1 From the Chairman s Office File No: Document No: Enquiries to: Blair Dickie 20 August 2012 Hon Amy Adams Minister for the Environment Freepost Parliament Private Bag , Parliament Buildings WELLINGTON 6160 Dear Minister Feedback on the Minister for the Environment s Resource Management Act 1991 Principles Technical Advisory Group, and RMA reforms Phase II. Last week the Waikato Regional Council s Policy and Strategy Committee considered a report on the above Technical Advisory Group s (TAG) report. It resolved to provide guidance to staff on a number of key matters in their advocacy in the development of the expected Resource Management Amendment Bill The report considered by the Council (DM# ) is attached to this communication and the key points are summarised below: The Waikato Regional Council opposes the removal of environmental bottom lines to be replaced by the wording broad overall judgement. There would be few regional economies that depend more on the quality and quantity of natural resources and the availability of networked infrastructure than that of the Waikato region. It is considered that the concept of balance between environment and economy is short term thinking and one that will not ensure the sustainability of the Region s economy into the future. The Waikato Regional Council supports the inclusion of new matters into the revised section 6 that reflect the built environment and contribute to the sustainable management of natural and physical resources. The use of operative Regional Policy Statements to define areas of significance for; landscapes, features and habitats is supported. It has been used in a limited way already in the Waikato region and can be expected to improve certainty for community and developers alike and positively incentivise Territorial Authority engagement in the policy development activity. It will, however, need central government commitment and support to ensure the criteria for definition are consistent nationally, that is between regions. Without this the certainty for linear infrastructure providers may be diminished. We note that this has not been costed. The Waikato Regional Council supports the package of recommendations that cover natural hazards, specifically: o The inclusion of risk in the management of natural hazards (as is already the case in the proposed Waikato Regional Policy Statement);

2 o The call for a regionally led, joint natural hazards plan (all region / all hazards), however, the Council is concerned that the target of three years is unrealistic in the current environment. Additional information will need to be collected to implement this requirement with a corresponding resourcing cost that will be borne primarily from regional ratepayers; o The development of central government guidance in the form of a National policy Statement and / or a National Environmental Standard to provide consistency between regions for regional hazard plans. Finally the Waikato Regional Council is concerned at the lack of consideration of costs in the recommendations made. Careful consideration of the TAG s Terms of Reference shows that not only was the TAG team required to identify the costs of the problems, but also what the costs and the benefits would be of any recommended changes to the resource management practice and / or legislation. The Waikato Regional Council does not consider this aspect has been complied with and irrespective of the perceived (and uncosted) benefits of aligning the legislation with previous Court interpretations on individual projects, the Waikato Regional Council s RMA planning documents have for the last 21 years been written to the letter of the legislation as found in the wording of Part 2 RMA. This is a considerable investment by the citizens of the businesses of the Waikato region. A change of the scope envisaged by the TAG recommendations will require a rewrite of RMA policies and plans as it would alter the basis of the s32 analysis the provisions are based upon. An initial estimate would put this in the vicinity of many millions of dollars in the Waikato region alone and many more when the rest of the country is factored in. In recognition of this detail, Waikato Regional Council staff would be prepared to work in conjunction with other councils in the Waikato region and with Local Government New Zealand to estimate the costs of implementing the recommended changes. Such an estimate would, I m sure, be useful to inform Ministry staff in the development of future legislation. I would welcome the opportunity to further discuss this letter should you have any questions or request clarification on any matter. Yours faithfully Peter Buckley Chairman Cc Tim Bennetts, Private Secretary for the Minister for the Environment Paul Reynolds, Chief Executive, Ministry for the Environment Miriam Eagle, Manager, Land and Water Forum Attached: Report to Waikato Regional Council: Policy Committee August Minister for the Environment s Technical Advisory Group (TAG) Report on sections 6 and 7 RMA. (WRC ref DM# ) Doc #

3 Report to Policy Committee August 2012 Decision Required File No: Date: 01 August 2012 To: From: Subject: Section Chief Executive Officer Group Manager Policy and Transport Minister for the Environment s Technical Advisory Group (TAG) Report on sections 6 and 7 RMA B (Committee has delegated authority to make decision) Purpose This report introduces Waikato Regional Council to the recently released TAG report into sections 6 & 7 Resource Management Act (RMA) (Principles) 1. It includes a summary of the TAG s findings and requests consideration of key themes in relation to recommended changes to the interpretation of the Resource Management Act 1991 (RMA). These will assist staff in their advocacy role to central government in the lead up to the Resource Management Amendment Bill Recommendation: 1. That the report Minister for the Environment s Technical Advisory Group (TAG) Report on sections 6 and 7 RMA (Doc # , dated 01 August 2012) be received, and 2. That the Policy Committee confirms the direction of comments on key matters to form the basis of advocacy to central government during the development of content for the expected Resource Management Amendment Bill 2012 as part of the phase II Resource Management reforms. Background The review of sections 6 & 7 (Principles) was commenced in 2011 as part of the National led government s resource management reforms and subsequent to the Resource Management Simplifying and Streamlining Amendment Act 2009 and the Urban 2 and Infrastructure 3 TAG reports, all of which recommended, among other things, changes to section 6 of the RMA. The Minister for the Environment sought independent advice on the principles that guide decision-making to assist interpretation of s5, the Purpose of the Resource Management Act The Terms of Reference are found in Attachment One of this report. It will be noted that the TAG did not have a mandate for consultation, however, initial input was made by WRC staff assisting with the preparation of a paper by Local Government New Zealand. The TAG report The 119 page report was commissioned by Minister Nick Smith in October 2011 and completed in February It was released by the new Minister for the Environment, the Honorable Amy Minister for the Environment Urban Technical Advisory Group report, July Minister for the Environment s Infrastructure Technical Advisory Group report, August Doc #

4 Adams in early July 2012 with a focus on the Natural Hazards content. The report is presented in seven chapters that follow the Terms of Reference. It interprets the issues associated with the use of the Act over its 20 year life and provides recommendations to change and rename sections 6 and 7. It also includes consequential changes to the interpretation section (s.2) to support recommendations for change of sections 6 & 7 and sets out other amendments (e.g. transitional requirements) that flow on from the recommendations. The concluding two chapters include an assessment of options to incorporate the Soil Conservation and Rivers Control Act 1941, Land Drainage Act 1908 and River Boards Act 1908 into other, more recent legislation, and a reflection on practice in relation to the Act. The following excerpt from the Minister s press release identifies the matters highlighted at the time of its release....environment Minister Amy Adams today released an independent report which considered changes to sections 6 and 7 of the Resource Management Act to address, among other things, management of natural hazards. After the Canterbury earthquakes, it became clear that consents for subdivisions had been granted without any consideration of the risk of liquefaction, Ms Adams says. The problem was that the RMA did not, and still does not, require these sorts of risks to be assessed and managed. Instead, the RMA prioritises preserving natural character, landscape, flora and fauna, public access, cultural values and heritage over managing natural hazards. The Government asked an independent technical advisory group to provide advice on whether the RMA should be amended to give greater consideration to emerging issues like natural hazards, and urban and infrastructure development. The report proposes that changes be made to the principles in sections 6 and 7 of the RMA to bring managing natural hazards and urban and infrastructure into the list of things that should be considered when Councils grant resource consents. It also says that none of these matters should be more important than another, and proposes changes to the structure of the RMA to make this clearer... The emphasis on Natural Hazards could give an indication that the government considers this to be important to the phase II Resource Management reforms. Current situation Part two of the Act is entitled Purpose and Principles and comprises four sections: Section 5 a Purpose; Section 6, Matters of national importance; Section 7, Other matters ; and Section 8, Treaty of Waitangi. The inference is that if section 5 is the Purpose, then the others form the principles. The Terms of Reference are limited to consideration of sections 6 and 7 and these are found as Attachment Two of this report. Reference to the current wording of sections 6 and 7 show that they provide national direction and guidance as to what is considered important. They are known as Environmental bottom lines. The differing requirements of decision makers to recognise and provide for section 6 matters and to have particular regard to section 7 matters automatically confers a hierarchy of importance between the two. Doc #

5 TAG recommended changes Attachment Three to this report contains the wording of the revised approach recommended by the TAG. Of interest is the change of name to: Section 6, Sustainable management principles; and Section 7, Sustainable management methods. The principles section collapses many of the matters previously contained in sections 6 & 7. New matters include those relevant to the built environment; e.g. Natural hazards, Infrastructure and urban design. These extend the scope to natural and physical resources and not just natural resources. Matters that are dropped include; amenity values, the intrinsic value of ecosystems and the habitats of trout and salmon. Additionally the references to protection, maintenance and enhancement and preservation are dropped in relation to; natural character, outstanding natural landscapes and features and to access to the coast, lakes and rivers and wetland. The new principles would be non-hierarchical and decision makers would be required to consider them within the context of a broad overall judgement as to whether the proposals achieve the purpose of the Act (section 5). The renamed section 7 does not contain principles and has been recast as sustainable resource management methods. This appears to be an attempt at legislating for best practise to improve efficiency and timeliness of RMA processes. Of interest here is the requirement to promote collaboration between local authorities and to have regard to voluntary form of environmental compensation, offsetting or similar measures. The principles section would be supported by new definitions for: Natural character; Archaeological site; Historic place; Historic areas; Mitigation; Outstanding natural landscapes and Outstanding natural features, Areas of significant indigenous biodiversity, Areas of significant indigenous terrestrial habitats; and Areas of significant aquatic habitats. The nine new definitions are proposed as consequential amendments, to section 2 RMA, Interpretation. Three are directly sourced from the Heritage New Zealand Pouhere Taonga Bill and four require further definition by the relevant operative Regional Policy Statement (RPS). In addition to the inclusion of the principle of managing the significant risks associated with natural hazards, the TAG recommended the development of a regionally led region wide natural hazards plan to be operative within three years. The operational nature of the Soil Conservation and Rivers Control Act, 1941, Land Drainage Act 1908 and the River Boards Act 1908 precluded the TAG from recommending their inclusion as part of sections 6 or 7. They did, however, recommend that the Acts be repealed and the important operational powers be incorporated into existing legislation (Preferably the Local Government Act 2002). Broad Overall Approach It is argued by the TAG that as a result of the Act being developed when the position of the government was an economically liberal one, the wider suite of matters relevant to sustainable management were not all stated as the social and economic activities were relatively free to occur so long as environmental bottom lines were met. The overwhelmingly biophysical matters listed in sections 6 & 7 constituted environmental bottom lines to support interpretation of section 5 (2)(a),(b)&(c). Doc #

6 The TAG refers to the way the Courts have interpreted the purpose of the Act as a broad overall judgement and have called this a fundamental mismatch or disconnect from the stated intention / interpretation of the government at the time. It proposes to rectify this by rewording the principles section to make the legislation conform to the courts interpretation. This is an interesting approach. The effect of changing the wording from an environmental bottom line approach to a broad overall judgement approach moves the fundamental relationship between the elements of sustainable management from one that recognises that vibrant social and economic elements are dependent upon the quality and quantity of natural resources. This is never more so than with the rural economy of the Waikato region. Changing the approach in the manner recommended by the TAG will allow trade-offs to occur between the elements of sustainability with potentially little guidance as how the reasonably foreseeable needs of future generations will be able to be provided for without Environmental bottom lines below which it is risky to go. It is difficult to see how the future generations of the Waikato region will get access to the ecosystem services that we get or free once they have bee traded for money at present day values. Other than say that there is a mismatch between the government s drafting and the Courts interpretation, there is little evidence presented or analysis to say why the covering phrase In making the overall judgement to achieve the purpose of this Act.. should be included as it has the effect of amending the interpretation of section 5(2)(a),(b)&(c). This was expressly excluded from the scope of the review (see Attachment One) The review will be limited from considering any matters that may affect other sections of Part Two of the RMA (sections 5 and 8 of the Act, which outline the RMA s purpose and principles). It is recommended that WRC oppose the inclusion of the wording broad overall judgement. Definitions Four new definitions that relate to features or areas of significant landscapes (regional or national scale) and habitats (regional significance) are required to be identified in an operative RPS. This will have the effect of focussing engagement between Territorial Authorities and relevant regional councils in respect of any of the defined areas. The inference is that regionally significant landscapes and habitats will be mapped. This can be expected to have the benefits of providing certainty and consistency at a catchment scale to all; however, it will also create significant new costs to upgrade each RPS. The requirement to define areas by mapping may not be too problematic if an indicative scale is able to be used such as that found in the Proposed Waikato RPS 2010 for landscapes. It is recommended that WRC support the idea of using RPSs to define indicative areas of regional significance. Such areas will need greater definition in district and or regional plans to allow interpretation and accurate application of relevant policies and methods including rules. Natural Hazards The high cost of the Christchurch earthquake, the specific inclusion of natural hazards in the TAG s Terms of Reference and the emphasis on natural hazards in the Minister s press release means that this is likely to be a topic that will be progressed. Specific recommendations relating to natural hazards are found in Attachment Four to this report. The report calls for a whole of region hazards plan which continues the trend of effecting solutions to district plans through strengthening of regional instruments. It also included the concept of risk which is in line with the direction of the proposed Waikato RPS The reference to managing significant risks associated with natural hazards needs to be defined and needs to be consistent across the country. Doc #

7 A recommendation is made to central government for the development of a National Policy Statement or National Environmental Standard on the management of natural hazards. This would be an appropriate instrument in which to provide national consistency for risk. The recommended change to section 106 that requires consent authorities to refuse consent if there is a significant increase in the risk associated with any natural hazard is an improvement upon the existing situation which allows the consent authority discretion with respect to natural hazards. It is recommended that Waikato Regional Council support the recommendations relating to the management of natural hazards and advise that the expectation that it be operative within three years is unrealistic given the challenging subject matter and the potential requirement for additional information and mapping. Increased costs The transitional costs of this proposal that not only changes the way the RMA is interpreted and applied, but also introduces a number of new definitions will be significant. The costs can be expected to land disproportionally on regional councils as: there is an increased requirement for regional policy statements to contain maps that can be applied at a district scale; and The requirement for a Regional Council led combined Natural Hazards plan. If implemented as recommended, Regional Councils will incur a significant extra cost to upgrade RPSs and identify areas of significance. There is little option but to map such areas and this can be expected to create demand for technical assessment and GIS support staff. Most RPS do not include maps at the scale and of the accuracy that can be relied upon to delineate significant areas to the individual property level. This is the domain of district plans. Regional councils are well under way with the review of operative and the proposal of second generation RPSs. The recommendation to define areas will require additional funding from rates over and above that already anticipated. Along with the recommendation for joint regionally led Natural Hazards plans, it is likely to create a pulse of policy/plan development that will affect all regions concurrently. This will not only apply to the policy development phase but also to the technical assessments, GIS support mapping, legal support. These only cover the type of costs that will be incurred by each council and does not cover the costs of the regional community. Neither of these are costed by the review TAG. The Terms of Reference specifically requires the Group s outputs to identify the costs and benefits of any recommended changes to resource management legislation practise/or legislation. It is recommended that Waikato Regional Council staff work with other local authorities within the region and with Local Government New Zealand to estimate of the scale of costs that implementation would incur. Such an estimate would be used to inform Ministry for the Environment staff. Next steps Comments on the TAG s report on sections 6 & 7 (RMA) have been sought without a timeframe, however, it is understood that there will be a Resource Management Amendment Bill in If this is the case it is also likely that a second Amendment Bill (2013) will be required to address matters from the Land and Water Forum s second report back later on in the year. It is worthwhile remembering that at the start of the current parliamentary term, the National party s Confidence and Supply Agreement with ACT New Zealand agreed that a significant change is needed to the RMA to promote investment, jobs and prosperity as well as environmental protection. While the previous administration had already embarked upon a programme of reform known as RM2, and the current review of sections 6 & 7 can be seen as an input to that review, it must be considered in light of the prevailing economic and political conditions. Doc #

8 Directions in response to identified key matters (above) will inform advocacy to central government, including Ministry for the Environment staff, involved in the development of the Resource Management Amendment Bill Additionally, Local Government New Zealand has convened a reference group to consider the TAG s recommendations and prepare feedback to the Ministry on the TAG sections 6 & 7 Report. The position of the Waikato Regional Council on key matters will be conveyed and where they are aligned, a joint approach will be proposed. Blair Dickie Principal Policy Advisor Policy and Transport Group Vaughan Payne Group Manager Policy and Transport Group Doc #

9 Attachment One; Terms of Reference: Review of sections 6 and 7 of the Resource Management Act 1991 Technical Advisory Group The Resource Management Act 1991 (RMA) Principles Technical Advisory Group (TAG) is appointed to provide independent advice to the Minister for the Environment on any changes needed to sections 6 and 7 of the RMA to improve the functioning of the RMA relative to: 20 years practical experience of its operation; the Government s environmental and economic objectives; and the broader second phase of resource management reforms. The TAG will commence and expire on the dates specified in the letters of appointment. Context This review sits within the government s Resource Management reform phase two work programme. The objectives of the programme are to consider: providing greater central government direction on resource management; improving economic efficiency of implementation without compromising underlying environmental integrity; avoiding duplication of processes under the RMA and other statutes; and providing for efficient and improved participation of Maori in resource management processes. Scope of work The TAG s role will be to undertake a focused review of sections 6 and 7 of the RMA. In particular, they will focus on whether sections 6 and 7 can be improved to: give greater attention to managing issues of natural hazards noting the RMA issues arising from the recent Canterbury earthquakes; consider the recommendations for changes to sections 6 and 7 from the urban and infrastructure technical advisory groups in a broader context; consider changes that would enable the incorporation of the Soil Conservation and Rivers Control Act 1941, River Boards Act 1908 and the Land Drainage Act 1908; reflect on the provisions relative to the resource management challenges facing New Zealand 20 year on from the RMA s enactment; promote consistency of interpretation through clear and modern drafting. In carrying out this review, the TAG will be able to consider the range of issues relevant to gain a clear view of the work needed on sections 6 and 7. The review will be limited from considering any matters that may affect other sections of Part Two of the RMA (sections 5 and 8 of the Act, which outline the RMA s purpose and principles). Outputs from the TAG The TAG is to work with officials and provide advice by the end of March 2012, in the form of a report to the Minister for the Environment. The TAG will have an evidential basis for the advice it provides to the Minister for the Environment. Specifically it will show how the identified problems create undesirable outcomes, what the costs of these problems are, and what the costs and benefits would be of any recommended changes to resource management practice and/or legislation. The first meeting of the TAG will be in October 2011, and fortnightly thereafter (some adjustment around the December 2011 to January 2012 period will be agreed). Officials will provide a set of proposals to the TAG by 31 October The TAG will meet the following timeframes for each stage of its work: o problems identified and substantiated by evidence by the end of November 2011; o the range of potential options to resolve problems identified by the end of December 2011; o key options identified by the end of January 2012; and o options fully developed and recommendations drafted by the end of February The TAG will report to the Minister for the Environment in February Doc #

10 TAG members will be available through to 30 June 2012 to provide oral advice to the Minister of the Environment. Working relationship with government officials Government officials from the Ministry for the Environment will provide secretariat support to the TAG and be available to answer questions as the TAG works through the processes agreed. Government officials may commission policy analysis or primary research from external consultants to assist the TAG, subject to the budget for this project. This may include advice from persons with local authority expertise. All considerations of the TAG are to remain confidential to the members and the Minister for the Environment, although they will be subject to the Official Information Act At least one official from the Ministry for the Environment will be present at all meetings of the TAG except where the chair requests a private session. Officials from other departments may be called upon as required to provide background information or explanations. Any advice on the Rivers Boards Act 1908 and the Land Drainage Act 1908 will be commissioned by the Ministry for the Environment in consultation with the Department of Internal Affairs. Doc #

11 Attachment Two: Current wording ss6&7 RMA 6 Matters of national importance In achieving the purpose of this Act, all persons exercising functions and powers under it, in relation to managing the use, development, and protection of natural and physical resources, shall recognise and provide for the following matters of national importance: (a) the preservation of the natural character of the coastal environment (including the coastal marine area), wetlands, and lakes and rivers and their margins, and the protection of them from inappropriate subdivision, use, and development: (b) the protection of outstanding natural features and landscapes from inappropriate subdivision, use, and development: (c) the protection of areas of significant indigenous vegetation and significant habitats of indigenous fauna: (d) the maintenance and enhancement of public access to and along the coastal marine area, lakes, and rivers: (e) the relationship of Maori and their culture and traditions with their ancestral lands, water, sites, waahi tapu, and other taonga: (f) the protection of historic heritage from inappropriate subdivision, use, and development: (g) the protection of protected customary rights. 7 Other matters In achieving the purpose of this Act, all persons exercising functions and powers under it, in relation to managing the use, development, and protection of natural and physical resources, shall have particular regard to (a) kaitiakitanga: (aa) the ethic of stewardship: (b) the efficient use and development of natural and physical resources: (ba) the efficiency of the end use of energy: (c) the maintenance and enhancement of amenity values: (d) intrinsic values of ecosystems: (e) [Repealed] (f) maintenance and enhancement of the quality of the environment: (g) any finite characteristics of natural and physical resources: (h) the protection of the habitat of trout and salmon: (i) the effects of climate change: (j) the benefits to be derived from the use and development of renewable energy. Doc #

12 Attachment Three: Proposed new wording Sections 6&7 RMA and supporting definitions 6. Sustainable management principles (1) In making the overall broad judgment to achieve the purpose of this Act, all persons performing functions and exercising powers under it must recognise and provide for: (a) The: (i) natural charactervalues of the coastal environment, wetlands, and lakes and rivers and their margins; and, (ii) value of public access to and along, the coastal marine area, wetlands, lakes and rivers. (b) The: (i) physical qualities of outstanding natural features; and, (ii) visual qualities of outstanding natural landscapes. (c) The physical qualities of: (i) areas of significant indigenous biodiversity; (ii) areas of significant indigenous terrestrial habitats; and (iii) areas of significant aquatic habitats. (d) In relation to climate change: (i) managing the significant risks of climate change effects; and, (ii) the benefits to be derived from the use and development of renewable energy. (e) In relation to Māori: (i) the relationship of Māori and their culture and traditions with their ancestral lands, water, sites, waahi tapu, taonga species and other taonga; (ii) the exercise by Māori of kaitiakitanga; and, (iii) protected customary rights. (f) Significant values of archaeological sites, historic places and historic areas; (g) The efficient use of natural and physical resources; (h) The significant benefits to be derived from the use and development of natural and physical resources; (i) Managing the significant risks associated with natural hazards; (j) The planning, design and functioning of the built environment, including the reasonably foreseeable availability of land for urban expansion, use and development; and (k) The planning, design and functioning of significant infrastructure: (2) For the avoidance of doubt, subsection (1) has no internal hierarchy. 7. Sustainable management methods All persons performing functions and exercising powers under this Act must: (a) Achieve timely, efficient and cost-effective resource management processes; (b) In the case of policy statements and plans: (i) include only those matters within the scope of this Act; (ii) use concise and plain language; and (iii) avoid repetition. (c) Have regard to any voluntary form of environmental compensation, off-setting or similar measure which is not encompassed by section 5(2)(c); (d) Promote collaboration between local authorities on common resource management issues; and, (e) Achieve an appropriate balance between public and private interests in the use of land. Definitions: The proposed changes to sections 6 and 7 would be supported by the following definitions: Doc #

13 Natural character means the physical qualities and features created by nature, and may include such matters as: (i) natural patterns and processes; (ii) biophysical, ecological, geological and geomorphological aspects; (iii) natural landforms, such as headlands, peninsulas, cliffs, dunes, wetlands and reefs; and, (iv) places or areas that are wild or scenic. Archaeological site means any place in New Zealand, including any building or structure (or part of a building or structure), that: (i) was associated with human activity that occurred before 1900 or is the site of the wreck of any vessel where the wreck occurred before 1900; and (ii) is or may be able, through investigation by archaeological methods, to provide evidence relating to the history of New Zealand 4. Historic place (a) means any of the following that form a part of the historical and cultural heritage of New Zealand and that lie within the territorial limits of New Zealand: (i) land, including an archaeological site; (ii) a building or structure (or part of a building or structure); and, (iii) any combination of land, buildings, structures, or associated buildings or structures (or parts of buildings, structures, or associated buildings or structures). (b) Includes anything that is in or fixed to land described in paragraph (a). 5 Historic areas means an area of land that (a) contains an inter-related group of historic places; (b) forms part of the historical and cultural heritage of New Zealand; and, (c) lies within the territorial limits of New Zealand. 6 Mitigation a) means to lessen the rigour or the severity of effects; and, b) contemplates that some adverse effects from developments may be considered acceptable, no matter what attributes the site might have. To what extent the adverse effects are acceptable, is, however, a question of fact and degree; c) but does not include any form of environmental or financial compensation or similar measure, except to the extent that such measure is to be provided on a voluntary basis. Outstanding natural features and outstanding natural landscapes means features and landscapes that are identified in an operative provision of a regional policy statement as being outstanding on a national or regional scale. Areas of significant indigenous biodiversity means areas identified in an operative provision of a regional policy statement which have species compositions or habitat structure or ecosystem functions, or a combination thereof, that are of significance for the maintenance of biodiversity nationally. Areas of significant indigenous terrestrial habitats means areas identified in an operative provision of a regional policy statement which have ecological attributes that are regionally significant. Areas of significant aquatic habitats means areas identified in an operative provision of a regional policy statement which have physical, recreational or ecological attributes that are regionally significant. 4 As per Heritage New Zealand Pouhere Taonga Bill 5 ibid 6 ibid Doc #

14 Attachment Four: Recommendations relating to the management of Natural Hazards A provision requiring decision-makers to recognise and provide for issues around natural hazard risks should be incorporated in s.6 of the RMA the wording of the provision to be, managing the significant risks associated with natural hazards: Retain the RMA definition of natural hazards. Further work should be undertaken on alignment of the definition across all relevant legislation, in particular to take account of the differing return periods for natural hazards. Amend provisions specifying matters to be considered in preparing RPS and plans to specifically refer to CDEM Group management plans as a matter which must be considered. Regional councils should have the lead function of managing all the effects of natural hazards. Territorial authorities are to retain their current function in regard to natural hazards. There should be one combined regional and district natural hazards plan. This plan should be required to be operative within three years of enactment of the empowering legislation. Require local authorities to make information about natural hazards available to all other local authorities within their region. This requirement should be drafted to expressly override any constraints arising from other legislation on information sharing, including the Privacy Act 1993 and the Local Government Official Information and Meetings Act Section 106 be amended to expressly include liquefaction and lateral spreading, along with any other consequences of the events included in the definition of natural hazard in s.2. Section 106 be amended to reflect the risk associated with any natural hazard, rather than the likelihood of the event. Section 106 be amended so that the consent authority must refuse consent if there will be a significant increase in the risk associated with any natural hazard. That the potential to extend the scope of s.106 to include land use consents issued by regional councils be investigated. That the Government promulgate a NPS or NES on the management of natural hazards. Doc #

15 Soil Conservation and Rivers Control Act 1948 (SCRCA), Land Drainage Act 1908 (LDA), and River Boards Act 1908 (RBA): Due to the operational nature of the SCRCA, LDA and RBA, their remaining provisions should not be incorporated into ss. 6 and 7 of the RMA. Repeal and transfer important operational powers currently under the SCRCA, LDA and RBA into existing legislation, preferably the LGA02. Incorporate existing land drainage/river management provisions contained in the LGA74 and LGA02 as part of a review of the SCRCA, LDA and RBA with the aim of integrating and repackaging them in the LGA02. Consider a comprehensive review of all flood-related legislation at some point in the future. Doc #

FORM C: OTHER MATTERS

FORM C: OTHER MATTERS APPLICATION FOR RESOURCE CONSENT FORM C: OTHER MATTERS NOTES The following information requirements were introduced by the RM Amendment Act 2013 and took effect on 3/3/2015. Due to this, it is mandatory

More information

Improving our resource management system: A discussion document

Improving our resource management system: A discussion document 1 Improving our resource management system: A discussion document Submission to the Minister for the Environment Dr Jan Wright Parliamentary Commissioner for the Environment 2 April 2013 Introduction In

More information

Legislative and Policy Framework

Legislative and Policy Framework 2 Legislative and Policy Framework 2 L E G I S L A T I V E A N D P O L I C Y F R A M E W O R K 2.1 Introduction The principal statute under which the natural and physical resources of Otago s coastal marine

More information

OPERATIVE STATUS and SEAL OF THE COUNCIL

OPERATIVE STATUS and SEAL OF THE COUNCIL Tairāwhiti Resource Management Plan Part A Last Updated 30 July 2018 OPERATIVE STATUS and SEAL OF THE COUNCIL Current Approval The common seal of the Gisborne District Council is here electronically affixed

More information

AND STATEMENT OF EVIDENCE OF RICHARD JOHN MATTHEWS

AND STATEMENT OF EVIDENCE OF RICHARD JOHN MATTHEWS IN THE MATTER of the Resource Management Act 1991 AND IN THE MATTER of the submissions and further submissions by Genesis Energy Limited on the Proposed Plan Change 3 to the Waitaki Catchment Water Allocation

More information

Integrating tikanga into resource management law reform

Integrating tikanga into resource management law reform Integrating tikanga into resource management law reform Professor Jacinta Ruru Faculty of Law, University of Otago Co-Director, Nga Pae o te Maramatanga NZ s Maori Centre of Research Excellence with Adam

More information

Resource Management Summary of Reform Proposals

Resource Management Summary of Reform Proposals Resource Management Summary of Reform Proposals 2013 1 Contents Minister s Foreword 3 Section one: Improving resource management planning 5 Section two: National consistency and guidance 11 Section three:

More information

The aims of the Kaipara River Catchment Water Allocation Strategy are:

The aims of the Kaipara River Catchment Water Allocation Strategy are: A Introduction 1 1 Background 1.1 Introduction The Kaipara River catchment is the third largest river system in the Auckland Region. In places, there are competing demands for the water resources of the

More information

13 Section 32 Summary for the Residential Chapter

13 Section 32 Summary for the Residential Chapter 13 Section 32 Summary for the Residential Chapter The purpose of this section is to present a summary of the evaluation of the objectives, policies and methods of the Residential Zone Chapter of the Proposed

More information

1 Introduction The Plan. 1.2 Plan Coverage

1 Introduction The Plan. 1.2 Plan Coverage 1 1 Introduction 1.1 The Plan This plan is the Auckland Regional Plan: Air, Land and Water. It has been prepared by the Auckland Regional Council (ARC) to assist it to carry out its functions in order

More information

PLANNING ASSESSMENT SHEET: FARMING ACTIVITY IN HINDS/HEKEAO CATCHMENT

PLANNING ASSESSMENT SHEET: FARMING ACTIVITY IN HINDS/HEKEAO CATCHMENT APPLICATION TO USE LAND FOR FARMING ACTIVITY IN HINDS/HEKEAO CATCHMENT PAGE 1 OF 11 MAY 2017 PLANNING ASSEMENT SHEET PREPARED FOR FARMING ACTIVTIES WITHIN HINDS/HEKEAO CATCHMENT The Resource Management

More information

EDS Position Paper on RMA Reforms

EDS Position Paper on RMA Reforms EDS Position Paper on RMA Reforms (1) IMPROVING RESOURCE MANAGEMENT PLANNING Proposal: National Planning Template The Minister for the Environment will develop content through a process that allows for

More information

SUBMISSION Improving our resource management system A discussion document

SUBMISSION Improving our resource management system A discussion document SUBMISSION Improving our resource management system A discussion document TO: FROM: Submission on Improving our resource management system A discussion document Ministry for the Environment PO Box 10362

More information

Ministry for the Environment - Biodiversity Planning and Management Research

Ministry for the Environment - Biodiversity Planning and Management Research Report Ministry for the Environment - Biodiversity Planning and Management Research Prepared for Ministry for the Environment Prepared by Beca Limited and Wildland Consultants Ltd 16 December 2016 Ministry

More information

AND STATEMENT OF EVIDENCE OF RICHARD JOHN MATTHEWS

AND STATEMENT OF EVIDENCE OF RICHARD JOHN MATTHEWS IN THE MATTER of the Resource Management Act 1991 AND IN THE MATTER of the submissions and further submissions by Genesis Energy Limited on Proposed Plan Change 4 to the Canterbury Land and Water Regional

More information

National Level AN EVERYDAY GUIDE TO THE RMA SERIES 1.4

National Level AN EVERYDAY GUIDE TO THE RMA SERIES 1.4 National Level Guidance and Processes AN EVERYDAY GUIDE TO THE RMA SERIES 1.4 AN EVERYDAY GUIDE TO THE RMA Series Overview 1.1 1.2 1.3 1.4 Getting in on the Act Resolving Resource Management Act Concerns

More information

Revised functions for Resource Management Act 1991 decision-makers

Revised functions for Resource Management Act 1991 decision-makers RESOURCE LEGISLATION AMENDMENTS 2017 FACT SHEET 2 Revised functions for Resource Management Act 1991 decision-makers This is part of a series of 16 fact sheets that give an overview of recent resource

More information

This section updated November 2007

This section updated November 2007 This section updated November 2007 In December 1993, the Waitakere City Council adopted a 20 year strategic plan - City Futures. In this, the Council embraced Eco-City as a goal and as a strategy to shift

More information

1. RESOURCE MANAGEMENT STRATEGY

1. RESOURCE MANAGEMENT STRATEGY 1. 1.1 RELATIONSHIP WITH COUNCIL S PLANNING DOCUMENTS 1.1.1 Council produces many plans and strategies to enable compliance with its legislative responsibilities and to set future directions. The District

More information

THE SECOND PHASE OF RESOURCE MANAGEMENT ACT REFORM

THE SECOND PHASE OF RESOURCE MANAGEMENT ACT REFORM THE SECOND PHASE OF RESOURCE MANAGEMENT ACT REFORM Published in November 2015 by the Ministry for the Environment on behalf of the Minister for the Environment PO Box 10362, Wellington 6143, New Zealand

More information

S e c t i o n S u b d i vision

S e c t i o n S u b d i vision S e c t i o n 2. 6 - S u b d i vision Subdivision is a process of defining and redefining land parcel boundaries and can provide a framework for future land use and development. Integrated, well planned

More information

In the Environment Court of New Zealand Christchurch Registry ENV-2016-CHC- Henley Downs Land Holdings Limited. Appellant. Otago Regional Council

In the Environment Court of New Zealand Christchurch Registry ENV-2016-CHC- Henley Downs Land Holdings Limited. Appellant. Otago Regional Council In the Environment Court of New Zealand Christchurch Registry ENV-2016-CHC- Under In the matter of Between the Resource Management Act 1991 (RMA) an appeal under Clause 14(1), First Schedule of the RMA

More information

Submission to Local Government and Environment Select Committee on HERITAGE NEW ZEALAND POUHERE TAONGA BILL (JUNE 2012)

Submission to Local Government and Environment Select Committee on HERITAGE NEW ZEALAND POUHERE TAONGA BILL (JUNE 2012) SUBMISSION Submission to Local Government and Environment Select Committee on HERITAGE NEW ZEALAND POUHERE TAONGA BILL (JUNE 2012) INTRODUCTION 1. Straterra Inc represents 90% by value of New Zealand minerals

More information

ROYAL FOREST AND BIRD PROTECTION SOCIETY OF NEW ZEALAND INCORPORATED KAPITI COAST DISTRICT COUNCIL

ROYAL FOREST AND BIRD PROTECTION SOCIETY OF NEW ZEALAND INCORPORATED KAPITI COAST DISTRICT COUNCIL IN THE ENVIRONMENT COURT I TE KOTI MATUA O AOTEAROA WELLINGTON REGISTRY ENV-2018-WLG IN THE MATTER OF AND IN THE MATTER OF BETWEEN An appeal to the Environment Court under clause 14 of the First Schedule

More information

8 Subdivision and Development

8 Subdivision and Development 8 Subdivision and Development 8.1 Significant Issues Subdivision and development can provide a catalyst for environmental protection and enhancement. Subdivision and development can provide opportunities

More information

CRITERIA AND METHODOLOGY FOR DETERMINING OUTSTANDING FRESHWATER BODIES

CRITERIA AND METHODOLOGY FOR DETERMINING OUTSTANDING FRESHWATER BODIES CRITERIA AND METHODOLOGY FOR DETERMINING OUTSTANDING FRESHWATER BODIES Literature Review One, Part Two: Summary Report December 2015 Contents 1. Executive summary 1 2. Purpose 1 3. Documents reviewed 2

More information

MPT.2.8. Management Plan Technique. Index. Description and Explanations

MPT.2.8. Management Plan Technique. Index. Description and Explanations MPT.1 Management Plan Technique Index MPT.1 Management Plan Technique MPT.1.1 MPT.1.2 MPT.1.3 MPT.1.4.1.2.3.4.5.6.7.8 Description and Expectations Eligibility Rule Objectives Explanation Description and

More information

Regional Policy Statement. Review

Regional Policy Statement. Review Regional Policy Statement Review Consultation Draft 26 November 2014 RPS Consultation Draft 26 November 2014 1 Chairpersons Foreword... 4 PART A: Introduction... 5 Overview... 5 The Otago Region... 5 RPS

More information

TUWHARETOA MAORI TRUST BOARD MAAORI AFFAIRS SELECT COMMITTEE. Contact Address: P.O. Box 87 Turangi 3353, and P.O. Box 126 Taupo 3330.

TUWHARETOA MAORI TRUST BOARD MAAORI AFFAIRS SELECT COMMITTEE. Contact Address: P.O. Box 87 Turangi 3353, and P.O. Box 126 Taupo 3330. TUWHARETOA MAORI TRUST BOARD ~=_~,REC ES VE~D % 0 FES 20j09 MAORi SELECT AF,FA!RS COMMI"ITTEE MAAORI AFFAIRS SELECT COMMITTEE Waikato Tainui Raupatu Claims (Waikato River) Settlement Bill Submission From:

More information

S e c t i o n B i o d i ve r s i t y

S e c t i o n B i o d i ve r s i t y S e c t i o n 2. 2 - B i o d i ve r s i t y The District has a wealth of ecosystems which support indigenous vegetation and habitats of indigenous fauna. Many of these ecosystems are the remnants of the

More information

7 Section 32 Summary for the Natural Hazards Chapter

7 Section 32 Summary for the Natural Hazards Chapter 7 Section 32 Summary for the Natural Hazards Chapter The purpose of this section is to present a summary of the evaluation of the objectives, policies and methods of the Natural Hazards Chapter of the

More information

Shaping Whanganui. Have your say, korero mai. Whanganui District Council District Plan Review Phase Six. Section 32AA Report

Shaping Whanganui. Have your say, korero mai. Whanganui District Council District Plan Review Phase Six. Section 32AA Report Shaping Whanganui Have your say, korero mai. Whanganui District Council District Plan Review Phase Six Section 32AA Report Proposed Plan Change 50 Tangata Whenua 1 CONTENTS Content... 2 Introduction....

More information

Draft Outline for the Ōtākaro/Avon River Corridor Regeneration Plan

Draft Outline for the Ōtākaro/Avon River Corridor Regeneration Plan Draft Outline for the Ōtākaro/Avon River Corridor Regeneration Plan DRAFT OUTLINE FOR THE ŌTĀKARO/AVON RIVER CORRIDOR REGENERATION PLAN Contents 1. Introduction... 4 2. What the Ōtākaro/Avon River Corridor

More information

The uneasy relationship between the RMA and the heritage New Zealand Pouhere Taonga Act Ideas for an integrated framework?

The uneasy relationship between the RMA and the heritage New Zealand Pouhere Taonga Act Ideas for an integrated framework? The uneasy relationship between the RMA and the heritage New Zealand Pouhere Taonga Act Ideas for an integrated framework? Jill Gregory Senior Solicitor, Chapman Tripp Amanda Stoltz Solicitor, Chapman

More information

Earthquake-Prone Buildings Policy

Earthquake-Prone Buildings Policy Earthquake-Prone Buildings Policy Introduction and Purpose The purpose of this Policy is to balance out the need to address earthquake risk and other priorities, taking account of the social, cultural

More information

Introduction to the Resource Management Act 1991 Section 32 reports

Introduction to the Resource Management Act 1991 Section 32 reports Introduction to the Resource Management Act 1991 Section 32 reports For the Proposed Natural Resources Plan Issues and Evaluation Report Introduction to the Resource Management Act 1991 section 32 reports

More information

CHAPTER 22: AQUACULTURE

CHAPTER 22: AQUACULTURE CHAPTER 22: AQUACULTURE 22.0 INTRODUCTION This chapter deals with aquaculture development in the coastal marine area of the District. Aquaculture development is expected to have significant social, cultural

More information

LEPs and SEPPs. Planning, Development & Heritage. Local environmental plans (LEPs) Last updated: January 2013

LEPs and SEPPs. Planning, Development & Heritage. Local environmental plans (LEPs) Last updated: January 2013 Planning, Development & Heritage LEPs and SEPPs Last updated: January 2013 These Fact Sheets are a guide only and are no substitute for legal advice. To request free initial legal advice on an environmental

More information

In the Environment Court of New Zealand Christchurch Registry ENV-2016-CHC- Real Journeys. Appellant. Otago Regional Council.

In the Environment Court of New Zealand Christchurch Registry ENV-2016-CHC- Real Journeys. Appellant. Otago Regional Council. In the Environment Court of New Zealand Christchurch Registry ENV-2016-CHC- Under In the matter of Between the Resource Management Act 1991 (RMA) an appeal under Clause 14(1), First Schedule of the RMA

More information

8.3.1 Objective TW1 Recognition of Values & Traditional Relationships

8.3.1 Objective TW1 Recognition of Values & Traditional Relationships 8. TANGATA WHENUA 8 TANGATA WHENUA 8.1 Introduction As tangata whenua, Rangitaane o Wairarapa and Ngati Kahungunu ki Wairarapa have occupied the Wairarapa for centuries. Both Iwi are holders of traditional

More information

Section 32 report: natural hazards

Section 32 report: natural hazards Section 32 report: natural hazards For the draft Natural Resources Plan For more information, contact the Greater Wellington Regional Council: Wellington PO Box T 04 384 5708 F 04 385 6960 www.gw.govt.nz

More information

SUBMISSION ON THE PROPOSED NATIONAL POLICY STATEMENT ON INDIGENOUS BIODIVERSITY. Environmental Defence Society Incorporated

SUBMISSION ON THE PROPOSED NATIONAL POLICY STATEMENT ON INDIGENOUS BIODIVERSITY. Environmental Defence Society Incorporated SUBMISSION ON THE PROPOSED NATIONAL POLICY STATEMENT ON INDIGENOUS BIODIVERSITY To: By email: Name of submitter: Ministry for the Environment Environment House 23 Kate Sheppard Place Wellington biodiversity@mfe.govt.nz

More information

13 Land Use Activities and Indigenous Biological Diversity

13 Land Use Activities and Indigenous Biological Diversity 13 Land Use Activities and Indigenous Biological Diversity 13.1 Land Use Activities 13.1.1 Objectives Objective 13-1: Accelerated erosion* - regulation of vegetation clearance*, land disturbance*, forestry*

More information

Proposed Plan Change : Hobsonville Corridor Precinct Plan Change 12 to the Auckland Unitary Plan (Operative in part) SECTION 32 EVALUATION REPORT

Proposed Plan Change : Hobsonville Corridor Precinct Plan Change 12 to the Auckland Unitary Plan (Operative in part) SECTION 32 EVALUATION REPORT Proposed Plan Change : Hobsonville Corridor Precinct Plan Change 12 to the Auckland Unitary Plan (Operative in part) SECTION 32 EVALUATION REPORT May 2018 1 Table of Contents Executive Summary... 4 1.

More information

Relevant objectives and policies

Relevant objectives and policies Appendix G. Relevant objectives and policies New Zealand Coastal Policy Statement Objective 1 To safeguard the integrity, form, functioning and resilience of the coastal environment and sustain its ecosystems,

More information

Briefing for the Minister of Civil Defence

Briefing for the Minister of Civil Defence Briefing for the Minister of Civil Defence Resilient New Zealand Contents 3 Foreword 5 Sector Overview 6 Strategic and Legislative Framework 7 Minister s Role 9 The ministry s Role 10 Key Issues and Themes

More information

SECTION 32 TRANSPORT CHAPTER

SECTION 32 TRANSPORT CHAPTER SECTION 32 TRANSPORT CHAPTER AUGUST 2014 VERSION 1 CONTENTS 1. STRATEGIC CONTEXT...3 1.1 PURPOSE AND SCOPE OF THE TRANSPORT CHAPTER...3 1.2 PROPOSED DISTRICT PLAN: OVERVIEW AND SYNOPSIS...4 1.3 RESEARCH...5

More information

SUBMISSION TO THE LOCAL GOVERNMENT ACT 2002 AMENDMENT BILL

SUBMISSION TO THE LOCAL GOVERNMENT ACT 2002 AMENDMENT BILL Chief Executive's Office 26 July 2012 Local Government and Environment Select Committee Parliament Buildings Private Bag 18041 Wellington 6160 Dear Madam Chair SUBMISSION TO THE LOCAL GOVERNMENT ACT 2002

More information

A smaller 7.65MW wind farm at Mount Stuart, comprising 9 turbines with a maximum height of 75- metres, was also constructed in 2011.

A smaller 7.65MW wind farm at Mount Stuart, comprising 9 turbines with a maximum height of 75- metres, was also constructed in 2011. 3.4. ENERGY 3.4.1. INTRODUCTION The use of energy is of fundamental importance to the development and functioning of modern society. The RMA definition of natural and physical resources includes energy

More information

Regulatory Impact Summary: Local Government (Community Well-being) Amendment Bill

Regulatory Impact Summary: Local Government (Community Well-being) Amendment Bill Regulatory Impact Summary: Local Government (Community Well-being) Amendment Bill Agency disclosure statement The Department of Internal Affairs (the Department) is solely responsible for the analysis

More information

SUBMISSION GUIDE ECOLOGICALLY SUSTAINABLE DEVELOPMENT. May

SUBMISSION GUIDE ECOLOGICALLY SUSTAINABLE DEVELOPMENT. May SUBMISSION GUIDE ECOLOGICALLY SUSTAINABLE DEVELOPMENT May 2017 1 CONTENTS Part 1: The new Biodiversity Offsets Scheme 5 What is the Biodiversity Offsets Scheme? 6 Step 1: The proponent determines if the

More information

Te Hunga Roia Maori o Aotearoa (Maori Law Society Inc.) SUBMISSION: Resource Management (Simplifying and Streamlining) Amendment Bill

Te Hunga Roia Maori o Aotearoa (Maori Law Society Inc.) SUBMISSION: Resource Management (Simplifying and Streamlining) Amendment Bill Te Hunga Roia Maori o Aotearoa (Maori Law Society Inc.) SUBMISSION: Resource Management (Simplifying and Streamlining) Amendment Bill 3 APRIL 2009 TE HUNGA ROIA MAORI O AOTEAROA, SUBMISSION REGARDING THE

More information

National Policy Statement for Freshwater Management 2011: Implementation Guide

National Policy Statement for Freshwater Management 2011: Implementation Guide National Policy Statement for Freshwater Management 2011: Implementation Guide Acknowledgements Thank you to Auckland Council, Hastings District Council, Northland Regional Council, West Coast Regional

More information

Office of the Minister of Conservation Chair, Cabinet Energy, Environment and Climate Committee

Office of the Minister of Conservation Chair, Cabinet Energy, Environment and Climate Committee Office of the Minister of Conservation Chair, Cabinet Energy, Environment and Climate Committee DEVELOPMENT OF A NEW NATIONAL BIODIVERSITY STRATEGY Proposal 1. This paper seeks Cabinet approval to the

More information

Significance & Engagement Policy

Significance & Engagement Policy Significance & Engagement Policy - November 2014 Central Otago District Council PO Box 122, Alexandra 9320 P (03) 440 0056 E submissions@codc.govt.nz W www.codc.govt.nz 1. Purpose The purpose of the policy

More information

Regulatory Impact Statement

Regulatory Impact Statement Regulatory Impact Statement Transfer of discharge and dumping regulatory functions from Maritime New Zealand to the Environmental Protection Authority Agency Disclosure Statement This Regulatory Impact

More information

Advocating for the Conservation of Historical and Cultural Heritage

Advocating for the Conservation of Historical and Cultural Heritage Advocating for the Conservation of Historical and Cultural Heritage Statement of General Policy for Heritage New Zealand Pouhere Taonga s Statutory Role of Advocacy Summary of Submissions 28 October 2015

More information

This part of the Plan explains what a District Plan is and provides a user friendly guide.

This part of the Plan explains what a District Plan is and provides a user friendly guide. This part of the Plan explains what a District Plan is and provides a user friendly guide. If you have any questions about this Plan and how it might affect a project you are contemplating, then you are

More information

SECTION 32 UTILITIES AND ENERGY

SECTION 32 UTILITIES AND ENERGY SECTION 32 UTILITIES AND ENERGY 1 CONTENTS 1. STRATEGIC CONTEXT...3 2. RESOURCE MANAGEMENT ISSUES...5 3. SCALE AND SIGNIFICANCE EVALUATION... 14 4. EVALUATION OF OBJECTIVES... 15 5. EVALUATION OF PROPOSED

More information

STAGE 3 - SECTION 32 CHAPTER 11 UTILITIES AND ENERGY

STAGE 3 - SECTION 32 CHAPTER 11 UTILITIES AND ENERGY STAGE 3 - SECTION 32 CHAPTER 11 UTILITIES AND ENERGY CONTENTS 1. STRATEGIC CONTEXT...2 2. RESOURCE MANAGEMENT ISSUES...4 3. SCALE AND SIGNIFICANCE EVALUATION... 14 4. EVALUATION OF OBJECTIVES... 15 5.

More information

Submission on : Proposed Canterbury Regional Policy Statement

Submission on : Proposed Canterbury Regional Policy Statement To: Proposed Canterbury Regional Policy Statement Environment Canterbury PO Box 345 Christchurch 8410 e-mail: mailroom@ecan.govt.nz Submission on : Proposed Canterbury Regional Policy Statement Submitter

More information

THE proposed IMPACT ASSESSMENT SYSTEM. A Technical Guide

THE proposed IMPACT ASSESSMENT SYSTEM. A Technical Guide THE proposed IMPACT ASSESSMENT SYSTEM A Technical Guide 1 A GUIDE TO THE PROPOSED NEW IMPACT ASSESSMENT SYSTEM A clean environment and a strong economy go hand in hand. The Government of Canada is putting

More information

Auckland Local Government Context - July 2010 Catherine Murray (Auckland Regional Council) Sustainable Pathways 2. Introduction

Auckland Local Government Context - July 2010 Catherine Murray (Auckland Regional Council) Sustainable Pathways 2. Introduction Auckland Local Government Context - July 2010 Catherine Murray (Auckland Regional Council) Sustainable Pathways 2 Introduction The Auckland region is in a process of integrating core local government functions

More information

SUBMISSION ON THE PROPOSED NATIONAL POLICY STATEMENT ON URBAN DEVELOPMENT CAPACITY

SUBMISSION ON THE PROPOSED NATIONAL POLICY STATEMENT ON URBAN DEVELOPMENT CAPACITY SUBMISSION ON THE PROPOSED NATIONAL POLICY STATEMENT ON URBAN DEVELOPMENT CAPACITY To: Comments on: Name of submitter: Ministry for the Environment Proposed National Policy Statement on Urban Development

More information

Key Event Date Notified Date Decision Released Date Operative. Regional Plan: Coast 1 July May September 2001

Key Event Date Notified Date Decision Released Date Operative. Regional Plan: Coast 1 July May September 2001 Key Event Date Notified Date Decision Released Date Operative Regional Plan: Coast 1 July 1994 16 May 1997 1 September 2001 Plan Change 1 (Harbourside) 26 January 2008 14 February 2009 1 December 2009

More information

Attention: Proposed Regional Plan for Northland Hearing Panel

Attention: Proposed Regional Plan for Northland Hearing Panel 23 March 2018 Ben Lee Policy Development Manager Northland Regional Council 36 Water street, Whangarei 0110 By Email: benl@nrc.govt.nz Attention: Proposed Regional Plan for Northland Hearing Panel Proposed

More information

Report and Recommendations of the Board of Inquiry into the Proposed National Policy Statement for Freshwater Management

Report and Recommendations of the Board of Inquiry into the Proposed National Policy Statement for Freshwater Management Report and Recommendations of the Board of Inquiry into the Proposed National Policy Statement for Freshwater Management Prepared in January 2010 by the Board of Inquiry into the Proposed National Policy

More information

Asset Management. Activity Management Plan. Amended Long Term Plan As amended through the FitForFuture restructure 22 April /

Asset Management. Activity Management Plan. Amended Long Term Plan As amended through the FitForFuture restructure 22 April / Christchurch City Council Activity Management Plan Amended Long Term Plan 2016 2025 As amended through the FitForFuture restructure 22 April 2016 16/1098088 Christchurch City Council Quality Assurance

More information

PLANNING ASSESSMENT SHEET: FARMING ACTIVITY IN RED ZONE

PLANNING ASSESSMENT SHEET: FARMING ACTIVITY IN RED ZONE APPLICATION TO USE LAND FOR FARMING ACTIVITY IN RED ZONE PAGE 1 OF 15 July 2016 PLANNING ASSEMENT SHEET PREPARED FOR FARMING ACTIVTIES WITHIN THE RED NUTRIENT ALLOCATION ZONE UNDER THE CANTERBURY LAND

More information

Bill 36, the Alberta Land Stewardship Act sets the bar for responsible regional planning

Bill 36, the Alberta Land Stewardship Act sets the bar for responsible regional planning April 27, 2009 Bill 36, the Alberta Land Stewardship Act sets the bar for responsible regional planning Proposed Act respects property rights and local decision-making Edmonton... Future development in

More information

Hawke's Bay Regional Coastal Environment Plan Operative

Hawke's Bay Regional Coastal Environment Plan Operative Hawke's Bay Regional Coastal Environment Plan Operative 8 November 2014 Contents Notes... iv PART A - INTRODUCTION... 1 1.1 Title and purpose of Plan... 1 1.2 Statutory context... 4 1.3 Management direction...

More information

5 Contaminated Sites

5 Contaminated Sites 5 Contaminated Sites 5.1 Introduction For the purpose of this Plan, a contaminated site is a site at which hazardous substances occur at concentrations above background levels and where assessment indicates

More information

STAKEHOLDER CONSULTATION PROCESS STANDARD EXECUTIVE SUMMARY

STAKEHOLDER CONSULTATION PROCESS STANDARD EXECUTIVE SUMMARY STAKEHOLDER CONSULTATION PROCESS STANDARD EXECUTIVE SUMMARY Introduction 1 The stakeholder consultation process standard sets out Best practice consultation process to be followed by fisheries managers;

More information

B. Stakeholder Guide: Infrastructure and utility providers

B. Stakeholder Guide: Infrastructure and utility providers B. Stakeholder Guide: Infrastructure and utility providers Why is the Government proposing new legislation? As our population grows, the Government wants to accelerate the building of new communities and

More information

Exploring the concept of a Treaty based environmental audit framework

Exploring the concept of a Treaty based environmental audit framework He rangahau ki te aria ko te Tiriti te putake e whakatuturutia ai nga tikanga mo te taiao Exploring the concept of a Treaty based environmental audit framework Health Impact Assessment Symposium 30 March

More information

It is recommended that the Council not make any separate response to the Government s foreshore and seabed consultation paper but that the Council:

It is recommended that the Council not make any separate response to the Government s foreshore and seabed consultation paper but that the Council: FORESHORE AND SEABED ISSUE GOVERNMENT CONSULTATION PAPER Officer responsible Author Director of Legal & Secretariat Services Peter Mitchell, DDI 941-8549 INTRODUCTION This report is to provide information

More information

Report for Agenda Item: 2

Report for Agenda Item: 2 QLDC Council 28 September 2017 Department: Planning & Development Report for Agenda Item: 2 Stage 2 Proposed District Plan Notification Purpose The purpose of this paper is to present those parts of Stage

More information

5.3 CONSERVATION (WETLAND) ZONE

5.3 CONSERVATION (WETLAND) ZONE 5.3 CONSERVATION (WETLAND) ZONE 5.3.1 ZONE PURPOSE (1) The purpose of the Conservation (Wetland) Zone is one of conservation, protection and enhancement (including values of importance to tangata whenua)

More information

Guide. Preparing a resource consent application to take surface water, including replacing a deemed permit

Guide. Preparing a resource consent application to take surface water, including replacing a deemed permit Guide Preparing a resource consent application to take surface water, including replacing a deemed permit August 2015 Contents 1. Purpose and structure of the guide... 1 2. Preparing a resource consent

More information

THE proposed IMPACT ASSESSMENT SYSTEM

THE proposed IMPACT ASSESSMENT SYSTEM THE proposed IMPACT ASSESSMENT SYSTEM A Technical Guide Updated August 14, 2018 1 A GUIDE TO THE PROPOSED NEW IMPACT ASSESSMENT SYSTEM A clean environment and a strong economy go hand in hand. The Government

More information

D9. Significant Ecological Areas Overlay

D9. Significant Ecological Areas Overlay D9. Significant Ecological Areas Overlay D9.1. Background Auckland's indigenous biodiversity is unique with a diverse range of ecosystems reflecting the complex physical environment of the region. Natural

More information

BEFORE THE MANAWATU- WANGANUI REGIONAL COUNCIL. IN THE MATTER of the Resource Management Act 1991

BEFORE THE MANAWATU- WANGANUI REGIONAL COUNCIL. IN THE MATTER of the Resource Management Act 1991 BEFORE THE MANAWATU- WANGANUI REGIONAL COUNCIL IN THE MATTER of the Resource Management Act 1991 AND IN THE MATTER of Submissions and Further Submissions lodged by Meridian Energy Limited to the Manawatu-Wanganui

More information

New Zealand Chapter Environment Institute of Australia and New Zealand [ withheld ]

New Zealand Chapter Environment Institute of Australia and New Zealand [ withheld ] New Zealand Chapter Environment Institute of Australia and New Zealand [ withheld ] Hon Amy Adams & Hon Nathan Guy Freshwater Reform PO Box 10362 Wellington 6143 New Zealand 4 February 2014 Dear Ministers

More information

Section 32 Evaluation Report Business Mixed Use Zone (formerly the Business Zone) Contents

Section 32 Evaluation Report Business Mixed Use Zone (formerly the Business Zone) Contents Section 32 Evaluation Report Business Mixed Use Zone (formerly the Business Zone) Contents Section 32 Evaluation Report: Business Mixed Use Zone (formerly the Business Zone)... 2 1. Strategic Context...

More information

1.5 HCC s comments on the Latest Draft are outlined in pages 3-7 of this submission using the table format provided by Waikato-Tainui.

1.5 HCC s comments on the Latest Draft are outlined in pages 3-7 of this submission using the table format provided by Waikato-Tainui. 24 June 2013 Tim Manukau Manager Environment Waikato-Tainui Private Bag 3344 Hamilton 3240 Dear Sir WAIKATO-TAINUI ENVIRONMENTAL PLAN (LATEST DRAFT) 1.0 INTRODUCTION 1.1 (HCC) welcomes the opportunity

More information

SUBMISSION ON THE PRODUCTIVITY COMMISSION BETTER URBAN PLANNING DRAFT REPORT

SUBMISSION ON THE PRODUCTIVITY COMMISSION BETTER URBAN PLANNING DRAFT REPORT SUBMISSION ON THE PRODUCTIVITY COMMISSION BETTER URBAN PLANNING DRAFT REPORT 30 September 2016 Better Urban Planning Inquiry New Zealand Productivity Commission P O Box 8036 The Terrace WELLINGTON 6143

More information

Regulatory Impact Statement

Regulatory Impact Statement Regulatory Impact Statement Agency Disclosure Statement 1. This Regulatory Impact Statement (RIS) has been prepared by the Ministry of Business, Innovation and Employment (MBIE). 2. It provides an analysis

More information

6. PROCEDURAL REQUIREMENTS FOR CREATION OF A UNITARY AUTHORITY

6. PROCEDURAL REQUIREMENTS FOR CREATION OF A UNITARY AUTHORITY 6. PROCEDURAL REQUIREMENTS FOR CREATION OF A UNITARY AUTHORITY General Manager responsible: General Manager Regulation and Democracy Services, DDI 941-8549 Officer responsible: Ian Thomson Author: Ian

More information

Section 32 Report: Chapter 8 - Transportation

Section 32 Report: Chapter 8 - Transportation Section 32 Report: Chapter 8 - Transportation Introduction Hurunui District is highly reliant on its land transport network. The District s size and rural nature necessitates an efficient, safe, sustainable

More information

CABINET DIRECTIVE ON STREAMLINING REGULATION

CABINET DIRECTIVE ON STREAMLINING REGULATION CABINET DIRECTIVE ON STREAMLINING REGULATION Her Majesty the Queen in Right of Canada, 2007 Catalogue No. BT22-110/2007 ISBN 978-0-662-49149-1 Table of Contents Our Commitment to Canadians... 1 1.0 Introduction...

More information

Through the adoption of proposed mitigation measures, it is considered that the Project will be consistent with this objective.

Through the adoption of proposed mitigation measures, it is considered that the Project will be consistent with this objective. New Zealand Coastal Policy Statement (2010) Reference Full text Comment 1 To safeguard the integrity, form, functioning and resilience of the coastal environment and sustain its ecosystems, including marine

More information

URBAN WATER QUALITY STRATEGY FOR OTAGO. Caring for Otago s environment: Enabling communities to thrive

URBAN WATER QUALITY STRATEGY FOR OTAGO. Caring for Otago s environment: Enabling communities to thrive URBAN WATER QUALITY STRATEGY FOR OTAGO Caring for Otago s environment: Enabling communities to thrive 1 CONTENTS Water quality in Otago 3 About this strategy 4 Who is involved 4 Otago s vision for water

More information

BETTER PUBLIC SERVICES PAPER 2: BETTER SYSTEM LEADERSHIP

BETTER PUBLIC SERVICES PAPER 2: BETTER SYSTEM LEADERSHIP Office of the Deputy Prime Minister Office of the Minister of State Services Chair Cabinet State Sector Reform and Expenditure Control Committee BETTER PUBLIC SERVICES PAPER 2: BETTER SYSTEM LEADERSHIP

More information

PIA NSW Submission into NSW Biodiversity Legislation Review

PIA NSW Submission into NSW Biodiversity Legislation Review 5 September, 2014 Office of Rob Stokes MP Minister for the Environment Minister for Heritage Assistant Minister for Planning Minister for the Central Coast CC Lydia Robertson Policy Advisor lydia.robertson@minister.nsw.gov.au

More information

THE GENERAL INTRODUCTION

THE GENERAL INTRODUCTION SECTION 1: THE GENERAL INTRODUCTION CONTENTS 1.1 A Description of Palmerston North and its Natural and Physical Resources 1 1.1.1 City and History 1 1.1.2 Land Area and Land Use 2 1.1.3 Demographics and

More information

IN THE MATTER of the Resource Management Act 1991 MERIDIAN ENERGY LIMITED. Appellant SOUTHLAND DISTRICT COUNCIL. Respondent NOTICE OF APPEAL

IN THE MATTER of the Resource Management Act 1991 MERIDIAN ENERGY LIMITED. Appellant SOUTHLAND DISTRICT COUNCIL. Respondent NOTICE OF APPEAL BEFORE THE ENVIRONMENT COURT AT CHRISTCHURCH ENV-2014-CHC- IN THE MATTER of the Resource Management Act 1991 AND IN THE MATTER BETWEEN of an appeal under Clause 14(1), First Schedule of the Act in relation

More information

3 Implementing Bill 73 Amendments to the Planning Act

3 Implementing Bill 73 Amendments to the Planning Act Clause 3 in Report No. 17 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on November 17, 2016. 3 Implementing Bill 73

More information

Greater Wellington Regional Council BIODIVERSITY STRATEGY. Cover photos

Greater Wellington Regional Council BIODIVERSITY STRATEGY. Cover photos Greater Wellington Regional Council BIODIVERSITY STRATEGY Cover photos Cover photo: Mt Climie, Pakuratahi Forest Contents Executive summary 3 1 Introduction 5 1.1. Biodiversity in the Wellington region:

More information

Senior Policy Analyst Kaitātari Kaupapahere Matua Policy Group, Policy, Regulatory and Ethnic Affairs Branch

Senior Policy Analyst Kaitātari Kaupapahere Matua Policy Group, Policy, Regulatory and Ethnic Affairs Branch Senior Policy Analyst Kaitātari Kaupapahere Matua Policy Group, Policy, Regulatory and Ethnic Affairs Branch The Department s Policy Group is the primary provider of policy advice services and leadership

More information

PART 1 - DISTRICT PLAN STRUCTURE

PART 1 - DISTRICT PLAN STRUCTURE CONTENTS... PAGE 1.1 DISTRICT PLAN...3 1.2 PLAN CONTENTS...3 1.3 PLAN TEXT...6 1.4 SUPPORTING INFORMATION...6 ISTHMUS SECTION - OPERATIVE 1999 Page 1 Page 2 ISTHMUS SECTION - OPERATIVE 1999 PART 1 - DISTRICT