7 CFO - SIKARIAGROUP <cfo.sikariagroup@gmail.com> Acknowledgement Slip for TOR application monitoring-ec@nic.in <monitoring-ec@nic.in> To: cfo.sikariagroup@gmail.com Cc: monitoring-ec@nic.in Wed, Nov 8, 2017 at 9:53 PM Acknowledgement Slip for TOR This is to acknowledge that the proposal has been successfully uploaded on the portal. The proposal shall be examined by MS of SEIAA to ensure that required information has been submitted. An will be sent for seeking additional information, if any, within 5 working days. Once verified, an acceptance letter shall be issued to the project proponent. Following should be mentioned in further correspondence 1. Proposal No. : SIA/TR/NCP/20807/ Category of the Proposal : 3. Project/Activity applied for : New Construction Projects and Industrial Estates 7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones 4. Name of the proposal : TRIPURA MEGA FOOD PARK 5. Date of submission for TOR : 08 Nov Name of the Project proponent along with contact details a) Name of the proponent : b) Mobile No. : c) State : West Bengal d) District : North 24 Parganas e) Pincode : SIKARIA MEGA FOODPARK PRIVATE LIMITED

8

9 11/8/2017 Report Part 1(FORM - B) APPENDIX I (See Paragraph-6) CATEGORY - B Note : If space provided against any parameter is inadequate,kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. (I)Basic Informations S.No. Item Details 1. Name of the Project TRIPURA MEGA FOOD PARK 2. Project Sector New Construction Projects and Industrial Estates 3. Location of the project TULAKONA BYE PASS 4. Shape of the project land Uploaded GPS file Uploaded copy of survey of India Toposheet Block (Polygon) Annexure-GPS file Annexure-Survey of india toposheet 5. Brief summary of project Annexure-Brief summary of project 6. State of the project Tripura Details of State of the project District Name S.no State Name Tehsil Name (1.) Jirania Tripura West Tripura Town / 7. Village TULAKONA Plot/Survey/Khasra ,586,587,601,588,590,600,591/2903,593,594/2902,592,591,589,594/2887,7957,7958,7925,7913,7914,7915,7916,7917,7918,7919,7920,7963,7910,7922,7923,7921,7933,7925/8983,7925/8982,7864/9113,7865,7874,7787,7882/P,7900/P,7881,7870,7867,7962,7967,7950,7869,7868,7955,7965,7961/8244,7964/8243, No. 9. S. No. in the schedule 7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones 10. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled ACRES ha. 11. New/Expansion/Modernization New 12. Category of project B 13. Does it attract the general condition? If yes, please specify No 15. Does it attract the specific condition? No 16. Is there any litigation pending against the project? No 17. Nearest railway station along with distance in kms. JOGENDRA NAGAR RAILWAY STATION, 4.4 km 18. Nearest airport along with distance in kms AGARTALA AIRPORT, 22 km 19. Nearest Town/City/District Headquarters along with distance in kms AGARTALA, 8.2 km 20. Distance of the project from nearest Habitation 1, 1 km 21. Details of alternative sites examined shown on a toposheet No 22. Whether part of interlinked projects? No 23. Whether the proposal involves approval/clearance under the Forest (Conservation)Act,1980? No 24. Whether the proposal involves approval/clearance under the wildlife (Protection)Act,1972? No 25. Whether the proposal involves approval/clearance under the C.R.Z notification,2011? No 26. Whether there is any Government Order/Policy relevent/relating to the site? No 27. Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? No 28. Project Cost(in lacs) Activity 1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes 1.2 Clearance of existing land, vegetation and buildings? Yes Food Park Proposed Built up Area : Acre i.e Ha i.e Sq.mtr Proposed Built up : Sq.mtr The Proposed Land (Industrial Land) lease by Tripura Industrial Development Corporation Limited Governme Tripura for 35 Years with sub lease condition. 1.3 Creation of new land uses? Yes Food Processing Industries including ancillary industry related to food processing. 1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Soil Testing Completed, Contour survey completed. Attached in Annexure III and Annexure II 1.5 Construction works? Yes Proposed construction of various building related to food,food processing,food storage and all basis ena infrastructure. 1.6 Demolition works? No Not Applicable 1.7 Temporary sites used for construction works or housing of construction workers? No Local labour will be employed 1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations Yes Proposed construction of food park/factory building/all basis enabling infrastructure having built up area:16732 Sq.mtr 1.9 Underground works including mining or tunneling? Yes Water Tank for storage of water Reclamation works? No Not involved 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and manufacturing processes? Yes Production of food product and ancillary industry. Attached in Annexureb IV 1.14 Facilities for storage of goods or materials? Yes Proposed Storage Facility Cold Storage : 2500 Dry Warehouse : 5000 MT Ripening chamber :40 MT 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Proposed facility ETP & STP : 1 MLD Solid Waste Digester 6 MT Par Day Biodegradable and non-biodegradable will be segregated.dry wast will be send for recycling and wet wast will be convert to composting for by or wast converter. Attached in Annexuree V 1.16 Facilities for long term housing of operational workers? Yes Temporary stay facility in the form of Gust house New road, rail or sea traffic during construction or operation? Yes Exciting road i.e NH 8 (By pass road ) will be used during construction New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? Yes 3.2 KM new road has been proposed in the project land Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not Applicable 1.20 New or diverted transmission lines or pipelines? Yes New transmission lines proposed in the project location of capacity 5 MW by 33/11 KV line Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not Applicable 1.22 Stream crossings? No No Stream crossings has been proposed Abstraction or transfers of water from ground or surface waters? Yes Transfers of water form ground has been proposed for the project 1500 KLD by 4 no of Deep tube wall Changes in water bodies or the land surface affecting drainage or run-off? No Not Applicable 1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes The transport of material during construction and operation phase will involve marginal increase traffic of truck transport of workers will also add to the present traffic. it is estimated that around 100 vehicle/day will be movi fully operation of the park Long-term dismantling or decommissioning or restoration works? No Not Applicable 1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not Applicable 1.28 Influx of people to an area in either temporarily or permanently? Yes Influx of temporary people during construction floating population as em[employees at the processing units temporary stay at guest house Introduction of alien species? No Not envisaged 1.30 Loss of native species or genetic diversity? No Not Applicable 1.31 Any other actions? No 2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): 2.1 Land especially undeveloped or agricultural land (ha) No The land (Industrial Land) lease by Tripura Industrial Development Corporation Limited Government of Tripur 35 Years. 2.2 Water (expected source & competing users) unit: KLD Yes water source has been proposed 4 No of Deep tube wall 1500 KLD 2.3 Minerals (MT) No Not Applicable 2.4 Construction material stone, aggregates, sand / soil (expected source MT) Yes Cement Coarse aggregates Fine aggregates Reinforcement Steel The above construction material required fo project will be source locally 2.5 Forests and timber (source MT) No Steel, Granite Door Frames will be used and flash,pvc,ms Door will be used 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes During Construction : 500 KW During Operation : 5 MW Source : Tripura State Electricity Corporation Limited & Base Power Plant 2.7 Any other natural resources (use appropriate standard units) No Not Applicable 3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No No hazardous wast will be used in the process 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not Applicable 3.3 Affect the welfare of people e.g. by changing living conditions? Yes Total employment generated by this project will be around more then Out of this from dir employment at the full operation. 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No The Proposed land (Industrial Land) lease Tripura Industrial Development Corporation Limited. 3.5 Any other causes No 4 Production of solid wastes during construction or operation or decommissioning (MT/month) 4.1 Yes Excavated material will be used for back filling at the site and top soil will be used for green belt development Spoil, overburden or mine wastes 4.2 Municipal waste (domestic and or commercial wastes) Yes Please refer Annexure V for solid waste detilas. 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) No Paints pigments will be only used during construction phase 4.4 Other industrial process wastes Yes Please refer Annexure IV 1/2

10 11/8/2017 Report Part 1(FORM - B) 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other sludge from effluent treatment Yes Sewage Sludge : 110 KG/Day Dry Waste : 6 TPD (Approx) 4.7 Construction or demolition wastes No Not Applicable 4.8 Redundant machinery or equipment No Not Applicable 4.9 Contaminated soils or other materials No Not Applicable 4.10 Agricultural wastes No Not Applicable 4.11 Other solid wastes No Not Applicable 5 Release of pollutants or any hazardous, toxic or noxious substances to air(kg/hr) 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Marginal emission to the atmosphere will be takes place from boiler and DG Set Capacity of Boiler : 4 TPH Quantity : 15 Lit/Hr DG Set 3300 KW Fuel : Natural Gas 5.2 Emissions from production processes No 5.3 Emissions from materials handling including storage or transport Yes 5.4 Emissions from construction activities including plant and equipment Yes 5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Fugitive dust and vehicular emission. However it will be localized. The fugitive dust will be controlled by re sprinkling Fugitive dust and vehicular emission. However it will be localized. The fugitive dust will be controlled by regul sprinkling During construction phase SPM level will slightly increase due to loading and unloading of construction mate earth excavation etc. it will be control by water sprinkling in surrounding area 5.6 Emissions from incineration of waste No Incineration is not used for during of the wast materials 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No No open burning of the weste 5.8 Emissions from any other sources No Not envisaged 6 Generation of Noise and Vibration, and Emissions of Light and Heat: 6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Sources of noise Pollution during construction phase are machinery like compressor,compactors, Concrete P Cranes and Transportation materials. During operation phase noise will be generated due to DG sets. Aco enclosures will be provided to DG sets to reduce noise and vibration. Thus,during operation no noise w generated due to machines. 6.2 From industrial or similar processes No Not envisaged 6.3 From construction or demolition Yes During construction Noise will be generated by loading unloading operations DG sets excavation activity etc. an demolition not carried out. 6.4 From blasting or piling No Blasting or piling not carried out 6.5 From construction or operational traffic Yes During construction trucks, tanker, two wheelers all will run on the site. During operation the two wheelers & wheelers will creates noise at the premises which is with in permissible limits. The noise levels will be below permissible limit owing to greenbelt around the plant premises 6.6 From lighting or cooling systems No Not Applicable 6.7 From any other sources No Not Applicable 7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: 7.1 From handling, storage, use or spillage of hazardous materials No No hazardous material will be used 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Sewage and other effluents will be treated and recycled and use completely in the premises only. 7.3 By deposition of pollutants emitted to air into the land or into water No It is Food processing project hence fuel burned in DG sets (Fuel : Natural Gas) which is used intermittently d power backup hence no gaseous emission. Boiler with design capacity 4000 kg/h (F&A 100 C) Design Press Kg/cm2(g) Fuel Type : Diesel 7.4 From any other sources No Not envisaged 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not envisaged 8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No Fuel stored is hardly 15 Ltr./hr. in safe place hence chances of fire are less 8.2 From any other causes Yes There is a risk of accident during construction however proper safety measures will be taken 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No Adequate earthquake proof design safety agents considering 55 m/s wind speed. The location being far away river hence no danger due to flood also project site falls in zone-v as per IS 1893 (Part-I):2002 classification. 9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality Lead to development of supporting utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.) housing development extractive industries supply industries Other Reinforcement of supporting Infrastructure like road, transport, communication, drinking water, sanitation and facilities 1.Development of housing infrastructure due to increased income & employment. 2.Development anc industry to support to plant requirements 3.Employment opportunities will increase due to the requireme workers for the proposed project. Local people will be preferred for employment. 9.1 Yes 9.2 Lead to after-use of the site, which could have an impact on the environment No 9.3 Set a precedent for later developments Yes Ancillary industries will be developed 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No The industry is not located in a critically polluted zone. There are no major industries in nearby areas. (III) Environmental Sensitivity S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value No Project Location distance is 22 KM (Approx) form international conventions 2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Project Location distance is 4.6 KM (Approx) form water courses (River : Haora River) 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Nil Within 15 KM 4 Inland, coastal, marine or underground waters No Nil 5 State, National boundaries No Nil 6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No Nil 7 Defence installations No Nil 8 Densely populated or built-up area Yes Agartala City 8.2 KM 9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Various hospital and schools facility exist in 15 km radius area. 10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Nil 11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Nil 12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Seismically, this area is categorized under Zone-V as per IS-1893 (Part-1) Adequate earthquake design and considering 55 m/s wind speed and The location being far away from river hence no danger d flood. (IV) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES 1 Uploaded Proposed TOR File Annexure-TOR file 2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter 3 Uploaded Pre-Feasibility report(pfr) Annexure-PFR 4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments (V) Undertaking The aforesaid application and documents furnished here with are true to my knowledge V.(i) Name SIKARIA MEGA FOODPARK PRIVATE LIMITED Designation Company Address CFO SIKARIA MEGA FOODPARK PRIVATE LIMITED TRIPURA MEGA FOOD PARK, TULAKONA BYE PASS 2/2

11 11/8/2017 FORM - B Print TOR Details Online Submission & Monitoring of Environmental, Forest and Wildlife Clearances -A Single Window Clearance System :00:00 UserID: Logout [cfo.sikariagroup@gmail.com] My Account My Proposals Environment Clearance My Proposals Forest Clearance My Proposals Wildlife Reference Help Print TOR Details Sno. Proposal No. Project Name Project Sector Location Detail Project Cost(in lacs) View/Print 1 SIA/TR/NCP/20807/2017 TRIPURA MEGA FOOD PARK New Construction Projects and Industrial Estates State: District: Tripura West Tripura Help Site Map FAQ Contact Us Designed, developed and hosted by NIC. Data owned,updated & Maintained by MoEFCC. 1/1