SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 1, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Size: px
Start display at page:

Download "SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 1, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)"

Transcription

1 Updated November 15, 2016 BEAVER COUNTY SR 588(B18) #91922 PROPOSAL:$22.80 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$62.40 The description and location of the project is as follows: For the bridge culvert replacement, bituminous pavement, drainage, guide rail, curb and sidewalk, pavement marking, and other miscellaneous construction, all within a length of linear feet (0.054 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 588, SECTION B18 (24th Street), in BEAVER COUNTY, CITY OF BEAVER FALLS, Commonwealth of Pennsylvania. This project being situated as follows: From 25th Street at Segment 0060 Offset 0354 (Station 3+00) to a point approximately 110 feet west of 9th Avenue at Segment 0060 Offset 0854 (Station 8+00). Anticipated Notice to Proceed , Required Completion LEHIGH COUNTY SR 873(0) # PROPOSAL:$14.76 PLANS:$ X18:$ X36:$31.20 The description and location of the project is as follows: New sidewalks/curbs on east side of SR 0873 and ADA crosswalk and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0873, SECTION 000, in Lehigh COUNTY Slatington BOROUGH from approximately near the Victory Park Access pathway at segment 0110 offset 0066 to approximately Fairmont Alley at segment 0110 offset DBE 5%, Anticipated Notice to Proceed , Required Completion NORTHAMPTON COUNTY SR 0000 # PROPOSAL:$20.16 PLANS:$ X18:$ X36:$39.00 The description and location of the project is as follows: replacement of sidewalk and select street trees as well as the addition of Design-Build ADA curb ramps on East Fourth St. and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE ----, SECTION BPI, in Northampton COUNTY Bethlehem CITY from approximately Adams St. at station to approximately Hayes St. at station DBE 2%, Anticipated Notice to Proceed , Required Completion Updated November 11, 2016 CLARION COUNTY SR 2013(0) # PROPOSAL:$14.76 PLANS:$ X18:$ X36:$46.80 The description and location of the project is as follows: A project to enhance the support of the interior of the tunnel for current and future public use. This includes placing a steel liner in a portion of the tunnel and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 2013, SECTION 392, in Clarion COUNTY Porter TOWNSHIP, Redbank Valley trail from station to station DBE 1%, Anticipated Notice to Proceed , Required Completion BUTLER COUNTY SR 19(299) #

2 PROPOSAL:$17.52 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: Infrastructure improvements, including asphalt paving, drainage, signs, lighting, replacement of the existing curb ramps and sidewalk, installation of bulbouts, reconstruction of the roadway in the area of curb reconstruction/modification, upgrade of the existing traffic signal and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 19, SECTION 299, in Butler COUNTY Zelienople BOROUGH from approximately 0.1 miles north of the SR19/SR 68 (W. Beaver Street) intersection at segment 0200 offset 970 to approximately 0.1 miles south of the SR 19/SR 68 (E. Grandview Avenue) intersection at segment 0200 offset DBE 6%, Anticiapted Notice to Proceed , Required Completion BUTLER COUNTY SR 0000 # PROPOSAL:$15.60 PLANS:$ X18:$ X36:$78.00 X-SEC:$ X18:$ X36:$66.30 The description and location of the project is as follows: A transportation enhancement project to repair storm sewers, road shoulders, and culverts; eliminate open ditches, install sidewalks, curb ramps, a pedestrian crossing and other miscellaneous construction, as indicated on the approved drawings included in the bid package for T-841 Kiester Road, SECTION 001, in Butler COUNTY Slippery Rock TOWNSHIP from the T-841 Kiester Road/T-377 Harmony Road intersection at station to approximately 780 feet west of the T-841 Kiester Road/Rocket Road intersection at station DBE 5%, Anticipated Notice to Proceed , Required Completion BUTLER COUNTY - SR 0000 # PROPOSAL:$15.60 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: A transportation enhancement project for repaving, drainage improvements and other miscellaneous construction, as indicated on the approved drawings included in the bid package for Trail Repaving, along the Butler-Freeport Community Trail from Old Mill Road station 0+00 to PA 28 station in Freeport Borough and South Buffalo Township, Armstrong County, and Buffalo Township, Butler County; SR 2015 (Monroe Road) station to PA 228 (Sarver Road) station in Buffalo Township, Butler County; and Marwood Road station 0+00 to SR 2002 (Herman Road) station in Winfield, Jefferson, and Summit Townships, Butler County. DBE 2%, Anticipated Notice to Proceed , Required Completion INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated November 8, 2016 HUNTINGDON COUNTY SR 305(11B) #56680 PROPOSAL:$21.36 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$35.10 The description and location of the project is as follows: This project is for the replacement of an existing corrugated metal pipe arch carrying SR 0305 over an Unamed Tributary East Branch Standing Stone Creek in Huntingdon County. The existing arch is to be replaced with a 12-0 x 8-0 Precast Reinforced Concrete Box Culvert and includes minimal roadway approach work and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0305, SECTION 11B in HUNTINGDON COUNTY, JACKSON TOWNSHIP at the following location: STATION to STATION SEGMENT 0560, OFFSET 2210 TO SEGMENT 0570, OFFSET DBE 6%, Anticipated Notice to Proceed , Required Completion ALLEGHENY COUNTY SR 0000(LOC) #

3 PROPOSAL:$17.04 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: for the application of pavement markings for bike lanes, sharrows, inlet grates and other miscellaneous construction all within a length of 24,536 Linear Feet (4.647 Miles), as indicated on the approved drawings included in the Bid Package for Neville Road and Grand Avenue in ALLEGHENY COUNTY, NEVILLE and STOWE TOWNSHIPS and CORAOPOLIS BOROUGH, from the intersection with SR 51 at Station to the intersection with SR 51 (Robinson Boulevard/Coraopolis Bridge) at Station DBE 8%, Anticipated Notice to Proceed , Required Completion Updated November 7, 2016 CENTRE COUNTY SR 2018(A01) #85142 PROPOSAL:$27.96 PLANS:$15.40 PLANS:$ X36:$ X-SEC:$ X18:$ X36:$50.70 EXSTRUCT:$ X18:$ X36:$11.70 The description and location of the project is as follows: For the improvements to a certain section of STATE HIGHWAY in CENTRE COUNTY, HAINES TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 2018, SECTION A01. The project being situated as follows: On SR 2018 on the bridge which spans over Pine Creek. Construction is from Segment 0040 Offset 0459 to Segment 0040 Offset 1134 for a total construction length of 575 feet (0.109 miles). For the replacement of the existing 2-span bridge with a single span comp prestressed concrete bulb-tee bridge of approximately length of 79 feet. Construction includes Superpave Asphalt Mixture Designs for the base, binder, and wearing courses, guide rail, pavement base drain, sinkhole repair, and miscellaneous construction as indicated on the approved construction drawings. DBE 3%, Anticipated Notice to Proceed , Required Completion CAMBRIA COUNTY SR 403(10B) #22630 PROPOSAL:$40.08 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ PLANS:$ X18:$ X36:$ X-SEC:$ X18:$2.70 4X36:$39.00 EXSTRUCT:$ X18:$ X36:$54.60 The description and location of the project is as follows: The project is for the replacement of the existing Moxham Bridge in the City of Johnstown, Cambria County. The structure carries four lanes of SR 0403 and two pedestrian sidewalks over the Stonycreek River. The proposed work consists of replacing the existing structure with a 2-Span Steel Multi-Girder Bridge on the existing horizontal and vertical alignments and includes minor roadway approach work and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0403, SECTION 10B, in CAMBRIA COUNTY, CITY OF JOHNSTOWN at the following location: Station to Station Segment 0090, Offset 1014 to Segment 0100, Offset DBE 4%, Anticipated Notice to Proceed , Required Completion DAUPHIN COUNTY SR 2018(TAP) # PROPOSAL:$20.28 PLANS:$ X18:$ X36:$78.00 EXSTRUCT:$ X18:$ X36:$23.40 The description and location of the project is as follows: This work is the modification of Turning Lanes, including existing Traffic Signals and the construction sidewalk and ADA ramps as indicated on the approved drawings included in the bid package for STATE ROUTE 2018, SECTION TAP, in Dauphin COUNTY Derry TOWNSHIP at the intersection of Walton Avenue and TR 39 segment 0050 offset 2068 to segment 0050 offset 3075 a distance of 957 feet, mile. DBE 7%, Anticipated Notice to Proceed , Required Completion

4 Updated November 3, 2016 WARREN COUNTY SR 0000(L00) #78469 PROPOSAL:$33.72 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$42.90 The description and location of the project is as follows: construction of a single span Composite Prestressed Concrete Spread Box Beam Bridge over Damon Run with an overall length of 63'-1"; removal of existing single span bridge; construction of approach roadway on new alignment using Superpave Asphalt Mixture designs; and other miscellaneous construction, as indicated on the approved drawings; for Township Road T-515, SECTION 000, in WARREN COUNTY, COLUMBUS TOWNSHIP from approximately 0.4 miles east of the intersection with SR 0426 at Station to approximately 1.5 miles west of the intersection with T-536 at Station DBE 2%, Anticipated Notice to Proceed , Required Completion ALLEGHENY COUNTY SR 0000 #73390 PROPOSAL:$32.88 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: Construction of an ADA compliant Switchback Pedestrian and Bicycle Ramp and other miscellaneous construction, as indicated on the approved drawings included in the bid package for SMITHFIELD STREET BRIDGE PED RAMP - WHARF in ALLEGHENY COUNTY, CITY OF PITTSBURGH from approximately the Monongahela Wharf to the Smithfield Street Bridge. DBE 5%, Anticipated Notice to Proceed , Required Completion YORK COUNTY SR 194(019) #87494 PROPOSAL:$24.84 PLANS:$ X18:$ X36;$ X-SEC:$ X18:$ X36:$42.90 The project involves the replacement of an existing two-span concrete T-beam bridge that carries two lanes over Mud Run with a proposed single-span bridge on the same horizontal alignment and a similar vertical alignment with minimal approach roadway work and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0194, SECTION 019, in YORK COUNTY, WASHINGTON TOWNSHIP, from Segment 0180 Offset 2512 to Segment 0190 Offset 0755, for an overall project length of linear feet (0.130 mile). Anticipated Notice to Proceed , Required Completion BEAVER COUNTY SR 351(B10) #28734 PROPOSAL:$ PLANS:$ X18:$ X36:$1, X-SEC:$ X18:$ X36:$ EXSTRUCT:$ X18:$ X36:$ The description and location of the project is as follows: For the bridge replacement, retaining walls, bituminous pavement, drainage, guide rail, landscaping, signing and pavement marking, water line relocation, and other miscellaneous construction, all within a length of 2,925 linear feet (0.554 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 0351, SECTION B10 (Fifth Avenue), in BEAVER COUNTY, KOPPEL BOROUGH, NORTH SEWICKLEY TOWNSHIP, Commonwealth of Pennsylvania. The project being situated as follows: From a point approximately 1050 feet north of Richard Street at Segment 0150 Offset 2194 (Station 51+50) to River Road (SR 351 and SR 1001) at Segment 0160 Offset 2192 (Station 81+75). DBE 6%, Anticipated Notice to Proceed , Required Completion ALLEGHENY COUNTY SR 4009(A11) #27394 PROPOSAL:$48.96 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$35.10 EXSTRUCT:$ X18:$ X36:$23.40 The description and location of the project is as follows: For the bridge superstructure replacement, bituminous approach, drainage, guide rail, signing, pavement marking, and 4

5 other miscellaneous construction, all within a length of linear feet (0.066 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 4009, SECTION A11 (Babcock Boulevard), in ALLEGHENY COUNTY, ROSS and SHALER TOWNSHIPS, Commonwealth of Pennsylvania. This project being situated as follows: From a point approximately 100 feet west of Schuetzen Park Road at Segment 0070 Offset 2026 (Station 15+50) to a point approximately 625 feet west of Greenhill Road at Segment 0070 Offset 1576 (Station 20+00). DBE 7%, Anticipated Notice to Proceed , Required Completion MONTGOMERY COUNTY SR 0000(LS3) # PROPOSAL:$35.28 The description and location of the project is as follows: High priority replacement of parts or repairs to large sign structures and other miscellaneous construction as indicated on the approved drawings included in the bid package for VARIOUS STATE ROUTES including but not limited to , 0013, 0309, 0132, 0332, 0413, 0611, 2071, 8005, 8029, and 8031, SECTION LS3, in BUCKS, MONTGOMERY AND PHILADELPHIA COUNTIES in VARIOUS CITIES/BOROUGHS/TOWNSHIPS as indicated on the BMS Location Maps. Anticipated Notice to Proceed , Required Completion INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated October 26, 2016 LACKAWANNA COUNTY SR 4032(250) #8006 PROPOSAL:$26.16 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$31.20 For the rehabilitation and improvement of a certain section of STATE HIGHWAY in LACKAWANNA COUNTY, SOUTH ABINGTON TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 4032, SECTION 250. The project being situated as follows: From a point approximately 493 linear feet (0.09 miles) WEST of SR 0011 at Segment 0070 Offset 2911 (Station ) to a point approximately 897 linear feet (0.17 miles) WEST of SR 0011 at Segment 0070 Offset 2507 (Station ), along SR This project will replace the existing slab on the bridge under the concrete arch associated with the DL&W Railroad with a new slab. This project is located on SR 4032 Shady Lane Road in South Abington Township over Summit Lake Creek under the railroad arch. MPT during construction will be a detour. Other work includes bituminous paving, line painting and guiderail work, all contained within an overall project length of linear feet (0.058 mile) as indicated on the approved drawings included in the bid package. DBE 0%, Anticipated Notice to Proceed , Required Completion INDIANA COUNTY SR 422(465) #95849 PROPOSAL:$30.60 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$78.00 EXSTRUCT:$ X18:$ X36:$19.50 The description and location of the project is as follows: For the replacement of the existing structure carrying SR 422 over Carney Run with a two lane 14'-0" x 7'-0" Precast Reinforced Concrete Box Culvert including Superpave, drainage, guiderail and other miscellaneous construction as indicated on the approved drawings for STATE ROUTE 422, SECTION 465 in Indiana COUNTY, Pine TOWNSHIP from approximately 2.6 miles west of the SR 422/SR 271 Duman Road intersection at segment 0650 offset 0644 to approximately.8 miles east of the SR 422/SR 403 intersection at segment 0640 offset DBE 5%, Anticipated Notice to Proceed , Required Completion ECMS ADVANCED INFORMATION DECEMBER 1, 2016 DELAWARE COUNTY SR 0000(WWC) #

6 PROPOSAL:$53.76 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: This project is for installation of new concrete curb and sidewalk. The new curb and sidewalk would run on the north side of Copples Lane from Callender Lane to the existing walk at the Strath Haven Middle School and other miscellaneous construction, as indicated on the approved drawings included in the bid package in DELAWARE COUNTY, Nether Providence Township, from approximately 500' east of SR 252 at segment 0020 offset 2355 to Callender Lane approximately 2700' east of SR 252 at segment 0020 offset DBE 8%, Anticipated Notice to Proceed , Required Completion NORTHAMPTON COUNTY SR 7301(HSB) #12080 PROPOSAL:15.72 PLANS:$ X18:$ X36:$ X-SEC:$.66 12X18:$ X36:$11.70 The description and location of the project is as follows: The project consists of replacing the existing High Street Bridge over the abandoned Norfolk Southern Railroad line in the City of Bethlehem, Northampton County. The proposed bridge will be a single span with two 12-foot lanes with a 5-foot sidewalk on the eastbound side and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 7301, SECTION HSB, in Northampton COUNTY, CITY of Bethlehem for a total length of feet. DBE 4%, Anticipated Notice to Proceed , Required Completion INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION 6