Today s Date: April 15, 2015 Bid Opening Date: April 22, 2015

Size: px
Start display at page:

Download "Today s Date: April 15, 2015 Bid Opening Date: April 22, 2015"

Transcription

1 ADDENDUM NO. 1 FOR CONSTRUCTION OF COMMUNITY SEWAGE LIFT STATIONS & WASTEWATER TREATMENT LAGOONS FOR THE WHITE SHIELD COMMUNITY FORT BERTHOLD RESERVATION McLEAN COUNTY, NORTH DAKOTA Project AB-14-S59, Item 1, Bid Schedule Today s Date: April 15, 2015 Bid Opening Date: April 22, 2015 A. Schedule B, Item 9, Splash Pads with Rip Rap: change estimated quantity to 1. B. Schedule B, Item 30, Culvert: change estimated quantity to 113 and unit to LF. C. Schedule B, Item 31, Primary Cell Inlet Splash Pad: Delete item from schedule. Attachment: Updated Bid Schedule

2 SCHEDULE A SITE MOBILIZATION 1. Site Mobilization (TP 1.06) 1 Job Total Schedule A 18

3 SCHEDULE B COMMUNITY WASTEWATER TREATMENT SYSTEM 1. Stripping and Grubbing (TP-7.18D) 26.5 Acre 2. Excavation (TP-7.22A) 182,648 CY 3. Lagoon Liner (TP-15.07) 654,588 SF 4. Protective Cover, 12-Inch Thick (TP N) 24,244 CY 5. Primary & Secondary Cell Geotextile, 26 Feet Wide (TP-25.06A) 4,012 LF 6. Rock Rip-Rap, 9-Inch Thick (TP C) 3,009 CY 7. Inlet Manhole w/ Coating(TP-4.13G) 8. 8-Inch D.I. Piping (TP-7.02C, TP- 7.18H) 100 LF 9. Splash Pads with Rip-Rap (TP- 7.18H) Inch PVC SDR 26 Pipe (TP-7.18G) 150 LF 11. Anchor Blocks with Rip-Rap (TP- 7.18H) 3 EA Valve Level Flow Control Structure (TP-7.18G) 13. Liquid Level Depth Indicator (TP- 7.18K) 14. Flow Control/Wetland Inlet Structure (TP-32.18G) 15. Wetland Flow Measurement/Discharge Structure (TP-32.18H) Inch HDPE DR-17 Pipe (TP G and TP-32.18H) 91 LF Inch Schedule 40 PVC (TP G) 95 LF Inch PVC SDR 26 Drain line (TP L) 1245 LF 19. Precast Concrete Drain line Outlet Structure (TP-32.13L) 20. Gravel-less Drainfield Chamber (TP K) 30 LF 21. Wetland Inlet Distribution Header Piping with Rip-Rap (TP-32.18F) 19

4 SCHEDULE B COMMUNITY WASTEWATER TREATMENT SYSTEM CONTINUED 22. Wetland Anchor Block with Rip-Rap (TP-32.18I) Inch Gate Valve with Box (TP J) Inch Gate Valve with Box (TP J) 25. Soil Preparation and Seeding (TP- 7.21G) 9 Acre 26. Lagoon Fencing (TP-7.21H) 4,398 LF 27. Access Road Subgrade TP-92.14B) 18,062 CY 28. Gravel Surfacing, 6-Inch Compacted Thickness (TP-92.13F) 1,637 CY 29. Geotextile Fabric for Gravel Access Road, 14 Feet Wide (TP-92.13E) 6,357 LF 30. Culvert (TP-92.13H) 113 LF Total Schedule B 20

5 SCHEDULE C NORTH COMMUNITY LIFT STATION AND SEWER FORCE MAIN 1. Community Lift Station (TP-13.16A) 2. Chain Link Fence w/ Double Swinging Gate (TP-13-16B) 120 LF 3. 4-Inch Gate Valve w/ Box (TP B) 4. 4-Inch SDR21 Sewer Force Main 4,372 LF 5. 4-Inch DR11 HDPE 200 PSI Noncased Directional Drilling (TP3.18D) 1,579 LF 6. 3-Inch SDR21 Sewer Force Main 387 LF 7. Inlet Manhole w/ Coating(TP-4.13G) 8. Shallow Manhole (TP-4.13E) 9. 8-Inch SDR35 Sewer Main (TP- 4.13A) 34 LF Inch SDR11 PE Pipe (TP-4.13A) 8 LF 11. Air Release Valve Manhole (TP C) 12. (TP-6.04A) 125 LF 13. Non-Case Boring (TP3.18H) 75 LF Curb Stop (TP-13.18D) Corporation Stop (TP-13.18C) 16. Connect to Existing Manhole (TP- 4.13G) 17. Manhole Abandonment (TP-4.13K) 18. Connect to Existing 3-Inch SFM 1 Job Total Schedule C 21

6 SCHEDULE D SOUTH COMMUNITY LIFT STATION AND SEWER FORCE MAIN 1. Community Lift Station (TP-13.16A) 2. Chain Link Fence w/ Double Swinging Gate (TP-13-16B) 120 LF 3. 6-Inch Gate Valve w/ Box (TP B) 4. 6-Inch SDR21 Sewer Force Main 16,969 LF 5. 6-Inch DR11 HDPE 200 PSI Noncased Directional Drilling (TP3.18D) 2,381 LF 6. Drop Manhole (TP-4.13F) 7. Inlet Manhole w/ Coating(TP-4.13G) 8. Shallow Manhole (TP-4.13E) 9. 8-Inch SDR35 Sewer Main (TP- 4.13A) 934 LF Inch SDR11 PE Pipe (TP-4.13A) 8 LF 11. Air Release Valve Manhole (TP C) 5 EA 12. (TP-6.04A) 225 LF 13. Non-Case Boring (TP3.18H) 75 LF Curb Stop (TP-13.18D) Corporation Stop (TP-13.18C) 16. Connect to Existing Manhole (TP- 4.13G) Total Schedule D 22

7 SCHEDULE E AWE HU VILLAGE SEWER FORCE MAIN 1. 4-Inch SDR21 Sewer Force Main 6,559 LF 2. 4-Inch DR11 HDPE 200 PSI Noncased Directional Drilling (TP3.18D) 216 LF 3. Air Release Valve Manhole (TP C) 4. Connect to Existing 4 PVC SFM 1 JOB Total Schedule E Project Total (SCH A-E) NOTICE TO ALL BIDDERS The BIDDER shall enter unit prices and total prices for all items on Schedules A - E. Bids will be evaluated and award will be based on the lowest responsible bidder. The estimated quantities of individual items may be increased or decreased as required to accommodate existing site conditions by an agreement between the contractor and owner at the unit bid price. However, in no event shall the total value of the work performed exceed the total contract amount without prior written approval of the owner. Contractor shall be paid for actual quantities installed. The BIDDER acknowledges, for the purpose of submitting this BID, he has explored the subsurface conditions at the project site and is satisfied with the accuracy of the estimated quantities of work to be done. Any discrepancies shall be brought to the Tribe s attention prior to bid opening. Respectfully Submitted: Signature Address Title Date 23