Harold Washington Elementary School 9130 S University Ave Chicago, IL 60619

Size: px
Start display at page:

Download "Harold Washington Elementary School 9130 S University Ave Chicago, IL 60619"

Transcription

1 930 S University Ave Chicago, IL 09 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank or ) or full replacement (rank, 3 or ). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main 90 3,300 $,8,90 Classroom Modular 999,00 $8,390 -Classroom Modular 999,00 $8,98 SITE $,008 Campus Total 8,00 $,,8 Building: Main Category: Building Exterior Entrance Entrance Control - Audio and Video EA $,03 Exterior Doors - Exterior FRP Door EA $3, Exterior Doors - Exterior Steel Door 9 EA $3,03 Exterior Doors - Exterior Steel Door 8 EA $3,8 Exterior Stairs - Concrete LF $98 Exterior Stairs - Concrete LF $,93 Exterior Stairs - Concrete LF $,88 Power Door Operator and Controls EA Ramp Handrail - Steel_Ramp Handrail LF $ Ramps - Concrete LF $0,8 Stair Handrail - Steel_Stair Handrail LF $0 Foundation Foundation - Concrete,0 LF Superstructure - Metal Deck/ Concrete Topping 80 SF Superstructure - Steel with Clay Tile Arch,30 SF WASHIGTO H ES Page of 3 Assessment Date: //0

2 Building: Main Category: Building Exterior Lighting 930 S University Ave Chicago, IL 09 Exterior Lighting - Wall Mounted EA $,33 Roof System Walls Windows Chimney - Brick Chimney- Concrete/ Mortar Liner LF $,3 Chimney - Brick Chimney- Concrete/ Mortar Liner LF $,0 Coping - Metal 3 LF $,9 Coping - Metal 0 LF $,8 Coping - Stone LF $3, Coping - Stone,8 LF $,3 Downspouts - Exterior Downspouts LF $,8 Downspouts - Exterior Downspouts 30 LF $0,9 Downspouts - Interior Downspouts 0 LF $,39 Parapet - " - 30" Height 80 LF $3,8 Parapet - " - 30" Height, LF $, Parapet - Parapet < " Height LF $, Parapet - Parapet > 30" LF $,39 Roof - Asphalt Gravel Ballast,89 SF $8,33 Roof - Asphalt Gravel Ballast 9,33 SF $98,03 Roof - Metal 9 SF $, Roof - Modified Bitumen 300 SF $,83 Roof Structure - Steel / Metal Deck/ Concrete Topping 300 SF Roof Structure - Steel with Clay Tile Arch 3,09 SF Canopy - Metal 3 SF $,8 Cheek-Wall - Stone SF $ Cornice - Cast Stone LF $, Cornice - Metal Projecting,0 LF $, Exterior Walls - Brick 0 SF $, Exterior Walls - Brick 30,00 SF $0,9 Exterior Walls - Prefabricated Metal Panel Wall SF $,00 Exterior Walls - Stone-Cast 0 SF $,0 Exterior Walls - Stone-Cast,0 SF $8,8 Exterior Walls - Stone-Cut SF $,008 Guard - Guards perforated 3,0 SF $,9 Lintels - Steel,0 LF $0,93 Lintels - Stone 830 LF WASHIGTO H ES Page of 3 Assessment Date: //0

3 Building: Main Category: Building Exterior Windows 930 S University Ave Chicago, IL 09 Skylite - Lexan SF $, Storefront Windows 3 SF $3, Windows - Sash Aluminum Double-pane 0, SF $8, Building Exterior Subtotal: $,0,8 Building: Main Category: Electrical System Emergency System Automatic Transfer Switch EA $,3 Emergency A/C Power - Auditoium and Aisle Lighting,3 SF $3,0 Emergency A/C Power - Corridors and Stairs,90 SF $3,8 Emergency A/C Power - Gym,90 SF $,0 Emergency A/C Power - Lunchrooms,9 SF $93 Emergency Generator- Indoor- atural Gas KW EA $9,3 Exit Signs - Auditoium EA $,09 Exit Signs - Corridors and Stairs 9 EA $,8 Exit Signs - Gym EA $3 Exit Signs - Lunchroom EA $99 Security System - CCTV,300 SF $3,3 Security System - Intrusion Detection,300 SF $9,89 Main Service Power Distribution Independent Electrical Service for emergency power EA $,9 Main Electrical Service - 00 A /08/3PH EA $, PA System,300 SF $, Lighting and Power Panels - 00 A EA $,89 Lighting and Power Panels - Above 00 A EA $3,889 Lighting and Power Panels - Above 00 A 8 EA $3,9 Main Distribution Panels amp EA $3,9 Main Distribution Panels amp EA $8 Main Distribution Panels - Less than 00 amp EA $,00 Electrical System Subtotal: $9,0 WASHIGTO H ES Page 3 of 3 Assessment Date: //0

4 Building: Main Category: Safty System Fire Alarm 930 S University Ave Chicago, IL 09 Fire Alarm Panel EA $,0 Fire Alarm Strobe Lights,300 SF $,3 Fire Alarm_System,300 SF $3,83 Safty System Subtotal: $, Building: Main Category: Mechanical System Air Handling Systems Air Handling Unit- Built Up-Multi Zone- Steam Coils cfm EA $8,08 Air Handling Unit- Built Up-Multi Zone- Steam Coils - Greater than 3000 cfm EA $9,9 Air Intake EA $,9 Auxiliaries cfm EA $, Auxiliaries - Greater than 3000 cfm EA $8,883 Return Duct Work - Indoor- Vertical Shaft and Ducts 00 LF $9,39 Zone Dampers EA $0,93 Boiler Systems Heating Devices Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler HP EA $3,033 Chemical Feed System EA $3,0 Chemical Feeder EA $3,0 Combustion Dampers EA $88 Condensate Pump EA $,0 Feed Water Pumps and Tank EA $, on Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler HP EA $3,033 Piping - Condensate Pipe- Steel 00 LF $,89 Piping - Steam Pipe- Steel 00 LF $,3 Steam Traps EA $3,8 Vacuum Pump EA $8,8 Cabinet Heaters - With Electric Coil 3 EA $,8 Radiators - Steam 8 EA $30, Unit Heater - Electric EA $,0 Unit Heater - Gas EA $8 Wall Heater - Electric EA $3, WASHIGTO H ES Page of 3 Assessment Date: //0

5 Building: Main Category: Mechanical System Temperature Control 930 S University Ave Chicago, IL 09 Pneumatic System,300 SF $,399 Thermostats - Pneumatic EA Ventilation Exhaust Fans- Indoor CFM EA $9 Exhaust Fans- Indoor CFM 3 EA $, Exhaust Fans- Indoor - Less than 00 CFM EA $9 Exhaust Fans- Roof Mounted CFM EA $,8 Exhaust Fans- Roof Mounted CFM EA $9 Type I Exhaust Hood- Kitchen EA $,8 Mechanical System Subtotal: $,0,09 Building: Main Category: Plumbing System Hot Water Electric Heater KW EA $,0 Gas Heater BTU/HR EA $30 Hot Water Storage Tank_Gas Gallons EA $,9 Piping Pumps Domestic Piping-Cold Water from Risers to Fixtures,300 SF Domestic Piping-Cold Water Horizontal Lines,300 SF $, Domestic Piping-Cold Water Risers,300 SF $,90 Domestic Piping-Hot Water from Risers to Fixtures,300 SF Domestic Piping-Hot Water Horizontal Lines,300 SF $99,8 Domestic Piping-Hot Water Return Lines,300 SF Domestic Piping-Hot Water Return Risers,300 SF $3,83 Sanitary Piping,300 SF $0, Storm Piping,300 SF $,9 Vent Piping,300 SF $,93 Pumps - Domestic Booster Pump-Simplex EA $, Pumps - Ejector-Simplex EA $ WASHIGTO H ES Page of 3 Assessment Date: //0

6 Building: Main Category: Plumbing System 930 S University Ave Chicago, IL 09 Plumbing System Subtotal:,99 Building: Main Category: Classrooms Art Room ( rooms) Casework 3 LF $808 Ceiling - Lay-in,90 SF $, Chalk Board LF $,9 Chalk Board LF $8 Doors - Wood Doors inclu hw EA Floor - Tile,90 SF $3,9 Lighting - Lay-in 8 EA Marker Board 8 LF $ Storage/ Closet 8 SF $,30 Walls - Plaster/Drywall,8 SF $, Kindergarten ( rooms) Library ( room) Casework 0 LF $,3 Ceiling - Lay-in,90 SF $, Chalk Board 8 LF $, Doors - Wood Doors inclu hw EA Floor - Tile,90 SF $3,9 Lighting - Lay-in 8 EA Marker Board 8 LF $ Storage/ Closet 8 SF $,30 Walls - Plaster/Drywall,030 SF $,80 Walls - Plaster/Drywall 8 SF $,8 Casework LF $,0 Ceiling - Lay-in 8 SF $,8 Doors - Transom Window SF $ Floor - Carpet 8 SF $, Lighting - Lay-in EA Storage/ Closet 9 SF Walls - Plaster/Drywall,030 SF $,80 WASHIGTO H ES Page of 3 Assessment Date: //0

7 Building: Main Category: Classrooms Music Room ( room) 930 S University Ave Chicago, IL 09 Casework 3 LF $808 Ceiling - Lay-in 9 SF $, Chalk Board LF $,0 Doors - Wood Doors inclu hw EA $30 Floor - Tile 9 SF $,0 Lighting - Lay-in EA Marker Board 8 LF $ Storage/ Closet 8 SF $ Walls - Plaster/Drywall 99 SF $,3 Office ( room) AC Units EA $,08 Casework LF $303 Ceiling - Lay-in 80 SF $,3 Chalk Board LF $,0 Doors - Wood Doors inclu hw EA $30 Floor - Tile 80 SF $,903 Lighting - Lay-in EA Walls - Plaster/Drywall 9 SF $,8 Other Instructional Use ( rooms) Casework 8 LF $0 Ceiling - Lay-in 0 SF $,3 Chalk Board 8 LF $,3 Doors - Wood Doors inclu hw 3 EA $903 Floor - Tile 0 SF $,3 Lighting - Lay-in EA Walls - Plaster/Drywall 83 SF $, Pre School ( room) Casework 3 LF $808 Ceiling - Lay-in 8 SF $,30 Chalk Board LF $,0 Doors - Wood Doors inclu hw EA $30 Floor - Tile 8 SF $,80 Lighting - Lay-in EA Marker Board 8 LF $ Storage/ Closet 9 SF Walls - Plaster/Drywall 8 SF $8,3 WASHIGTO H ES Page of 3 Assessment Date: //0

8 Building: Main Category: Classrooms Pre School ( room) ( rooms) Special Education ( rooms) 930 S University Ave Chicago, IL 09 AC Units EA $,3 AC Units EA $99 Casework LF $,0 Ceiling - Lay-in 3,8 SF $,0 Chalk Board LF $,8 Chalk Board LF $,9 Doors - Wood Doors inclu hw EA $,8 Floor - Carpet, SF $, Floor - Tile, SF $,38 Floor - Tile 0,30 SF $3,039 Lighting - Lay-in 8 EA $3,33 Lighting - Lay-in 9 EA Lighting - Pendent/Surface EA Marker Board 0 LF $,99 Marker Board LF Storage/ Closet,8 SF $9,3 Walls - Plaster/Drywall,9 SF $3,93 Walls - Plaster/Drywall,3 SF $3,03 Work Sink EA $39 Casework LF $ Ceiling - Lay-in,8 SF $, Chalk Board LF $,00 Doors - Wood Doors inclu hw EA $,0 Floor - Tile,8 SF $3, Lighting - Lay-in 9 EA Storage/ Closet 08 SF $83 Walls - Plaster/Drywall,90 SF $, Classrooms Subtotal: $3,9 Building: Main Category: Rooms (Other Than Classrooms) WASHIGTO H ES Page 8 of 3 Assessment Date: //0

9 Building: Main Category: Rooms (Other Than Classrooms) Administrative Suites/Offices 930 S University Ave Chicago, IL 09 AC Unit EA $,08 Ceiling - Lay-in 8 SF $,38 Ceiling - Plaster/Drywall 0 SF $ Doors - Wood Doors inclu hw EA $,80 Floor - Carpet SF $,8 Floor - Carpet 30 SF $ Floor - Tile 0 SF $8 Lighting - Lay-in 3 EA $, Lighting - Lay-in EA Lighting - Pendent/Surface EA Storage/ Closet SF $0 Walls - Plaster/Drywall,8 SF $3, Auditorium & Theater Gymnasia Balcony Seating 08 EA $3, Ceiling - Plaster/Drywall,38 SF $3,3 Doors - Wood Doors inclu hw EA $,0 Floor - Carpet 3,9 SF $9,98 Floor - Wood 3,9 SF $,9 Lighting - Pendent/Surface EA Main Floor Seating EA $98,3 Sound System EA $0, Stage 0 SF $3, Stage Curtain EA Stage Lift EA $8, Stage Lighting System EA Stage-Stairs - Wood 8 LF $9 Stairs - Asphalt 0 LF $93 Walls - Plaster/Drywall, SF $3,8 Ceiling - Exposed,90 SF $,0 Doors - Steel Doors incl hw EA $,0 Floor - Sport Flooring,90 SF $,39 Lighting - Chandelier, Incandescent EA $,3 Scoreboards EA $, Walls - Plaster/Drywall 3,08 SF $8,0 WASHIGTO H ES Page 9 of 3 Assessment Date: //0

10 Building: Main Category: Rooms (Other Than Classrooms) Kitchen Lunch & Multipurpose Room 930 S University Ave Chicago, IL 09 Ceiling - Plaster/Drywall SF $90 Doors - Wood Doors inclu hw 3 EA $903 Floor - Tile SF $3 Lighting - Pendent/Surface 3 EA Storage/ Closet SF $0 Walls - Plaster/Drywall 0 SF $,9 Ceiling - Plaster/Drywall SF $,3 Ceiling - Splined,9 SF $,300 Doors - Wood Doors inclu hw EA $,0 Floor - Tile, SF $,903 Lighting - Pendent/Surface 38 EA Serving Line LF $,0 Storage/ Closet 8 SF $ Walls - Masonry 300 SF $9 Walls - Plaster/Drywall,3 SF $,0 MDF_IDF AC Unit EA $99 Doors - Wood Doors inclu hw EA $30 Finishes 90 SF $, Mechanical/ Service Rooms Boiler Room, SF $8,9 Coal Room 9 SF $,0 Janitor's Closet 90 SF $ Mechanical/ Service Rooms, SF $,3 Storage Room 3,8 SF $,0 Restroom Accessories,8 SF $,09 Ceiling - Plaster/Drywall,93 SF $8, Doors - Transom Window SF $ Doors - Wood Doors inclu hw 3 EA $3,93 Floor - Tile 8 SF $90 Floor - Tile Ceramic/ Porcelain,0 SF $,39 Floor - Tile Ceramic/ Porcelain 39 SF Floor Drain EA $,3 WASHIGTO H ES Page 0 of 3 Assessment Date: //0

11 Building: Main Category: Rooms (Other Than Classrooms) Restroom 930 S University Ave Chicago, IL 09 Lavatory EA $8,30 Lighting - Pendent/Surface EA Partitions EA $, Urinals EA $,0 Urinals 0 EA $3,30 Walls - Plaster/Drywall 9 SF $99 Walls - Plaster/Drywall,9 SF $,9 Walls - Structural Glazed Tile SF $3,3 Walls - Structural Glazed Tile, SF $3,0 Water Closet EA $9,0 Water Closet 8 EA $9,0 Rooms (Other Than Classrooms) Subtotal: $,3 Building: Main Category: Building Interior Corridor Ceiling - Plaster/Drywall 0,90 SF $, Drinking Fountains - Double Fountain EA $,03 Floor - Asphalt Floor 0,90 SF $,3 Lighting - Pendent/Surface EA Walls - Masonry 3,8 SF $,80 Walls - Plaster/Drywall 3,8 SF $, Walls - Plaster/Drywall 3,8 SF $,38 Safety Stairs Camera Viewing Station 3 EA $,08 Ceiling - Plaster/Drywall,00 SF $,8 Floor - Asphalt 9 SF $,38 Floor - Tile 8 SF $ Handrails 3 LF $, Lighting - Chandelier, Incandescent 3 EA Lighting - Pendent/Surface 8 EA Stairs - Asphalt,3 LF $, Stairs - Tile 30 LF $8 WASHIGTO H ES Page of 3 Assessment Date: //0

12 Building: Main Category: Building Interior Stairs 930 S University Ave Chicago, IL 09 Walls - Plaster/Drywall, SF $3,3 Vertical Conveyance Elevator - Elevator- Roped Holeless Hydraulic EA $9,38 Wheelchair Lift - Chair Lift EA $,9 Building Interior Subtotal: $0, Total Building Cost $,8,90 Building: Classroom Modular Category: Building Exterior Entrance Exterior Doors - Exterior Steel Door 3 EA $,8 Exterior Stairs - Wood 0 LF $3 Ramp Handrail - Wood_Ramp Handrail LF $ Ramps - Wood Ramp 33 LF $,98 Stair Handrail - Wood_Stair Handrail 3 LF $3 Foundation Lighting Roof System Walls Windows Foundation - Concrete 9 LF Superstructure - Steel,00 SF Exterior Lighting - Wall Mounted 3 EA 3 $3,090 Downspouts - Exterior Downspouts LF $8 Roof - Metal,0 SF $9, Roof Structure - Steel / Metal Deck/ Concrete Topping,00 SF Exterior Walls - Wood Siding 0 SF $8 Exterior Walls - Wood Siding,8 SF $, Guard - Guards perforated SF $, Lintels - Steel 0 LF $, WASHIGTO H ES Page of 3 Assessment Date: //0

13 Building: Classroom Modular Category: Building Exterior Windows 930 S University Ave Chicago, IL 09 Windows - Sash Aluminum Double-pane SF $,3 Building Exterior Subtotal: $, Building: Classroom Modular Category: Electrical System Emergency System Emergency A/C Power - Corridors and Stairs,00 SF $3 Emergency Battery Packs - Corridors and Stairs 3 EA 8 Exit Signs - Corridors and Stairs 3 EA $9 Main Service Power Distribution Independent Electrical Service for emergency power EA $,9 PA System,00 SF $9 Lighting and Power Panels - 00 A EA $98 Electrical System Subtotal: $,89 Building: Classroom Modular Category: Safty System Sprinkler System Dry Sprinkler System,00 SF $ Sprinkler Heads,00 SF Sprinkler Piping,00 SF $390 Safty System Subtotal: $93 Building: Classroom Modular Category: Mechanical System Temperature Control Thermostats - DDC EA WASHIGTO H ES Page 3 of 3 Assessment Date: //0

14 Building: Classroom Modular Category: Mechanical System Unit Ventilation 930 S University Ave Chicago, IL 09 Unit Ventilators- Floor Mounted- Electric Heating & DX Cooling Coil W/ Self Contained Compressor EA $9, Ventilation Exhaust Fans- Roof Mounted CFM 3 EA $,3 Mechanical System Subtotal: $3,9 Building: Classroom Modular Category: Plumbing System Hot Water Electric Heater - Less than 0 KW EA $8 Piping Domestic Piping-Cold Water Horizontal Lines,00 SF $ Domestic Piping-Hot Water Horizontal Lines,00 SF $390 Sanitary Piping,00 SF $,9 Storm Piping,00 SF $,83 Vent Piping,00 SF $, Plumbing System Subtotal: $,8 Building: Classroom Modular Category: Classrooms ( rooms) Ceiling - Plaster/Drywall, SF $, Chalk Board LF $,0 Chalk Board LF $8 Doors - Wood Doors inclu hw EA Floor - Tile SF $3, Floor - Tile SF $, Lighting - Pendent/Surface 0 EA Walls - Metal Panel 89 SF $89, Walls - Metal Panel 89 SF $,9 WASHIGTO H ES Page of 3 Assessment Date: //0

15 Building: Classroom Modular Category: Classrooms 930 S University Ave Chicago, IL 09 Classrooms Subtotal: $08, Building: Classroom Modular Category: Rooms (Other Than Classrooms) Restroom Accessories 88 SF $8 Ceiling - Plaster/Drywall 88 SF $30 Doors - Wood Doors inclu hw EA Floor - Tile 88 SF $93 Floor Drain EA $,8 Lavatory EA $39 Lighting - Pendent/Surface EA Walls - Vinyl Coated Gypsum Panel 03 SF $0 Walls - Vinyl Coated Gypsum Panel 03 SF $8 Water Closet EA $ Rooms (Other Than Classrooms) Subtotal: $,38 Building: Classroom Modular Category: Building Interior Corridor Ceiling - Lay-in 0 SF $330 Drinking Fountains - Single Water Cooler EA $33 Floor - Tile/Sheet 0 SF Lighting - Lay-in EA Walls - Metal Panel 0 SF $,9 Building Interior Subtotal: $,8 Total Building Cost $8,390 Building: -Classroom Modular Category: Building Exterior WASHIGTO H ES Page of 3 Assessment Date: //0

16 Building: -Classroom Modular Category: Building Exterior Entrance 930 S University Ave Chicago, IL 09 Exterior Doors - Exterior Steel Door EA $, Exterior Doors - Exterior Steel Door EA $8 Exterior Stairs - Wood LF $,3 Exterior Stairs - Wood 3 LF $38 Ramp Handrail - Wood_Ramp Handrail LF $ Ramps - Wood Ramp 33 LF $,98 Stair Handrail - Wood_Stair Handrail LF $,803 Stair Handrail - Wood_Stair Handrail LF $08 Foundation Lighting Roof System Walls Windows Foundation - Concrete 9 LF Superstructure - Steel,00 SF Exterior Lighting - Wall Mounted 3 EA 3 $3,090 Downspouts - Exterior Downspouts LF $8 Roof - Metal,0 SF $9, Roof Structure - Steel / Metal Deck/ Concrete Topping,00 SF Exterior Walls - Wood Siding 0 SF $8 Exterior Walls - Wood Siding,8 SF $,3 Guard - Guards perforated SF $, Lintels - Steel 0 LF $, Windows - Sash Aluminum Double-pane SF $,3 Building Exterior Subtotal: $,3 Building: -Classroom Modular Category: Electrical System Emergency System Emergency A/C Power - Corridors and Stairs,00 SF $3 Emergency Battery Packs - Corridors and Stairs 3 EA 8 Exit Signs - Corridors and Stairs 3 EA $9 WASHIGTO H ES Page of 3 Assessment Date: //0

17 Building: -Classroom Modular Category: Electrical System Main Service 930 S University Ave Chicago, IL 09 Independent Electrical Service for emergency power EA $,9 PA System,00 SF $9 Power Distribution Lighting and Power Panels - 00 A EA $98 Electrical System Subtotal: $,89 Building: -Classroom Modular Category: Safty System Sprinkler System Dry Sprinkler System,00 SF $ Sprinkler Heads,00 SF Sprinkler Piping,00 SF $390 Safty System Subtotal: $93 Building: -Classroom Modular Category: Mechanical System Temperature Control Thermostats - DDC EA Unit Ventilation Unit Ventilators- Floor Mounted- Electric Heating & DX Cooling Coil W/ Self Contained Compressor EA $9, Ventilation Exhaust Fans- Roof Mounted CFM 3 EA $,3 Mechanical System Subtotal: $3,9 Building: -Classroom Modular Category: Plumbing System WASHIGTO H ES Page of 3 Assessment Date: //0

18 Building: -Classroom Modular Category: Plumbing System Hot Water 930 S University Ave Chicago, IL 09 Electric Heater - Less than 0 KW EA $8 Piping Domestic Piping-Cold Water Horizontal Lines,00 SF $ Domestic Piping-Hot Water Horizontal Lines,00 SF $390 Sanitary Piping,00 SF $,9 Storm Piping,00 SF $,83 Vent Piping,00 SF $, Plumbing System Subtotal: $,8 Building: -Classroom Modular Category: Classrooms ( rooms) Ceiling - Plaster/Drywall, SF $, Chalk Board LF $3 Doors - Wood Doors inclu hw EA Floor - Tile, SF $3,330 Lighting - Pendent/Surface 0 EA Walls - Metal Panel, SF $3,8 Classrooms Subtotal: $,90 Building: -Classroom Modular Category: Rooms (Other Than Classrooms) Restroom Accessories 88 SF $8 Ceiling - Plaster/Drywall 88 SF $30 Doors - Wood Doors inclu hw EA Floor - Tile 88 SF $93 Floor Drain EA $,8 Lavatory EA $39 Lighting - Pendent/Surface EA Walls - Vinyl Coated Gypsum Panel 0 SF $9 Water Closet EA $ WASHIGTO H ES Page 8 of 3 Assessment Date: //0

19 Building: -Classroom Modular Category: Rooms (Other Than Classrooms) Restroom 930 S University Ave Chicago, IL 09 Rooms (Other Than Classrooms) Subtotal: $,909 Building: -Classroom Modular Category: Building Interior Corridor Ceiling - Lay-in 0 SF $330 Drinking Fountains - Single Water Cooler EA $33 Floor - Tile/Sheet 0 SF Lighting - Lay-in EA Walls - Vinyl Coated Gypsum Panel 0 SF $ Building Interior Subtotal: $, Total Building Cost $8,98 SITE Category: Site Civil/Drainage Fencing Landscape Civil/ Drainage - Catch Basin 0 EA $0,938 Civil/ Drainage - Site Drain EA $,3 Civil/ Drainage - Site Manhole EA $8,9 Fencing - Chain Link LF $9 Fencing - Chain Link LF $0,3 Fencing - Chain Link 30 LF $,8 Fencing - ew Standard Ornamental,0 LF $, Benches EA $,8 Benches 9 EA $8, Landscape - Grass,0 SF $0,3 Lighting - Pole Mounted EA $,8 Parkway trees EA $30,3 WASHIGTO H ES Page 9 of 3 Assessment Date: //0

20 930 S University Ave Chicago, IL 09 SITE Category: Site Landscape Parking Lot Playground Sidewalks Signage Planting Beds/ Area,0 SF $3,8 Play Area - Asphalt/ Hardscape,00 SF $,8 Retaining Wall - Concrete 8 SF $,99 Trash Receptacles EA $3 Lighting - Pole Mounted EA $, Surface - Asphalt 8,0 SF $9,938 Surface - Concrete 8,0 SF $, Trash Enclosure - Chain Links 0 SF $,3 Equipment - School Age - EA $3, Surface - Poured Surface,0 SF $9,83 Sidewalks - Internal Walks 0 LF $3,9 Sidewalks - Internal Walks 30 LF $3, Sidewalks - Perimeter Sidewalks 8,0 SF $3,89 Flag Pole - Flag Pole EA $, Marquee - Free Standing Back Lighted EA Site Subtotal: $,008 Total Site Cost $,008 Campus Total ² ³ $,,8 ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. WASHIGTO H ES Page 0 of 3 Assessment Date: //0

21 930 S University Ave Chicago, IL 09 Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. WASHIGTO H ES Page of 3 Assessment Date: //0

22 930 S University Ave Chicago, IL 09 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Art Room Art Room Kindergarten Kindergarten Library Music Room Office Other Instructional Use Other Instructional Use Pre School Special Education Special Education Special Education Special Education Other Instructional Use Kindergarten Office st Floor st Floor nd Floor nd Floor st Floor st Floor st Floor st Floor nd Floor nd Floor nd Floor nd Floor nd Floor nd Floor nd Floor nd Floor nd Floor nd Floor , Classroom Modular st Floor st Floor M00 M00 M3 M Classroom Modular st Floor M003 M WASHIGTO H ES Page of 3 Assessment Date: //0

23 930 S University Ave Chicago, IL 09 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board -Classroom Modular st Floor M00 M WASHIGTO H ES Page 3 of 3 Assessment Date: //0