FORM 1. 8 Does it attract the specific condition? It yes, No Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai

Size: px
Start display at page:

Download "FORM 1. 8 Does it attract the specific condition? It yes, No Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai"

Transcription

1 FORM 1 (I) Basic Information Sr. Item Details. 1 Name of the Project WHITE CITY METAL 2 S.. in the Schedule 8 (b) 3 Proposed capacity/area /length/tonnage to Plot area: 45, sq.mt. be handled/command area/lease area/ FSI Built-up area: 67, sq.mt. number of wells to be drilled Total Construction area : 1,73,043.36sq.mt. 4 New/Expansion/Modernization For revalidation 5 Existing Capacity/Area etc. EC received dated ( Ref. SEAC- 2010/CR.748/TC.2) 6 Category of Project i.e. A or B B 7 Does it attract the general condition? If, Please specify 8 Does it attract the specific condition? It yes, Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai Plot/Survey/Khasra. CTS 174 C Village Akurli, Akurli Road Tehsil Kandivali (E) District State Mumbai Maharashtra 10 Nearest railway station/airport along with distance in kms. Kandivali Railway Station (2 kms) 11 Nearest Town, City, District Headquarters along with distance in kms. Kandivali (2 kms) 12 Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal Municipal Corporation of Greater Mumbai addresses with telephone nos. to be given) 13 Name of the applicant M/s. Rajesh Real Estate Developers Pvt. Ltd. 14 Registered Address M/s. Rajesh Real Estate Developers Pvt. Ltd. 15 Address for correspondence: As Above Name Designation(Owner/Partner/CEO) Address R.B. House, M.I.D.C. Cross Road B, Off Andheri Kurla Road, Mumbai Mr. Priyal K. Patel Director As above Pin Code rajeshbuilders@vsnl. com Telephone Fax Enviro Analysts & Engineers Pvt. Ltd. 1

2 16 Details of Alternative Sites examined, If any. Location of these sites should be shown on a topo sheet. 17 Interlinked Projects 18 Whether separate application of interlinked project has been submitted? 19 It yes, date of submission NA 20 If no, reason NA 21 Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z. tification, 1991? 22 Whether there is any Government NA Order/Policy relevant/relating to the site? 23 Forest land involved (hectares) 24 Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case. (c) Orders/directions of the Court, if any and its Relevance with the proposed project. Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for 23 mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) (II) Activity 1. Construction, operation or decommissioning of the project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies etc.) Information/ Checklist confirmation / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? The developers have planned Residential Complex on this land. The project site is enhanced with best landscape design and plantation. 1.3 Creation of new land uses? Vacant land to residential use. Enviro Analysts & Engineers Pvt. Ltd. 2

3 1.4 Pre-construction investigations e.g. Detailed Feasibility studies are completed. bore houses, soil testing? 1.5 Construction works? Construction of residential complex. 1.6 Demolition works? The present site area is a vacant land, so the question of demolition does not arise. 1.7 Temporary sites used for About 75 workers (skilled, semi-skilled and construction works or housing of non-skilled) will be employed at the site construction workers? during construction period, temporary 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including mining or tunnelling? 1.10 Reclamation works? t Applicable 1.11 Dredging? t Applicable 1.12 Offshore structures? t Applicable housing facilities are provided on the site. Building-A,B & C = 2B + St + Podium + 40 Floors Building-D & E = 2B + St + Podium + 15 Floors Commercial Bldg. - (Gr+ 4 th Floor) Club House G+1 Excavation and filling will be done manually, as per requirement. Only lay down of pipes, electric cables, Under Ground water storage tanks etc 1.13 Production and manufacturing Processes? 1.14 Facilities for storage of goods or materials? 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? t Applicable Temporary storage provided at the project site for construction materials during construction phase. The Solid waste generated will be segregated at source into biodegradable and non biodegradable waste. The bio degradable waste will send to OWC & then used as a manure for landscaping & gardening after treatment. n biodegradable waste will send to MCGM for further disposal. Sewage sludge is used as manure. DESCRIPTION TOTAL Biodegradable waste (kg/day) 1221 n Biodegradable waste 1034 (kg/day) Total Solid Waste (kg/day) 2255 Garden waste = 33 Kg/Day STP Sludge = 118 Kg/Day Enviro Analysts & Engineers Pvt. Ltd. 3

4 1.16 Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or Altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? 1.21 Impoundment, damming, realignment or other changes to the hydrology of watercourses or aquifers? long term housing proposed for construction workers, as most of them will be from the local nearby areas. Road traffic will increase due to transport of material and persons during both construction and operational phase. t Applicable Existing road or traffic flow will not be hampered because of upcoming construction. t Applicable t Applicable 1.22 Stream crossings? t Applicable 1.23 Abstraction or transfers of water form ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or run-off? 1.25 Transport of personnel or materials for construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? Water supply to the site during Construction will be by tankers and during Operation Phase water requirement will be fulfilled by MCGM and recycled water. There will be no change in the drainage pattern. It will be improved by well planned development. Existing roads nearby the site will be utilized for transportation of materials and personnel. t Applicable ise Pollution due to machineries and air pollution because of dust. Influx of people to an area is temporary in construction phase & permanent in operation phase Introduction of alien species? t envisaged 1.30 Loss of native species or genetic The present project site is a vacant land with diversity? small herbs. 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Information/ Checklist confirmation / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data Enviro Analysts & Engineers Pvt. Ltd. 4

5 2.1 Land especially undeveloped or agricultural land (ha) 2.2 Water (expected source & competing users) unit: KLD Land belongs to n Agricultural category. The total water requirement during constructio phase will be approximately 100 KLD which will be met through tankers. After commissioning of project the Total water requirement will be up to 650 KLD. Purpose KLD Domestic 369 Flushing 222 Landscaping 53 Fire fighting 6 Total 650 Water Requirement will be met by MCGM. 2.3 Minerals (MT) t Applicable 2.4 Construction material stone, All basic materials will be from local market. aggregates, sand / soil (expected source MT) 2.5 Forests and timber (source MT) Mostly Timber free construction but wood will be used for doors only. 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources (use appropriate standard units) (a) Construction Phase 200 KVA (b) Operation Phase Maximum Demand 8.35 MW The power requirement will be met from TATA Power Company Ltd. 2. of DG Sets (750 KVA) & 1. of DG Set (1250 KVA) as back-up. t envisaged 3.0 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Information/ Checklist confirmation / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) t Applicable. 3.2 Changes in occurrence of disease or t Applicable. Enviro Analysts & Engineers Pvt. Ltd. 5

6 affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. 3.5 Any other causes t Applicable Positive impact due to employment opportunities during construction and revenue generation, Aesthetic value of area will improve due to planned development and proposed plantation. t envisage 4. Production of solid wastes during construction or operation or decommissioning (MT/ month) Information/ Checklist confirmation / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes t Applicable 4.2 Municipal waste (domestic and or commercial wastes) 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) 4.4 Other industrial process wastes t Applicable 4.5 Surplus product t Applicable The bio degradable waste will send to OWC & then used as a manure for landscaping & gardening after treatment. n biodegradable waste will send to authorized vendors for further disposal. Sewage sludge is used as manure. MSW Quantity :2255 Kg/Day t Applicable 4.6 Sewage sludge or other sludge from effluent treatment Approx. 118 Kg/day sewage sludge will be generated will be used as manure. 4.7 Construction or demolition wastes All construction waste will be collected and segregated properly. Most of that will be reused for the construction activity and surplus will be disposed off at proper site as per the norms. 4.8 Redundant machinery or equipment t Applicable 4.9 Contaminated soils or other materials t Applicable 4.10 Agricultural wastes t Applicable 4.11 Other solid wastes t Applicable 5. Release of pollutants or any hazardous, toxic or noxious substances to air (kg/ hr) Enviro Analysts & Engineers Pvt. Ltd. 6

7 Information/ Checklist confirmation / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Source: DG Set and Exhaust emissions generated from increased vehicles and traffic movements. 5.2 Emissions from production processes Since it is a residential project, there is no production process involved. 5.3 Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including plant and equipment Fugitive emissions are envisaged from material handling and its transportation during construction phase. Fugitive dust during construction activities. 5.5 Dust or odours from handling of materials including construction materials, sewage and waste 5.6 Emissions from incineration of waste t Applicable 5.7 Emissions from burning of waste in open t Applicable air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources t Applicable Adequate measures taken to mitigate problems due to dust or odor from construction activity and sewage. 6. Generation of ise and vibration and Emissions of Light and Heat Information/ Checklist confirmation 6.1 From operation of equipment e.g. engines, ventilation plant, crushers / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data The noise generated from the construction machinery and trucks bringing construction material. This is about db (A), how ever limited to construction time only. 6.2 From industrial or similar processes t Applicable 6.3 From construction or demolition The operation will be restricted to day time. Adequate measures taken to keep noise and vibrations under control. 6.4 From blasting or piling t Applicable 6.5 From construction or operational traffic The noise levels will be < 75 db (A) and these will be provided with protective equipment such as ear muffs etc. Enviro Analysts & Engineers Pvt. Ltd. 7

8 6.6 From lighting or cooling systems t Applicable 6.7 From any other sources t Applicable 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea Information/ Checklist confirmation / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 7.1 From handling, storage, use or spillage of hazardous materials t Applicable 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Maximum extent of sewage water will be used for flushing and landscaping. 7.3 By deposition of pollutants emitted to t Applicable air into the land or into water. 7.4 From any other sources t Applicable 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? t Applicable 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment Information/ Checklist confirmation / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances. 8.2 From any other causes t Applicable 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. Floods, earthquakes, landslides, cloudburst etc)? hazardous substances are involved but still Fire Fighting system will be provided. Mumbai comes under Seismic Zone III. The construction will be as per ISI893 (Part-II): Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality Information/ Checklist confirmation / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data 9.1 Lead to development of supporting utilities, ancillary development or Supporting and ancillary development will Enviro Analysts & Engineers Pvt. Ltd. 8

9 development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, 31 etc.) housing development extractive industries supply industries other 9.2 Lead to after-use of the site, which could have an impact on the environment. take place. Sewage Treatment Plant for waste water treatment and internal road construction to smoothen the traffic. Residential Flats t Applicable 9.3 Set a precedent for later developments This project will be establishing state of the art system leading to set precedent in environment management. 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects t Applicable (III) Environmental Sensitivity Areas 1. Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value. 2. Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3. Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration. Name/ Identity Sanjay Gandhi National Park Sanjay Gandhi National Park Sanjay Gandhi National Park Aerial Distance (within 15 km.) Proposed project location boundary Adjacent Adjacent Adjacent 4. Inland, coastal, marine or underground t Applicable waters 5. State, National boundaries The project is located within municipal limits. 6. Routes or facilities used by the public for t Applicable Enviro Analysts & Engineers Pvt. Ltd. 9

10 access to recreation or other tourist, pilgrim areas. 7. Defence installations defense installation in the neighborhood. 8. Densely populated or built-up area Residential area in close vicinity 9. Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) 10. Areas containing important, high quality or scarce resources (groundwater resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11. Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12. Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) t Applicable t Applicable t Applicable Earthquake Seismic Zone III having basic horizontal seismic coefficients (α) 0.04 but the construction is earthquake resistant and as per the NBC norms which takes care of environmental threat. Enviro Analysts & Engineers Pvt. Ltd. 10