Federal Republic of Somalia Ministry of Constitutional Affairs. Request for Quotation (RFQ)

Size: px
Start display at page:

Download "Federal Republic of Somalia Ministry of Constitutional Affairs. Request for Quotation (RFQ)"

Transcription

1 Jamhuuriyadda Federaalka Soomaaliya Wasaaradda Arrimaha Dastuurka Xafiiska Wasiirka Federal Republic of Somalia Ministry of Constitutional Affairs جمهورية الصومال الفدرالية وزارة الشؤون الدستور ية مكتب الوزير Request for Quotation (RFQ) NAME & ADDRESS OF THE INSTITUTION; MINISTRY OF THE CONSTITUTIONAL AFFAIRS OFFICE OF THE PRIME MINISTER BUILDING, VILLA SOMALIA Date: 29 May 2018 REFERENCE: RFQC0085 for construction of renovation works of offices of the Ministry Dear Sir / Madam: The Ministry of the Constitutional Affairs hereby invites you to submit your quotation for construction works of renovation of an office space in the ministry as detailed in technical specifications in Annex 1. All interested bidders/contractors are hereby informed to submit their quotation in sealed envelope to Office of the Ministry or via (info@moca.gov.so) not later than 04 June 2018 at 3:00 pm. It shall remain the responsibility to ensure that your quotation will reach the address above on or before the deadline. Following is the technical specification. Please take note of the following requirements and conditions concerning to the construction works of renovation of offices. CONDITIONS Major Conditions Please deliver in a sealed envelope or your quotation to the Ministry of the Constitutional Affairs addressed to the office of the ministry located in the Office of the Prime Minister in Villa Somalia clearly marked RFQ NUMBER or Via info@moca.gov.so Period of validity of the 30 Days quotes starting the submission date Partial Quotes Not permitted Expected completion date of renovation works Payment Terms Currency for quotation Deadline for submission of quotes 20 days from the issuance of the purchase order/contract Within 30 Days upon receipt of Invoice USD 04 June 2018, at 3:00 pm

2 Special conditions of contract Cancellation of PO/Contract if the completion is delayed by 30 days or quality of the work is unsatisfactory Conditions for release of Written acceptance of the works by the ministry and civil payment engineer consultant based on full compliance with RFQ requirements Contact person for inquiries (only written inquiries9) Mr. Mohamed Abdullahi Mohamed Director of Administration and Finance of the Ministry Telephone: or REQUIREMENTS 1.0 Language 1.1 All documentation shall be in: English 2.0 Evaluation of Bids (i) Compliance with the technical specifications provided (ii) Vendor must be able to deliver within the delivery lead time stipulated (iii) Vendor must be an authorized dealer/ distributor able to enforce warranty on the equipment Preliminary Examination: Prior to the detailed evaluation, the Ministry will determine the substantial responsiveness of each Bid to the Request for Quotation (RFQ). A substantially responsive Bid is one which conforms to all the terms and conditions of the RFQ without material deviations. 2.2 The Ministry will examine the bids to determine whether they are complete, whether any computational errors have been made, whether the documents have been properly signed, and whether the bids are generally in order Arithmetical errors will be rectified on the following basis: If there is a discrepancy between the unit price and the total price that is obtained by multiplying the unit price and quantity, the unit price shall prevail and the total price shall be corrected. If the Bidder does not accept the correction of errors, its Bid will be rejected. If there is a discrepancy between words and figures the amount in words will prevail A Bid determined as not substantially responsive will be rejected by the ministry and may not subsequently be made responsive by the Bidder by correction of the nonconformity. 3.0 Evaluation of Bids: Determination of compliance with the Solicitation Documents is based on the content of the Bid itself without recourse to extrinsic evidence.

3 Evaluation Criteria 1.1 Compliance with pricing conditions set in the RFQ. 1.2 Compliance with Special and General Conditions specified by these Solicitation Documents. Following documents be submitted: Latest Company Profile 1.4 Valid Certificate of registration issued by Somali Federal Government 4.0 Award of Purchase Order 4.1 Award Criteria: The procuring entity will issue the PO and contract to the lowest and qualified vendor. The Ministry reserves the right to accept or reject any quote, to annul the solicitation process and reject all quotes at any time prior to award of contract, without thereby incurring any liability to the affected vendor(s) or any obligation to provide information on the grounds for the purchaser s action. 5. Identification of Quotation: The vendor shall ensure that the quote is on their letter head and / or their quote is stamped Anti-Terrorism clause: The Contractor agrees to undertake all reasonable efforts to ensure that none of the Ministry funds received under this Contract are used to provide support to individuals or entities associated with terrorism and that the recipients of any amounts provided by the ministry hereunder do not appear on the list maintained by the Security Council Committee established pursuant to resolution 1267 (1999). I acknowledge that I have read and accept the conditions on reverse NAME, FUNCTIONAL TITLE:, Signature: ADDRESS: ; (for both quotation/queries);

4 Annex 1 TECHNICAL SPECIFICATION No Description Unit Quantity 1 Dismantling of doors, windows, and cleaning No 13 2 Wall hacking Sqm 37 3 Ceiling and roof hacking from old finishes Sqm 44 4 Replastering degraded ceilings, applying antioxide agents 50% 5 Plastering of walls with cement sand Sqm 70 a) Internal Sqm 36 6 Supplying & fixing dif. Sizes of Alluminum windows a) (1.50x1.65) No. 4 b) (1.5x1.2) No 2 c) (0.8x1) No 1 7 Supplying & fixing new wooden doors of size: - a) (0.90x2.15) No 3 b) (0.8x2.15) No 2 c) (1.50x2.15) No 1 8 Painting of walls (Internal ) with a) two coat of emulsion paint Sqm Supply & fixing Electrical Equipments Lsum 1 10 Suppling and fixing sanitary Equipments for toilets Lsum 3 11 Supply and Fixing Air Conditioners No 4

5 12 Ceiling Decorations with GYBSUM board Sqm Curtain No 6 14 Repairing & fixing Alluminum windows Sqm Painting & fixing wooden doors of size:- a) (0.90x2.15x11) No 11 b) (0.80x2.15x4) No 4 c) Supply and Fixing new main Door No 1 16 Painting of walls (Internal) with c) Two coats of emulsion paint Sqm Painting of slab with a) Two coats of emulsion paint Sqm b) Suppling and fixing sanitary equipments for toilets No 3 c) Supply & fixing Electrical Equipments Lsum 1 18 Curtain No Repairing some part of the cracked roof slape Sqm 70