Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Size: px
Start display at page:

Download "Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK"

Transcription

1 17065:2012 to provide product conformity certification Unit 4 Pioneer Way Pioneer Business Park Castleford WF10 5QU Contact: Mr Mark Rollins-Mann Tel: +44 (0) Fax: +44 (0) info@stroma.com Website: Locations where certification activities covered by the above Accreditation Stard are undertaken Unit 4 Pioneer Way Pioneer Business Park Castleford WF10 5QU Assessment Manager: KG1 Page 1 of 6

2 DETAIL OF ACCREDITATION Micro-generation Installer Certification Scheme for supply, design, installation, set to work, commissioning hover (MCS 001) Additional Requirements for MCS Installation Companies to become Green Deal Authorised Stard Requirements for Micro-generation installations in the following technologies: Solar heating systems (MIS 3001) Solar photovoltaic systems (MIS 3002) Solid Biofuel Heating Systems (Biomass) (MIS 3004) Heat pump systems (MIS 3005) MCS 023 Service provided by Green Deal Advisors Green Deal Advisor Domestic Specification for Certification Bodies certifying the Green Deal Advice Service Version 205/2014, 1 April 2014 Specification for organisations providing the Green Deal Advice Service Version 005/2014,1 April 2014 Installation of following measures: Condensing Boilers, Natural Gas Fired Liquified Petroleum Gas Fired (domestic non-domestic) Condensing Boilers, Oil Fired (domestic nondomestic) Heating Hot Water System Controls Under-floor Heating Flue Gas Heat Recovery Devices Natural Gas Fired Liquefied Petroleum Gas Fired Warm Air Heating Systems Electric Storage Heaters (domestic non-domestic) Cavity Wall Insulation Room In Roof Loft Insulation Pitched Roof Insulation Flat Roof Insulation Internal Wall Insulation External Wall Insulation Hybrid Wall Insulation Draught Proofing Floor Insulation Heating System Insulation (pipes cylinders) Energy Efficient Glazing Doors PAS 2030:2017 Specification for the installation of energy efficiency measures (EEM) in existing buildings Edition 4 - February 2017 PAS 2031:2017 Certification of energy efficiency measure (EEM) installation in existing buildings Edition 3 March 2017 Assessment Manager: KG1 Page 2 of 6

3 Stard Installation of following Green Deal measures: (cont d) Light Fittings, Lighting Systems Lighting System Controls Water Efficient Taps Showers Hot Water Systems PAS 2030:2017 Specification for the installation of energy efficiency measures (EEM) in existing buildings Edition 4 - February 2017 PAS 2031:2017 Certification of energy efficiency measure (EEM) installation in existing buildings Edition 3 March 2017 Installation of a heating or hot water system, or associated controls. Installation of (a) an oil-fired combustion appliance; or (b) oil storage tanks the pipes connecting them to combustion appliances.this paragraph does not apply to the provision of a masonry chimney. Installation of a solid fuel burning combustion appliance other than a biomass appliance. This paragraph does not apply to the provision of a masonry chimney Installation of a mechanical ventilation or air conditioning system or associated controls, in a building other than a dwelling, that does not involve work on a system shared with parts of the building occupied separately Assessment Manager: KG1 Page 3 of 6

4 Stard Installation of an air conditioning or ventilation system in a dwelling, that does not involve work on a system shared with other dwellings. Installation of an energy efficient lighting system or electric heating system, or associated electrical controls, in buildings other than dwellings. Installation of fixed low or extra-low voltage electrical installations in dwellings. Installation of fixed low or extra-low voltage electrical installations in dwellings as a necessary adjunct to or arising out of other work being carried out by the registered person. Installation, as a replacement, of a window, rooflight, roof window or door in an existing dwelling. Assessment Manager: KG1 Page 4 of 6

5 Stard Installation of a sanitary convenience, sink, washbasin, bidet, fixed bath, shower or bathroom in a dwelling, which does not involve work on shared or underground drainage. Installation of a supply of non-wholesome water to a sanitary convenience fitted with a flushing device which does not involve work on shared or underground drainage. Installation in a building of a system to produce electricity, heat or cooling (a) by microgeneration, or (b) from renewable sources (as defined in Directive 2009/28/EC of the European Parliament of the Council on the promotion of the use of energy from renewable sources (15)). Excluding:- Biomass, CHP Wind Insertion of insulating material into the cavity walls of an existing building Installation, as a replacement, of a window, rooflight, roof window or door in an existing building other than a dwelling. This paragraph does not apply to glass which is load bearing or structural or which forms part of glazed curtain walling or a revolving door. Assessment Manager: KG1 Page 5 of 6

6 Stard Installation of insulating material to the internal walls of a building, not including the installation of flexible thermal linings. Installation of insulating material to the external walls of a building, not including insulation of demountable-clad buildings. Installation of a wholesome cold water supply or a softened wholesome cold water supply Installation of insulating material to the external internal walls of a building ( hybrid insulation ), not including the insulation of demountable-clad buildings, not including the installation of flexible thermal linings Requirements for electrical installations in buildings other than dwellings industrial locations referred to in the IET Electrotechnical Assessment Specification (EAS) Work Category A1.2 Stroma Commercial Electrical Competent Persons Scheme incorporating BS7671:2008 (2011) END Assessment Manager: KG1 Page 6 of 6