1 Flood Management and Mitigation measures Prepared by Somphone KHONGSAB Department of water resource, WREA 1

2 Contents 1. Main flood plains in Lao PDR 1.1 Mitigation measures and Response Flood damages and Loss 2. Institutional arrangement for flood mitigation 2.1 Data Monitoring and Collection Systems 2.2 Flood Forecast and Warning System 3. Programs and investments 4. Problems and challenges and assistance required 2

3 1. Main floodplains 1. Louangnamtha Province (Flashflood) 2. The Vientiane Plain (Vientiane Municipality and Vientiane province), 3. Khammouane Province (Thakhek Town and Xebangfai Mouth, Hinboun Mouth), 4. Savannakhet Province, 5. Saravan Province,Champasak Province (Pakse Town), and Attapeu province. 3

4 Luangprabang Province Flash flood in urban center and adjacent districts Xiengkhouang Province Hailstorms Borikhamxay Province Flash flood along the Mekong on the Road No.13 Vientiane Province Flash flood in Vangvieng District Vientiane Capital Flash flood in Urban districts Khammouan Province Flash flood along the Mekong on the Road No.13 and Lower Xebangfai River 4

5 1.1 Flood damages and Loss Flood Damages and Losses (Billion Kip) Khammouan Borikhamxay Vientiane Capital Luangprabang Luangprabang Vientiane Capital Borikhamxay Khammouan 5

6 (US dollar) Flood damages per year 70,000, ,000, ,000, ,000, ,000, ,000, ,000, Total flood damages ( ) Total flood damages floods and droughts damage costs, which US$ 104,897, , 1979, 1986, 1991, 1993,1997 and 1999 damage caused by floods and Drought US$597,700,000 While the most severe damages from flooding in 2001, 2002, 2008 caused more than US$ 50,000,000 6

7 Vientiane Capital City, September 1966 Mekong. Vientiane Capital City Centre. September Central Business Area under water for 5 weeks of monsoon. Floodpeak = cumecs. (approximately a 1 in year event.) Source picture from French s News Papers 7

8 1.2 Mitigation measures and Response Flood forecasting by department of Meteorology and Hydrology (WREA) and the Department of Waterway (Ministry of Public Works and Transport), with technical support from MRCs such as: major tributaries, rainfall data for flood forecasting. Flood protection: levees, gates, drains have been built by the Lao government in major cities located along the Mekong River. (Vientiane, Bolikhamsay, Khammouan, Savannakhet,Champasak provinces). The work was carried out by Government s budget, loans and foreign assistances. 8

9 9

10 2. Institutional arrangement for flood mitigation Deputy Prime Minister s office Ministry of Planning and Investment Minister of Labor and Social Welfare Minister of Agriculture and Forestry Water Resources and Environment Administration (WREA) Ministry of Energy and Mines Chief of Cabinet, Ministry of Foreign Affaires Chief of Cabinet, Ministry of Defense Chief of Cabinet, Ministry of Security Chief of Cabinet, Ministry of Education Director General of Budget Department, Ministry of Finance Director General of Transport Department, Ministry of Public Works and Transport Director of Industry Department, Ministry of Industry and Commerce Director of Hygiene Department, Ministry of Public Health Director of Mass Media Department, Ministry of Information and Culture Director of Social Welfare Department, Ministry of Labors and Social Welfare Chairman of Lao Red Cross Society Lao Women Union Lao Youth Union Chairman Vice Chairman Vice Chairman 10

11 2.1 Data Monitoring and Collection Systems DMH there are 17 stations are main synoptic surface (monthly data recording and rainfall observation only) rain gauges, - Staff gauges are 119 stations, - 49 discharge measurement stations, C-Band Doppler radar at DMH Headquarter and MTSAT 1R satellite receiving station. Collected data by the Provincial Meteorology and Hydrology Office (PMHO) with the assistance from the local people who live close to the stations, the data will later be reported to the DMH in Vientiane Capital. 11

12 2.2 Flood Forecast and Warning System Nearly warning In the case the water level forecast at that station will expect to be at below warning level. DMH has to provide the warning and timely delivering to Mass media and Ministry of Agriculture and Forestry Prime Minister s Office, Lao National Mekong Committee (LNMC) and NDMO DMH make an interview to mass media DMH sent the warning information to Provincial Agriculture and Forestry Office (PAFO) and PMHO and to focus areas The warning message is broadcasted through national and local radio stations during daily programme for disaster management Urgent warning In the case the water level exceeds warning level. DMH has to provide the urgent warning to Mass media and DMH makes an interview to mass media DMH report to Ministry of Agriculture and Forestry and later report to Prime Minister Prime Minister s Office, and LNMC DMH sent the warning information to PAFO and PMHO and to focus areas At the same time DMH sends urgent warning to NDMO NDMO sends the urgent warning to Provincial disaster management office and later to district office and focus areas National radio stations will broadcast the warning massage through its program regularly 12

13 3. Programs and investments Construction and improvement of disaster warning stations (gauge the flow of the Mekong River and its tributaries). Achieve the automatic collecting and dispatching of data through satellite at the 13 existing stations. Refine the prevision of flooding through the installation of internet at the 13 stations. Ensure a nation-wide system of floods mitigation. 13

14 3. Programs and investments Compile statistics data logs on water levels and flow rates. Water drainage construction plan in Vientiane Capital. In Bolikhamsay Province, the construction of locks against floods will continue on most critical tributaries such as Nam San and Nam Kading. 14

15 4. Problems and challenges and assistance required 1. Problems and challenges Data and information: flood management and mitigation data have available limited due to data quality system, limited of communication 2. Assistance system (village, required province) Fund for flood Wemanagement: need to support need to improve on flood capacity building of water resources management management, andflood mitigation forecasting capacity system; early warning; mitigation; building, and andalso technical we need support. to improve to drain water system, build a flood protection system due to some area has a low level. Expert and technical support: insufficient; because the flood management of our country to be a new work. Therefore, we have low experience for flood management and mitigation. 15

16 IP Action Plan Activities Month June July August Propose IP to DWR Fist draft Meeting for IP content Revise IP content Review data for IP Scond draft meeting for IP Revise after get comment from meeting Final IP (Submit to TWM Training Program)

17 Target group who will use the IP? Department of Water Resources Water Resources Section of Provinces and Districts