1 NGPL Winter Operations Review

2 Pipeline Management Operations Review Winter Recap 2017 Summer 2017 Storage & Transport Review Winter 2017/2018 Maintenance Update Completed & Waiting Winter Readiness Winter Checklist HP Readiness Checklist Contact Lists 2

3 Winter peak day delivery 5.2 BCF Storage working cap 288 BCF Mainline linepack 12.3 BCF Approximate values Miles of pipe 9,200 Flow meters 700 Total HP 1,037,000 Total compressor stations 52 Total storage fields 12 Approximate values 3

4 Winter 2016/2017 Recap Winter 2016/2017 was 13 % Warmer than Normal Highest monthly system average throughput was 5.3 Bcf/day in Dec 2016 Market 3.6 Bcf/d Field 1.6 Bcf/d Met Nov 1 storage goals No pressure or deliverability issues 4

5 Chicago O Hare HDDs Actual Actual HDD's % of Normal HDD's % of Normal Nov % % Dec % % Jan % % Feb % % Mar % % % % 2014/2015 winter 110% of normal 5

6 November - March Throughput Comparison 2016/17 Nov Mar 2015/16 Nov Mar % Change 2014/15 Nov Mar LDC 2,699 2, % 2,967 Power % 263 Industrial % 47 Interconnects 1,577 1, % 1,096 Storage % 206 TOTAL 4,855 4, % 4,579 All volumes are MDth 6

7 November - March Throughput Comparison Market Area Only 2016/17 Nov Mar 2015/16 Nov Mar % Change 2014/15 Nov Mar LDC 2,692 2, % 2,960 Power % 20 Industrial % 33 Interconnects % 235 Storage % 97 TOTAL 3,018 2, % 3,345 All volumes are MDth 7

8 Mdth/d Winter Average Daily LDC Demand 8

9 Significant Changes Summer 2017 Record setting Power loads in July. Top 5 power days were: July 20, Bcf/d July 19, July 21, July 25, July 22, Top 15 days: 6 in in 2016 Gulf Coast system continues to flow south from station 310 Since Jan 1, flows are southbound approximately 60% of the time 9

10 Gulf Coast Flow Direction 10

11 Summer 2017 Transport Summary Power generation deliveries set records in July Amarillo transports near max from Midcontinent Managing around integrity remediation Capacity available north of Trailblazer Gulf Coast utilization higher and less variable REX Moultrie receipts remain strong, many days > 1.3Bcf No restrictions on East Texas receipts Arkansas receipts averaging approximately 78,000 MMBtu/d Utilization of the Louisiana system increased due to LNG exports Deliveries into South Texas increased due to exports to Mexico 11

12 Chicago O Hare CDDs Actual Actual CDD's % of Normal CDD's % of Normal Apr % 7 78% May 21 48% % Jun % % Jul % % Aug % % Sep % % Oct % % % % 2015 summer 97% of normal 12

13 April - October Throughput Comparison % Change 2015 LDC 1,763 1, % 1,800 Power % 288 Industrial % 51 Interconnects 1,667 1, % 1,050 Storage % 918 TOTAL 4,514 4, % 4,107 All volumes are MDth 13

14 April - October Throughput Comparison Market Area Only % Change 2015 LDC 1,757 1, % 1,797 Power % 69 Industrial % 33 Interconnects % 102 Storage % 366 TOTAL 2,517 2, % 2,367 All volumes are MDth 14

15 Summer Average Daily Power Demand (MDth/d) 15

16 Average La Line Demand (MDth/d) 16

17 NGPL Storage Data Review Injection Withdrawal 17

18 Winter 2017/2018 Projected to meet market storage working inventory target of 116 MM Dth on Nov 1 Working inventory on Nov 1 estimated at 117 MM Dth Field storage has space to inject Market area maintenance projects to be complete by early Nov. No expected impact Expected changes in pipeline flows: REX receipts will increase on Gulf Coast Deliveries to LNG export facilities will continue to increase Deliveries to Mexico markets will continue Traditional supply basins: TX-OK will remain strong Midcontinent will remain at capacity 18

19 NOAA Weather 19

20 NGPL Maintenance Program Integrity IMP SCC General maintenance HP replacement program Updated 12 Month Rolling Maintenance Plan is posted on EBB around the 20 th of each month A detailed listing/description of the next month s outages is also posted on the 20 th of each month. 20

21 2017 NGPL Maintenance Program TYPE 2017 JOB COUNT 2016 JOB COUNT 2015 JOB COUNT 2014 JOB COUNT Integrity O&M System Total Market Area and Storage Amarillo projects GC projects Posted Posted (with an impact) Not posted (no impact)

22 2017 Remaining Projects with Potential Impacts Gulf Coast Sta 312 Sta 206a GC# remediation 4 anamolies Currently underway, expect completion end of Nov No expected impact GC# make piggable Impacted section to be complete by Nov AG # EMAT Final results due mid Dec 4 4 GC # EMAT Expected results late February No expected impact 5&6 5 LA # EMAT Expected results April LA # EMAT Expected results March

23 2017 Remaining Projects with Potential Impacts Amarillo 4 3 Sta 312 Sta 206a 1 OE # EMAT Expect final report in early November 2 2 M&M line Remediation 9 digs Expected to complete by end of Oct 1 3 AM # AFD & MFL Final report due in Dec 5 immediate digs already addressed 4 AM # Remediation 3 digs To be complete mid Nov 23

24 Winter Checklist Compression Test run all compression units prior to increased demand due to colder weather Incorporate 206A and 312 into the compression plan Storage Achieve market storage plan by Nov 1 Field storage is currently 86% full Pipeline Maintain linepack targets by area Maintain throughput targets Maintain pressures for key areas Field ops to man key sites Scheduled Maintenance Limit planned maintenance activities to those required by regulation or policy Customer Communication NGPL posts system capacity and outage information NGPL scheduling representatives and Account Directors available for questions 24

25 HP Readiness Checklist Amarillo All mainline stations tested and are ready. Gulf Coast All mainline stations tested and are ready. La Line 302 Unit #3 repair to be completed by Nov 4. Market Area All stations tested and are ready (113, 114, 312 & 206A). Storage All HP and related facilities have been tested and are ready. 25

26 NGPL 2017/2018 Contact List Gas Control Emer hr Trennis Curry Cell Bill Weidlein Cell Kenny Robbins Transport and Stor Services TSS Hotline 24 hr Richard Williams Cell Gene Nowak Cell Account Services Dave Weeks Cell Donette Bisett Cell Jim Brett Cell Field Operations Dee Bennett Director Cell Ron Bessette VP Cell Ken Grubb COO Cell Cell Danny Ivy Cell Ray Miller Cell Houston TX Office Louisiana St Houston, TX Downers Grove IL Office Lacey Rd Suite 700 Downers Grove, IL