COUNTY OF SACRAMENTO CALIFORNIA For the Agenda of: May 28, 2014 Timed: 2:45 p.m.

Size: px
Start display at page:

Download "COUNTY OF SACRAMENTO CALIFORNIA For the Agenda of: May 28, 2014 Timed: 2:45 p.m."

Transcription

1 COUNTY OF SACRAMENTO CALIFORNIA For the Agenda of: May 28, 2014 Timed: 2:45 p.m. To: From: Board of Supervisors Department of Community Development Subject: PLNP General Plan Amendments Related To The Capital Southeast Connector. Request For Modifications To The Circulation Element, Transportation Plan And Bikeway Master Plan To Provide The Policies Needed For The Connector Project. Applicant: Capital Southeast Connector Joint Powers Authority And Sacramento County Department Of Community Development; APN: Various; Environmental Document: Prior Environmental Supervisorial District(s): MacGlashan, Nottoli Contact: Cindy Storelli, Principal Planner, (916) Michael Winter, Senior Planner, (916) Overview The Board of Supervisors first heard this project at the March 11, 2014 hearing. After discussion and public testimony, the Board continued the item to allow further consideration of issues that were raised during the hearing, including addressing concerns related to maintaining County control over the project, future public outreach, and project design issues such as access for agricultural interests and multi-modal trails. After meeting internally, and with stakeholders, the proposed project and the findings have been modified to better address the concerns. The resolution attached to this report includes the General Plan amendment for the Delta Protection Element item, as both amendments must be adopted together for the first round of General Plan amendments for this year. Recommendation 1. Acting as a CEQA Responsible Agency, consider the information in the attached Certified Final Program Environmental Impact Report for the Capital Southeast Connector Project (Attachment 1) and acknowledge that the contents of the Final PEIR have been considered. Additionally, adopt the findings of fact and statement of overriding considerations (Attachment 2); prepared by the Capital Southeast Connector Joint Powers Authority; 2. Adopt the attached Resolution Amending the General Plan and Repealing Board Resolution No ; 3. Adopt both the applicable mitigation measures contained within the Final PEIR prepared by the Capital Southeast Connector Joint Powers Authority, and the JPA s Mitigation Monitoring and Reporting Program for the Connector Project (Attachment 3), limited to those measures which mitigate or avoid the direct or indirect environmental effects of those parts of the project which the County decides to carry out, finance or approve; and 4. Direct County staff to continue to work with JPA staff.

2 Page 2 Measures/Evaluation The General Plan amendments provide for the Capitol Southeast Connector to be consistent with the Sacramento County General Plan. Fiscal Impact As co-applicants, the County s share of the cost of processing the application is included in the annual budget. BACKGROUND The Capital SouthEast Connector (Connector) project has been in progress since 2006 when the Connector Joint Powers Authority (JPA) was established by the jurisdictions along the general alignment. On March 11, 2014 the Board of Supervisors first heard the proposed General Plan amendments related to the Connector. Several questions and concerns were raised by Board members and the public during that hearing. The Board opted to continue the hearing to April 9, 2014 to allow time for stakeholder meetings with County and JPA staff to determine solutions to the concerns. Prior to that meeting the project was again continued to today s date to allow for the stakeholder meetings. Amendments to the Connector JPA Agreement. Independent of the General Plan Amendment process, the County has been processing amendments to the Connector Joint Powers Authority agreement. Three changes are proposed: 1. Prior to executing their power of eminent domain on land in the unincorporated county, the Connector JPA Board must receive concurrence from the County Board of Supervisors. 2. The County can withdraw from the Connector JPA agreement with a 10-day notice, if the County has no outstanding financial obligation to the Connector JPA. 3. Prior to imposing any financial obligation on the County, the Connector JPA must have agreement from the County Board of Supervisors. These JPA agreement amendments are scheduled to be heard as a County Department of Transportation item prior to today s General Plan Amendment hearing. The JPA agreement amendments have already been approved by other participating jurisdictions. DISCUSSION On March 11, 2014, the Board of Supervisors held the first hearing on the subject General Plan Amendments. After Board discussion and public testimony, the Board continued the project to allow stakeholder meetings to consider specific issues. Stakeholder Meetings. County and JPA staff met with stakeholders on March 28, April 11 and April 24, 2014 to discuss the concerns of the stakeholders and to consider how to resolve them. In attendance were Supervisors Nottoli and MacGlashan, Assemblyman Ken Cooley, Connector JPA representatives, landowners, representatives for landowners, members of the Cosumnes CPAC, the Farm Bureau and the Pacific Legal Foundation. County agencies represented were the Chief Deputy County Executive, County Counsel, Department of Community Development

3 Page 3 and Department of Transportation. The minutes for the April 11, 2014 meeting are provided as Attachment 4. The results of these and other meetings will be forwarded by JPA staff to the Connector JPA Board for informational purposes. Issues and Responses. The following reflects the primary issues raised during the prior Board hearing and the stakeholder meetings. Access Concerns. Agricultural interests want assurance that they will be able to move farm equipment and products in an efficient and timely manner along the proposed Connector. Further, they are concerned about a de facto loss of development rights if access is restricted to certain properties. To address these specific issues, Connector JPA staff agreed to meet with landowners within 1,000 feet of the Connector alignment to discuss specific access needs and solutions. Two meetings are scheduled for May 2014 that will focus on Connector Segments A and B. Two additional meetings are scheduled for June to discuss Segment D. Need for General Plan Amendments. The current General Plan thoroughfare designations for the Connector alignment would allow expansion up to six lanes. Some stakeholders questioned the need for the General Plan Amendments at all. The General Plan Circulation Element defines the circulation network that will support the mobility needs of both the existing land uses and the anticipated growth in land uses as defined in the General Plan. Along the Connector roadway alignment, the current General Plan Circulation Element proposes either a four-lane arterial or a six-lane thoroughfare roadway, and the County currently has the ability to improve the roadways along the Connector alignment consistent with the current roadway designations. This General Plan Amendment to the Circulation Element will align the County s General Plan with the roadway designations as developed by the Connector JPA thus allowing for future roadway improvements along the Connector alignment to be implemented consistent with the vision set forth by the Connector JPA. Loss of Representation in Land Use Decisions. The JPA agreement grants authority for the JPA to act independent of the County as it relates to some planning and construction aspects of the Connector. Concern was expressed that JPA decisions may not represent the best interests of County residents. The aforementioned inter-jurisdictional JPA agreement amendment will allow the County to withdraw from the process at any time, with a 10-day notice. This addresses the stakeholder s concerns, in part, by allowing the County Board of Supervisors, who represent unincorporated residents, to exercise appropriate control over land use decisions, if needed. Power of Eminent Domain by the JPA. There is a general concern that the County will not have control over the use of the power of eminent domain by the Connector JPA. There is a particular concern that eminent domain would be used to secure mitigation land and for the multimodal path.

4 Page 4 The JPA staff have provided assurance that eminent domain would only be used for necessary roadway right-of-way needs and not mitigation. Mitigation purchases are willing buyer-willing seller. JPA staff will take this statement forward to the JPA Board for confirmation and approval. Note that with the recent JPA Agreement amendments, County approval is required prior to any condemnation in the unincorporated county by the JPA Board. Additionally, the multi-modal path will be part of the overall right-ofway. Discussion also occurred regarding the possibility that the Connector might mitigate via the pending South Sacramento Habitat Conservation Plan (SSHCP). This is a fact as the JPA is a partner in the SSHCP. While not yet completed or adopted, the SSHPC is also being developed under a willing seller-willing buyer approach. ECOS Settlement Agreement. The Connector JPA Board agreed to settle a CEQArelated lawsuit out of court. The related Settlement Agreement obligates the JPA to establish an MOU with SACOG that would provide funding for an inventory of possible mitigation lands in the South County. This inventory could be used by various entities, including the South Sacramento Habitat Conservation Plan (SSHCP), for identifying land to use for mitigating future habitat impacts. The stakeholders expressed multiple concerns including 1) that the County is bound to the Settlement Agreement (it is referenced in the JPA Design Guidelines); 2) the documents (MOU and inventory) required by the Settlement agreement are not currently available for review; 3) the required mitigation inventory will affect private property rights if previously undiscovered resources are revealed; and 4) the use of Measure A funds to support the SSHCP is inappropriate. In response, County Counsel has studied the Settlement Agreement and opined that it does not obligate the County in any way. When the Design Guidelines are updated, the Connector JPA staff will include removing a reference to the Settlement Agreement. The JPA staff is actively working with SACOG on an MOU for funding to prepare the mitigation inventory and will share that document with stakeholders prior to the next JPA Board meeting where it will be discussed. JPA staff noted that the mitigation inventory will only use existing biological data, will not involve additional resource surveys and will not be parcel-specific. It was also clarified that the funds provided to SACOG under the Settlement Agreement fund only a portion of the mitigation inventory, a document that SACOG was planning to prepare prior to the Settlement Agreement. Expansion of Multi-purpose trail system. Some stakeholders are concerned that the proposed expansion of the multi-purpose trails may adversely impact agricultural operations and residences. The existing Bikeway Master Plan designations for the Connector alignment allow for bike paths along its entire length. The Connector General Plan amendments would maintain the same bikeway connectivity, but would upgrade significant portions to a Class I bikeway with a multimodal path. Bikeways and the multi-path trails are defined

5 Page 5 as being within the Connector ROW and would not extend beyond the ROW into the agricultural areas. See the Exhibit C of the attached Resolution for details. Revisions to the proposed General Plan Amendments. Much of the response to the stakeholder concerns relates to the details of the Connector Project and will be addressed by Connector JPA staff through subsequent meetings and proposed actions by the Connector JPA Board. In response to the stakeholder meetings the General Plan Amendments under consideration would be modified as follows: 1. Circulation Element Policy CI-7 (strikeout/bold format). The initial proposed modification to CI-7 acknowledged that the Capital SouthEast Connector Design Guidelines apply to the Connector alignment as designated on the Transportation Plan Map. It has since been modified to clarify that the County maintains control over access to the roadway within the unincorporated county. CI-7. Plan and construct transportation facilities as delineated on the Transportation Plan of the Sacramento County General Plan. Transportation facilities shall be consistent with the Sacramento County, Municipal Services Agency Improvement Standards and Construction Specifications, the Connector Project Design Guidelines, and supplemented by the California Department of Transportation (Caltrans) design standards. The County may deviate from the adopted County Improvement Standards and Construction Specifications in circumstances where conditions warrant special treatment. The Capital SouthEast Connector, as designated in the Transportation Plan map, shall be consistent with the most current JPAapproved Capital SouthEast Connector JPA Project Design Guidelines, provided that the Project Design Guidelines will not be applied to diminish or alter the rights of County-approved projects and provided that the design exception process within the Project Design Guidelines is not amended to diminish the County s land use authority to approve future projects proximate to or its authority to determine access to the Capital SouthEast Connector. The Capital SouthEast Connector is intended to serve the transportation demand for both existing land uses and future growth within the Urban Services Boundary (USB). The County reserves all of its rights and powers to assure that sufficient access to and from the Connector roadway is available to accommodate the existing land uses as well as the future growth within the USB. For areas of the unincorporated County outside of the USB, the County will limit access to and from the Connector roadway to only accommodate the existing and future land uses permitted outside of the USB. 2. Modifications to Circulation Element Text. In response to discussions, the phrase productive agricultural uses was changed to production agriculture. (See page 12 of Circulation Element, last bullet.) 3. Modifications to the Board Resolution. In addition, in response to stakeholder concerns, the following findings have been added to the Board Resolution as related to the Connector Project:

6 Page 6 BE IT FURTHER RESOLVED, that, to address concerns raised by agricultural users, the Board of Supervisors finds that this General Plan Amendment is subject to the following findings: 1. The Objectives of the Connector Project, as set forth in the Program EIR, include the preservation of production agriculture uses. The Connector Project will include design features intended to minimize encroachment on natural and agricultural resources, and support and protect the regional need to transport agricultural products and ancillary agricultural operations and to move agricultural equipment. Such support and protection of agriculture and the efficient access of agricultural products and equipment to existing and planned transportation facilities, including the Connector Project, is a high priority of the County. 2. The Capital SouthEast Connector JPA has adopted an agricultural outreach process to solicit early input on design and access issues to reduce the Connector Project s impact on agricultural uses, practices and productivity. Responsiveness of the Connector JPA to the results of the outreach process is of high importance to the County. 3. The ECOS settlement with the Connector JPA is not binding on the County of Sacramento, as the County was not a party to the settlement agreement. The County s final authority to approve access and land use proximate to the Capital SouthEast Connector in the future is unaffected by the settlement agreement. 4. The County retains all land use authority over the Capital SouthEast Connector, including the ability to determine access to and land uses surrounding the roadway. Under the Connector JPA s Project Design Guidelines, the County shall notify and consult with the Connector JPA on the future proposed access to the Capital SouthEast Connector, but the County has final authority over access to and land uses proximate to the Connector in unincorporated Sacramento County. CONCLUSION While additional stakeholder meetings will continue to occur to address many of the issues touched upon in this report, the wording of CI-7 and other text in the Circulation Element, and the findings in the General Plan resolution have been modified to provide assurances to the stakeholders that their concerns will continue to be discussed after the General Plan amendment process has concluded. In addition to approving the General Plan amendments, staff is asking the Board to direct staff to continue working with the JPA staff. The attached resolution amends the General Plan for this project as well as for the Delta Protection Element. Both sets of General Plan amendments are adopted concurrently with one resolution as part of the first hearing round of 2014.

7 Page 7 MEASURES/EVALUATION The General Plan Amendments provide for the Capitol Southeast Connector to be consistent with the Sacramento County General Plan. FINANCIAL ANALYSIS As co-applicants, the County s share of the cost of processing the application is included in the annual budget. Respectfully submitted, APPROVED: BRADLEY J. HUDSON County Executive LORI A. MOSS, Director Department of Community Development Attachments: BY: ROBERT B. LEONARD Chief Deputy County Executive RES - Resolution Amending the General Plan and Repealing Board Resolution No RES EXH A - Transportation Plan Map RES EXH B - Circulation Element Clean Copy RES EXH C - Bikeway Master Plan Maps RES EXH D - Delta Protection Element RES EXH E - Open Space Element ATT 1 - Capital Southeast Connector Final Program Environmental Impact Report (Link only: Revised-Draft.pdf ) ATT 2 - Findings of Fact and Statement of Overriding Considerations (Environmental Documentation for General Plan Amendments Memo) ATT 3 - Mitigation Monitoring and Reporting Program for the Connector Project (Link only: ) ATT 4 - Minutes of Stakeholder Meeting April 11, 2014

ARTICLE 38: AIR QUALITY ASSESSMENT AND VENTILATION REQUIREMENT FOR URBAN INFILL RESIDENTIAL DEVELOPMENTS

ARTICLE 38: AIR QUALITY ASSESSMENT AND VENTILATION REQUIREMENT FOR URBAN INFILL RESIDENTIAL DEVELOPMENTS San Francisco Health Code ARTICLE 38: AIR QUALITY ASSESSMENT AND VENTILATION REQUIREMENT FOR URBAN INFILL RESIDENTIAL DEVELOPMENTS Sec. 3801. Sec. 3802. Sec. 3803. Sec. 3804. Sec. 3805. Sec. 3806. Sec.

More information

Sacramento Local Agency Formation Commission

Sacramento Local Agency Formation Commission Sacramento Local Agency Formation Commission Peter Brundage, Executive Officer; Donald J. Lockhart, Assistant Executive Officer; Diane Thorpe, Commission Clerk www.saclafco.org Sacramento LAFCo Web Site:

More information

COUNTY OF SACRAMENTO CALIFORNIA

COUNTY OF SACRAMENTO CALIFORNIA COUNTY OF SACRAMENTO CALIFORNIA For the Agenda of: February 25, 2014 Timed: 10:15 a.m. To: From: Subject: Supervisorial District(s): Board of Supervisors Department of Community Development PLNP2013-00185.

More information

Sacramento Local Agency Formation Commission

Sacramento Local Agency Formation Commission Sacramento Local Agency Formation Commission Peter Brundage, Executive Officer; Donald J. Lockhart, Assistant Executive Officer; Diane Thorpe, Commission Clerk www.saclafco.org Sacramento LAFCo Web Site:

More information

FERRY COUNTY COUNTY-WIDE PLANNING POLICIES

FERRY COUNTY COUNTY-WIDE PLANNING POLICIES FERRY COUNTY COUNTY-WIDE PLANNING POLICIES This memorandum of understanding lays out the framework upon which the comprehensive planning process for Ferry County and the City of Republic will be built.

More information

... Noes: Supervisors:-N_o_n&...

... Noes: Supervisors:-N_o_n&... Click Hereto Return to AgeTM BOARD OF SUPERVISORS OF THE COUNTY OF STANISLAUS ACTION AGENDA SUMMARY DEPT: Planning & Communitv Development BOARD AGENDA # 9:30 a.m. Urgent Routine X AGENDA DATE: March 30,

More information

Memorandum. FROM: Jim Ortbal Rosalynn Hughey Barry Ng TO: HONORABLE MAYOR, CITY COUNCIL. DATE: June 16, 2017

Memorandum. FROM: Jim Ortbal Rosalynn Hughey Barry Ng TO: HONORABLE MAYOR, CITY COUNCIL. DATE: June 16, 2017 CITY OF SANjOSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR, CITY COUNCIL SUBJECT: TRANSPORTATION POLICY UPDATE REQUIRED BY STATE LAW - LOS TO VMT Memorandum FROM: Jim Ortbal Rosalynn Hughey Barry Ng

More information

HELENA CHEMICAL COMPANY NELSON TERMINAL PROJECT USE PERMIT UP Butte County Board of Supervisors January 29, 2013

HELENA CHEMICAL COMPANY NELSON TERMINAL PROJECT USE PERMIT UP Butte County Board of Supervisors January 29, 2013 HELENA CHEMICAL COMPANY NELSON TERMINAL PROJECT USE PERMIT UP10-0003 Butte County Board of Supervisors January 29, 2013 Helena Chemical Nelson Terminal Project Develop the Nelson site for use as a regional

More information

2 PROJECT DESCRIPTION

2 PROJECT DESCRIPTION The project is a landowner-initiated proposal to amend: 2 PROJECT DESCRIPTION 1. the City of Elk Grove Sphere of Influence (SOI); 2. the Sacramento Area Sewer District (SASD) SOI; and 3. the Sacramento

More information

Agenda Fremont Successor Agency Meeting May 14, :00 PM

Agenda Fremont Successor Agency Meeting May 14, :00 PM City Council Chambers 3300 Capitol Avenue Fremont, CA Agenda Fremont Successor Agency Meeting May 14, 2013 7:00 PM 1. Call to Order 2. Consent Calendar 3. Public Communications A. Oral and Written Communications

More information

SANTA CRUZ LOCAL AGENCY FORMATION COMMISSION SPHERES OF INFLUENCE POLICIES AND GUIDELINES

SANTA CRUZ LOCAL AGENCY FORMATION COMMISSION SPHERES OF INFLUENCE POLICIES AND GUIDELINES SANTA CRUZ LOCAL AGENCY FORMATION COMMISSION SPHERES OF INFLUENCE POLICIES AND GUIDELINES I. Legislative Authority Amended by Resolution No. 2011-1; February 2, 2011 The Knox-Nisbet Act of 1963 (former

More information

3.0 COMMENTS AND RESPONSES

3.0 COMMENTS AND RESPONSES General Plan 3.0-374 October 2003 3.0-375 General Plan Final Environmental Impact Report General Plan 3.0-376 October 2003 3.0-377 General Plan Final Environmental Impact Report General Plan 3.0-378 October

More information

REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES. Issuance Date November 27, 2017

REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES. Issuance Date November 27, 2017 REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES Issuance Date November 27, 2017 Submittal Deadline January 8, 2018 Page Is Blank For Photocopying MARIN LAFCO 2 TABLE OF CONTENTS Section Page Number I.

More information

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies APPENDIX B Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies Revised December 7, 2010 via Resolution # 100991 Reformatted March 18, 2011 TABLE OF CONTENTS

More information

GOOD NEIGHBOR POLICY

GOOD NEIGHBOR POLICY Regional Open Space MIDPENINSULA REGIONAL OPEN SPACE DISTRICT GOOD NEIGHBOR POLICY Adopted by the Board of Directors October 26, 1988 Amended August 14, 1996 Amended September 26, 2007 Introduction The

More information

City of La Palma Agenda Item No. 2

City of La Palma Agenda Item No. 2 City of La Palma Agenda Item No. 2 MEETING DATE: March 9, 2015 TO: FROM: SUBMITTED BY: AGENDA TITLE: DEVELOPMENT COMMITTEE DOUGLAS D. DUMHART COMMUNITY DEVELOPMENT DIRECTOR SCOTT HUTTER, ASSOCIATE PLANNER

More information

Purpose of the EIR. Chapter 1 Introduction

Purpose of the EIR. Chapter 1 Introduction Chapter 1 Introduction Purpose of the EIR The County of Monterey (County) has prepared this environmental impact report (EIR) to provide the public, responsible agencies, and trustee agencies with information

More information

Community Development Department Planning Division 1600 First Street + P.O. Box 660 Napa, CA Napa (707)

Community Development Department Planning Division 1600 First Street + P.O. Box 660 Napa, CA Napa (707) Community Development Department Planning Division 1600 First Street + P.O. Box 660 Napa, CA 94559-0660 Napa (707) 257-9530 PLANNING COMMISSION STAFF REPORT MAY 19, 2016 AGENDA ITEM #7.B. 16-0063-DR; NAPA

More information

COMMISSION ACTION FORM SUBJECT: PROPOSED BARILLA URBAN RENEWAL AREA AND TAX INCREMENT FINANCING DISTRICT

COMMISSION ACTION FORM SUBJECT: PROPOSED BARILLA URBAN RENEWAL AREA AND TAX INCREMENT FINANCING DISTRICT ITEM # 7 DATE 06-21-17 COMMISSION ACTION FORM SUBJECT: PROPOSED BARILLA URBAN RENEWAL AREA AND TAX INCREMENT FINANCING DISTRICT BACKGROUND: At the City Council meeting on February 28, 2017, the City Manager

More information

3 REVISIONS TO THE DRAFT EIR

3 REVISIONS TO THE DRAFT EIR 3 REVISIONS TO THE DRAFT EIR This section contains changes to the text of the Draft EIR and General Plan. The changes are presented in the order in which they appear and are identified by page number.

More information

A RESOLUTION OF THE PLANNING COMMISSION OF THE 3 CITY OF CARLSBAD, CALIFORNIA, APPROVING COASTAL DEVELOPMENT PERMIT CDP TO ALLOW THE

A RESOLUTION OF THE PLANNING COMMISSION OF THE 3 CITY OF CARLSBAD, CALIFORNIA, APPROVING COASTAL DEVELOPMENT PERMIT CDP TO ALLOW THE 1 PLANNING COMMISSION RESOLUTION NO. 6092 2 A RESOLUTION OF THE PLANNING COMMISSION OF THE 3 CITY OF CARLSBAD, CALIFORNIA, APPROVING COASTAL DEVELOPMENT PERMIT CDP 0-1 TO ALLOW THE INSTALLATION OF UNDERGROUND

More information

Fresno LAFCo Annexation Program Guidelines

Fresno LAFCo Annexation Program Guidelines Fresno LAFCo Annexation Program Guidelines It is Fresno LAFCo policy (102-01) that within the sphere of influence each agency should implement an orderly, phased annexation program. A proposal should not

More information

COUNTY OF RIVERSIDE, CALIFORNIA BOARD OF SUPERVISORS POLICY. Policy Subject: Number Page SOLAR POWER PLANTS B-29 1 of 7

COUNTY OF RIVERSIDE, CALIFORNIA BOARD OF SUPERVISORS POLICY. Policy Subject: Number Page SOLAR POWER PLANTS B-29 1 of 7 SOLAR POWER PLANTS B-29 1 of 7 Purpose: The Board supports solar energy and acknowledges its benefits. The benefits of solar power plants, however, occur on a national, statewide and regional level. The

More information

ADOPTION OF CHAPTER 120 (TREE CONSERVATION ORDINANCE) OF THE 1976 CODE OF THE COUNTY OF FAIRFAX, VIRGINIA

ADOPTION OF CHAPTER 120 (TREE CONSERVATION ORDINANCE) OF THE 1976 CODE OF THE COUNTY OF FAIRFAX, VIRGINIA ADOPTION OF CHAPTER 120 (TREE CONSERVATION ORDINANCE) 36-07-120 (Also see Heritage, Specimen, Memorial and Street Trees Ordinances 37-07-N adopted simultaneously on October 15, 2007) OF THE 1976 CODE OF

More information

Northwest State Route 138 Corridor Improvement Project

Northwest State Route 138 Corridor Improvement Project Northwest State Route 138 Corridor Improvement Project Los Angeles County, CA DISTRICT 7- LA- 138 (PM 0.0/36.8); DISTRICT 7- LA- 05 (PM 79.5/83.1); DISTRICT 7- LA- 14 (PM 73.4/74.4) 265100/ 0700001816

More information

CITY OF PHOENIX URBAN RENEWAL PLAN

CITY OF PHOENIX URBAN RENEWAL PLAN CITY OF PHOENIX URBAN RENEWAL PLAN Phoenix Urban Renewal Agency June, 2005 CITY OF PHOENIX URBAN RENEWAL PLAN CITY OF PHOENIX URBAN RENEWAL PLAN ACKNOWLEDGEMENTS This urban renewal plan was prepared with

More information

Board Chair s Signature: Date Signed: 9/12/2014

Board Chair s Signature: Date Signed: 9/12/2014 Grievance Policy and Procedure Approval Date: 9/12/2014 Rev. Date(s): COA Standards: HR 5.02 Purpose of Policy: To give a clear and specific written course of action for resolving disputes within the Broward

More information

4.n. 07/12/2007. Wayne M. Fowler, Sr. Local Government Analyst

4.n. 07/12/2007. Wayne M. Fowler, Sr. Local Government Analyst 4.n. 07/12/2007 TO: FROM: SUBJECT: Local Agency Formation Commission Wayne M. Fowler, Sr. Local Government Analyst LAFCO 2007-13-4 MINOR SPHERE OF INFLUENCE AMENDMENT (addition) TO THE CITY OF BLYTHE AND

More information

Long-term Management Plan For The Mitigation Bank

Long-term Management Plan For The Mitigation Bank Note: The California multi-agency Project Delivery Team developed this general outline to assist in the development of the Long-term Management Plan for mitigation banks. Objectives and tasks are provided

More information

SAN LUIS OBISPO COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT ZONE 9 ADVISORY COMMITTEE

SAN LUIS OBISPO COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT ZONE 9 ADVISORY COMMITTEE SAN LUIS OBISPO COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT ZONE 9 ADVISORY COMMITTEE Location: 919 Palm, Conference Room #1 Wednesday, August 9, 2017 Corner of Palm and Morro Streets 1:30 3:30

More information

Closing Date/Time: Wed. 04/13/16 11:59 PM Pacific Time

Closing Date/Time: Wed. 04/13/16 11:59 PM Pacific Time Job Title: Senior Planner Salary: $33.78 - $46.03 Hourly $5,856.00 - $7,978.83 Monthly $70,272.00 - $95,746.00 Annually Job Type: Full-time Location: Port of San Diego, California The Port of San Diego

More information

(Added by Ord , File No , App. 7/3/2003) (Derivation Former Administrative Code Section 5.239; added by Ord , File No.

(Added by Ord , File No , App. 7/3/2003) (Derivation Former Administrative Code Section 5.239; added by Ord , File No. CHAPTER 12: URBAN FORESTRY COUNCIL Sec. 1200. Purpose--Urban Forestry Council. Sec. 1201. Scope of Authority. Sec. 1202. Council Composition and Administration. Sec. 1203. Responsibilities. Sec. 1204.

More information

GENERAL ADMINISTRATION FUNCTION - PART I

GENERAL ADMINISTRATION FUNCTION - PART I CITY OF WEST SACRAMENTO REGULAR MEETING OF THE WEST SACRAMENTO CITY COUNCIL AND WEST SACRAMENTO REDEVELOPMENT SUCCESSOR AGENCY & WEST SACRAMENTO FINANCING AUTHORITY MARCH 20, 2013 AGENDA Christopher L.

More information

Sustainable Ag Lands Conservation (SALC) Stakeholder Kickoff Meeting Agenda (Meeting #1) 1) Welcome and Introductions (10 min)

Sustainable Ag Lands Conservation (SALC) Stakeholder Kickoff Meeting Agenda (Meeting #1) 1) Welcome and Introductions (10 min) Sustainable Ag Lands Conservation (SALC) Stakeholder Kickoff Meeting Agenda (Meeting #1) Thursday, April 28, 2016 10:00 am to Noon Development Services Training Room 7 County Center Drive, Oroville AGENDA

More information

Province - Department of Municipal and Provincial Affairs Nunatsiavut Government. Activities Responsibility Timing

Province - Department of Municipal and Provincial Affairs Nunatsiavut Government. Activities Responsibility Timing SUBJECT: Consultation on land use laws Activity Sheet: 10-1 OBLIGATION: PARTIES: Consult on land use policy or development regulation in Labrador Inuit Settlement Area (LISA) outside Labrador Inuit Lands

More information

INTERGOVERNMENTAL COORDINATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

INTERGOVERNMENTAL COORDINATION ELEMENT GOALS, OBJECTIVES, AND POLICIES INTERGOVERNMENTAL COORDINATION ELEMENT GOALS, OBJECTIVES, AND POLICIES Goal 8 To provide accessible, effective and frequent intergovernmental opportunities to achieve consistency among all government agencies

More information

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913 RICK SCOTT GOVERNOR Florida Department of Transportation 10041 Daniels Parkway Fort Myers, FL 33913 ANANTH PRASAD, P.E. SECRETARY Mr. Ray Eubanks Plan Processing Administrator Department of Economic Opportunity

More information

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA CITY OF SIGNAL HILL 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: FROM: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL SCOTT CHARNEY DIRECTOR OF COMMUNITY DEVELOPMENT SUBJECT: PUBLIC HEARING

More information

BOARD GUIDELINES ON SIGNIFICANT CORPORATE GOVERNANCE ISSUES

BOARD GUIDELINES ON SIGNIFICANT CORPORATE GOVERNANCE ISSUES BOARD GUIDELINES ON SIGNIFICANT CORPORATE GOVERNANCE ISSUES Management and the Board of Directors ( Board ) of Nabors Industries Ltd. (the Company ) are committed to conducting business consistent with

More information

Zoning Code and Design Guidelines. Department of Community Development. October 7, Tricia Stevens #46. Planning and Environmental Review

Zoning Code and Design Guidelines. Department of Community Development. October 7, Tricia Stevens #46. Planning and Environmental Review Zoning Code and Design Guidelines Department of Community Development Tricia Stevens Planning and Environmental Review #46 Introduction by Leighann Moffitt October is National Community Planning Month

More information

MEMORANDUM OF UNDERSTANDING Between UNITED STATES ARMY CORPS OF ENGINEERS And BNSF RAILWAY COMPANY

MEMORANDUM OF UNDERSTANDING Between UNITED STATES ARMY CORPS OF ENGINEERS And BNSF RAILWAY COMPANY MEMORANDUM OF UNDERSTANDING Between UNITED STATES ARMY CORPS OF ENGINEERS And BNSF RAILWAY COMPANY I. Purpose The purpose of this Memorandum of Understanding (MOU) is to establish communication protocols

More information

3 PROJECT DESCRIPTION

3 PROJECT DESCRIPTION 3.1 PROJECT OVERVIEW 3 PROJECT DESCRIPTION The Rocklin 60 project (proposed project) includes the subdivision of 56.9 acres of land, construction of 179 single-family, detached dwelling units, and installation

More information

New Jersey Department of Transportation. Local Freight Impact Fund Handbook. Procedures and Criteria for Local Freight Impact Fund Grant Program

New Jersey Department of Transportation. Local Freight Impact Fund Handbook. Procedures and Criteria for Local Freight Impact Fund Grant Program New Jersey Department of Transportation Local Freight Impact Fund Handbook Procedures and Criteria for Local Freight Impact Fund Grant Program Page 1 of 10 Overview The New Jersey Department of Transportation

More information

STATEWIDE MUTUAL AID AGREEMENT AN ACT. relating to resource sharing among certain political subdivisions,

STATEWIDE MUTUAL AID AGREEMENT AN ACT. relating to resource sharing among certain political subdivisions, STATEWIDE MUTUAL AID AGREEMENT H.B. No. 1471 AN ACT relating to resource sharing among certain political subdivisions, including regional planning commissions, during a disaster. BE IT ENACTED BY THE LEGISLATURE

More information

Guidelines of Corporate Governance

Guidelines of Corporate Governance Guidelines of Corporate Governance December 2017 The Board of Directors (the Board ) of Radian Group Inc. ( Radian or the Company ) has established guidelines for corporate governance based on an assessment

More information

LOCAL AGENCY FORMATION COMMISSION REGULAR MEETING AGENDA. Wednesday, March 8, :00 a.m.

LOCAL AGENCY FORMATION COMMISSION REGULAR MEETING AGENDA. Wednesday, March 8, :00 a.m. LOCAL AGENCY FORMATION COMMISSION REGULAR MEETING AGENDA Wednesday, 9:00 a.m. Board of Supervisors' Hearing Room, Room 381B Kenneth Hahn Hall of Administration 500 West Temple Street, Los Angeles 90012

More information

January 26, Kern County Planning Commission Kern County Administrative Center 1115 Truxtun Avenue Bakersfield, CA 93301

January 26, Kern County Planning Commission Kern County Administrative Center 1115 Truxtun Avenue Bakersfield, CA 93301 Lorelei H. Oviatt, AICP, Director 2700 M Street, Suite 100 Bakersfield, CA 93301-2323 Phone: (661) 862-8600 Fax: (661) 862-8601 TTY Relay 1-800-735-2929 Email: planning@co.kern.ca.us Web Address: http://pcd.kerndsa.com/

More information

3.0 CUMULATIVE IMPACT ANALYSIS METHODOLOGY

3.0 CUMULATIVE IMPACT ANALYSIS METHODOLOGY 3.0 CUMULATIVE IMPACT ANALYSIS METHODOLOGY 1. PURPOSE The purpose of this section is to explain the methodology for the cumulative project analysis presented in this EIR. This section is important because,

More information

RESOLUTION NUMBER 4162

RESOLUTION NUMBER 4162 RESOLUTION NUMBER 4162 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PERRIS, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA, APPROVING MITIGATED NEGATIVE DECLARATION 2274, ALUC OVERRULE AND APPROVAL OF DEVELOPMENT

More information

2.1 Project Definition/Classification/Initial Study Project Definition

2.1 Project Definition/Classification/Initial Study Project Definition 2.1 Project Definition/Classification/Initial Study 2.1.1 Project Definition The correct and complete definition of all reasonably foreseeable elements of a proposed project is the single most important

More information

CPI CARD GROUP INC. CORPORATE GOVERNANCE GUIDELINES

CPI CARD GROUP INC. CORPORATE GOVERNANCE GUIDELINES CPI CARD GROUP INC. CORPORATE GOVERNANCE GUIDELINES The Board of Directors (the Board ) of CPI Card Group Inc. (the Company ) has adopted the following Corporate Governance Guidelines (the Guidelines )

More information

City of Los Angeles. Integrated Resources Plan (IRP) Certification of Final Environmental Impact Report (EIR) and Adoption of IRP Recommendations

City of Los Angeles. Integrated Resources Plan (IRP) Certification of Final Environmental Impact Report (EIR) and Adoption of IRP Recommendations City of Los Angeles Integrated Resources Plan (IRP) Certification of Final Environmental Impact Report (EIR) and Adoption of IRP Recommendations City Council Meeting November 14, 2006 The Challenges New

More information

City of Palo Alto (ID # 6096) City Council Staff Report

City of Palo Alto (ID # 6096) City Council Staff Report City of Palo Alto (ID # 6096) City Council Staff Report Report Type: Consent Calendar Meeting Date: 12/7/2015 Summary Title: Crescent Park No Overnight Parking Title: Adoption of an Ordinance to add Chapter

More information

Environmental Setting, Impacts, Standard Conditions of Approval, and Mitigation Measures

Environmental Setting, Impacts, Standard Conditions of Approval, and Mitigation Measures CHAPTER 4 Environmental Setting, Impacts, Standard Conditions of Approval, and Mitigation Measures This Draft EIR has been prepared in accordance with CEQA, as amended (Public Resources Code Section 21000,

More information

UNIT 14 - FRESNO SHERIFF S SERGEANTS ASSOCIATION FRESNO COUNTY EMPLOYEE GRIEVANCE PROCEDURE PURPOSE

UNIT 14 - FRESNO SHERIFF S SERGEANTS ASSOCIATION FRESNO COUNTY EMPLOYEE GRIEVANCE PROCEDURE PURPOSE UNIT 14 - FRESNO SHERIFF S SERGEANTS ASSOCIATION FRESNO COUNTY EMPLOYEE GRIEVANCE PROCEDURE PURPOSE It is a mutual obligation on the part of administrative, supervisory and non-supervisory employees of

More information

GENESIS GROUP HOLDINGS, INC. CORPORATE GOVERNANCE POLICIES OF THE BOARD OF DIRECTORS

GENESIS GROUP HOLDINGS, INC. CORPORATE GOVERNANCE POLICIES OF THE BOARD OF DIRECTORS GENESIS GROUP HOLDINGS, INC. CORPORATE GOVERNANCE POLICIES OF THE BOARD OF DIRECTORS I. INTRODUCTION The board of directors of Genesis Group Holdings, Inc. has adopted these governance policies to assist

More information

YAKIMA COUNTY-WIDE PLANNING POLICY

YAKIMA COUNTY-WIDE PLANNING POLICY YAKIMA COUNTY-WIDE PLANNING POLICY A Policy Framework to Guide the Development of Comprehensive Plans Under the Washington State Growth Management Act Originally adopted June 1993 Revised and adopted October

More information

Medical Marijuana Regulation and Safety Act. Transportation & Planning Committee April 13, 2016

Medical Marijuana Regulation and Safety Act. Transportation & Planning Committee April 13, 2016 Medical Marijuana Regulation and Safety Act Transportation & Planning Committee April 13, 2016 Background Legislation Previous T & P Meeting AC Working Group Members Today s Presentation Permitting issue

More information

LOAD SERVING ENTITIES PJM REGION

LOAD SERVING ENTITIES PJM REGION Intra-PJM Tariffs --> RELIABILITY ASSURANCE AGREEMENT PJM Interconnection, L.L.C. Rate Schedule FERC No. 44 RELIABILITY ASSURANCE AGREEMENT Among LOAD SERVING ENTITIES in the PJM REGION Effective Date:

More information

- FACT SHEET - THE GUIDING PRINCIPLES

- FACT SHEET - THE GUIDING PRINCIPLES THE GUIDING PRINCIPLES The General Plan begins with seven ideas that together create a vision for the City s future. When the City approved the General Plan in 1994, these idea were dubbed the Seven Guiding

More information

Final Design Guideline

Final Design Guideline Final Design Guideline May, 2016 July, 2011 Check the Capital Project Delivery website to ensure this is the current version Table of Contents Purpose... 1 Introduction... 1 FD Support... 1 Roadway and

More information

IID Interim Water Supply Policy for Non-Agricultural Projects

IID Interim Water Supply Policy for Non-Agricultural Projects IID Interim Water Supply Policy for Non-Agricultural Projects 1.0 Purpose. Imperial Irrigation District (the District) is developing an Integrated Water Resources Management Plan (IWRMP) that will identify

More information

1.0 INTRODUCTION 1.1 EIR REQUIREMENT

1.0 INTRODUCTION 1.1 EIR REQUIREMENT This Draft Environmental Impact Report (EIR) describes the potential environmental effects that could result from implementation of the proposed Sonoma County General Plan 2020 (Draft GP 2020), which provides

More information

CITY OF CLOVIS Traffic Impact Study Guidelines

CITY OF CLOVIS Traffic Impact Study Guidelines CITY OF CLOVIS Traffic Impact Study Guidelines CLOVIS, A WAY OF LIFE Approved August 25, 2014 City Council Resolution 2014-79 Prepared by City of Clovis Engineering Division Steve White, City Engineer

More information

Transportation Workshop. FORA Staff 9/8/17

Transportation Workshop. FORA Staff 9/8/17 Transportation Workshop FORA Staff 9/8/17 Overview History/Background Policy Context CEQA Mitigations Projects Status 2018 TAMC Regional Impact Fee Study Future Considerations 2 Fort Ord Transportation

More information

Board of County Commissioners. Peter Russell, Senior Transportation Planner. DATE: October 7, 2015

Board of County Commissioners. Peter Russell, Senior Transportation Planner. DATE: October 7, 2015 TO: FROM: Board of County Commissioners Peter Russell, Senior Transportation Planner DATE: October 7, 2015 SUBJECT: Work session on amending the Deschutes County Comprehensive Plan to add an exception

More information

Virginia Department of Environmental Quality EMS Manual

Virginia Department of Environmental Quality EMS Manual The Virginia Department of Environmental Quality (DEQ) has implemented an environmental management system (EMS) based on DEQ E 3 /ISO 14001, the International and American National Environmental Management

More information

STORMWATER MANAGEMENT LEGISLATION IN COOK COUNTY (P.A )

STORMWATER MANAGEMENT LEGISLATION IN COOK COUNTY (P.A ) STORMWATER MANAGEMENT LEGISLATION IN COOK COUNTY (P.A. 093-1049) Summary of the Act In November 2004, the responsibility of Stormwater Management* in Cook County was placed under the authority of the MWRDGC

More information

Appendix K Sample Evacuation Order

Appendix K Sample Evacuation Order Dane County/Madison Metropolitan Area Evacuation Plan Appendix K Sample Evacuation Order H:\Emerplan\Evacuation Planning\Plan\Appendix K - Evac Declaration Process\Appendix K - Sample Evac Order.doc Evacuation

More information

ACCOUNTING SYSTEM/PROMPT PAYMENT

ACCOUNTING SYSTEM/PROMPT PAYMENT ACCOUNTING SYSTEM/PROMPT PAYMENT FILE: DIA TITLE: Timely Settlement of District Liabilities POLICY: Each principal or other person in charge of district funds used for external procurement of goods or

More information

INTERIM CONSULTATION PROCEDURE WITH TREATY 8 FIRST NATIONS September 2011

INTERIM CONSULTATION PROCEDURE WITH TREATY 8 FIRST NATIONS September 2011 INTERIM CONSULTATION PROCEDURE WITH TREATY 8 FIRST NATIONS September 2011 Version 1.1 Contents 1 PREFACE...3 BACKGROUND...3 2 INTRODUCTION...4 OVERVIEW...4 3 OVERVIEW OF COMMISSION CONSULTATION...5 PHASE

More information

November 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe:

November 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe: November 8, 2006 Mr. Glenn Rowe, P.E. Pennsylvania Department of Transportation Bureau of Highway Safety and Traffic Engineering Commonwealth Keystone Building 400 North Street, 6 th Floor Harrisburg,

More information

Route 7 Corridor Improvements Project Reston Avenue to Jarrett Valley Drive Public Hearing

Route 7 Corridor Improvements Project Reston Avenue to Jarrett Valley Drive Public Hearing Project Reston Avenue to Jarrett Valley Drive Public Hearing Nicholas J. Roper, P.E. District Project Development Engineer Email: nicholas.roper@vdot.virginia.gov Phone: (703)259-1953 Agenda 7:00-7:15

More information

CENTRAL CHARLOTTE COUNTY DRAINAGE DISTRICT

CENTRAL CHARLOTTE COUNTY DRAINAGE DISTRICT ,. CENTRAL CHARLOTTE COUNTY DRAINAGE DISTRICT Water Control Plan (October 1, 2000! Section 298.225 of the Florida Statutes requires each water control district to develop or revise its water control plan

More information

TOWN ADMINISTRATOR. Position Purpose:

TOWN ADMINISTRATOR. Position Purpose: TOWN ADMINISTRATOR Position Purpose: Performs professional management work overseeing activities of town departments under the jurisdiction of the Board of Selectmen and in accordance with federal, state,

More information

Application Deadline: August 14, 5 PM

Application Deadline: August 14, 5 PM Vacancy Announcement Title: Reports To: Location: Salary: Classification: Summary: Chief of Staff Tribal Council Happy Camp with travel to other offices $90,000 - $120,000 DOE Full Time, Regular, Exempt,

More information

This ordinance applies to the entire unincorporated areas of Waupaca County.

This ordinance applies to the entire unincorporated areas of Waupaca County. REPEAL AND RECREATE CHAPTER 10, SECTION 10.50 OF THE WAUPACA COUNTY CODE OF ORDINANCES RELATING TO MANURE STORAGE AND LAND SPREADING OF MANURE MANURE MANAGEMENT 10.50 GENERAL PROVISIONS A. Title: This

More information

County of El Dorado Notice of Preparation Tilden Park Project

County of El Dorado Notice of Preparation Tilden Park Project County of El Dorado Tilden Park Project DATE: December 19, 2012 TO: FROM: SUBJECT: Responsible Agencies, Trustee Agencies, and Interested Parties Pierre Rivas, Principal Planner, El Dorado County (NOP)

More information

Capacity Resource versus Energy Resource

Capacity Resource versus Energy Resource Capacity Resource versus Energy Resource Seasonal Capacity Resource Senior Task Force April 18, 2016 Capacity Resource or Energy Resource? When a new generator connects to PJM s system through the PJM

More information

Government Gazette REPUBLIC OF SOUTH AFRICA

Government Gazette REPUBLIC OF SOUTH AFRICA Government Gazette REPUBLIC OF SOUTH AFRICA Vol. 482 Cape Town 1 August 200No. 27898 THE PRESIDENCY No. 82 1 August 200 It is hereby notified that the President has assented to the following Act, which

More information

KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES

KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES Bureau of Transportation Safety and Technology 700 SW Harrison, Topeka, KS 66603 July 30, 2008 Definitions Significant Project All Federal-aid

More information

EXHIBIT A: Report from City Planning and the Los Angeles City Planning Commission (CPC)

EXHIBIT A: Report from City Planning and the Los Angeles City Planning Commission (CPC) EXHIBIT A: Report from City Planning and the Los Angeles City Planning Commission (CPC) West Adams-Baldwin Hills-Leimert New Community Plan CPC-2006-5567-CPU; CPC-2006-5567-CPU-M1; CPC-2006-5567-CPU-M2;

More information

Statutory Changes to the Community Planning Act (Chapter 163, Part II, Florida Statutes):

Statutory Changes to the Community Planning Act (Chapter 163, Part II, Florida Statutes): Contents 1986: Chapter 86 191, sections 7 12 and 18 31, Laws of Florida... 3 1987 Chapter 87 224, sections 24, 25 and 26 (Reviser s bill) and Chapter 87 338, Laws of Florida... 4 1988, 1989, and 1990 [None]...

More information

Published on e-li (http://ctas-eli.ctas.tennessee.edu) January 03, 2018 Solid Waste Management, Collection and Disposal

Published on e-li (http://ctas-eli.ctas.tennessee.edu) January 03, 2018 Solid Waste Management, Collection and Disposal Published on e-li (http://ctas-eli.ctas.tennessee.edu) January 03, 2018 Solid Waste Management, Collection and Disposal Dear Reader: The following document was created from the CTAS electronic library

More information

Oregon Theodore R. Kulongoski, Governor

Oregon Theodore R. Kulongoski, Governor Oregon Theodore R. Kulongoski, Governor NOTICE OF ADOPTED AMENDMENT Department of Land Conservation and Development 635 Capitol Street NE, Suite 150 Salem, Oregon 97301-2524 Phone: (503) 373-0050 First

More information

- Intergovernmental Coordination Goal, Objectives and Policies.

- Intergovernmental Coordination Goal, Objectives and Policies. 9.0 INTERGOVERNMENTAL COORDINATION 9.1 INTRODUCTION The INTERGOVERNMENTAL COORDINATION element is required to be included within the Comprehensive Plan per requirements of State planning law and criteria.

More information

1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\

1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\ 1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\ Executive Summary 3UHSDUHGýIRUã 3UHSDUHGýE\ã.DQVDVý'HSDUWPHQWýRI 7UDQVSRUWDWLRQ,QýDVVRFLDWLRQýZLWKã (DUWKý7HFKý,QFï EXECUTIVE SUMMARY Introduction This Northwest

More information

GRASS VALLEY WASTEWATER TREATMENT INQUIRY

GRASS VALLEY WASTEWATER TREATMENT INQUIRY GRASS VALLEY WASTEWATER TREATMENT INQUIRY REASON FOR INVESTIGATION The 2003-2004 Grand Jury investigated the status of wastewater treatment in unincorporated Nevada County. This year, the Grand Jury investigated

More information

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento 915 I Street, Sacramento, CA 95814-2671 4 To: Members of the Planning and Design Commission: PUBLIC HEARING May 11, 2017 Subject: Capital City

More information

Minimum Elements of a Local Comprehensive Plan

Minimum Elements of a Local Comprehensive Plan Minimum Elements of a Local Comprehensive Plan Background OKI is an association of local governments, business organizations and community groups serving more than 180 cities, villages, and townships in

More information

MALIBU BOATS, INC. CORPORATE GOVERNANCE PRINCIPLES

MALIBU BOATS, INC. CORPORATE GOVERNANCE PRINCIPLES MALIBU BOATS, INC. CORPORATE GOVERNANCE PRINCIPLES The Board of Directors (the Board ) of Malibu Boats, Inc. (the Company ) has adopted the following principles of corporate governance ( Principles ).

More information

ADMINISTRATIVE HEARING STAFF REPORT

ADMINISTRATIVE HEARING STAFF REPORT ADMINISTRATIVE HEARING STAFF REPORT Salt Lake City Water Treatment Facility 1365 West 2300 North CONDITIONAL USE Case #PLNPCM2013-00762 December 12, 2013 Planning and Zoning Division Department of Community

More information

Venice Pumping Plant Dual Force Main Project Draft EIR 1.0 I NTRODUCTION

Venice Pumping Plant Dual Force Main Project Draft EIR 1.0 I NTRODUCTION 1.0 I NTRODUCTION 1.1 PURPOSE OF THE EIR The purpose of an Environmental Impact Report (EIR), as defined in Section 15121(a) of the State Guidelines for the implementation of the California Environmental

More information

ADDENDUM TO THE NEWARK GENERAL PLAN TUNE UP PROGRAM ENVIRONMENTAL IMPACT REPORT (SCH ) FOR THE NEWPARK PLACE SPECIFIC PLAN.

ADDENDUM TO THE NEWARK GENERAL PLAN TUNE UP PROGRAM ENVIRONMENTAL IMPACT REPORT (SCH ) FOR THE NEWPARK PLACE SPECIFIC PLAN. ADDENDUM TO THE NEWARK GENERAL PLAN TUNE UP PROGRAM ENVIRONMENTAL IMPACT REPORT (SCH 2013012052) FOR THE NEWPARK PLACE SPECIFIC PLAN. INTRODUCTION The City of Newark (City) certified a Environmental Impact

More information

NORTH VINEYARD STATION SPECIFIC PLAN

NORTH VINEYARD STATION SPECIFIC PLAN NORTH VINEYARD STATION SPECIFIC PLAN 604-10. INTENT. It is the intent of the Board of Supervisors in adopting this Specific Plan to allow development of the North Vineyard Station area in a manner consistent

More information

REPORT OF THE CHIEF LEGISLATIVE ANALYST

REPORT OF THE CHIEF LEGISLATIVE ANALYST REPORT OF THE CHIEF LEGISLATIVE ANALYST DATE: TO: May 18, 2017 Honorable Members of the Rules, Elections, Intergovernmental Relations, and Neighborhoods Committee FROM: Sharon M. Ts< _ Chief Legislative

More information

IX. STRATEGIC PLAN ELEMENT

IX. STRATEGIC PLAN ELEMENT IX. STRATEGIC PLAN ELEMENT The Strategic Plan Element provides the action and implementation plan for the New Brunswick Master Plan. New Brunswick is a fully developed, older urban area in central New

More information

Sutter County Community Services

Sutter County Community Services Sutter County Community Services 1130 Civic Center Boulevard Yuba City, CA 95993 Animal Control Building Inspection Emergency Services Environmental Health Fire Services Planning Date: March 29, 2007 To:

More information

3.0 REVIEW OF PREVIOUS STUDIES

3.0 REVIEW OF PREVIOUS STUDIES 3.0 REVIEW OF PREVIOUS STUDIES This section of the highlights the significant features from previous plans and studies that could impact the development of the I-20 East Transit Initiative. Much of the

More information

For Discussion Purposes Only EDMONTON METROPOLITAN REGION BOARD REGULATION. Part 1 Edmonton Metropolitan Region Board

For Discussion Purposes Only EDMONTON METROPOLITAN REGION BOARD REGULATION. Part 1 Edmonton Metropolitan Region Board LEGEND - Outlines the sections of the Municipal Government Act that apply to growth management boards. Provides an explanation of the regulation s contents. * N E W R E G U L AT I O N For Discussion Purposes

More information