FORM OF TENDER RITHET RESERVOIR DRAIN PROJECT ( TITLE OF CONTRACT ) T 34/16 ( OWNER S CONTRACT REFERENCE NO. )

Size: px
Start display at page:

Download "FORM OF TENDER RITHET RESERVOIR DRAIN PROJECT ( TITLE OF CONTRACT ) T 34/16 ( OWNER S CONTRACT REFERENCE NO. )"

Transcription

1 PAGE 1 OF 6 FOR USE WHEN UNIT S FORM THE BASIS OF PAYMENT - TO BE USED ONLY WITH THE GENERAL CONDITIONS AND OTHER STANDARD DOCUMENTS OF THE UNIT MASTER MUNICIPAL CONSTRUCTION DOCUMENTS. Owner: Contract: Reference No. THE CORPORATION OF THE DISTRICT OF SAANICH ( NAME OF OWNER ) RITHET RESERVOIR DRAIN PROJECT ( TITLE OF ) T 34/16 ( OWNER S REFERENCE NO. ) To Owner: WE, THE UNDERSIGNED: 1.1 have received and carefully reviewed all of the Contract Documents, including the Instructions to Tenderers, the specified edition of the Master Municipal Construction Documents - General Conditions, Specifications and Standard Detail Drawings and the following Addenda: ( ADDENDA, IF ANY ) Addendum No. 1 Addendum No. 2 Addendum No. 3 Addendum No. 4 Addendum No. 5 Addendum No. 6 Addendum No. 7 ACCORDINGLY WE HEREBY OFFER 1.2 have full knowledge of the Place of the Work, and the Work required; and 1.3 have complied with the Instructions to Tenderers; and 2.1 to perform and complete all of the Work and to provide all the labour, equipment and material all as set out in the Contract Documents, in strict compliance with the Contract Documents; and 2.2 to achieve Substantial Performance of the Work on or before ; and ( WORK DURATION OR DATE ) 2.3 to do the Work for the price, which is the sum of the products of the actual quantities incorporated into the Work and the appropriate unit prices set out in Appendix 1, the Schedule of Quantities and Prices, plus any lump sums or specific prices and adjustment amounts as provided by the Contract Documents. For the purposes of tender comparison, our offer is to complete the Work for the Tender Price as set out on Appendix 1 of this Form of Tender. Our Tender Price is based on the estimated quantities listed in the Schedule of Quantities and Prices, and excludes GST.

2 PAGE 2 OF 6 WE CONFIRM: 3.1 that we understand and agree that the quantities as listed in the Schedule of Quantities and Prices are estimated, and that the actual quantities will vary. 4.1 that the following appendices are attached to and form a part of this tender: the appendices as required by paragraph 5.3 of the Instructions to Tenderers Part II; and the Bid Security as required by paragraph 5.2 of the Instructions to Tenderers Part II. WE AGREE: 5.1 that this tender will be irrevocable and open for acceptance by the Owner for a period of 60 calendar days from the day following the Tender Closing Date and Time, even if the tender of another Tenderer is accepted by the Owner. If within this period the Owner delivers a written notice ( Notice of Award ) by which the Owner accepts our tender we will: within 15 Days of receipt of the written Notice of Award deliver to the Owner:.1 a Performance Bond and a Labour and Material Payment Bond, each in the amount of 50% of the Contract Price, covering the performance of the Work including the Contractor s obligations during the Maintenance Period, issued by a surety licensed to carry on the business of suretyship in the province of British Columbia, and in a form acceptable to the Owner;.2 a Baseline Construction Schedule, as provided by GC 4.6.1;.3 a clearance letter indicating that the Tenderer is in Worksafe BC compliance; and.4 a copy of the insurance policies as specified in GC 24 indicating that all such insurance coverage is in place and; within 2 Days of receipt of written Notice to Proceed, or such longer time as may be otherwise specified in the Notice to Proceed, commence the Work; and sign the Contract Documents as required by GC WE AGREE: 6.1 that, if we receive written Notice of Award of this Contract and, contrary to paragraph 5 of this Form of Tender, we: fail or refuse to deliver the documents as specified by paragraph of this Form of Tender; or

3 PAGE 3 OF 6 OUR ADDRESS IS AS FOLLOWS: fail or refuse to commence the Work as required by the Notice to Proceed, then such failure or refusal will be deemed to be a refusal by us to enter into the Contract and the Owner may, on written notice to us, award the Contract to another party. We further agree that, as full compensation on account of damages suffered by the Owner because of such failure or refusal, the Bid Security shall be forfeited to the Owner, in an amount equal to the lesser of: the face value of the Bid Security; and the amount by which our Tender Price is less than the amount for which the Owner contracts with another party to perform the Work. Phone: Fax: Attention: This Tender is executed this day of, 2017 Contractor: (FULL LEGAL NAME OF CORPORATION, PARTNERSHIP OR INDIVIDUAL) (AUTHORIZED SIGNATORY) (AUTHORIZED SIGNATORY)

4 PAGE 4 OF 6 APPENDIX 1 SCHEDULE OF QUANTITIES AND S (See paragraph of the Instructions to Tender Part II) (All prices and Quotations including the Contract Price shall include all applicable Taxes, but shall not include GST. GST shall be shown separately).) Any work called for in these Contract Documents, shown on the plans, or which is necessary for the completion of the Work called for in these Contract Documents and which is not specifically listed as a separate payment item in this Appendix shall be deemed incidental to the performance of the Work and to the general purpose of the Contract; no separate payment will be made on account of any such Work, but the cost of any such incidental Work shall be included in the Unit and Prices. Section Para Specification Title Unit Quantity Div 01 - General Requirements Temporary Structures Subsection Unit Price Amount SS Temporary Structures Including Mobilization and Demobilization Traffic Control, Vehicle Access and Parking Subsection SS Traffic Control Div 03 - Concrete Concrete Walks, Curb And Gutter Subsection Hand Formed Curb and Gutter Metre 18 $ $ Concrete Walks, Infill Strips and Walkways lncluding ramps, Broomed Finish and 100mm thickness. Square Metre 6 $ $ Cast-In-Place Concrete Subsection Reinforced Concrete Energy Dissipater Including tie-in to main. Div 31 - Earthwork Clearing and Grubbing Subsection Isolated Tree Clearing Shrub and Tree Preservation Subsection SS Preservation of Existing Trees Rock Removal Subsection Trench Rock - Blasting Permitted Cubic Metre 110 $ $

5 PAGE 5 OF 6 APPENDIX 1 SCHEDULE OF QUANTITIES AND S (cont d) Section Para Specification Title Unit Quantity Unit Price Amount Div 32 - Roads and Site Improvements Hot-Mix Asphalt Concrete Paving Subsection SS Permanent Pavement Restoration - 80 mm thick as per DOS Detail G5bSS. Square 360 $ $ SS Permanent Pavement Restoration - 50 mm thick as per DOS Detail G5aSS. Square 540 $ $ Painted Pavement Markings Subsection Permanent Painted Pavement Markings Planting of Trees, Shrubs & Ground Cover Subsection Trees Reinstate any trees, shrubs or ground cover disturbed during construction. Div 33 - Utilities Storm Sewers Subsection Trench Drain PVC DR mm OD for depth of main 0.9m - 3m, imported backfill. 10 $ $ Waterworks (Pressurized Drain) Subsection Pressure Drain Pipe HDPE DR mm OD for depth of main 0.9m - 3m, imported backfill, including pressure testing and disinfection. 633 $ $ Pressure Drain Pipe HDPE DR mm OD for depth of main 0.9m - 3m, imported backfill, including pressure testing and disinfection. 45 $ $ Bend 406 OD 45 Degree DR17 HDPE, rated to full pressure, supply and install. Each 4 $ $ Bend 356 OD 45 Degree DR17 HDPE, rated to full pressure, supply and install. Each 2 $ $ Eccentric Increaser mm OD DR17 HDPE, rated to full pressure, supply and install. Each Eccentric Reducer mm OD DR17 HDPE, rated to full pressure, supply and install. Each Check Valve Supply and install, as per detail on contract drawings Concrete Thrust Blocks Cubic Meters 8 $ $

6 PAGE 6 OF 6 APPENDIX 1 SCHEDULE OF QUANTITIES AND S (cont d) Section Para Specification Title Unit Quantity Div 33 - Utilities (cont d) Unit Price Amount Concrete Anchor Blocks/Trench Dams Cubic Meters 10 $ $ Tie-in 150 mm trench drain to existing 150 mm storm drain. Each Tie-in 406 mm HDPE to existing 300 mm DI drain. Each Manholes and Catchbasins Subsection SS Inspection Port As per detail on contract drawings Each 6 $ $ SS Provisional Subsection 5.4.1, Prime Allowance SUB-TOTAL $ GST $ TOTAL TENDER (incl. GST) $