1 SECTION BIDDING AND CONTRACT REQUIREMENTS ADDENDUM NUMBER () January 5, 07 Demonica Kemper Architects 5 N. Halsted Street, Suite 30 Chicago, IL To: Prospective Bidders Re: ADDENDUM NUMBER () TO THE BIDDING DOCUMENTS: Illinois Valley Community College Cultural Center Renovations Architect s Project Number: 6-08 This addendum forms a part of the bidding and contract documents and modifies the original bidding documents dated January 3, 07. Acknowledge receipt of this addendum in the space provided on Bid Form. FAILURE TO DO SO MAY SUBJECT BIDDER TO DISQUALIFICATION. ADDENDA TO THE PROJECT MANUAL. Section a. Page ; Article., Paragraph A i. REVISE sentence to read on or before Tuesday, January 3, 07 at :00 p.m. b. Page ; Article., Paragraph D i. REVISE Room C36 to Room C33. Section a. Page i. REVISE first sentence to read Sealed proposals are invited for the Cultural Center Renovations at Illinois Valley Community College pursuant to specifications. ADDENDA TO THE DRAWINGS Architectural Drawings. A.0 a. Level Reflected Ceiling Plan i. ADD new reference note # in 3 locations. See below for new note #. See attached Sketch A0- ii. REVISE text note to read: HANGING PENDANT FIXTURE (TYP. FOR 59) PAINT ALL VISIBLY-EXPOSED FIXTURE SUPPORTS, BOX, ANCHORS AND CANOPY MATTE BLACK SEE ELEC DRAWINGS Illinois Valley Community College Page of Cultural Center Renovations DKA 6-08 ADDENDUM NUMBER ()

2 b. RCP Reference Notes i. ADD new reference note # to read: PAINT VERTICAL, VISIBLY- EXPOSED GYP BOARD / PLASTER CEILING BLACK. A7.0 a. Detail # i. ADD dimension to detail from outside face of base to outside face of fabric wrapped acoustical panel. See attached Sketch A70- Electrical Drawings. E3.0 a. ADD note # to fixture schedule to read: "FIXTURE TYPES PA AND PB-ALT TO BE PROVIDED WITH STEM BY THE ELECTRICAL CONTRACTOR. FIXTURE OUTSIDE SHADE AND HEAT SINK TO BE PAINTED FACTORY MATTE BLACK BY FIXTURE MANUFACTURER. STEMS TO BE PAINTED A MATCHING MATTE BLACK FINISH." CLARIFICATIONS Q: Will the pendant fixture shades be painted from the manufacturer? A: DKA Response - Yes. Addressed above Q: The spec calls for S00 panels, /8. Several places on the plans note panels. A: DKA Response - The specification is correct. panel is noted nominally on the plans. /8 is the actual depth, per Basis-of-Design product. Q3. In spec section.. it states that the contractor shall purchase and maintain boiler and machinery insurance. Is this insurance necessary for this project? A3. DKA Response - No. Boiler and machinery insurance is not necessary for this project. Attachments Project Manual None. Drawings: A0- A70- Pre-Bid Meeting Agenda END OF SECTION Illinois Valley Community College Page of Cultural Center Renovations DKA 6-08 ADDENDUM NUMBER ()

3 ALTERNATE BID #: NEW LIGHT FIXTURES HATCHED AREA INDICATES EXISTING CEILING TO BE PAINTED BLACK ILLINOIS VALLEY COMMUNITY COLLEGE CULTURAL CENTER RENOVATIONS PROJECT: 6-08 DATE: REF SHEET: ADDENDUM A.0 A0-

4 AUDITORIUM SIDE ONLY EXISTING RECESSED DOOR FRAME - PAINT BLACK ON AUDITORIUM SIDE ONLY EXISTING CONCRETE WALL BEYOND - PAINT BLACK PRIOR TO INSTALLATION OF WOOD GRILLE SYSTEM VERTICAL WOOD GRILLE SYSTEM WOOD BASE - MATCH SPECIES AND STAIN OF WOOD GRILLE SYSTEM - 3 7/8" V.I.F. JAMB TRIM - MATCH SPECIES AND STAIN OF WOOD GRILLE SYSTEM DOOR BASE RAPPED ACOUSTICAL ASS PANEL TAL TRIM - MATCH SPECIES IN OF WOOD GRILLE SYSTEM 5/8" FABRIC WRAPPED ACOUSTCAL FIBERGLASS PANEL EXISTING BLOCK WALL HIDDEN ANCHOR SYSTEM " MITER CORNER BLOCKING RAPPED ACOUSTICAL ASS PANEL CMU WALL 7/8" BASE TRIM - MATCH SPECIES AND STAIN OF WOOD GRILLE SYSTEM EXISTING FLOOR TO REMAIN DETAIL /" = '-0" ED ACOUSTICAL ANEL ATE TO REMAIN CE BOX EPTHIN FIELD G ED ACOUSTICAL ANEL ILLINOIS VALLEY COMMUNITY COLLEGE CULTURAL CENTER RENOVATIONS PROJECT: 6-08 DATE: REF SHEET: ADDENDUM A7.0 A70-

5 Illinois Valley Community College Cultural Center Renovations Pre-Bid Meeting Agenda January 7, 07 at :00 pm in the Cultural Center, at Illinois Valley Community College. Bids are due to IVCC, attention Michelle Carboni, on January 3, 07 at :00 pm. Any bids received by IVCC after this time will be returned to the bidder unopened. a. Bidders assume all responsibility for their choice of carrier if they choose to have their bids delivered to the College. b. Submit three copies of the bid in an opaque sealed envelope. On the envelope include the following: Bidder name and address, Bid title, Bid opening time and date. c. Fax and copies of bids will not be accepted. d. A bid bond in the amount of 0% of the bid shall be submitted with the bid, made payable to Illinois Valley Community College. e. Bids will be publicly opened immediately after the submittal deadline. f. A performance bond and labor and material payment bond in the amount of 00% of the bid amount will be required to be submitted by the successful bidder upon award of the contract. g. General contractors will be required to identify their subcontractors prior to award of the contract. h. AIA Document A0 General Conditions of the Contract for Construction for this project is included in the specifications. i. Two () alternate bids are requested on the Bid Form and are described in the specifications.. Bids will be required to be held for 90 days after the due date. 3. All contractors and subcontractors are required to pay prevailing wages in accordance with the specifications and the Illinois Department of Labor.. It is planned that a contract will be awarded to the successful bidder at the February 9, 07 Board Meeting. 5. Work may begin on site on or after May, Substantial Completion is August, Project Description a. Upgraded wall treatments and upgraded lighting with the existing auditorium. 8. Questions regarding the bidding documents or bidding procedures shall be directed to Brett Loehmann at Demonica Kemper Architects. bloehmann@dka-design.com; phone: Bidders may access the project site after by contacting Scott Curly at The last day for submittal of questions regarding the Bidding Documents is January, 07 at 5:00 pm. The last addendum will be issued on January 7, 07 to address any questions raised by bidders.. All contractors and subcontractors are required to pay prevailing wages in accordance with the specifications and the Illinois Department of Labor.. Be sure to provide unit prices as requested on the Bid Form.