1 APPENDIX I (See paragraph 6) Form 1 (I) Basic Information Sr.. Item Details 1 Name of the Project/s Proposed expansion in Environment Clearance for Residential and Commercial project by Manikchand Kumar Properties at S.. 9/1, 9/2/1A to 9/2/7, Undri, Pune S.. in the Schedule 8(a) 3 Proposed capacity/ area/ length/ tonnage to Built Up Area- 1,42, sq.m. be handled/ command area/ lease area/number of wells to be drilled 4 New/Expansion/Modernization Expansion 5 Existing Capacity / Area etc. 45, m 2 construction completed as per EC 6 Category of Project i.e. A or B Category B 7 Does it attract the general condition? If, please specify 8 Does it attract the specific condition? If, please specify 9 Location Plot/Survey/Khasra. S.. 9/1, 9/2/1A to 9/2/7 Village Undri Tehsil Haveli District Pune State Maharashtra 10 Nearest railway station/ airport along with distance in kms. Pune Railway Station Km Lohegoan Airport- 15 Km 11 Nearest Town, City, District Headquarters Pune- 8 Km along with distance in Kms. 12 Village Panchayat, ZillaParishad, Municipal Pune Municipal Corporation Corporation, Local Body (complete postal address with telephone nos. to be given) 13 Name of the Applicant Manikchand Kumar Properties 14 Registered Address Kumar Capital, 2413, East Street, Camp, Pune 15 Address for correspondence : Kumar Capital, 2413, East Street, Camp, Pune Name Mr. Samir Patil Designation (Owner / Partner/CEO) Manager Sustainable Development Address Kumar Capital, 2413, East Street, Camp, Pune Pin Code Moef11@kumarworld.com Telephone Fax. 16 Details of Alternative Sites examined, if t applicable any. Location of these sites should be shown on a top sheet 17 Interlinked Projects t applicable

2 18 Whether separate application of interlinked t applicable project has been submitted? 19 If yes, date of submission t applicable 20 If no, reason t applicable 21 Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. a. The Forest (Conservation) Act, 1980? b. The Wildlife (Protection) Act, 1972? c. The C.R.Z. tification, 1991? 22 Whether there is any Government Order/ Policy relevant/ relating to the site?, The proposal does not involve any of this approval/clearance. t applicable 23 Forest Land involved (hectares), there is no forest land involved. 24 Whether there is any litigation pending against the project and/ or land in which the project is propose to be set up? a. Name of the Court b. Case. c. Orders/directions of the Court, if any And its relevance with the proposed project Litigation details: 2 cases a. Civil court senior division b. Case no.: 622 and 1901 c. S (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Information/Checklist confirmation Permanent or temporary changes in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Clearance of existing land, vegetation and buildings? / 1.3 Creation of new land uses? t applicable 1.4 Pre-construction investigation e.g. bore houses, soil testing? 1.5 Construction works? t applicable quantities / rates, wherever possible) with source of information data The existing land use pattern is residential. There will be no change in land use pattern due to proposed project. Necessary permissions obtained Hydro geological report is done of the project site. 1.6 Demolition Works? t applicable Temporary sites used for construction Temporary sheds are provided for workers. 1.7 works or housing of construction workers? 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations Excavation for foundation is prominent activity. The debris and rubble removed would be used as filling material for levelling and for road construction. Top soil will be stored for

3 landscaping 1.9 Underground works including mining or tunnelling? t applicable 1.1 Reclamation works? t applicable 1.11 Dredging? t applicable 1.12 Offshore structures? t applicable 1.13 Production and manufacturing processes? t applicable 1.14 Facilities for storage of goods or materials? t applicable 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? During Construction Phase During construction phase, construction waste will be sold to recyclers. Unusable, excess construction debris will be used within the site for backfilling and filling low lying areas. Workers will use common facilities which are provided on site Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction or operation? New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? During Operation Phase OWC has been provided to treat wet waste generated from existing users and another OWC will be provided to treat wet waste generated from proposed project. Dry waste will be handed over to SWACH. Sewage Treatment Plants are provided to treat the generated sewage and the treated sewage will be reuse within site for flushing and landscaping and excess treated sewage shall be disposed off to municipal sewer. t Applicable. The proposal pertains to construction. Workers involved during operation phase There will be some increase in road traffic: Construction phase: 4-5 trucks/day, Poclain, JCB may ply once or twice a day. Operation phase: Site is located at Undri, which is rural urban area. w a day, the area is developing with proper road infrastructure, internal roads, footpaths etc. The development will not have major impact on traffic pattern. Internal roads will be well constructed to manage traffic. t applicable t applicable

4 1.2 New or diverted transmission lines or pipelines? t applicable Impoundment, damming, Culverting, 1.21 realignment or other changes to the t applicable hydrology of water courses or aquifers 1.22 Stream crossings? t applicable 1.23 Abstraction or transfer of water form During construction phase Tanker water will ground or surface waters? be used for the construction purpose Changes in water bodies or the land surface affecting drainage or run-off? t applicable 1.25 Transport of personnel or materials for Movements of trucks/vehicles are envisaged construction, operation or for transport of construction materials. Road decommissioning? transport will be used for transportation of raw materials & labours during construction phase. During operation phase, the road transport will be utilized by the floating population for Long-term dismantling or decommissioning or restoration works? Ongoing activity during decommissioning which could have an impact on the environment? transportation. Proposed project does not involve any longterm dismantling or decommissioning or restoration works. Since project does not involve any decommissioning thus no impact on environment.. influx of people during construction phase 1.28 since approx. 100 nos. of local labourers will Influx of people to an area in either be employed. temporarily or permanently? During operation phase the total proposed population will be around 3924 persons Introduction of alien species? introduction of alien species is anticipated 1.3 Loss of native species or genetic diversity? deforestation is involved and only site clearance will be taken up and care will be taken to avoid loss of any native species or genetic diversity Any other Actions? other actions/activities envisaged. 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S.. Information/Checklist confirmation 2.1 Land especially undeveloped or agricultural land (ha) 2.2 Water (expected source & competing users) unit : KLD /N o quantities / rates, wherever possible) with source of information data t applicable During construction: 15 KLD Source: Tanker water During operation:

5 Source: PMC 2.3 Minerals (MT) t applicable 2.4 Construction Material- stone, aggregates, Locally available materials will be used. and / soil (expected source-mt) Various construction materials like cement, sand, steel, bricks, etc. shall be required for construction. 2.5 Forest & Timber (Source-MT) 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) wood or timber will be used at greater extent during construction phase by project proponent. Source: Maharashtra State Electricity Distribution Company Limited. During Construction 116 KVA approx. DG Set at site for construction purpose- 100 KVA. During operation: Source: Maharashtra State Electricity Distribution Company Limited. (MSEDCL) Residential Building Building Demand (incl. Diversity & P.F.)=3459 KVA Transformer Suggested = 6 x 630 KVA,315 KVA X 1 Alternative Back up= Back up only for Utility Load. DG Set Suggested=1X 200 KVA, 125 KVA x 1 & 300 KVA x 2 nos. 2.7 Any other natural resources (use appropriate standard units) t applicable 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.. Information/Checklist confirmation Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) Affect the welfare of people e.g. by changing living conditions? / quantities / rates, wherever possible) with source of information data t applicable t applicable Project will not negatively affect welfare of people.

6 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes Peoples will not be affected by project rather since project aimed to provide good infrastructure and amenities to people in operation phase. 4. Production of solid wastes during construction or operation or decommission (MT/month) S.. Information/Checklist confirmation / Spoil, overburden or mine wastes Municipal Waste (domestic and or commercial wastes) quantities / rates, wherever possible) with source of information data Debris and Excavated material will be used for back filling at the site Solid Waste management Total proposed population of the scheme is 3924 nos. Quantity of solid waste kg/day Quantity of wet waste kg/day considering Quantity of dry waste- 780 kg/day Biodegradable and non biodegradable waste will be segregated. Dry waste will be sent for recycling and Wet waste will be treated in OWC 4.3 Hazardous wastes (as per Hazardous Negligible amount may generate and same will Waste Management Rules) be handed over to authorized vendor. 4.4 Other industrial process wastes t applicable 4.5 Surplus product t applicable 4.6 Sewage sludge or other sludge from To be used as manure for gardening purpose or effluent Treatment will be disposed off as per norms. 4.7 Construction waste will be used for roads and as Construction or demolition wastes fill material for levelling and road, pathway construction. 4.8 Redundant machinery or equipment t applicable 4.9 Contaminated soils or other materials t applicable 4.12 Agricultural wastes t applicable 4.11 Other solid wastes t applicable 5. Release of pollutants or any hazardous, toxic or noxious to air (Kg/hr) S.. Information/Checklist confirmation / 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources quantities / rates, wherever possible) with source of information data During construction phase emissions from combustion of fossil fuels will be from use of construction machineries, vehicles and DG Sets.

7 During operation phase emissions will be from use of DG sets on power break down and vehicles for transportation. 5.2 Emission from production processes t applicable 5.3 Emissions from materials handling Vehicle having PUC certificate will be used including storage or transport 5.4 Emissions from construction activities including plant and equipment 5.5 Dust or odours from handling of materials including construction materials, sewage and waste 5.6 Emissions from incineration of waste t applicable 5.7 Emissions from burning of waste in open t applicable air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources t applicable for materials handling Dust emissions may occur during excavation and earthwork proper care will be taken to reduce dust emission. Dust will be generated during transport and handling of material.

8 6. Generation of ise and Vibration, and Emissions of Light and Heat: S.. Information/Checklist confirmation / quantities / rates, wherever possible) with source of information data 6.1 From operation of equipment e.g. engines, ventilation plant, crushers Source of noise pollution during construction phase are machinery like compressor, comparators, concrete plant, cranes and transportation materials. During operation phase DG sets with acoustic enclosure will be provided with Canopy to reduce noise and vibration 6.2 From industrial or similar processes t applicable 6.3 From construction or demolition Due to Construction machinery and vehicle movement 6.4 From blasting or piling t applicable 6.5 From construction or operational The source of noise would be due to traffic vehicular and construction equipment. 6.6 From lighting or cooling systems t applicable 6.7 From any other sources t applicable 7. Risk of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, ground water, coastal waters or the sea: `S.. Information/Checklist confirmation / 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode & place of discharge) quantities / rates, wherever possible) with source of information data t applicable 7.3 By deposition of pollutants emitted to air into the land or into water t applicable 7.4 From any other sources t applicable 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? t applicable Possibility of discharge of sewage into sewer line due to mechanical failure in STP. 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S.. Information/Checklist confirmation / quantities / rates, wherever possible) with source of information data

9 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances 8.2 From any other causes 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? t applicable There is a risk of accidents during construction, however proper safety measures will be taken Floods and landslides are not expected in the area. Cloudburst may occur. Earthquakes proneness: The area falls under Zone III as per IS Hence relevant design parameters as per zone III have been considered for RCC design of the buildings. 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S.. Information/Checklist confirmation / quantities / rates, wherever possible) with source of information data 9.1 Lead to development of supporting facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc) Housing Development Extractive industries Supply industries Other 9.2 Lead to after-use of the site, which could have an impact on the environment Housing development: There are many proposed residential and commercial project coming in the vicinity of this project site. The proposed development will cater the needs of the residents. t applicable 9.3 Set a precedent for later developments t applicable 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects t applicable (III) Environmental Activities S.. Information/Checklist confirmation / quantities / rates, wherever possible) with source of information

10 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value Areas which are important or sensitive for ecological reasons-wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Areas used by protected, important or sensitive spices of flora or fauna of breeding, nesting, foraging, resting, over wintering, migration. Inland, coastal, marine or underground water data t applicable The proposed location is at a distance of 6 km from Katraj lake t applicable t applicable 5 State, National boundaries t applicable Routes or facilities used by the public for t applicable 6 access to recreation or other tourist, pilgrim areas 7 Defence installations t applicable 8 Densely populated or built-up area Project located in rural urban area Vighnaharta Hospital- 0.9 Km Chintamani Hospital- 1.5 Km Bishops school, Km 9 Kidzee 1.20 Km Areas occupied by sensitive man-made Sanskriti school 0.10 Km land uses(hospitals,schools, places of Laxmi mata mandir 0.60 Km worship, community, facilities) Lord Shiva mandir 1.5 Km Siddque masjid Km Union Bank- 0.9 Km SBI Km Areas containing important, height quality or scarce resources ( ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) Areas susceptible to natural hazard which could cause the project to present environmental problems ( earthquakes, subsidence, landslides, erosion, flooding) t applicable t applicable t applicable (IV). Proposed Terms of Reference for EIA studies: - NA

11