AMENDED AND RESTATED TODD CREEK VILLAGE METROPOLITAN DISTRICT SCHEDULE OF FEES, RATES, AND CHARGES

Size: px
Start display at page:

Download "AMENDED AND RESTATED TODD CREEK VILLAGE METROPOLITAN DISTRICT SCHEDULE OF FEES, RATES, AND CHARGES"

Transcription

1 AMENDED AND RESTATED TODD CREEK VILLAGE METROPOLITAN DISTRICT SCHEDULE OF FEES, RATES, AND CHARGES Amended and Restated: November 14, 2017

2 1. TAP FEES. These fees are privilege-of-service fees that a Customer must pay before a Permit for service is issued. Total Tap Fees include fees for: a) Water Connection and Infrastructure Fee; b) Water Resource Fee; and c) Capital Construction Reserve Fee. The Term "paired set" refers to a combination of one Potable and one Irrigation Tap. RESIDENTIAL TAP FEES Water Tap Fee ¾ Meter (paired set) Water Tap Fee 1 Meter (paired set) Accessory Dwelling Unit* $28, $44, $14, *Units such as a guest house, carriage house, or in-law-suite, whether attached to or detached from the primary residence, that contain provisions for sleeping, cooking, and sanitation. COMMERCIAL TAP FEE COMBINE ONE POTABLE COMMERCIAL TAP WITH ONE IRRIGATION COMMERCIAL TAP TO COMPLETE A PAIRED SET Potable Water Tap Fee ¾ Meter $29, Potable Water Tap Fee 1 Meter $49, Potable Water Tap Fee 1 ½ Meter $98, Potable Water Tap Fee 2 Meter $157, Irrigation Water Tap Fee ¾ Meter $29, Irrigation Water Tap Fee l Meter $49, Irrigation Water Tap Fee 1 ½ Meter $98, Irrigation Water Tap Fee 2 Meter $157, IRRIGATION ONLY TAP FEE Irrigation Water Tap Fee ¾ Meter $29, Irrigation Water Tap Fee 1 Meter $49, Irrigation Water Tap Fee 1 ½ Meter $98, Irrigation Water Tap Fee 2 Meter $157, INSPECTION FEE. This fee covers the estimated cost to the District of inspecting water service connection before service commences. Potable Water Inspection Fee Irrigation Water Inspection Fee $ $ * Inspections lasting more than one hour will be charged an additional $90.00 per hour.

3 3. WATER SERVICE CHARGES. Billed monthly based on actual services provided. RESIDENTIAL RATES Facility Investment Fee: Potable and Irrigation (paired set) $57.00 Potable Only $42.00 Irrigation Only $15.00 Conservation Fee: ¾ Tap: Up to 4,999 gallons $ 0.00 Up to 9,999 gallons $0.00 5,000 to 5,999 gallons $ ,000 to 14,999 gallons $5.00 6,000 to 7,999 gallons $ ,000 to 19,999 gallons $ ,000 to 9,999 gallons $ ,000 to 24,999 gallons $ ,000 to 14,999 gallons $ ,000 to 34,999 gallons $ ,000 to 19,999 gallons $ ,000 to 44,999 gallons $ ,000 to 24,999 gallons $ ,000 to 54,999 gallons $ ,000 and over $ ,000 to 64,999 gallons $ ,000 and over $ Tap: Up to 4,999 gallons $ 0.00 Up to 19,999 gallons $0.00 5,000 to 5,999 gallons $ ,000 to 29,999 gallons $ ,000 to 7,999 gallons $ ,000 to 39,999 gallons $ ,000 to 9,999 gallons $ ,000 to 49,999 gallons $ ,000 to 14,999 gallons $ ,000 to 69,999 gallons $ ,000 to 19,999 gallons $ ,000 to 89,999 gallons $ ,000 to 24,999 gallons $ ,000 to 109,999 gallons $ ,000 and over $ ,000 to 129,999 gallons $ ,000 and over $80.00 Water Usage Fees: Potable Irrigation $4.30 per 1,000 gallons $3.95 per 1,000 gallons

4 COMMERCIAL RATES Facility Investment Fee: ¾ Tap: Potable and Irrigation $36.00 Potable Only $18.50 Irrigation Only $ Tap: Potable and Irrigation $72.00 Potable Only $37.00 Irrigation Only $ ½ Tap: Potable and Irrigation $ Potable Only $74.00 Irrigation Only $ Tap: Potable and Irrigation $ Potable Only $ Irrigation Only $ Conservation Fee: ¾ Tap: Up to 4,999 gallons $ 0.00 Up to 9,999 gallons $0.00 5,000 to 5,999 gallons $ ,000 to 14,999 gallons $5.00 6,000 to 7,999 gallons $ ,000 to 19,999 gallons $ ,000 to 9,999 gallons $ ,000 to 24,999 gallons $ ,000 to 14,999 gallons $ ,000 to 34,999 gallons $ ,000 to 19,999 gallons $ ,000 to 44,999 gallons $ ,000 to 24,999 gallons $ ,000 to 54,999 gallons $ ,000 and over $ ,000 to 64,999 gallons $ ,000 and over $40.00

5 1 Tap: Up to 4,999 gallons $0.00 Up to 19,999 gallons $0.00 5,000 to 5,999 gallons $ ,000 to 29,999 gallons $ ,000 to 7,999 gallons $ ,000 to 39,999 gallons $ ,000 to 9,999 gallons $ ,000 to 49,999 gallons $ ,000 to 14,999 gallons $ ,000 to 69,999 gallons $ ,000 to 19,999 gallons $ ,000 to 89,999 gallons $ ,000 to 24,999 gallons $ ,000 to 109,999 gallons $ ,000 and over $ ,000 to 129,999 gallons $ ,000 gallons and over $ ½ Tap: Up to 9,999 gallons $0.00 Up to 39,999 gallons $ ,000 to 11,999 gallons $ ,000 to 59,999 gallons $ ,000 to 15,999 gallons $ ,000 to 79,999 gallons $ ,000 to 19,999 gallons $ ,000 to 99,999 gallons $ ,000 to 29,999 gallons $ ,000 to 139,999 gallons $ ,000 to 39,999 gallons $ ,000 to 179,999 gallons $ ,000 to 49,999 gallons $ ,000 to 219,999 gallons $ ,000 gallons and over $ ,000 to 259,999 gallons $ ,000 gallons and over $ Tap: Up to 19,999 gallons $0.00 Up to 79,999 gallons $ ,000 to 23,999 gallons $ ,000 to 119,999 gallons $ ,000 to 31,999 gallons $ ,000 to 159,999 gallons $ ,000 to 39,999 gallons $ ,000 to 199,999 gallons $ ,000 to 59,999 gallons $ ,000 to 279,999 gallons $ ,000 to 79,999 gallons $ ,000 to 359,999 gallons $ ,000 to 99,999 gallons $ ,000 to 439,999 gallons $ ,000 gallons and over $ ,000 to 519,999 gallons $ ,000 gallons and over $ Water Usage Fees Potable Irrigation $4.30 per 1,000 gallons $3.95 per 1,000 gallons

6 4. FAILURE TO CONNECT FEE. Billed Monthly beginning the 25 th month after tap is purchased $ WATER METER CHARGES. Potable Meters ¾ SRII ECR Meter, Touch Pad with MXU 1 SRII ECR Meter, Touch Pad with MXU* 1 ½ SRII ECR Meter, Touch Pad with MXU* 2 SRII ECR Meter, Touch Pad with MXU* $ $ $1, $1, Irrigation Meters 3/4 SRII TR/PL Meter with MXU $ SRII ECR Meter, Touch Pad with MXU* $ ½ SRII ECR Meter, Touch Pad with MXU* $1, SRII ECR Meter, Touch Pad with MXU* $1, Actual cost may vary from time to time. Please call District at time of installation for actual cost. $90.00/hour will be charged for sets inspections greater than one hour. 6. VOLUNTARY YEARLY OWS INSPECTION. Onsite Wastewater System Inspection $90.00 Todd Creek Village Metropolitan District will offer a voluntary OWS inspection program for Homeowners wishing to participate. 7. DAILY CONSTRUCTION HYDRANT USAGE FEES. Fee Schedule for Daily Construction Hydrant Usage Individual Lot Site Work Hydrant Meter Valve Deposit $60.00/day $2, Major construction water costs will be charged at $60.00 per day, plus $6.00 per thousand gallons for irrigation water, should potable be used the charge will be $10.00 per thousand gallons.

7 8. MISCELLANEOUS FEES. Maintenance Service Fee (per occurrence) Tum-On/Turn-Off Fee Transfer Fee Unauthorized Connection Fee Penalty for Late Payments Interest on Delinquent Balances Penalty for Late Payment of Tap Fee Interest for Late Payment of Tap Fee Administrative Fee for Collections & NSF Checks Foreclosure Fee Penalty for Unauthorized Tampering Non-Compliance Penalty Fee $75.00 $ $75.00 $10, or twice the current Tap Fee, whichever is greater Greater of $10.00 or 5% of outstanding bill 1%/month time 1%/month $30.00 $1, minimum or actual cost Actual expense, loss or damage or $500.00, whichever is greater 1st Offense 2nd Offense 3rd Offense Written Warning 2nd Written Warning and Fine Potable Shut off and Fine and Referral to legal $ $ Copies Certification Fee CORA (Colorado Open Records Act) $0.50 per page $10.00 See Rules of Official Custodian

8 9. MAJOR INFRASTRUCTURE DEVELOPMENT FEES. Plan Review Fee Internal District Staff Review District Engineer or Attorney Review (review process shall be at the discretion of the District) Permit Fee Inspection Fee $90.00/hour Cost plus 10% $ $90.00/hour