - Annual Concrete Replacement 2019 This is a one year contract of concrete replacement at Turning Basin Terminal. The work will consist of removing damaged and or deteriorating concrete pavement in st Qtr th Qtr Concrete Excavation Saw-cutting Concrete Traffic Barriers Barbara H. Smith bhsmith@poha.com

27 Woodhouse - Water and Sewer line Replacement This project work will consist of furnishing and installing approximately 5,000 linear feet of 6 to 8 water main and 2,000 linear feet of sewage force main and a duplex sewage pump station. 4th Qtr nd. Qtr Underground utilities installation Barbara H. Smith bhsmith@poha.com