1 880 S Indiana Ave Chicago, IL 09 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank or ) or full replacement (rank 2, or ). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main 90 22,9 $,2,82 SITE $,22 Campus Total 22,9 $2,09,0 Category: Building Exterior Entrance Entrance Control - Audio EA $9 Exterior Doors - Exterior FRP Door 2 EA $, Exterior Doors - Side lite 8 EA $2,0 Exterior Doors - Transom Lite EA $, Exterior Stairs - Concrete 9 LF $,2 Power Door Operator and Controls EA Power Door Operator and Controls EA Ramp Handrail - Steel_Ramp Handrail LF $2 Ramp Handrail - Steel_Ramp Handrail 8 LF $ Ramps - Concrete LF $,0 Stair Handrail - Steel_Stair Handrail LF $ Stair Handrail - Steel_Stair Handrail 2 LF $208 Foundation Lighting Foundation - Concrete LF $2,208 Foundation - Concrete 8 LF $,9 Foundation - Concrete 00 LF Superstructure - Concrete 22,9 SF Exterior Lighting - Wall Mounted EA $,282 MCDADE Page of 2 Assessment Date: /8/20

2 Category: Building Exterior Lighting 880 S Indiana Ave Chicago, IL 09 Exterior Lighting - Wall Mounted 0 EA $8,2 Roof System Walls Windows Chimney - Brick Chimney- Stainless Steel Liner LF $,0 Coping - Metal 9 LF $0,99 Downspouts - Interior Downspouts 00 LF $,2 Roof - Asphalt Gravel Ballast 20,09 SF $80,2 Roof - Modified Bitumen,2 SF $0, Roof Structure - Concrete 2,8 SF Canopy - Concrete/ Stucco 290 SF $9,9 Exterior Walls - Brick,00 SF $,08 Exterior Walls - Prefabricated Metal Panel Wall 20 SF $2 Exterior Walls - Prefabricated Metal Panel Wall 220 SF $,29 Guard - Guards perforated 2 SF $2,988 Windows - Casement Aluminum Double-pane 2,8 SF $8,2 Windows - Decorative SF $,9 Windows - Decorative 9 SF $ Windows - Insulated Panel 8 SF $,0 Windows - Louver 8 SF $ Building Exterior Subtotal: $89,2 Category: Electrical System Emergency System Automatic Transfer Switch EA $8 Emergency A/C Power - Corridors and Stairs, SF Emergency A/C Power - Lunchrooms 2, SF Emergency A/C Power - Students Toilets 9 SF Emergency Battery Packs - Corridors and Stairs 0 EA Emergency Battery Packs - Lunchrooms EA Emergency Battery Packs - Students Toilets EA Exit Signs - Corridors and Stairs EA MCDADE Page 2 of 2 Assessment Date: /8/20

3 Category: Electrical System Emergency System Main Service Power Distribution 880 S Indiana Ave Chicago, IL 09 Exit Signs - Lunchroom 2 EA Security System - CCTV 22,9 SF $,80 Security System - Intrusion Detection 22,9 SF $,82 Independent Electrical Service for emergency power EA $2,92 Main Electrical Service A 20/208/PH EA $,08 PA System 22,9 SF $,2 Lighting and Power Panels - 00 A EA Main Distribution Panels amp EA Electrical System Subtotal: $28,2 Category: Safty System Fire Alarm Fire Alarm Panel EA $, Fire Alarm Strobe Lights 22,9 SF $8,02 Safty System Subtotal: $,8 Category: Mechanical System Boiler Systems Gas Booster Boiler Auxiliary- on Condensing Hot Water MBH 2 EA $,09 Chemical Pot Feeder EA $2 Combustion Dampers 2 EA $88 Glycol Feed System EA $9 on Condensing- Water Tube- Flexible Tube- Force Draft- Hot Water Boiler EA $,99 MBH Water Fill System EA $,8 Gas Booster EA $99 MCDADE Page of 2 Assessment Date: /8/20

4 Category: Mechanical System Gas Booster 880 S Indiana Ave Chicago, IL 09 Heating Devices Mechanical Plumbing Temperature Control Unit Ventilation Ventilation Cabinet Heaters - With Hot Water Coil 2 EA $,22 Unit Heater - Electric EA $28 Wall Heater - Electric EA $ Hot Water Pump - Less than 0 2 EA $2,222 Hydronic Supply and Return - Steel 00 LF $2,0 Hybrid Pneumatic/DDC System 22,9 SF $20, Thermostats - Pneumatic 8 EA Unit Ventilators- Floor Mounted- Hot Water Heating Coils Only 8 EA $22,9 Exhaust Fans- Roof Mounted CFM 2 EA Exhaust Fans- Roof Mounted CFM EA Exhaust Fans- Roof Mounted - Less than 00 CFM EA Mechanical System Subtotal: $82,8 Category: Plumbing System Hot Water Gas Heater BTU/HR EA $0 Piping Pumps Domestic Piping-Cold Water Horizontal Lines 22,9 SF $2, Domestic Piping-Hot Water Horizontal Lines 22,9 SF $29,09 Domestic Piping-Hot Water Return Lines 22,9 SF $9, Sanitary Piping 22,9 SF Storm Piping 22,9 SF Vent Piping 22,9 SF Pumps - Domestic Booster Pump-Simplex EA $, MCDADE Page of 2 Assessment Date: /8/20

5 Category: Plumbing System Pumps 880 S Indiana Ave Chicago, IL 09 Plumbing System Subtotal: $82,98 Category: Classrooms Computer Lab ( room) AC Units EA $,08 Casework 2 LF $ Ceiling - Plaster/Drywall 89 SF $,09 Chalk Board 20 LF $,8 Doors - Wood Doors inclu hw EA $0 Floor - Tile 89 SF $,9 Lighting - Pendent/Surface 2 EA Marker Board 20 LF Storage/ Closet SF $29 Walls - Concrete Block, SF $,2 Wireless System EA $2 Work Sink EA $9 Kindergarten ( room) Music Room ( room) AC Units EA $,08 Casework 2 LF $, Ceiling - Plaster/Drywall,00 SF $,80 Doors - Wood Doors inclu hw EA $90 Floor - Tile/Sheet,00 SF $,0 Lighting - Pendent/Surface 2 EA Marker Board LF Storage/ Closet SF $2 Walls - Concrete Block, SF $,0 Work Sink EA $9 AC Units EA $,08 Casework LF $, Ceiling - Plaster/Drywall 82 SF $2,98 Chalk Board 8 LF $, Doors - Wood Doors inclu hw EA $0 MCDADE Page of 2 Assessment Date: /8/20

6 Category: Classrooms Music Room ( room) ( rooms) 880 S Indiana Ave Chicago, IL 09 Floor - Tile Quarry 82 SF $,80 Lighting - Pendent/Surface EA Marker Board 8 LF $8 Walls - Concrete Block 89 SF $2,0 AC Units EA $2,0 Casework 2 LF $,98 Ceiling - Plaster/Drywall,80 SF $20,0 Chalk Board LF $2,8 Doors - Wood Doors inclu hw EA $2,0 Floor - Tile, SF $9,08 Floor - Tile/Sheet, SF $, Lighting - Pendent/Surface 2 EA Marker Board LF $ Marker Board 00 LF Storage/ Closet 20 SF $,8 Walls - Concrete Block,0 SF $20,8 Work Sink EA $,89 Science ( room) AC Units EA $,08 Casework 2 LF $ Ceiling - Plaster/Drywall 82 SF $2,80 Chalk Board 20 LF $,8 Doors - Wood Doors inclu hw EA $0 Floor - Tile 82 SF $, Lighting - Pendent/Surface EA Marker Board 20 LF Storage/ Closet SF $29 Walls - Concrete Block,0 SF $,29 Work Sink EA $9 Classrooms Subtotal: $89,902 Category: Rooms (Other Than Classrooms) MCDADE Page of 2 Assessment Date: /8/20

7 Category: Rooms (Other Than Classrooms) Administrative Suites/Offices 880 S Indiana Ave Chicago, IL 09 AC Unit EA $8,29 Ceiling - Plaster/Drywall, SF $,2 Doors - Store Front EA $,208 Doors - Wood Doors inclu hw EA $,20 Floor - Tile,0 SF $2,28 Floor - Tile/Sheet SF $ Lighting - Lay-in EA Lighting - Pendent/Surface 2 EA Power Distribution 2 EA $,99 Storage/ Closet 2 SF $2 Walls - Concrete Block 2,9 SF $,88 Gymnasia Library MDF_IDF Ceiling - Plaster/Drywall 2, SF $,2 Doors - Wood Doors inclu hw EA $,20 Floor - Tile/Sheet 2, SF $2, Lighting - Lay-in 2 EA Sound System EA $, Storage/ Closet SF $, Walls - Concrete Block, SF $,8 Walls - Structural Glazed Tile, SF $, AC Unit 2 EA $2, Casework 2 LF $,88 Ceiling - Plaster/Drywall,00 SF $,80 Doors - Wood Doors inclu hw EA $90 Floor - Tile/Sheet,00 SF $,0 Lighting - Pendent/Surface 2 EA Storage/ Closet 0 SF $28 Walls - Concrete Block,82 SF $,0 AC Unit EA $,08 Doors - Steel Doors incl hw EA $0 Finishes 2 SF $92 Mechanical/ Service Rooms Boiler Room 9 SF $,99 MCDADE Page of 2 Assessment Date: /8/20

8 Category: Rooms (Other Than Classrooms) Mechanical/ Service Rooms 880 S Indiana Ave Chicago, IL 09 Janitor's Closet SF $2 Storage Room 22 SF $, Restroom Accessories 9 SF $8,8 Ceiling - Plaster/Drywall 2 SF $2 Ceiling - Plaster/Drywall 908 SF $,2 Doors - Steel Doors incl hw EA $0 Doors - Wood Doors inclu hw EA $,80 Floor - Tile 28 SF $ Floor - Tile Ceramic/ Porcelain SF $, Floor - Tile/Sheet 2 SF $2 Floor Drain 2 EA $2,8 Hand Dryer EA $920 Lavatory EA $, Lighting - Lay-in 2 EA Lighting - Pendent/Surface EA Lighting - Wall Mounted EA Partitions 2 EA $, Urinals 8 EA $2,88 Walls - Concrete Block,08 SF $,0 Walls - Structural Glazed Tile 980 SF $,08 Water Closet EA $,2 Rooms (Other Than Classrooms) Subtotal: $2,0 Category: Building Interior Corridor Ceiling - Lay-in, SF $0,99 Doors - Wood Doors include hw 8 EA $2,8 Drinking Fountains - Double Fountain EA $ Drinking Fountains - Double Water Cooler 2 EA $ Floor - Tile/Sheet, SF $,98 Lighting - Lay-in 0 EA Student Lockers - Two Tiers 9 EA $, MCDADE Page 8 of 2 Assessment Date: /8/20

9 Category: Building Interior Corridor 880 S Indiana Ave Chicago, IL 09 Walls - Concrete Block, SF $9, Safety Camera Viewing Station 8 EA $, Security Cameras 9 EA $, Building Interior Subtotal: $,2 Total Building Cost $,2,82 SITE Category: Site Civil/Drainage Fencing Landscape Parking Lot Civil/ Drainage - Catch Basin EA $2,0 Civil/ Drainage - Catch Basin EA Fencing - Chain Link LF $2, Fencing - Chain Link,0 LF $9,2 Fencing - ew Standard Ornamental 2 LF $,88 Benches EA $2,82 Benches 9 EA $,80 Irrigation 9, SF $29,2 Landscape - Grass 2, SF $9,80 Lighting - Pole Mounted EA $,0 Lighting - Pole Mounted EA $,089 Planting Beds/ Area 2,800 SF $,0 Play Area - Asphalt/ Hardscape,0 SF $, Trash Receptacles EA $,29 Concrete Curbs LF $9,2 Interior Plantings 20 LF Lighting - Pole Mounted EA Surface - Asphalt 00 SF $2,9 MCDADE Page 9 of 2 Assessment Date: /8/20

10 880 S Indiana Ave Chicago, IL 09 SITE Category: Site Parking Lot Playground Sidewalks Signage Surface - Asphalt,9 SF $2,92 Vehicular Screening 2 LF Equipment - Combo -2 2 EA $,8 Equipment - Swingset EA $,82 Surface - Wood Chips,89 SF $,80 Sidewalks - Internal Walks 9 LF $0,99 Sidewalks - Perimeter Sidewalks, SF $, Flag Pole - Flag Pole EA $, Marquee - Free Standing Back Lighted EA Monument - Building Mounted Cut Letter Sign EA Site Subtotal: $,22 Total Site Cost $,22 Campus Total ² ³ $2,09,0 ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). MCDADE Page 0 of 2 Assessment Date: /8/20

11 880 S Indiana Ave Chicago, IL 09 Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. MCDADE Page of 2 Assessment Date: /8/20

12 880 S Indiana Ave Chicago, IL 09 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Computer Lab Kindergarten Music Room Science Computer Lab Kindergarten st Floor st Floor st Floor st Floor st Floor st Floor st Floor st Floor st Floor st Floor st Floor , MCDADE Page 2 of 2 Assessment Date: /8/20