1

2 CORPORATION OF THE CITY OF NEW WESTMINSTER CONTRACT NWIT DITCH INFILL AT WOOD, BOYD AND BOYNE STREETS ADDENDUM 3 This Addendum shall form part of the Contract No. NWIT INVITATION TO TENDER 1) Change: Tender closing Date: August 11, 2011 INSTRUCTIONS TO TENDER 2) Clause 3.1, Change: Tender closing Date: August 11, 2011 FORM OF TENDER 3) Replace Appendix 1 Schedule of Quantities and Prices with the attached Addendum No. 3 Schedule of Quantities and Prices. SUPPLEMENTARY SPECIFICATIONS 01025S MEASUREMENT AND PAYMENT 4) Amend clause 3.0 in Addendum No. 2 as follows: Delete the sentence: Measurement shall be based on the length of storm sewer exposed and replaced. And replace with: This item includes work to regrade storm sewers for manhole to manhole sections. Work for regrading of point sags will be assessed separately and shall be paid on force account rates. 5) Add clause 4.0 as follows: mm clear crush gravel This optional item is to replace the Type 1 bedding material with clear crush gravel to bed the pipe as directed by the Contract Administrator. The rate shall be an extra over the Type 1 bedding allowed for in the Tender. Page 1 of 2

3 02721S STORM SEWERS 6) Add the following to clause 1.6.2: Contractor to supply and install flexible couplings (Fernco Large Diameter Coupling (LDC) c/w shear band or approved equivalent) to prevent differential settlement between the manhole and the storm sewers. Two couplings will be required for all manhole connections. Couplings shall be installed within 1 and 3 s (respectively) from the outside of the manhole. The Contractor shall also ensure the couplings are adequately sealed to the corrugated storm sewers through any modifications to the pipe as necessary. Attach this Addendum to the Contract Documents. Date: August 8, 2011 Addendum No. 3 received. Signature of Tenderer Name of Tenderer (please print) Opus DaytonKnight Consultants Ltd. City of New Westminster # Harbourside Drive Purchasing Department North Vancouver, B.C. 511 Royal Avenue V7P 3S1 New Westminster, B.C. V3L 1H9 Page 2 of 2

4 CONTRACT ADDENDUM 3 Form of Tender Appendix 1 DITCH INFILL AT WOOD, BOYD AND BOYNE STREETS SCHEDULE OF QUANTITIES AND S (See paragraph of the Instructions to Tender Part II) (All prices and Quotations including the Contract Price shall include all Taxes, but shall not include HST. HST shall be shown separately.) SECTION A EARTHWORKS A S 2.0 A /2 A A S 2.12 A S A S A A DESCRIPTION QUANTITY Ditch Regrading on Boyne Street Lineal 16 Isolated tree clearing Each 2 Excavate peat, off-site disposal Light-weight mineral fill Geosynthetics Geotextile Geosynthetics Geogrid Imported topsoil Nursery Sod Square Square Square SECTION B ROAD AND SIDEWALK B /2 B /2 B B B B B DESCRIPTION QUANTITY Granular base 230 mm thickness for road Asphaltic concrete paving upper course #2 Asphaltic concrete paving lower course #2 Extruded asphaltic concrete curb, Type 2 Curb and gutter, Barrier, Std. Dwg. C4 Sidewalk, 1.8 m wide, 100 mm thick, c/w granular base Driveway crossing including ramps, 120 mm thick, c/w granular base Square 350 Tonne 50 Tonne 65 Lineal 220 Lineal 130 Square 35 Each 1

5 SECTION C STORM PIPE C S 2.3.2/2.7.1 C S 2.3.2/2.7.1 C S 2.3.2/2.7.1 C C C S C C C C C C C C C C DESCRIPTION QUANTITY Pipe 750 mm diam. (HDPE Ribbed Pipe) at 1 m depth, imported backfill Lineal 106 Pipe 600 mm diam. (HDPE Ribbed Lineal 282 Pipe) at 1 m depth, imported backfill Pipe 450 mm diam. (HDPE Ribbed Lineal 12 Pipe) at 1 m depth, imported backfill Service connection 100 mm, all Each 18 lengths Service connection 150mm, all Each 3 lengths Tie-in 750 mm diam. pipe into Each 1 existing manhole Tie-in Existing 450 mm diam. pipe Each 1 into 1350 mm diam. manhole Tie-in Existing 450 mm diam. pipe Each 1 into 1800 mm diam. manhole Endwalls sand bag as per detail on Each 3 Drawing PP2. Manhole base, lid, slab, cover and Each 1 frame, hand-benched 1800 mm diam. Manhole base, lid, slab, cover and Each 3 frame 1350 mm diam. Manhole base, lid, slab, cover and Each 2 frame 1200 mm diam. Catchbasin top inlet Std. Dwg. S11 Each 5 Catchbasin lead mm diam., all Each 5 lengths Inspection Chamber Std. Dwg. S9 Each 19 Inspection Chamber c/w brooks box Std. Dwg. S9 Each 2 SECTION D WATERWORKS D /2 D D S DESCRIPTION QUANTITY Pipe 200 mm diam. Ductile Iron Class 52, 1.0 to 1.5 m depth, imported backfill Tie-into existing 200mm main c/w valves, fittings, and couplings as per detail on Drawing PP2. Hydrant Relocation c/w valves, fittings, and couplings Lineal Lump Sum Lump Sum 5 1 1

6 SECTION E OPTIONAL E1 E S S 4.0 DESCRIPTION QUANTITY Regrading of the storm sewers after settlement 20mm clear crush gravel Lineal Summary: Section A Earthworks $ Section B Road and Sidewalk $ Section C Storm Pipe $ Section D Waterworks $ Section E Optional $ TOTAL OF TENDER $ It is understood and agreed that the quantities stated herein are approximate only and are given for the purpose of providing a uniform basis for the comparison of tenders. Payment will be made only on quantities as actually determined on final measurements. It is understood that the lowest or any tender will not necessarily be accepted. Witness Address of Tenderer Signature of Tenderer Company Name Telephone Number