REHABILITATION OF LUUQ LOCAL ADMINISTRATION OFFICES GRANT NO.: - KIS062

Size: px
Start display at page:

Download "REHABILITATION OF LUUQ LOCAL ADMINISTRATION OFFICES GRANT NO.: - KIS062"

Transcription

1 LUUQ LOCAL ADMINISTRATION OFFICES GRANT NO.: - KIS062 PROJECT DETAILS Implementation Partner: Project title: OFFICES Grant No.: KIS069 Content : ARCHITECTURAL DRAWINGS

2 SHEET NO. COVER SHEET INDEX SHEET LUUQ LOCAL ADMINISTRATION OFFICES GRANT NO.: - KIS062 CONTENTS E-0 E-02 AS-0 to AS-03 3D-0 to 3D-05 GPS COORDINATES FLOOR PLAN ELEVATIONS SECTIONS SCHEDULES ELECTRICAL LIGHTING ELECTRICAL POWER ANALYSIS SHEETS 3 DIMENSIONAL PROJECTIONS PROJECT DETAILS Implementation Partner: Project title: OFFICES Grant No.: KIS069 Content : ARCHITECTURAL DRAWINGS

3 3.7924N E GPS COORDINATES 0 N/A

4 3,350 2,400, 2,700 5, ,295 2,85 2,85 850,345 3,280 3,280,348,02 3,00,300 3,00,005,252,243 3,350 2,400, 2,700 5,300 E-02 6,50,348,02 3,00,300 3,00,005,252,243 6,50 E-04 CORRIDOR E-03 F ,00 5,650 4,450 5,00,,500,200, ,300,200, ,250 2,500,950 2,300 2,950,300 3,000 7,050,850 5,00 2,300 2,50 5, ,550,250, ,850,200,450 EX POSTAL 5 E STORE 2,300 3,000 2,300 STORE D OFFICE 0 CORRIDOR OFFICE 02 MEETING HALL OFFICE 03 CORRIDOR OFFICE 04 C 2 2,300 2, B 2,85 2,505 3,000,300 3,40 2,505 2,5 CORRIDOR A,500,200, ,700, ,650 4,450 5,00 5,200, ,000,300, ,500, 2,500,950 2,300,850, ,450 3, ,850,200,450 5,00 2,300 2,50 5,650 5,200 E-0 FLOOR PLAN 02 :20

5 , , ,500, , ,330, ,500,300 3, ,500, ,500,300, ,600, , ,500, , , ,500, , , ,000,000, , ELEVATION-0 5,650 4,450 5,00, 2,500,950 2,300,850 5,00 2,300 2,50 5, ,000, ELEVATION-03 5,650 2,50 2,300 5,00,850 2,300,950 2,500, 5,00 4,450 5,650 E D C B A A B C D E E,300,300 ELEVATION-02 2,700, 2,400 3,350 3,350 2,400, 2,700 ELEVATION-04 ELEVATIONS 03 :20

6 300 3,800,000, ,00,660,000, , mm thick concrete beam to S.E's details 200mm R.C. Slab with 25mm thick protective cement and sand screed, laid to fall towards drains. 500mm thick masonry rubble wall plastered and painted to approval Hardwood pannel timber doors 709, Floor level +4,00 Floor level +300 G.L 5,650 4,450 5,00, 2,500,950 2,300,850 5,00 2,300 2,50 5,650 SECTION-0 FOUNDATION SPECIFICATION -50mm thick slab laid on app.dpm and blinding -on a b.r.c mesh -600x200mm deep R.C strip foundation to S.E's details -depth to be determined on site -hardcore fill consolidated at 300mm level SECTION 04 :20

7 Store Office 0 Office 02 Office 03 Store Corridor Corridor Meeting hall Office 04 Corridor LEGEND 4FT Flourescent Light Point Light Twin Sockets with Switch Consumer Unit Power outlet circuit Lighting circuit Lighting mains 3 gang way switch Power mains to CU Main Distribution Board Floodlights ELECTRICAL LIGHTING E-0 ELECTRICAL DRAWINGS

8 CORRIDOR EX POSTAL 5 STORE STORE OFFICE 0 CORRIDOR OFFICE 02 MEETING HALL OFFICE 03 CORRIDOR OFFICE CORRIDOR LEGEND 4FT Flourescent Light Point Light Twin Sockets with Switch Consumer Unit Power outlet circuit Lighting circuit Lighting mains 3 gang way switch Power mains to CU Main Distribution Board Floodlights ELECTRICAL POWER E-02 ELECTRICAL DRAWINGS

9 QTY AREA FLOOR FINISH SKIRTING WALL FINISH CEILING OFFICE 0 OFFICE 02 OFFICE 03 OFFICE 04 EX-POSTAL CORRIDORS MEETING HALL STORES 2 34M M M 2 34M 2 0.6M 2 4.2M 2 3.6M 2 3.6M 2 4.2M 2 0.6M 2 55M M 2 8.5M 2 f.f. f.f. f.f. f.f. f.f. f.f. f.f. f.f. f.f. f.f. f.f. f.f. f.f. 50mm (H) 50mm (H) 50mm (H) 50mm (H) 50mm (H) 50mm (H) 50mm (H) 50mm (H) 50mm (H) 50mm (H) 50mm (H) 50mm (H) 50mm (H) AREA SCHEDULES 05 N/A

10 WALLS All eroded walls to be cleaned, filled with approved cement sand, plastered and paint with two coats to approval The plinth at the base of the building to be cleaned, filled with approved cement, plastered and painted to approval ANALYSIS SHEET 0 AS-0

11 R.C.C. SLAB Cut and clear all dead shrubs from the surface of the building. Hack and demolish existing floor screed. Supply and fix an approved water proof membrane. Hack and scratch the old plaster from the surface of slab and replaster again. Provide 25mm thick protective cement and sand screed, laid to fall towards drains. ANALYSIS SHEET 02 AS-02

12 DOORS AND WINDOWS Replace the old wooden windows with aluminum casement windows as per schedules to fabricator's details. Provide new hard wood panel timber doors ANALYSIS SHEET 03 AS-03

13 3 DIMENSIONAL PROJECTION 3D-0 N/A

14 3 DIMENSIONAL PROJECTION 3D-02 N/A

15 3 DIMENSIONAL PROJECTION 3D-03 N/A

16 3 DIMENSIONAL PROJECTION 3D-04 N/A

17 3 DIMENSIONAL PROJECTION 3D-05 N/A