Swerve. Equipment Manufacturer

Size: px
Start display at page:

Download "Swerve. Equipment Manufacturer"

Transcription

1 Equipment Manufacturer

2 Equipment Manufacturer

3 0'-5" [9.9M] PLAYWORLD SYSTEMS, INC. 000 Buffalo Road Lewisburg, PA USA TRANSFER STATION [.84M] -" [.85M] TWISTED TWINE EQUIPMENT SIZE: 8'4" x " x '0" 5,59M x 4,9M x 4,M USE ZONE: 0'5" x 8'" 9,9M x 8,56M 8'-" [8.56M] CURVY 0,9M 48",M 0,9M 48",M ROOFS (Qty. ) SLITHER SLIDE [.84M] AREA: 666 SqFt. 6,87 SqM. USER CAPACITY: FALL HEIGHT: 8 Ft.,44M PERIMETER: 94 Ft. 8,65M AGE GROUP: 5- SWERVE CATALOG PRE-DESIGN POST MOUNT WHEEL SPIRAL LADDER W/ ACCESS LADDER [.84M] LEG LIFT ADA SCHEDULE Required Provided Total Elevated Play Activities: Total Ground-Level Play Activities: Elevated Activities Ground-Level Activities 5 Ground-Level Play Types ASTM F487-7 CPSC #5 0 5' 0' PROJECT NO: SCALE: A /4"='-0" *PLAYGROUND SUPERVISION REQUIRED Meters DRAWN BY: I. PERKINS DATE: -DEC-7 Paper Size B

4 0'-5" [9.9M] PLAYWORLD SYSTEMS, INC. 000 Buffalo Road Lewisburg, PA USA [.84M] 7 -" [.85M] 7 EQUIPMENT SIZE: 8'4" x " x '0" 5,59M x 4,9M x 4,M USE ZONE: 0'5" x 8'" 9,9M x 8,56M 8'-" [8.56M] 7 7 0,9M 48",M 0,9M 48",M [.84M] AREA: 666 SqFt. 6,87 SqM. USER CAPACITY: FALL HEIGHT: 8 Ft.,44M PERIMETER: 94 Ft. 8,65M AGE GROUP: 5- SWERVE CATALOG PRE-DESIGN ADA SCHEDULE Total Elevated Play Activities: Total Ground-Level Play Activities: Elevated Activities Ground-Level Activities 5 Ground-Level Play Types [.84M] Required Provided ASTM F487-7 CPSC #5 0 5' 0' PROJECT NO: SCALE: A /4"='-0" *PLAYGROUND SUPERVISION REQUIRED Meters DRAWN BY: I. PERKINS DATE: -DEC-7 Paper Size B

5 COMPONENT FOOTING (DETAIL ) SPIRAL SLIDE CENTER POST FOOTING (DETAIL) SUPPORT POST FOOTING (DETAIL or 4) (" INDICATES POST LENGTH) CANTILEVER, "T" POST, AND COMPONENT POST FOOTING (DETAIL ) (ZZCH850 INDICATES PART NUMBER) GROUND ZERO POST FOOTING (DETAIL ) (44" INDICATES POST LENGTH) SCALE: DRAWN BY: DATE:

6 PLAYWORLD SYSTEMS, INC. 000 Buffalo Road Lewisburg, PA USA TRANSFER STATION 7" 6" 6" 7" " 4" " 9" 9" CURVY " " 4" 68" 7" 68" 68" 8" TWISTED 68" 7" " 9" 7" 9" 8" 68" 4" " 6" 4" 4" 68" " SPIRAL LADDER W/ ACCESS LADDER 64" 7" " " " TWINE SLITHER SLIDE 67" FOOTING LEGEND COMPONENT FOOTING (DETAIL ) SPIRAL SLIDE CENTER POST FOOTING (DETAIL) " SUPPORT POST FOOTING (DETAIL or 4) (" INDICATES POST LENGTH) ZZCH 850 CANTILEVER, "T" POST, AND COMPONENT POST FOOTING (DETAIL ) (ZZCH850 INDICATES PART NUMBER) SWERVE CATALOG PRE-DESIGN 8" 44" GZ GROUND ZERO POST FOOTING (DETAIL ) (44" INDICATES POST LENGTH) PROJECT NO: SCALE: A /4"='-0" *PLAYGROUND SUPERVISION REQUIRED DRAWN BY: M. MERTZ DATE: -DEC-7 Paper Size B

7 Design Number: A - Bill Of Material Ref. No. Part No. Description Quantity Posts ZZCH008.5in OD x 6in STEEL POST W/ RIVETED CAP ZZCH07.5in OD x 68in SWAGED STEEL POST 6 Decks & Kick Plates ZZCH067 TRIANGULAR COATED DECK ASSEMBLY 4 ZZCH068 / HEX COATED DECK ASSEMBLY 5 ZZCH50 in DECK TO DECK KICK PLATE 6 ZZUN90 COATED DECK TO DECK CONNECTION KIT ADA Items 7 ZZCH in TRANSFER STATION Slides 8 ZZCH06 SLITHER SLIDE.0 ENTRANCE & EXIT 9 ZZUN09 SLITHER SLIDE.0 (LEFT SECTION) Activity Panels 0 ZZCH490 POST MOUNTED STEERING WHEEL Climbers ZZCH707 48in TWINE ZZCH in TWIST ZZCH7056 6in CURVY Overhead Events 4 ZZCH5770 LEG LIFT 5 ZZCH5880 6ft HORIZONTAL SPIRAL LADDER 6 ZZCH5970 OVERHEAD EVENT ACCESS LADDER (6in DECK) Roofs & Arches 7 ZZCH9867 ROOF Additional Tool & Maintenance Kits 8 ZZCHGUID CHALLENGER GUIDELINES 9 ZZUN990 SURFACING WARNING LABEL KIT 0 ZZUN990 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL Friday, September 9, 07 Page of Playworld.com

8 Design Number: A - Compliance and Technical Data Reference Document: ASTM F487 Ref. No. Part No. Qty. Description Unit ASTM Status Total Weight (lbs) Pre- Post- Consumer Recycled Content (lbs) COe Footprint (kgs) Users Install Hours Concrete (Yds) Active Play Events ZZCH008.5in OD x 6in STEEL POST W/ RIVETED Certified CAP ZZCH07 6.5in OD x 68in SWAGED STEEL POST Certified ZZCH067 TRIANGULAR COATED DECK ASSEMBLY Certified ZZCH068 / HEX COATED DECK ASSEMBLY Certified ZZCH50 in DECK TO DECK KICK PLATE Certified ZZUN90 COATED DECK TO DECK CONNECTION KIT Certified ZZCH in TRANSFER STATION Certified ZZCH06 SLITHER SLIDE.0 ENTRANCE & EXIT Certified ZZUN09 SLITHER SLIDE.0 (LEFT SECTION) Certified ZZCH490 POST MOUNTED STEERING WHEEL Certified ZZCH707 48in TWINE Certified ZZCH in TWIST Certified ZZCH7056 6in CURVY Certified ZZCH5770 LEG LIFT Certified ZZCH5880 6ft HORIZONTAL SPIRAL LADDER Certified ZZCH5970 OVERHEAD EVENT ACCESS LADDER (6in Certified DECK) 7 ZZCH9867 ROOF Certified 54.79, ZZCHGUID CHALLENGER GUIDELINES N/A ZZUN990 SURFACING WARNING LABEL KIT Certified ZZUN990 PIPE SYSTEMS MAINTENANCE KIT W/ N/A 90 AEROSOL Totals:, , Kg 7 Kg Kg 6 Metric Tons.7 m Friday, September 9, 07 Page of Playworld.com

9 Design Number: A - Compliance and Technical Data Reference Document: ASTM F487 Ref. No. Part No. Qty. Description Unit ASTM Status Total Weight (lbs) Pre- Post- Consumer Recycled Content (lbs) COe Footprint (kgs) Users Install Hours Concrete (Yds) Active Play Events ASTM F487 The lay-out for this custom playscape, design number A, has been configured to meet the requirements of the ASTM F487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance. 00 ADA Standards for Design The lay-out was also designed to meet the 00 Standards published 5-Sep-00, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F95 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F9, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure. Installation Times Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working / of the given hours. [Eg. Installation Time = 0 hours. For a crew of three, each member will work 0 hours on the installation for a total of 0 hours on the project.] Carbon Footprint The COe (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle. Pre-Consumer Recycle Content A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 00% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels. Post-Consumer Recycle Content A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **0% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product. ** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel. Friday, September 9, 07 Page of Playworld.com