Addendum to Request For Bid: Request for Bid: Cisco Network Infrastructure Refresh. Project No. IT June 28, 2018

Size: px
Start display at page:

Download "Addendum to Request For Bid: Request for Bid: Cisco Network Infrastructure Refresh. Project No. IT June 28, 2018"

Transcription

1 Addendum to Request For Bid: Request for Bid: Cisco Network Infrastructure Refresh Project No. IT June 28, 2018 This Addendum shall be considered part of the bid documents for the above-mentioned services as though it had been issued at the same time and shall be incorporated integrally therewith. Where provisions of the following supplementary data differ from those of the original bid documents, this Addendum shall govern and take precedence. Bidders are hereby notified that they shall make any necessary adjustments in their pricing as a result of this addendum. It will be construed that each bid is submitted with full knowledge of all modifications and supplemental data specified herein. Please include a signed copy of this addendum with your bid submittal. Failure to do so may subject Bidder to disqualification. Revision of Section Appendix A: Include page 2 within this addendum as part of the RFB. Replace the sub-section Implementation Services on page 16 of the RFB with the section included on this page 3 of this addendum. Revision of General Provisions: Include page 4-36 within this addendum as part of the RFB. Revision of Proposal Requirements/Evaluation Criteria Replace the page 22 of the RFB with page 37 within this addendum. End of Addendum Request For Bid: Cisco Network Infrastructure Refresh Original RFB documents can be found by clicking here The undersigned Bidder hereby acknowledges receipt of the following Addendum and will replace and include identified pages in the bid packet. Bidder Contact Signature: Printed Name: Title: Date: Page 1 of 37

2 Appendix A Line Number Item Name Description Service Duration (Months) Lead Time (Days) Included Item Quantity Service Type 1.0 SNS-3515-K9 Small Secure Network Server for ISE Applications N/A 14 No CON-SSSNT-SNS3515K SOLN SUPP 8X5XNBD Small Secure Network Server for ISE Ap12 N/A No 1 PRIMARYSERVICE 1.1 SW-3515-ISE-K9 Cisco ISE Software for the SNS-3515-K9 appliance N/A 14 No CAB-9K12A-NA Power Cord, 125VAC 13A NEMA 5-15 Plug, North America N/A 8 No SNS-MR-1X081RU-A 8GB DDR Mhz Memory Module N/A 14 Yes SNS-MRAID12G-1GB 1GB FBWC for Cisco 12G SAS Modular RAID N/A 14 Yes SNS-PSU1-770W 770W power supply N/A 14 Yes R2XX-RAID0 Enable RAID 0 Setting N/A 10 Yes SNS-MRAID12G Avila Cisco 12G SAS Modular Raid Controller N/A 14 Yes SNS-CPU-E52620D 2.40 GHz E v3/6c N/A 14 Yes SNS-HD600G10K12G 600GB SAS 10K RPM HDD N/A 14 Yes SNS-MLOM-IRJ45 MLOM Intel -Quad Port 1Gb RJ45 N/A 14 Yes L-ISE-PLS-S-100= Cisco ISE 100 Endpoint Plus Subscription License N/A 2 No ISE-PLS-3YR-100 Cisco ISE 3-Yr 100 Endpoint Plus License 36 1 No L-ISE-APX-S-500= Cisco ISE 500 Endpoint Apex Subscription License N/A 2 No ISE-APX-3YR-500 Cisco ISE 3-Yr 500 Endpoint Apex License 36 N/A No L-ISE-TACACS= Cisco ISE Device Admin License N/A 2 No L-AC-APX-LIC= Cisco AnyConnect Apex Term License, Total Authorized Users N/A 2 No L-AC-APX-3Y-S4 Cisco AnyConnect Apex License, 3YR, Users 36 N/A No 500 Page 2 of 37

3 Implementation Services: We require professional services to design, configure, install and test all proposed switches and equipment to all BPHC buildings MDF and IDF. The winning vendor will work with the Information Technology Department on configuring details of this equipment using Cisco s best practices. All zc9407r-96u-bndl-a switches Configure switches as a virtual switching system (VSS). Use Cisco DNA Center Assurance to determine the heath of the network and services for Catalyst switches under Software Defined Network Architecture. Full ISE implementation which also need to include 802.1x, device management, and posture check. The switches will be deployed in stack wise manner and we expect stacking cable, and stacking part are part of the scope. Page 3 of 37

4 CHARLES D. BAKER Governor KARYN E. POLITO Lt. Governor THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the Massachusetts General Laws, Chapter 149, Sections 26 to 27H ROSALIN ACOSTA Secretary WILLIAM D MCKINNEY Director Awarding Authority: Contract Number: Description of Work: Boston Public Health Commission IT City/Town: BOSTON Boston Public Health Commission Cisco Network Infrastructure Refresh - Upgrade Job Location: 1010 Mass Avenue Information about Prevailing Wage Schedules for Awarding Authorities and Contractors This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the Wage Request Number on all pages of this schedule. An Awarding Authority must request an updated wage schedule from the Department of Labor Standards ( DLS ) if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK projects (bid pursuant to G.L. c.149a), the earlier of: (a) the execution date of the GMP Amendment, or (b) the bid for the first construction scope of work must be within 90-days of the wage schedule issuance date. The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, 27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a conspicuous place at the work site for the life of the project in accordance with M.G.L. c The wages listed on the wage schedule must be paid to employees performing construction work on the project whether they are employed by the prime contractor, a filed sub-bidder, or any sub-contractor. All apprentices working on the project are required to be registered with the Massachusetts Department of Labor Standards, Division of Apprentice Standards (DLS/DAS). Apprentice must keep his/her apprentice identification card on his/her person during all work hours on the project. An apprentice registered with DAS may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. Any apprentice not registered with DLS/DAS regardless of whether or not they are registered with any other federal, state, local, or private agency must be paid the journeyworker's rate for the trade. The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule. Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. For multi-year CM AT RISK projects, awarding authority must request an annual update no later than two weeks before the anniversary date, determined as the earlier of: (a) the execution date of the GMP Amendment, or (b) the execution date of the first amendment to permit procurement of construction services. Contractors are required to obtain the wage schedules from awarding authorities, and to pay no less than these rates to covered workers. The annual update requirement is not applicable to 27F rental of equipment contracts. Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll reports and a Statement of Compliance directly to the awarding authority by mail or and keep them on file for three years. Each weekly payroll report must contain: the employee s name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at (617) Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor Division of the office of the Attorney General at (617) Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and 02/12/2018 Wage Request Number: Page 4 of 37

5 Construction (2 AXLE) DRIVER - EQUIPMENT TEAMSTERS JOINT COUNCIL NO. 10 ZONE A (3 AXLE) DRIVER - EQUIPMENT TEAMSTERS JOINT COUNCIL NO. 10 ZONE A (4 & 5 AXLE) DRIVER - EQUIPMENT TEAMSTERS JOINT COUNCIL NO. 10 ZONE A ADS/SUBMERSIBLE PILOT PILE DRIVER LOCAL 56 (ZONE 1) For apprentice rates see "Apprentice- PILE DRIVER" AIR TRACK OPERATOR ASBESTOS REMOVER - PIPE / MECH. EQUIPT. HEAT & FROST INSULATORS LOCAL 6 (BOSTON) ASPHALT RAKER ASPHALT/CONCRETE/CRUSHER PLANT-ON SITE BACKHOE/FRONT-END LOADER 12/01/2016 $33.25 $10.91 $10.89 $ /01/2016 $33.32 $10.91 $10.89 $ /01/2016 $33.44 $10.91 $10.89 $ /01/2017 $92.97 $9.90 $21.15 $ /01/2018 $97.80 $9.90 $21.15 $ /01/2019 $ $9.90 $21.15 $ /01/2017 $38.25 $7.70 $14.75 $ /01/2018 $39.20 $7.70 $14.75 $ /01/2018 $40.15 $7.70 $14.75 $ /01/2019 $41.15 $7.70 $14.75 $ /01/2019 $42.15 $7.70 $14.75 $ /01/2020 $43.14 $7.70 $14.75 $ /01/2020 $44.12 $7.70 $14.75 $ /01/2021 $45.14 $7.70 $14.75 $ /01/2021 $46.15 $7.70 $14.75 $ /01/2017 $35.90 $11.50 $7.10 $ /01/2018 $36.90 $11.50 $7.10 $ /01/2018 $37.90 $11.50 $7.10 $ /01/2019 $38.90 $11.50 $7.10 $ /01/2019 $39.90 $11.50 $7.10 $ /01/2020 $40.90 $11.50 $7.10 $ /01/2020 $41.90 $11.50 $7.10 $ /01/2017 $37.75 $7.70 $14.75 $ /01/2018 $38.70 $7.70 $14.75 $ /01/2018 $39.65 $7.70 $14.75 $ /01/2019 $40.65 $7.70 $14.75 $ /01/2019 $41.65 $7.70 $14.75 $ /01/2020 $42.64 $7.70 $14.75 $ /01/2020 $43.62 $7.70 $14.75 $ /01/2021 $44.64 $7.70 $14.75 $ /01/2021 $45.65 $7.70 $14.75 $ /01/2017 $46.63 $10.50 $15.50 $ /01/2017 $46.63 $10.50 $15.50 $0.00 $55.05 $55.12 $55.24 $ $ $ $60.70 $61.65 $62.60 $63.60 $64.60 $65.59 $66.57 $67.59 $68.60 $54.50 $55.50 $56.50 $57.50 $58.50 $59.50 $60.50 $60.20 $61.15 $62.10 $63.10 $64.10 $65.09 $66.07 $67.09 $68.10 $72.63 $72.63 Page 5 of 37

6 BARCO-TYPE JUMPING TAMPER BLOCK PAVER, RAMMER / CURB SETTER BOILER MAKER BOILERMAKERS LOCAL 29 12/01/2017 $37.75 $7.70 $14.75 $ /01/2018 $38.70 $7.70 $14.75 $ /01/2018 $39.65 $7.70 $14.75 $ /01/2019 $40.65 $7.70 $14.75 $ /01/2019 $41.65 $7.70 $14.75 $ /01/2020 $42.64 $7.70 $14.75 $ /01/2020 $43.62 $7.70 $14.75 $ /01/2021 $44.64 $7.70 $14.75 $ /01/2021 $45.65 $7.70 $14.75 $ /01/2017 $38.25 $7.70 $14.75 $ /01/2018 $39.20 $7.70 $14.75 $ /01/2018 $40.15 $7.70 $14.75 $ /01/2019 $41.15 $7.70 $14.75 $ /01/2019 $42.15 $7.70 $14.75 $ /01/2020 $43.14 $7.70 $14.75 $ /01/2020 $44.12 $7.70 $14.75 $ /01/2021 $45.14 $7.70 $14.75 $ /01/2021 $46.15 $7.70 $14.75 $ /01/2017 $42.92 $6.97 $16.21 $0.00 $60.20 $61.15 $62.10 $63.10 $64.10 $65.09 $66.07 $67.09 $68.10 $60.70 $61.65 $62.60 $63.60 $64.60 $65.59 $66.57 $67.59 $68.60 $66.10 Apprentice - BOILERMAKER - Local 29-01/01/ $27.90 $6.97 $10.54 $0.00 $ $27.90 $6.97 $10.54 $0.00 $ $30.04 $6.97 $11.35 $0.00 $ $32.19 $6.97 $12.16 $0.00 $ $34.34 $6.97 $12.97 $0.00 $ $36.48 $6.97 $13.78 $0.00 $ $38.63 $6.97 $14.59 $0.00 $ $40.77 $6.97 $15.40 $0.00 $63.14 Apprentice to Journeyworker Ratio:1:5 Page 6 of 37

7 BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING) BRICKLAYERS LOCAL 3 (BOSTON) 02/01/2018 $52.06 $10.75 $20.03 $ /01/2018 $53.41 $10.75 $20.16 $ /01/2019 $54.05 $10.75 $20.16 $ /01/2019 $55.40 $10.75 $20.30 $ /01/2020 $56.04 $10.75 $20.30 $ /01/2020 $57.39 $10.75 $20.45 $ /01/2021 $58.03 $10.75 $20.45 $ /01/2021 $59.43 $10.75 $20.61 $ /01/2022 $60.02 $10.75 $20.61 $0.00 $82.84 $84.32 $84.96 $86.45 $87.09 $88.59 $89.23 $90.79 $91.38 Apprentice - BRICK/PLASTER/CEMENT MASON - Local 3 Boston - 02/01/2018 $26.03 $10.75 $20.03 $0.00 $56.81 $31.24 $10.75 $20.03 $0.00 $ $36.44 $10.75 $20.03 $0.00 $ $41.65 $10.75 $20.03 $0.00 $ $46.85 $10.75 $20.03 $0.00 $ /01/2018 $26.71 $10.75 $20.16 $0.00 $57.62 $32.05 $10.75 $20.16 $0.00 $ $37.39 $10.75 $20.16 $0.00 $ $42.73 $10.75 $20.16 $0.00 $ $48.07 $10.75 $20.16 $0.00 $78.98 Apprentice to Journeyworker Ratio:1:5 BULLDOZER/GRADER/SCRAPER CAISSON & UNDERPINNING BOTTOM MAN LABORERS - FOUNDATION AND MARINE CAISSON & UNDERPINNING LABORER LABORERS - FOUNDATION AND MARINE CAISSON & UNDERPINNING TOP MAN LABORERS - FOUNDATION AND MARINE 12/01/2017 $46.17 $10.50 $15.50 $ /01/2016 $37.45 $7.60 $14.35 $ /01/2016 $36.30 $7.60 $14.35 $ /01/2016 $36.30 $7.60 $14.35 $0.00 $72.17 $59.40 $58.25 $58.25 Page 7 of 37

8 CARBIDE CORE DRILL OPERATOR CARPENTER CARPENTERS -ZONE 1 (Metro Boston) 12/01/2017 $37.75 $7.70 $14.75 $ /01/2018 $38.70 $7.70 $14.75 $ /01/2018 $39.65 $7.70 $14.75 $ /01/2019 $40.65 $7.70 $14.75 $ /01/2019 $41.65 $7.70 $14.75 $ /01/2020 $42.64 $7.70 $14.75 $ /01/2020 $43.62 $7.70 $14.75 $ /01/2021 $44.64 $7.70 $14.75 $ /01/2021 $45.65 $7.70 $14.75 $ /01/2017 $46.43 $9.90 $17.50 $ /01/2018 $47.54 $9.90 $17.50 $ /01/2018 $48.69 $9.90 $17.50 $ /01/2019 $49.84 $9.90 $17.50 $0.00 $60.20 $61.15 $62.10 $63.10 $64.10 $65.09 $66.07 $67.09 $68.10 $73.83 $74.94 $76.09 $77.24 Apprentice - CARPENTER - Zone 1 Metro Boston - 09/01/2017 $23.22 $9.90 $1.73 $0.00 $34.85 $27.86 $9.90 $1.73 $0.00 $ $32.50 $9.90 $12.31 $0.00 $ $34.82 $9.90 $12.31 $0.00 $ $37.14 $9.90 $14.04 $0.00 $ $37.14 $9.90 $14.04 $0.00 $ $41.79 $9.90 $15.77 $0.00 $ $41.79 $9.90 $15.77 $0.00 $ /01/2018 $23.77 $9.90 $1.73 $0.00 $35.40 $28.52 $9.90 $1.73 $0.00 $ $33.28 $9.90 $12.31 $0.00 $ $35.66 $9.90 $12.31 $0.00 $ $38.03 $9.90 $14.04 $0.00 $ $38.03 $9.90 $14.04 $0.00 $ $42.79 $9.90 $15.77 $0.00 $ $42.79 $9.90 $15.77 $0.00 $68.46 % Indentured After 10/1/17; 45/45/55/55/70/70/80/80 Step 1&2 $32.52/ 3&4 $38.84/ 5&6 $56.44/ 7&8 $62.81 Apprentice to Journeyworker Ratio:1:5 Page 8 of 37

9 CEMENT MASONRY/PLASTERING BRICKLAYERS LOCAL 3 (BOSTON) 01/01/2018 $46.02 $12.35 $22.41 $ /01/2018 $47.41 $12.35 $22.41 $ /01/2019 $48.15 $12.35 $22.41 $ /01/2019 $49.54 $12.35 $22.41 $ /01/2020 $50.29 $12.35 $22.41 $0.30 $81.08 $82.47 $83.21 $84.60 $85.35 Apprentice - CEMENT MASONRY/PLASTERING - Eastern Mass (Boston) - 01/01/2018 $23.01 $12.35 $15.41 $0.00 $50.77 $27.61 $12.35 $17.41 $0.30 $ $29.91 $12.35 $18.41 $0.30 $ $32.21 $12.35 $19.41 $0.30 $ $34.52 $12.35 $20.41 $0.30 $ $36.82 $12.35 $21.41 $0.30 $ $41.42 $12.35 $22.41 $0.30 $ /01/2018 $23.71 $12.35 $15.41 $0.00 $51.47 $28.45 $12.35 $17.41 $0.30 $ $30.82 $12.35 $18.41 $0.30 $ $33.19 $12.35 $19.41 $0.30 $ $35.56 $12.35 $20.41 $0.30 $ $37.93 $12.35 $21.41 $0.30 $ $42.67 $12.35 $22.41 $0.30 $77.73 Steps 3,4 are 500 hrs. All other steps are 1,000 hrs. CHAIN SAW OPERATOR Apprentice to Journeyworker Ratio:1:3 CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES COMPRESSOR OPERATOR 12/01/2017 $37.75 $7.70 $14.75 $ /01/2018 $38.70 $7.70 $14.75 $ /01/2018 $39.65 $7.70 $14.75 $ /01/2019 $40.65 $7.70 $14.75 $ /01/2019 $41.65 $7.70 $14.75 $ /01/2020 $42.64 $7.70 $14.75 $ /01/2020 $43.62 $7.70 $14.75 $ /01/2021 $44.64 $7.70 $14.75 $ /01/2021 $45.65 $7.70 $14.75 $ /01/2017 $47.63 $10.50 $15.50 $ /01/2017 $31.80 $10.50 $15.50 $0.00 $60.20 $61.15 $62.10 $63.10 $64.10 $65.09 $66.07 $67.09 $68.10 $73.63 $57.80 Page 9 of 37

10 DELEADER (BRIDGE) PAINTERS LOCAL 35 - ZONE 1 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36 Apprentice - PAINTER Local 35 - BRIDGES/TANKS - 01/01/2017 $25.71 $7.85 $0.00 $0.00 $ $28.28 $7.85 $3.66 $0.00 $ $30.85 $7.85 $3.99 $0.00 $ $33.42 $7.85 $4.32 $0.00 $ $35.99 $7.85 $14.11 $0.00 $ $38.56 $7.85 $14.44 $0.00 $ $41.13 $7.85 $14.77 $0.00 $ $46.27 $7.85 $15.44 $0.00 $69.56 Steps are 750 hrs. DEMO: ADZEMAN Apprentice to Journeyworker Ratio:1:1 DEMO: BACKHOE/LOADER/HAMMER OPERATOR DEMO: BURNERS DEMO: CONCRETE CUTTER/SAWYER 12/01/2017 $37.65 $7.70 $14.75 $ /01/2018 $38.60 $7.70 $14.75 $ /01/2018 $39.55 $7.70 $14.75 $ /01/2019 $40.55 $7.70 $14.75 $ /01/2019 $41.55 $7.70 $14.75 $ /01/2017 $38.65 $7.70 $14.75 $ /01/2018 $39.60 $7.70 $14.75 $ /01/2018 $40.55 $7.70 $14.75 $ /01/2019 $41.55 $7.70 $14.75 $ /01/2019 $42.55 $7.70 $14.75 $ /01/2017 $38.40 $7.70 $14.75 $ /01/2018 $39.35 $7.70 $14.75 $ /01/2018 $40.30 $7.70 $14.75 $ /01/2019 $41.30 $7.70 $14.75 $ /01/2019 $42.30 $7.70 $14.75 $ /01/2017 $38.65 $7.70 $14.75 $ /01/2018 $39.60 $7.70 $14.75 $ /01/2018 $40.55 $7.70 $14.75 $ /01/2019 $41.55 $7.70 $14.75 $ /01/2019 $42.55 $7.70 $14.75 $0.00 $60.10 $61.05 $62.00 $63.00 $64.00 $61.10 $62.05 $63.00 $64.00 $65.00 $60.85 $61.80 $62.75 $63.75 $64.75 $61.10 $62.05 $63.00 $64.00 $65.00 Page 10 of 37

11 DEMO: JACKHAMMER OPERATOR DEMO: WRECKING LABORER DIRECTIONAL DRILL MACHINE OPERATOR DIVER PILE DRIVER LOCAL 56 (ZONE 1) For apprentice rates see "Apprentice- PILE DRIVER" DIVER TENDER PILE DRIVER LOCAL 56 (ZONE 1) For apprentice rates see "Apprentice- PILE DRIVER" DIVER TENDER (EFFLUENT) PILE DRIVER LOCAL 56 (ZONE 1) For apprentice rates see "Apprentice- PILE DRIVER" DIVER/SLURRY (EFFLUENT) PILE DRIVER LOCAL 56 (ZONE 1) For apprentice rates see "Apprentice- PILE DRIVER" DRAWBRIDGE OPERATOR (Construction) ELECTRICIANS LOCAL 103 For apprentice rates see "Apprentice- ELECTRICIAN" ELECTRICIAN ELECTRICIANS LOCAL /01/2017 $38.40 $7.70 $14.75 $ /01/2018 $39.35 $7.70 $14.75 $ /01/2018 $40.30 $7.70 $14.75 $ /01/2019 $41.30 $7.70 $14.75 $ /01/2019 $42.30 $7.70 $14.75 $ /01/2017 $37.65 $7.70 $14.75 $ /01/2018 $38.60 $7.70 $14.75 $ /01/2018 $39.55 $7.70 $14.75 $ /01/2019 $40.55 $7.70 $14.75 $ /01/2019 $41.55 $7.70 $14.75 $ /01/2017 $46.17 $10.50 $15.50 $ /01/2017 $61.98 $9.90 $21.15 $ /01/2018 $65.20 $9.90 $21.15 $ /01/2019 $68.52 $9.90 $21.15 $ /01/2017 $44.27 $9.90 $21.15 $ /01/2018 $46.57 $9.90 $21.15 $ /01/2019 $48.94 $9.90 $21.15 $ /01/2017 $66.41 $9.90 $21.15 $ /01/2018 $69.86 $9.90 $21.15 $ /01/2019 $73.41 $9.90 $21.15 $ /01/2017 $92.97 $9.90 $21.15 $ /01/2018 $97.80 $9.90 $21.15 $ /01/2019 $ $9.90 $21.15 $ /01/2017 $49.28 $13.00 $17.48 $ /01/2018 $50.15 $13.00 $17.85 $ /01/2018 $51.34 $13.00 $17.89 $ /01/2019 $52.53 $13.00 $17.93 $ /01/2017 $49.28 $13.00 $17.48 $ /01/2018 $50.15 $13.00 $17.85 $ /01/2018 $51.34 $13.00 $17.89 $ /01/2019 $52.53 $13.00 $17.93 $0.00 $60.85 $61.80 $62.75 $63.75 $64.75 $60.10 $61.05 $62.00 $63.00 $64.00 $72.17 $93.03 $96.25 $99.57 $75.32 $77.62 $79.99 $97.46 $ $ $ $ $ $79.76 $81.00 $82.23 $83.46 $79.76 $81.00 $82.23 $83.46 Page 11 of 37

12 Apprentice - ELECTRICIAN - Local /01/ $19.71 $13.00 $0.59 $0.00 $ $19.71 $13.00 $0.59 $0.00 $ $22.18 $13.00 $13.39 $0.00 $ $22.18 $13.00 $13.39 $0.00 $ $24.64 $13.00 $13.76 $0.00 $ $27.10 $13.00 $14.12 $0.00 $ $29.57 $13.00 $14.50 $0.00 $ $32.03 $13.00 $14.87 $0.00 $ $34.50 $13.00 $15.25 $0.00 $ $36.96 $13.00 $15.62 $0.00 $ /01/ $20.06 $13.00 $0.60 $0.00 $ $20.06 $13.00 $0.60 $0.00 $ $22.57 $13.00 $13.61 $0.00 $ $22.57 $13.00 $13.61 $0.00 $ $25.08 $13.00 $13.99 $0.00 $ $27.58 $13.00 $14.38 $0.00 $ $30.09 $13.00 $14.76 $0.00 $ $32.60 $13.00 $15.15 $0.00 $ $35.11 $13.00 $15.53 $0.00 $ $37.61 $13.00 $15.93 $0.00 $66.54 : App Prior 1/1/03; 30/35/40/45/50/55/65/70/75/80 Apprentice to Journeyworker Ratio:2:3*** ELEVATOR CONSTRUCTOR ELEVATOR CONSTRUCTORS LOCAL 4 01/01/2017 $55.86 $15.28 $15.71 $0.00 $86.85 Page 12 of 37

13 Apprentice - ELEVATOR CONSTRUCTOR - Local 4-01/01/2017 $27.93 $15.28 $0.00 $0.00 $ $30.72 $15.28 $15.71 $0.00 $ $36.31 $15.28 $15.71 $0.00 $ $39.10 $15.28 $15.71 $0.00 $ $44.69 $15.28 $15.71 $0.00 $75.68 Steps 1-2 are 6 mos.; Steps 3-5 are 1 year Apprentice to Journeyworker Ratio:1:1 ELEVATOR CONSTRUCTOR HELPER ELEVATOR CONSTRUCTORS LOCAL 4 For apprentice rates see "Apprentice - ELEVATOR CONSTRUCTOR" FENCE & GUARD RAIL ERECTOR FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY FIELD ENG.PARTY CHIEF-BLDG,SITE,HVY/HWY FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY FIRE ALARM INSTALLER ELECTRICIANS LOCAL 103 For apprentice rates see "Apprentice- ELECTRICIAN" FIRE ALARM REPAIR / MAINTENANCE / COMMISSIONINGELECTRICIANS LOCAL 103 For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHNICIAN" 01/01/2017 $39.10 $15.28 $15.71 $ /01/2017 $37.75 $7.70 $14.75 $ /01/2018 $38.70 $7.70 $14.75 $ /01/2018 $39.65 $7.70 $14.75 $ /01/2019 $40.65 $7.70 $14.75 $ /01/2019 $41.65 $7.70 $14.75 $ /01/2020 $42.64 $7.70 $14.75 $ /01/2020 $43.62 $7.70 $14.75 $ /01/2021 $44.64 $7.70 $14.75 $ /01/2021 $45.65 $7.70 $14.75 $ /01/2017 $42.88 $10.00 $15.25 $ /01/2018 $43.59 $10.00 $15.25 $ /01/2017 $44.34 $10.00 $15.25 $ /01/2018 $45.06 $10.00 $15.25 $ /01/2017 $22.83 $10.00 $15.25 $ /01/2018 $23.26 $10.00 $15.25 $ /01/2017 $49.28 $13.00 $17.48 $ /01/2018 $50.15 $13.00 $17.85 $ /01/2018 $51.34 $13.00 $17.89 $ /01/2019 $52.53 $13.00 $17.93 $ /01/2017 $36.96 $13.00 $15.62 $ /01/2018 $37.61 $13.00 $15.93 $ /01/2018 $38.51 $13.00 $15.96 $ /01/2019 $39.40 $13.00 $15.98 $0.00 $70.09 $60.20 $61.15 $62.10 $63.10 $64.10 $65.09 $66.07 $67.09 $68.10 $68.13 $68.84 $69.59 $70.31 $48.08 $48.51 $79.76 $81.00 $82.23 $83.46 $65.58 $66.54 $67.47 $68.38 Page 13 of 37

14 FIREMAN (ASST. ENGINEER) FLAGGER & SIGNALER FLOORCOVERER FLOORCOVERERS LOCAL 2168 ZONE I 12/01/2017 $38.57 $10.50 $15.50 $ /01/2017 $21.50 $7.70 $14.75 $ /01/2018 $21.50 $7.70 $14.75 $ /01/2018 $22.50 $7.70 $14.75 $ /01/2019 $22.50 $7.70 $14.75 $ /01/2019 $23.50 $7.70 $14.75 $ /01/2020 $23.50 $7.70 $14.75 $ /01/2020 $24.50 $7.70 $14.75 $ /01/2021 $24.50 $7.70 $14.75 $ /01/2021 $24.50 $7.70 $14.75 $ /01/2016 $42.13 $9.80 $17.62 $0.00 $64.57 $43.95 $43.95 $44.95 $44.95 $45.95 $45.95 $46.95 $46.95 $46.95 $69.55 Apprentice - FLOORCOVERER - Local 2168 Zone I - 03/01/2016 $21.07 $9.80 $1.79 $0.00 $ $23.17 $9.80 $1.79 $0.00 $ $25.28 $9.80 $12.25 $0.00 $ $27.38 $9.80 $12.25 $0.00 $ $29.49 $9.80 $14.04 $0.00 $ $31.60 $9.80 $14.04 $0.00 $ $33.70 $9.80 $15.83 $0.00 $ $35.81 $9.80 $15.83 $0.00 $61.44 Steps are 750 hrs. % After 09/1/17; 45/45/55/55/70/70/80/80 (1500hr Steps) Step 1&2 $30.55/ 3&4 $36.49/ 5&6 $53.33/ 7&8 $59.33 Apprentice to Journeyworker Ratio:1:1 FORK LIFT/CHERRY PICKER GENERATOR/LIGHTING PLANT/HEATERS GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS) GLAZIERS LOCAL 35 (ZONE 1) 12/01/2017 $46.63 $10.50 $15.50 $ /01/2017 $31.80 $10.50 $15.50 $ /01/2017 $46.70 $7.85 $16.10 $0.00 $72.63 $57.80 $70.65 Page 14 of 37

15 Apprentice - GLAZIER - Local 35 Zone 1-01/01/2017 $23.35 $7.85 $0.00 $0.00 $ $25.69 $7.85 $3.66 $0.00 $ $28.02 $7.85 $3.99 $0.00 $ $30.36 $7.85 $4.32 $0.00 $ $32.69 $7.85 $14.11 $0.00 $ $35.03 $7.85 $14.44 $0.00 $ $37.36 $7.85 $14.77 $0.00 $ $42.03 $7.85 $15.44 $0.00 $65.32 Steps are 750 hrs. Apprentice to Journeyworker Ratio:1:1 HOISTING ENGINEER/CRANES/GRADALLS 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63 Apprentice - OPERATING ENGINEERS - Local 4-12/01/ $25.65 $10.50 $0.00 $0.00 $36.15 $27.98 $10.50 $15.50 $0.00 $ $30.31 $10.50 $15.50 $0.00 $ $32.64 $10.50 $15.50 $0.00 $ $34.97 $10.50 $15.50 $0.00 $ $37.30 $10.50 $15.50 $0.00 $ $39.64 $10.50 $15.50 $0.00 $ $41.97 $10.50 $15.50 $0.00 $67.97 Apprentice to Journeyworker Ratio:1:6 HVAC (DUCTWORK) SHEETMETAL WORKERS LOCAL 17 - A For apprentice rates see "Apprentice- SHEET METAL WORKER" HVAC (ELECTRICAL CONTROLS) ELECTRICIANS LOCAL 103 For apprentice rates see "Apprentice- ELECTRICIAN" HVAC (TESTING AND BALANCING - AIR) SHEETMETAL WORKERS LOCAL 17 - A 02/01/2018 $44.11 $12.20 $24.12 $ /01/2017 $49.28 $13.00 $17.48 $ /01/2018 $50.15 $13.00 $17.85 $ /01/2018 $51.34 $13.00 $17.89 $ /01/2019 $52.53 $13.00 $17.93 $ /01/2018 $44.11 $12.20 $24.12 $2.41 $82.84 $79.76 $81.00 $82.23 $83.46 $82.84 Page 15 of 37

16 For apprentice rates see "Apprentice- SHEET METAL WORKER" HVAC (TESTING AND BALANCING -WATER) PIPEFITTERS LOCAL 537 For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" HVAC MECHANIC PIPEFITTERS LOCAL 537 For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" HYDRAULIC DRILLS INSULATOR (PIPES & TANKS) HEAT & FROST INSULATORS LOCAL 6 (BOSTON) 03/01/2017 $51.19 $9.70 $18.14 $ /01/2017 $51.19 $9.70 $18.14 $ /01/2017 $38.25 $7.70 $14.75 $ /01/2018 $39.20 $7.70 $14.75 $ /01/2018 $40.15 $7.70 $14.75 $ /01/2019 $41.15 $7.70 $14.75 $ /01/2019 $42.15 $7.70 $14.75 $ /01/2020 $43.14 $7.70 $14.75 $ /01/2020 $44.12 $7.70 $14.75 $ /01/2021 $45.14 $7.70 $14.75 $ /01/2021 $46.15 $7.70 $14.75 $ /01/2017 $47.09 $11.75 $14.20 $ /01/2018 $49.34 $11.75 $14.20 $ /01/2019 $51.84 $11.75 $14.20 $0.00 $79.03 $79.03 $60.70 $61.65 $62.60 $63.60 $64.60 $65.59 $66.57 $67.59 $68.60 $73.04 $75.29 $77.79 Apprentice - ASBESTOS INSULATOR (Pipes & Tanks) - Local 6 Boston - 09/01/2017 $23.55 $11.75 $10.45 $0.00 $45.75 $28.25 $11.75 $11.20 $0.00 $ $32.96 $11.75 $11.95 $0.00 $ $37.67 $11.75 $12.70 $0.00 $ /01/2018 $24.67 $11.75 $10.45 $0.00 $46.87 $29.60 $11.75 $11.20 $0.00 $ $34.54 $11.75 $11.95 $0.00 $ $39.47 $11.75 $12.70 $0.00 $63.92 Steps are 1 year Apprentice to Journeyworker Ratio:1:4 IRONWORKER/WELDER IRONWORKERS LOCAL 7 (BOSTON AREA) 03/16/2017 $44.65 $7.80 $20.85 $0.00 $73.30 Page 16 of 37

17 Apprentice - IRONWORKER - Local 7 Boston - 03/16/ $26.79 $7.80 $20.85 $0.00 $ $31.26 $7.80 $20.85 $0.00 $ $33.49 $7.80 $20.85 $0.00 $ $35.72 $7.80 $20.85 $0.00 $ $37.95 $7.80 $20.85 $0.00 $ $40.19 $7.80 $20.85 $0.00 $68.84 ** Structural 1:6; Ornamental 1:4 Apprentice to Journeyworker Ratio:** JACKHAMMER & PAVING BREAKER OPERATOR LABORER 12/01/2017 $37.75 $7.70 $14.75 $ /01/2018 $38.70 $7.70 $14.75 $ /01/2018 $39.65 $7.70 $14.75 $ /01/2019 $40.65 $7.70 $14.75 $ /01/2019 $41.65 $7.70 $14.75 $ /01/2020 $42.64 $7.70 $14.75 $ /01/2020 $43.62 $7.70 $14.75 $ /01/2021 $44.64 $7.70 $14.75 $ /01/2021 $45.65 $7.70 $14.75 $ /01/2017 $37.50 $7.70 $14.75 $ /01/2018 $38.45 $7.70 $14.75 $ /01/2018 $39.40 $7.70 $14.75 $ /01/2019 $40.40 $7.70 $14.75 $ /01/2019 $41.40 $7.70 $14.75 $ /01/2020 $42.39 $7.70 $14.75 $ /01/2020 $43.37 $7.70 $14.75 $ /01/2021 $44.39 $7.70 $14.75 $ /01/2021 $45.40 $7.70 $14.75 $0.00 $60.20 $61.15 $62.10 $63.10 $64.10 $65.09 $66.07 $67.09 $68.10 $59.95 $60.90 $61.85 $62.85 $63.85 $64.84 $65.82 $66.84 $67.85 Page 17 of 37

18 Apprentice - LABORER - Zone 1-12/01/ $22.50 $7.70 $14.75 $0.00 $ $26.25 $7.70 $14.75 $0.00 $ $30.00 $7.70 $14.75 $0.00 $ $33.75 $7.70 $14.75 $0.00 $ /01/ $23.07 $7.70 $14.75 $0.00 $ $26.92 $7.70 $14.75 $0.00 $ $30.76 $7.70 $14.75 $0.00 $ $34.61 $7.70 $14.75 $0.00 $57.06 Apprentice to Journeyworker Ratio:1:5 LABORER: CARPENTER TENDER LABORER: CEMENT FINISHER TENDER LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2017 $37.50 $7.70 $14.75 $ /01/2018 $38.45 $7.70 $14.75 $ /01/2018 $39.40 $7.70 $14.75 $ /01/2019 $40.40 $7.70 $14.75 $ /01/2019 $41.40 $7.70 $14.75 $ /01/2020 $42.39 $7.70 $14.75 $ /01/2020 $43.37 $7.70 $14.75 $ /01/2021 $44.39 $7.70 $14.75 $ /01/2021 $45.40 $7.70 $14.75 $ /01/2017 $37.50 $7.70 $14.75 $ /01/2018 $38.45 $7.70 $14.75 $ /01/2018 $39.40 $7.70 $14.75 $ /01/2019 $40.40 $7.70 $14.75 $ /01/2019 $41.40 $7.70 $14.75 $ /01/2020 $42.39 $7.70 $14.75 $ /01/2020 $43.37 $7.70 $14.75 $ /01/2021 $44.39 $7.70 $14.75 $ /01/2021 $45.40 $7.70 $14.75 $ /01/2017 $37.65 $7.70 $14.75 $ /01/2018 $38.60 $7.70 $14.75 $ /01/2018 $39.55 $7.70 $14.75 $ /01/2019 $40.55 $7.70 $14.75 $ /01/2019 $41.55 $7.70 $14.75 $0.00 $59.95 $60.90 $61.85 $62.85 $63.85 $64.84 $65.82 $66.84 $67.85 $59.95 $60.90 $61.85 $62.85 $63.85 $64.84 $65.82 $66.84 $67.85 $60.10 $61.05 $62.00 $63.00 $64.00 Page 18 of 37

19 LABORER: MASON TENDER LABORER: MULTI-TRADE TENDER LABORER: TREE REMOVER 12/01/2017 $37.75 $7.70 $14.75 $ /01/2018 $38.70 $7.70 $14.75 $ /01/2018 $39.65 $7.70 $14.75 $ /01/2019 $40.65 $7.70 $14.75 $ /01/2019 $41.65 $7.70 $14.75 $ /01/2020 $42.64 $7.70 $14.75 $ /01/2020 $43.62 $7.70 $14.75 $ /01/2021 $44.64 $7.70 $14.75 $ /01/2021 $45.65 $7.70 $14.75 $ /01/2017 $37.50 $7.70 $14.75 $ /01/2018 $38.45 $7.70 $14.75 $ /01/2018 $39.40 $7.70 $14.75 $ /01/2019 $40.40 $7.70 $14.75 $ /01/2019 $41.40 $7.70 $14.75 $ /01/2020 $42.39 $7.70 $14.75 $ /01/2020 $43.37 $7.70 $14.75 $ /01/2021 $44.39 $7.70 $14.75 $ /01/2021 $45.40 $7.70 $14.75 $ /01/2017 $37.50 $7.70 $14.75 $ /01/2018 $38.45 $7.70 $14.75 $ /01/2018 $39.40 $7.70 $14.75 $ /01/2019 $40.40 $7.70 $14.75 $ /01/2019 $41.40 $7.70 $14.75 $ /01/2020 $42.39 $7.70 $14.75 $ /01/2020 $43.37 $7.70 $14.75 $ /01/2021 $44.39 $7.70 $14.75 $ /01/2021 $45.40 $7.70 $14.75 $0.00 This classification applies to all tree work associated with the removal of standing trees, and trimming and removal of branches and limbs when the work is not done for a utility company for the purpose of operation, maintenance or repair of utility company equipment. LASER BEAM OPERATOR 12/01/2017 $37.75 $7.70 $14.75 $ /01/2018 $38.70 $7.70 $14.75 $ /01/2018 $39.65 $7.70 $14.75 $ /01/2019 $40.65 $7.70 $14.75 $ /01/2019 $41.65 $7.70 $14.75 $ /01/2020 $42.64 $7.70 $14.75 $ /01/2020 $43.62 $7.70 $14.75 $ /01/2021 $44.64 $7.70 $14.75 $ /01/2021 $45.65 $7.70 $14.75 $0.00 $60.20 $61.15 $62.10 $63.10 $64.10 $65.09 $66.07 $67.09 $68.10 $59.95 $60.90 $61.85 $62.85 $63.85 $64.84 $65.82 $66.84 $67.85 $59.95 $60.90 $61.85 $62.85 $63.85 $64.84 $65.82 $66.84 $67.85 $60.20 $61.15 $62.10 $63.10 $64.10 $65.09 $66.07 $67.09 $68.10 Page 19 of 37

20 MARBLE & TILE FINISHERS BRICKLAYERS LOCAL 3 - MARBLE & TILE 02/01/2018 $39.82 $10.75 $18.34 $ /01/2018 $40.90 $10.75 $18.47 $ /01/2019 $41.41 $10.75 $18.47 $ /01/2019 $42.49 $10.75 $18.61 $ /01/2020 $43.00 $10.75 $18.61 $ /01/2020 $44.08 $10.75 $18.76 $ /01/2021 $44.59 $10.75 $18.76 $ /01/2021 $45.71 $10.75 $18.92 $ /01/2022 $46.18 $10.75 $18.92 $0.00 $68.91 $70.12 $70.63 $71.85 $72.36 $73.59 $74.10 $75.38 $75.85 Apprentice - MARBLE & TILE FINISHER - Local 3 Marble & Tile - 02/01/2018 $19.91 $10.75 $18.34 $0.00 $49.00 $23.89 $10.75 $18.34 $0.00 $ $27.87 $10.75 $18.34 $0.00 $ $31.86 $10.75 $18.34 $0.00 $ $35.84 $10.75 $18.34 $0.00 $ /01/2018 $20.45 $10.75 $18.47 $0.00 $49.67 $24.54 $10.75 $18.47 $0.00 $ $28.63 $10.75 $18.47 $0.00 $ $32.72 $10.75 $18.47 $0.00 $ $36.81 $10.75 $18.47 $0.00 $66.03 Apprentice to Journeyworker Ratio:1:3 MARBLE MASONS,TILELAYERS & TERRAZZO MECH BRICKLAYERS LOCAL 3 - MARBLE & TILE 02/01/2018 $52.10 $10.75 $20.03 $ /01/2018 $53.45 $10.75 $20.16 $ /01/2019 $54.07 $10.75 $20.16 $ /01/2019 $55.42 $10.75 $20.30 $ /01/2020 $56.05 $10.75 $20.30 $ /01/2020 $57.40 $10.75 $20.45 $ /01/2021 $58.04 $10.75 $20.45 $ /01/2021 $59.44 $10.75 $20.61 $ /01/2022 $60.01 $10.75 $20.61 $0.00 $82.88 $84.36 $84.98 $86.47 $87.10 $88.60 $89.24 $90.80 $91.37 Page 20 of 37

21 Apprentice - MARBLE-TILE-TERRAZZO MECHANIC - Local 3 Marble & Tile - 02/01/2018 $26.05 $10.75 $20.03 $0.00 $56.83 $31.26 $10.75 $20.03 $0.00 $ $36.47 $10.75 $20.03 $0.00 $ $41.68 $10.75 $20.03 $0.00 $ $46.89 $10.75 $20.03 $0.00 $ /01/2018 $26.73 $10.75 $20.16 $0.00 $57.64 $32.07 $10.75 $20.16 $0.00 $ $37.42 $10.75 $20.16 $0.00 $ $42.76 $10.75 $20.16 $0.00 $ $48.11 $10.75 $20.16 $0.00 $79.02 Apprentice to Journeyworker Ratio:1:5 MECH. SWEEPER OPERATOR (ON CONST. SITES) MECHANICS MAINTENANCE MILLWRIGHT (Zone 1) MILLWRIGHTS LOCAL Zone 1 12/01/2017 $46.17 $10.50 $15.50 $ /01/2017 $46.17 $10.50 $15.50 $ /01/2017 $39.52 $9.90 $18.50 $ /01/2018 $40.42 $9.90 $18.50 $ /01/2018 $41.32 $9.90 $18.50 $ /01/2019 $42.22 $9.90 $18.50 $0.00 $72.17 $72.17 $67.92 $68.82 $69.72 $70.62 Page 21 of 37

22 Apprentice - MILLWRIGHT - Local 1121 Zone 1-10/01/ $21.74 $9.90 $5.31 $0.00 $ $25.69 $9.90 $15.13 $0.00 $ $29.64 $9.90 $16.10 $0.00 $ $33.59 $9.90 $17.06 $0.00 $ /01/ $22.23 $9.90 $5.31 $0.00 $ $26.27 $9.90 $15.13 $0.00 $ $30.32 $9.90 $16.10 $0.00 $ $34.36 $9.90 $17.06 $0.00 $61.32 Steps are 2,000 hours Apprentice to Journeyworker Ratio:1:5 MORTAR MIXER OILER (OTHER THAN TRUCK CRANES,GRADALLS) OILER (TRUCK CRANES, GRADALLS) OTHER POWER DRIVEN EQUIPMENT - CLASS II PAINTER (BRIDGES/TANKS) PAINTERS LOCAL 35 - ZONE 1 12/01/2017 $37.75 $7.70 $14.75 $ /01/2018 $38.70 $7.70 $14.75 $ /01/2018 $39.65 $7.70 $14.75 $ /01/2019 $40.65 $7.70 $14.75 $ /01/2019 $41.65 $7.70 $14.75 $ /01/2020 $42.64 $7.70 $14.75 $ /01/2020 $43.62 $7.70 $14.75 $ /01/2021 $44.64 $7.70 $14.75 $ /01/2021 $45.65 $7.70 $14.75 $ /01/2017 $23.24 $10.50 $15.50 $ /01/2017 $27.40 $10.50 $15.50 $ /01/2017 $46.17 $10.50 $15.50 $ /01/2017 $51.41 $7.85 $16.10 $0.00 $60.20 $61.15 $62.10 $63.10 $64.10 $65.09 $66.07 $67.09 $68.10 $49.24 $53.40 $72.17 $75.36 Page 22 of 37

23 Apprentice - PAINTER Local 35 - BRIDGES/TANKS - 01/01/2017 $25.71 $7.85 $0.00 $0.00 $ $28.28 $7.85 $3.66 $0.00 $ $30.85 $7.85 $3.99 $0.00 $ $33.42 $7.85 $4.32 $0.00 $ $35.99 $7.85 $14.11 $0.00 $ $38.56 $7.85 $14.44 $0.00 $ $41.13 $7.85 $14.77 $0.00 $ $46.27 $7.85 $15.44 $0.00 $69.56 Steps are 750 hrs. Apprentice to Journeyworker Ratio:1:1 PAINTER (SPRAY OR SANDBLAST, NEW) * * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.painters LOCAL 35 - ZONE 1 01/01/2017 $48.10 $7.85 $16.10 $0.00 $72.05 Apprentice - PAINTER Local 35 Zone 1 - Spray/Sandblast - New - 01/01/2017 $24.05 $7.85 $0.00 $0.00 $ $26.46 $7.85 $3.66 $0.00 $ $28.86 $7.85 $3.99 $0.00 $ $31.27 $7.85 $4.32 $0.00 $ $33.67 $7.85 $14.11 $0.00 $ $36.08 $7.85 $14.44 $0.00 $ $38.48 $7.85 $14.77 $0.00 $ $43.29 $7.85 $15.44 $0.00 $66.58 Steps are 750 hrs. Apprentice to Journeyworker Ratio:1:1 PAINTER (SPRAY OR SANDBLAST, REPAINT) PAINTERS LOCAL 35 - ZONE 1 01/01/2017 $46.16 $7.85 $16.10 $0.00 $70.11 Page 23 of 37

24 Apprentice - PAINTER Local 35 Zone 1 - Spray/Sandblast - Repaint - 01/01/2017 $23.08 $7.85 $0.00 $0.00 $ $25.39 $7.85 $3.66 $0.00 $ $27.70 $7.85 $3.99 $0.00 $ $30.00 $7.85 $4.32 $0.00 $ $32.31 $7.85 $14.11 $0.00 $ $34.62 $7.85 $14.44 $0.00 $ $36.93 $7.85 $14.77 $0.00 $ $41.54 $7.85 $15.44 $0.00 $64.83 Steps are 750 hrs. Apprentice to Journeyworker Ratio:1:1 PAINTER (TRAFFIC MARKINGS) For Apprentice rates see "Apprentice- LABORER" PAINTER / TAPER (BRUSH, NEW) * * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.painters LOCAL 35 - ZONE 1 12/01/2017 $37.50 $7.70 $14.75 $ /01/2018 $38.45 $7.70 $14.75 $ /01/2018 $39.40 $7.70 $14.75 $ /01/2019 $40.40 $7.70 $14.75 $ /01/2019 $41.40 $7.70 $14.75 $ /01/2020 $42.39 $7.70 $14.75 $ /01/2020 $43.37 $7.70 $14.75 $ /01/2021 $44.39 $7.70 $14.75 $ /01/2021 $45.40 $7.70 $14.75 $ /01/2017 $46.70 $7.85 $16.10 $0.00 $59.95 $60.90 $61.85 $62.85 $63.85 $64.84 $65.82 $66.84 $67.85 $70.65 Page 24 of 37

25 Apprentice - PAINTER - Local 35 Zone 1 - BRUSH NEW - 01/01/2017 $23.35 $7.85 $0.00 $0.00 $ $25.69 $7.85 $3.66 $0.00 $ $28.02 $7.85 $3.99 $0.00 $ $30.36 $7.85 $4.32 $0.00 $ $32.69 $7.85 $14.11 $0.00 $ $35.03 $7.85 $14.44 $0.00 $ $37.36 $7.85 $14.77 $0.00 $ $42.03 $7.85 $15.44 $0.00 $65.32 Steps are 750 hrs. Apprentice to Journeyworker Ratio:1:1 PAINTER / TAPER (BRUSH, REPAINT) PAINTERS LOCAL 35 - ZONE 1 01/01/2017 $44.76 $7.85 $16.10 $0.00 $68.71 Apprentice - PAINTER Local 35 Zone 1 - BRUSH REPAINT - 01/01/2017 $22.38 $7.85 $0.00 $0.00 $ $24.62 $7.85 $3.66 $0.00 $ $26.86 $7.85 $3.99 $0.00 $ $29.09 $7.85 $4.32 $0.00 $ $31.33 $7.85 $14.11 $0.00 $ $33.57 $7.85 $14.44 $0.00 $ $35.81 $7.85 $14.77 $0.00 $ $40.28 $7.85 $15.44 $0.00 $63.57 Steps are 750 hrs. Apprentice to Journeyworker Ratio:1:1 PANEL & PICKUP TRUCKS DRIVER TEAMSTERS JOINT COUNCIL NO. 10 ZONE A PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND DECK) PILE DRIVER LOCAL 56 (ZONE 1) For apprentice rates see "Apprentice- PILE DRIVER" PILE DRIVER PILE DRIVER LOCAL 56 (ZONE 1) 12/01/2016 $33.08 $10.91 $10.89 $ /01/2017 $44.27 $9.90 $21.15 $ /01/2018 $46.57 $9.90 $21.15 $ /01/2019 $48.94 $9.90 $21.15 $ /01/2017 $44.27 $9.90 $21.15 $ /01/2018 $46.57 $9.90 $21.15 $ /01/2019 $48.94 $9.90 $21.15 $0.00 $54.88 $75.32 $77.62 $79.99 $75.32 $77.62 $79.99 Page 25 of 37

26 Apprentice - PILE DRIVER - Local 56 Zone 1-08/01/2017 $22.14 $9.90 $21.15 $0.00 $53.19 $26.56 $9.90 $21.15 $0.00 $ $30.99 $9.90 $21.15 $0.00 $ $33.20 $9.90 $21.15 $0.00 $ $35.42 $9.90 $21.15 $0.00 $ $35.42 $9.90 $21.15 $0.00 $ $39.84 $9.90 $21.15 $0.00 $ $39.84 $9.90 $21.15 $0.00 $ /01/2018 $23.29 $9.90 $21.15 $0.00 $54.34 $27.94 $9.90 $21.15 $0.00 $ $32.60 $9.90 $21.15 $0.00 $ $34.93 $9.90 $21.15 $0.00 $ $37.26 $9.90 $21.15 $0.00 $ $37.26 $9.90 $21.15 $0.00 $ $41.91 $9.90 $21.15 $0.00 $ $41.91 $9.90 $21.15 $0.00 $72.96 Apprentice to Journeyworker Ratio:1:5 PIPEFITTER & STEAMFITTER PIPEFITTERS LOCAL /01/2017 $51.19 $9.70 $18.14 $0.00 $79.03 Apprentice - PIPEFITTER - Local /01/ $20.48 $9.70 $7.50 $0.00 $ $23.04 $9.70 $18.14 $0.00 $ $30.71 $9.70 $18.14 $0.00 $ $35.83 $9.70 $18.14 $0.00 $ $40.95 $9.70 $18.14 $0.00 $68.79 ** 1:3; 3:15; 1:10 thereafter / Steps are 1 yr. Refrig/AC Mechanic **1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max) Apprentice to Journeyworker Ratio:** Page 26 of 37

27 PIPELAYER PLUMBERS & GASFITTERS PLUMBERS & GASFITTERS LOCAL 12 12/01/2017 $37.75 $7.70 $14.75 $ /01/2018 $38.70 $7.70 $14.75 $ /01/2018 $39.65 $7.70 $14.75 $ /01/2019 $40.65 $7.70 $14.75 $ /01/2019 $41.65 $7.70 $14.75 $ /01/2020 $42.64 $7.70 $14.75 $ /01/2020 $43.62 $7.70 $14.75 $ /01/2021 $44.64 $7.70 $14.75 $ /01/2021 $45.65 $7.70 $14.75 $ /01/2017 $53.94 $11.57 $15.26 $ /01/2018 $55.44 $11.57 $15.26 $ /01/2018 $56.94 $11.57 $15.26 $ /01/2019 $58.44 $11.57 $15.26 $ /01/2019 $59.94 $11.57 $15.26 $ /01/2020 $61.44 $11.57 $15.26 $ /01/2020 $62.94 $11.57 $15.26 $ /01/2021 $64.44 $11.57 $15.26 $0.00 $60.20 $61.15 $62.10 $63.10 $64.10 $65.09 $66.07 $67.09 $68.10 $80.77 $82.27 $83.77 $85.27 $86.77 $88.27 $89.77 $91.27 Apprentice - PLUMBER/GASFITTER - Local 12-09/01/ $18.88 $11.57 $5.54 $0.00 $ $21.58 $11.57 $6.29 $0.00 $ $29.67 $11.57 $8.53 $0.00 $ $35.06 $11.57 $10.03 $0.00 $ $40.46 $11.57 $11.52 $0.00 $ /01/ $19.40 $11.57 $5.54 $0.00 $ $22.18 $11.57 $6.29 $0.00 $ $30.49 $11.57 $8.53 $0.00 $ $36.04 $11.57 $10.03 $0.00 $ $41.58 $11.57 $11.52 $0.00 $64.67 ** 1:2; 2:6; 3:10; 4:14; 5:19/Steps are 1 yr Step4 with lic$60.10 Step5 with lic$66.99 Apprentice to Journeyworker Ratio:** PNEUMATIC CONTROLS (TEMP.) PIPEFITTERS LOCAL 537 For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" 03/01/2017 $51.19 $9.70 $18.14 $0.00 $79.03 Page 27 of 37

28 PNEUMATIC DRILL/TOOL OPERATOR POWDERMAN & BLASTER POWER SHOVEL/DERRICK/TRENCHING MACHINE PUMP OPERATOR (CONCRETE) PUMP OPERATOR (DEWATERING, OTHER) READY MIX CONCRETE DRIVERS after 4/30/10 (Drivers Hired After 4/30/2010)TEAMSTERS LOCAL 25a READY-MIX CONCRETE DRIVER TEAMSTERS LOCAL 25a RECLAIMERS RESIDENTIAL WOOD FRAME (All Other Work) CARPENTERS -ZONE 1 (Residential Wood) 12/01/2017 $37.75 $7.70 $14.75 $ /01/2018 $38.70 $7.70 $14.75 $ /01/2018 $39.65 $7.70 $14.75 $ /01/2019 $40.65 $7.70 $14.75 $ /01/2019 $41.65 $7.70 $14.75 $ /01/2020 $42.64 $7.70 $14.75 $ /01/2020 $43.62 $7.70 $14.75 $ /01/2021 $44.64 $7.70 $14.75 $ /01/2021 $45.65 $7.70 $14.75 $ /01/2017 $38.50 $7.70 $14.75 $ /01/2018 $39.45 $7.70 $14.75 $ /01/2018 $40.40 $7.70 $14.75 $ /01/2019 $41.40 $7.70 $14.75 $ /01/2019 $42.40 $7.70 $14.75 $ /01/2020 $43.39 $7.70 $14.75 $ /01/2020 $44.37 $7.70 $14.75 $ /01/2021 $45.39 $7.70 $14.75 $ /01/2021 $46.40 $7.70 $14.75 $ /01/2017 $46.63 $10.50 $15.50 $ /01/2017 $46.63 $10.50 $15.50 $ /01/2017 $31.80 $10.50 $15.50 $ /01/2017 $28.18 $8.48 $9.72 $ /01/2017 $31.44 $8.48 $9.72 $ /01/2017 $46.17 $10.50 $15.50 $ /01/2016 $43.92 $9.80 $16.82 $0.00 $60.20 $61.15 $62.10 $63.10 $64.10 $65.09 $66.07 $67.09 $68.10 $60.95 $61.90 $62.85 $63.85 $64.85 $65.84 $66.82 $67.84 $68.85 $72.63 $72.63 $57.80 $46.38 $49.64 $72.17 $70.54 RESIDENTIAL WOOD FRAME CARPENTER ** ** The Residential Wood Frame Carpenter classification applies only to the construction of new, wood frame residences that do not exceed four stories including the basement.carpenters -ZONE 1 (Residential Wood) 10/01/2017 $31.07 $7.07 $7.86 $ /01/2018 $31.54 $7.07 $7.86 $ /01/2018 $32.01 $7.07 $7.86 $ /01/2019 $32.49 $7.07 $7.86 $ /01/2019 $32.97 $7.07 $7.86 $0.00 As of 9/1/09 Carpentry work on wood-frame residential WEATHERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate. $46.00 $46.47 $46.94 $47.42 $47.90 Page 28 of 37

29 Apprentice - CARPENTER (Residential Wood Frame) - Zone 1-10/01/ $18.64 $7.07 $0.00 $0.00 $25.71 $18.64 $7.07 $0.00 $0.00 $ $20.20 $7.07 $7.86 $0.00 $ $21.75 $7.07 $7.86 $0.00 $ $23.30 $7.07 $7.86 $0.00 $ $24.86 $7.07 $7.86 $0.00 $ $26.41 $7.07 $7.86 $0.00 $ $27.96 $7.07 $7.86 $0.00 $ /01/ $18.92 $7.07 $0.00 $0.00 $25.99 $18.92 $7.07 $0.00 $0.00 $ $20.50 $7.07 $7.86 $0.00 $ $22.08 $7.07 $7.86 $0.00 $ $23.66 $7.07 $7.86 $0.00 $ $25.23 $7.07 $7.86 $0.00 $ $26.81 $7.07 $7.86 $0.00 $ $28.39 $7.07 $7.86 $0.00 $43.32 % Indentured After 10/1/17; 45/45/55/55/70/70/80/80 Step 1&2 $21.05/ 3&4 $28.91/ 5&6 $36.68/ 7&8 $39.79 Apprentice to Journeyworker Ratio:1:5 RIDE-ON MOTORIZED BUGGY OPERATOR ROLLER/SPREADER/MULCHING MACHINE ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg) ROOFERS LOCAL 33 12/01/2017 $37.75 $7.70 $14.75 $ /01/2018 $38.70 $7.70 $14.75 $ /01/2018 $39.65 $7.70 $14.75 $ /01/2019 $40.65 $7.70 $14.75 $ /01/2019 $41.65 $7.70 $14.75 $ /01/2020 $42.64 $7.70 $14.75 $ /01/2020 $43.62 $7.70 $14.75 $ /01/2021 $44.64 $7.70 $14.75 $ /01/2021 $45.65 $7.70 $14.75 $ /01/2017 $46.17 $10.50 $15.50 $ /01/2018 $42.36 $11.35 $14.80 $ /01/2018 $43.46 $11.35 $14.80 $ /01/2019 $44.61 $11.35 $14.80 $0.00 $60.20 $61.15 $62.10 $63.10 $64.10 $65.09 $66.07 $67.09 $68.10 $72.17 $68.51 $69.61 $70.76 Page 29 of 37

30 Apprentice - ROOFER - Local 33-02/01/2018 $21.18 $11.35 $3.44 $0.00 $35.97 $25.42 $11.35 $14.80 $0.00 $ $27.53 $11.35 $14.80 $0.00 $ $31.77 $11.35 $14.80 $0.00 $ $36.01 $11.35 $14.80 $0.00 $ /01/2018 $21.73 $11.35 $3.44 $0.00 $36.52 $26.08 $11.35 $14.80 $0.00 $ $28.25 $11.35 $14.80 $0.00 $ $32.60 $11.35 $14.80 $0.00 $ $36.94 $11.35 $14.80 $0.00 $63.09 ** 1:5, 2:6-10, the 1:10; Reroofing: 1:4, then 1:1 Step 1 is 2000 hrs.; Steps 2-5 are 1000 hrs. (Hot Pitch Mechanics' receive $1.00 hr. above ROOFER) Apprentice to Journeyworker Ratio:** ROOFER SLATE / TILE / PRECAST CONCRETE ROOFERS LOCAL 33 For apprentice rates see "Apprentice- ROOFER" SHEETMETAL WORKER SHEETMETAL WORKERS LOCAL 17 - A 02/01/2018 $42.61 $11.35 $14.80 $ /01/2018 $43.71 $11.35 $14.80 $ /01/2019 $44.86 $11.35 $14.80 $ /01/2018 $44.11 $12.20 $24.12 $2.41 $68.76 $69.86 $71.01 $82.84 Page 30 of 37

31 Apprentice - SHEET METAL WORKER - Local 17-A - 02/01/ $17.64 $12.20 $5.61 $0.00 $ $17.64 $12.20 $5.61 $0.00 $ $19.85 $12.20 $10.85 $1.29 $ $19.85 $12.20 $10.85 $1.29 $ $22.06 $12.20 $11.80 $1.38 $ $22.06 $12.20 $12.05 $1.39 $ $26.47 $12.20 $13.70 $1.57 $ $28.67 $12.20 $14.65 $1.67 $ $33.08 $12.20 $16.56 $1.86 $ $37.49 $12.20 $17.96 $2.03 $69.68 Steps are 6 mos. SIGN ERECTOR PAINTERS LOCAL 35 - ZONE 1 Apprentice to Journeyworker Ratio:1:4 06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93 Apprentice - SIGN ERECTOR - Local 35 Zone 1-06/01/2013 $12.91 $7.07 $0.00 $0.00 $ $14.20 $7.07 $2.45 $0.00 $ $15.49 $7.07 $2.45 $0.00 $ $16.78 $7.07 $2.45 $0.00 $ $18.07 $7.07 $7.05 $0.00 $ $19.36 $7.07 $7.05 $0.00 $ $20.65 $7.07 $7.05 $0.00 $ $21.94 $7.07 $7.05 $0.00 $ $23.23 $7.07 $7.05 $0.00 $37.35 Steps are 4 mos. Apprentice to Journeyworker Ratio:1:1 SPECIALIZED EARTH MOVING EQUIP < 35 TONS TEAMSTERS JOINT COUNCIL NO. 10 ZONE A SPECIALIZED EARTH MOVING EQUIP > 35 TONS TEAMSTERS JOINT COUNCIL NO. 10 ZONE A 12/01/2016 $33.54 $10.91 $10.89 $ /01/2016 $33.83 $10.91 $10.89 $0.00 $55.34 $55.63 Page 31 of 37

32 SPRINKLER FITTER SPRINKLER FITTERS LOCAL (Section A) Zone 1 01/01/2018 $57.03 $9.12 $17.40 $ /01/2018 $58.53 $9.12 $17.40 $ /01/2018 $60.03 $9.12 $17.40 $ /01/2019 $60.03 $9.47 $17.60 $ /01/2019 $61.53 $9.47 $17.60 $ /01/2019 $63.03 $9.47 $17.60 $ /01/2020 $64.53 $9.47 $17.60 $ /01/2020 $66.03 $9.47 $17.60 $ /01/2021 $67.53 $9.47 $17.60 $0.00 $83.55 $85.05 $86.55 $87.10 $88.60 $90.10 $91.60 $93.10 $94.60 Apprentice - SPRINKLER FITTER - Local 550 (Section A) Zone 1-01/01/ $19.96 $9.12 $8.90 $0.00 $ $22.81 $9.12 $8.90 $0.00 $ $25.66 $9.12 $8.90 $0.00 $ $28.52 $9.12 $8.90 $0.00 $ $31.37 $9.12 $8.90 $0.00 $ $34.22 $9.12 $10.40 $0.00 $ $37.07 $9.12 $10.40 $0.00 $ $39.92 $9.12 $10.40 $0.00 $ $42.77 $9.12 $10.40 $0.00 $ $45.62 $9.12 $10.40 $0.00 $ /01/ $20.49 $9.12 $8.90 $0.00 $ $23.41 $9.12 $8.90 $0.00 $ $26.34 $9.12 $8.90 $0.00 $ $29.27 $9.12 $8.90 $0.00 $ $32.19 $9.12 $8.90 $0.00 $ $35.12 $9.12 $10.40 $0.00 $ $38.04 $9.12 $10.40 $0.00 $ $40.97 $9.12 $10.40 $0.00 $ $43.90 $9.12 $10.40 $0.00 $ $46.82 $9.12 $10.40 $0.00 $66.34 Apprentice entered prior 9/30/10: 40/45/50/55/60/65/70/75/80/85 Steps are 850 hours Apprentice to Journeyworker Ratio:1:3 STEAM BOILER OPERATOR TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN 12/01/2017 $46.17 $10.50 $15.50 $ /01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 $72.17 Page 32 of 37

33 TELECOMMUNICATION TECHNICIAN ELECTRICIANS LOCAL /01/2017 $36.96 $13.00 $15.62 $ /01/2018 $37.61 $13.00 $15.93 $ /01/2018 $38.51 $13.00 $15.96 $ /01/2019 $39.40 $13.00 $15.98 $0.00 $65.58 $66.54 $67.47 $68.38 Apprentice - TELECOMMUNICATION TECHNICIAN - Local /01/ $14.78 $13.00 $0.44 $0.00 $ $14.78 $13.00 $0.44 $0.00 $ $16.63 $13.00 $12.55 $0.00 $ $16.63 $13.00 $12.55 $0.00 $ $18.48 $13.00 $12.82 $0.00 $ $20.33 $13.00 $13.10 $0.00 $ $22.18 $13.00 $13.39 $0.00 $ $24.02 $13.00 $13.66 $0.00 $ $25.87 $13.00 $13.95 $0.00 $ $27.72 $13.00 $14.22 $0.00 $ /01/ $15.04 $13.00 $0.45 $0.00 $ $15.04 $13.00 $0.45 $0.00 $ $16.92 $13.00 $12.74 $0.00 $ $16.92 $13.00 $12.74 $0.00 $ $18.81 $13.00 $13.03 $0.00 $ $20.69 $13.00 $13.32 $0.00 $ $22.57 $13.00 $13.61 $0.00 $ $24.45 $13.00 $13.90 $0.00 $ $26.33 $13.00 $14.19 $0.00 $ $28.21 $13.00 $14.48 $0.00 $55.69 Apprentice to Journeyworker Ratio:1:1 TERRAZZO FINISHERS BRICKLAYERS LOCAL 3 - MARBLE & TILE 02/01/2018 $51.00 $10.75 $20.03 $ /01/2018 $52.35 $10.75 $20.16 $ /01/2019 $52.99 $10.75 $20.16 $ /01/2019 $54.34 $10.75 $20.30 $ /01/2020 $54.98 $10.75 $20.30 $ /01/2020 $56.33 $10.75 $20.45 $ /01/2021 $56.97 $10.75 $20.45 $ /01/2021 $58.37 $10.75 $20.61 $ /01/2022 $58.96 $10.75 $20.61 $0.00 $81.78 $83.26 $83.90 $85.39 $86.03 $87.53 $88.17 $89.73 $90.32 Page 33 of 37