APPENDIX I (See paragraph 6) FORM 1

Size: px
Start display at page:

Download "APPENDIX I (See paragraph 6) FORM 1"

Transcription

1

2 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project Limestone Mine 2. S.. in the schedule S.. 1(a) mining of mineral is 3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number of wells to be drilled 4. New/ Expansion/ Modernization Categorized in category A under S.. 1 (a) (>50 hectare of mining lease area). Proposed Capacity: TPA of Limestone M.L. Area: Ha. Modernization project 5. Existing capacity / Area etc. The mining lease is of Hectares with 6. Category of project i.e. `A or B 7. Does it attract the general condition? If yes, please specify. 8. Does it attract the specify condition? If yes, please specify. production capacity of MTPA of Masonry Stone. Category A 1

3 9. Location S.. Particulars Details 1. Near Village Pundloo 2. Tehsil & District Merta 3. FRP Piller G (m/s Gotan Lime Stone Khanij Udyog Ka) Plot/ Survey/ Khasra. M.L.. 37/89, Village Pundloo Tehsil & District Merta State Rajasthan 10. Nearest railway station/ airport along with distance in kms. Railhead : Merta Road Airport : - Jodhpur 11. Nearest Town, city, District Town: Merta Headquarters along with City : Merta city distance in kms. District Headquarter - Nagaur 12. Village Panchayats, Zila Village Panchayat Pundloo Parishad, Municipal Panchayat Samiti Nagaur Corporation, Local body Postal address with telephone no. (complete postal addresses with telephone nos. to be given) Near Village: Pundloo Tehsil Merta District: Nagaur (Raj.) 13. Name of the applicant Ms. Divya Gehlot 14. Registered Address Divya Gehlot Village Gotan District - Nagur 15. Address for correspondence Applicant: Divya Gehlot Village Gotan District - Nagur 2

4 - Fax.: t Available l16. Details of Alternative Sites The mining lease was granted over the specific area, examined, if any. Location of these sites should be shown on thus no Alternative site was examined as it is a site specific project. a topo sheet. 17. Interlinked Projects ne 18. Whether separate application of t Applicable interlinked project has been submitted? 19. If yes, date of submission t Applicable 20. If no, reason It s an independent project. 21. Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C. R. Z. tification, 1991? 22. Whether there is any Yes Government Order/ Policy relevant/ relating to the site? 23. Forest land involved (hectares) ne 24. Whether there is any litigation pending against the project and/ or land in which the project is litigation is pending against the project or the land in which this project is proposed to be set up. 3

5 propose to be set up? (a) Name of the Court (b) Case. (c) Orders/ directions of the Court, if any and its relevance with the proposed project. Capacity corresponding to sectoral activity (such as production capacity for manufacturing mining lease area and production capacity for mineral production area for mineral exploration length for linear transport infrastructure generation capacity for power generation etc.) (II) Activity 1. Construction operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography land use changes in water bodies etc.) S.. Information/Checklist confirmation 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? Yes/ Yes Yes Details thereof (with approximate quantities /rates, wherever possible) with source of information data - Open cast mining will be carried out by forming 3mts bench height and the width of the benches will be always more than the height and ultimate pit slope of 45º. - At the end of life of mine total 54.36hectare area will be excavated. Waste will be used in backfilled by available O.B./waste and remaining area will be used in water reservoir. There is no building & structure which need to be demolished/ removed from mining lease area. 1.3 Creation of new land uses? Yes Mining and its related activities will change the land use pattern and topography of the area. 1.4 Pre-construction investigations e.g. bore site is proposed for the pre construction investigation. 4

6 houses, soil testing? 1.5 Construction works? Yes It is proposed to construct mine office cum rest shelter inside the lease area. The statutory requirements like store, First Aid Centre, Toilets, Potable Blasting Shelters etc. shall also be provided at the mines. 1.6 Demolition works? demolition is proposed at the mining site. 1.7 Temporary sites used for Local villagers will be employed thus construction works of specific Site is required for Housing housing of construction for the workers. workers? 1.8 Above ground buildings structures, cut and fill or excavations Yes Construction of offices, toilets, rest shelter, First Aid center etc. will be done inside the mine. Earthworks: Excavation operations for mining will be carried out. 1.9 Underground works Only open cast mining will be done. including mining or tunneling? 1.10 Reclamation works? Yes Reclamation work will start after complete excavation of Lime stone up to its full depth Dredging? There is no Dredging involved in this lease area Offshore structures? t applicable 1.13 Production and Yes The proposed method of mining will manufacturing processes? be open cast mining. Production has been planned from the pit and mining 5

7 1.14 Facilities for storage of goods or materials? 1.15 Facilities for treatment of disposal of solid waste or liquid effluents? 1.16 Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction or operation? 1.18 New road, rail or air waterborne or other transport infrastructure including new of altered routed and stations, ports, airports etc.? 1.19 Closure or diversion of existing transport routes or infrastructures leading to changes in traffic movements? Yes shall be carried by forming proper benches. Sides are almost vertical. It is proposed to shape the pit systematically by for mining benches within the mining area. Very little quantity of soil is present in the area. Waste generated will be stacked ultimately will be used for backfilling. Temporarily waste dumps may be created. Once Lime Stone is fully extracted the waste (OB/reject) will be backfilled to restore the area. Local residents will get employment thus no housing facilities are required at the mine site Existing road network will be adequate. Existing road network will be adequate. There will be no such change caused due to the proposed project. 6

8 1.20 New or diverted There is no proposal for new transmission lines or construction or diversion of any pipelines? transmission lines or pipelines Impoundment, damming, culverting, realignment of There is no water course falling in this lease area. other changes to the hydrology of watercourses of aquifers? 1.22 Stream crossings? There is no stream (perennial or Seasonal) within the lease area Abstraction or transfers of water form ground or surface waters? Yes Drinking water from nearby PHED supply. Surface water will be used for spraying for dust suppression and plantation Changes in water bodies or - the land surface affecting drainage or run- off? 1.25 Transport of personnel or materials for construction The staff and the workers involved in the project will use the local transport operation or for commutation to the project area. decommissioning? 1.26 Long-term dismantling or -. decommissioning or restoration works? 1.27 Ongoing activity during activity of commissioning or decommissioning which decommissioning is proposed in this could have an impact on mine area. the environment? 1.28 Influx of people to an area in either temporarily or Technical and managerial staff will be employed for the operation of mines as 7

9 permanently? per the qualifications mentioned in the rules and regulations. Preference to local residents from the nearby villages will be given for carrying out the mining process Introduction of alien Only Local wild species which are species? already present will be given preference during afforestation programme Loss of native species or genetic diversity? significant loss of native species will occur Any other actions? other actions are proposed Use of Natural resources for construction or operation of the project (Such as Land, water, material or energy, especially any resources which are non-renewable or in short supply): S.. Information/Checklist confirmation 2.1 Land especially undeveloped or agricultural land (Ha) 2.2 Water (expected source & competing users) unit: KLD Yes/ Details thereof (with approximate quantities /rates, wherever possible) with source of information data The lease area is a part of the hillock Yes 6-7 KLD water will be brought from near by surface water body. 2.3 Minerals (MT) Yes 1,50,000 TPA of Limestone 2.4 Construction material stone, aggregates, and / soil (expected source MT) 2.5 Forests and timber (source MT) 2.6 Energy including electricity and fuel (source, competing users) Unit: fuel (MT) energy (MW) construction is proposed at the mine site. There is no proposal to develop colonies for worker so no timber will be required. Electricity is required as the machinery used in the mining operations will be diesel operated.

10 2.7 Any other natural resources (use appropriate standard units) other natural resource will be required. 3. Use, storage transport handling or production of substance or material, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.. Information/Checklist confirmation 3.1 Use of substance or materials which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patient, Yes/ Yes Details thereof (with approximate quantities /rates, wherever possible) with source of information data Blasting will be done with light explosives only for removing the waste rock. The blasting will be done with all the adequate precautions, only once or twice in a week by the competent persons as per provisions of MMR Special gelatin cartridge of 25 mm dia and 140 mm length will be used with R-cord and delay detonator. Proper precautions will be taken up to maintain hygienic conditions of working. Living conditions will change for better as beneficial aspects would be there due to employment generation. Impacts of this type are not expected as mine site is far away from settlements and no unauthorized 9

11 children, the elderly etc, person will be allowed to enter mining area. 3.5 Any other causes t Applicable. 4. Production of solid waste during construction or operation or decommissioning (MT/month) S.. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities /rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine Yes Waste rock and reject will be 10 wastes 4.2 Municipal waste (domestic and or commercial wastes) 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) generated. It will be stored at earmarked dump site with safe height and slope of head. The O.B. will be used for simultaneous backfilling after conformation of non-availability of mineral. municipal waste will generate thus no treatment is required. hazardous process waste will be generated from the proposed project. 4.4 Other industrial process wastes As mineral beneficiation will not be done for the propose project there will be absence of any industrial process waste. 4.5 Surplus product The entire mined out masonry stone 4.6 Sewage sludge or other sludge from effluent treatment will be directly sent to the local retailers. sewage will generate thus no treatment is required.

12 4.7 Construction or demolition Construction or demolition wastes activity will be done in proposed area. 4.8 Redundant machinery or redundant machinery or equipment equipment will be left at site after closure of mining operation. 4.9 Contaminated soils or other materials Very insignificant 4.10 Agricultural wastes Agricultural waste will be generated 4.11 Other solid waste other solid waste will generate. 5. Release of pollutants or any hazardous, toxic or noxious substance to air (kg/hr) S.. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities /rates, wherever possible) with source of information data 5.1 Emissions from combustion of Yes Diesel equipments used for fossil fuels from stationary or mobile sources transportation and mining process will generate insignificant gaseous emissions. Mitigation Measures for controlling the gaseous emissions generating from Diesel equipments will be following:- 1. Regular maintenance of equipments machineries, and 2. Proper calibration of fuel injection pumps, 3. Proper air/ fuel ratio 4. Timely changing of oil filters etc. 5. Proper maintenance of 11

13 5.2 Emissions from production processes 5.3 Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including plant and equipment 5.5 Dust or odors from handling of materials including construction materials sewage and waste Yes Yes Yes Silencers/ mufflers. Dust is the main pollutant which, will generate from the various production processes like drilling, blasting, Excavation Process, Mineral handling, Haul Road & transportation of mineral. The measures which will be followed to reduce the scale of dust emissions are:- 1. Wet drilling will be done. 2. Water sprinkling on roads. 3. Plantation to act as green barrier. 4. Regular maintenance of the transporting vehicles and the machineries. Regular water sprinkling on roads will suppress the dust particles which will generate during material handling, loading of material into dumpers and during the transportation. Controlled loading and unloading will be done. construction activity is proposed in the mine lease area. Emission of dust due to movement of vehicles, drilling loading, unloading and blasting will produce 12

14 5.6 Emissions from incineration of waste 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources impact on air. Measures like water sprinkling, green belt development and maintaining haul roads will reduce the dust emissions and impact on air. odour will generate during the process. incineration activity is involved. waste will be burnt in open air. other emissions will be there. 6. Generation of ise and Vibration, and Emissions of Light and Heat: S.. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities /rates, wherever possible) with source of information data 6.1 From operation of equipment Yes ise generation will envisage due to e.g. engines, ventilation plant, crushers mining operation like drilling & blasting and also from operation & movement of machinery. Standard measures will be taken up to control it. Measures like lubrication & preventive maintenance shall be taken to control noise from the machinery. PPE s like earmuff will be used by employees. Regular noise level monitoring will be done and noise level will be kept within permissible 13

15 limits. The generated noise levels will be attenuated to a considerable level by the green belt within the mining lease area. 6.2 From industrial or similar There is no proposal of process processes plant. 6.3 From construction or Construction or demolition will not demolition be carried out for the purpose project. 6.4 From blasting or piling Yes Very occasionally blasting will be used for loosen of hard rock. Blasting will be performed by competent person. 6.5 From construction or Yes Due to vehicular traffic and material operational traffic transportation within lease area, noise will generate but measures will be taken up to control the noise levels within the DGMS & CPCB norms. 6.6 From lighting or cooling system Mining will be done in day time so no lighting will be required and cooling systems are not required. 6.7 From any other sources other source of noise and vibration are there. 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface water groundwater, coastal waters or the sea: S.. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities /rates, wherever possible) with source of information data 7.1 From handling storage use or The mining lease project will not 14

16 spillage of hazardous materials involve handling, storage and use of hazardous materials. Oiling and lubrication of hauling vehicles will be done by using oil tray to prevent spillage on soil. Occasional blasting will be carried out. Vehicles and machinery will be well maintained to prevent leakage of oil. 7.2 From discharge of sewage or other effluents to water or the There is no risk of contamination of land or water. land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water Dust generated during the mining process, loading and transportation may cause impact on the air but the measures followed will control the air pollutions. 7.4 From any other sources other sources are there. 7.5 Is there a risk of long term build - up of pollutants in the environment from these sources 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S.. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities /rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires Yes Very occasionally blasting will be etc from storage, handling, use or production of hazardous substances done for loosen of hard rock. Explosives will be handled with utmost care in compliance to rules 15

17 and regulations and as per provisions of MMR1961. Precautionary measures taken shall be by using the sand bags over the blast for the protection and on drill hole to control the fly rock. 8.2 From any other causes Yes Accidents by transport vehicles due to negligence and/or ignoring the safety aspects. Accidents during mining caused due to negligence of workers or bad mining practice. loose stone or debris will be allowed to remain near the edges of excavation and along the sides of road. However, to deal the minor incidences and accidents, first aid measures at site will be provided. 8.3 Could the project be affected by The project is located in the Seismic natural disaster causing Zone II. There has been no flood, environmental damage (e.g. cloudbursts and landslide reported so floods, earthquake, landslides, far. cloudburst etc)? 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S.. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities /rates, wherever possible) with source of information data 16

18 9.1 Lead to development of supporting. Cities, ancillary development or development stimulated by the project which could have impact on the environment *Supporting infrastructure (roads, power supply, waste or waste water treatment, etc) * Housing development * Extractive industries * Supply industries * Other 9.2 Lead to after use of the site, which could have an impact on the environment 9.3 Set a precedent for later developments 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects The project will improve the socioeconomic status of villages around the mine area. The project will also benefit the local people by generating the employment. Improvement in educational facilities. Provision of Health facilities will be implied. Conditions of the nearby village Roads will be improved. The lease area is located in the remote area with very little vegetation. The after use of site planned would be better than the present, owing to existing & proposed green belt development in lease area. A better after use scenario with increase in greenery. major industries except few mines of mineral masonry stone and other minerals are located in the 10 km area. Thus there is likelihood of cumulative effect due to the transportation of masonry stone. A better planned and executed project has to yield a better result individually; which in turn has to give better cumulative effect also. 17

19 (III) Environmental Sensitivity S. Areas Name/ Identity 1 Areas protected under international conventions, national or local legislation for their ecological, landscape cultural or other related value 2 Areas which are important or sensitive for ecological reasons- Wetlands, watercourses or other water bodies, coastal zone, biospheres, forests mountains, 3 Areas used by protected important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground waters Name of Rivers/Ponds Aerial distance (within 15km,) Proposed project location boundary such place is there in 15 km radius. Distance & Direction such place is there in 15 km radius. such place is there in 15 km radius. such place is there in 15 km radius. 5 State, National boundaries such place is there in 6 Routes or facilities used by the public for access to 15 km radius. such place is there in 15 km radius. 18

20 recreation or other tourist, pilgrim areas 7 Defense installations such place is there in 15 km radius. 8 Densely populated or built Yes Village Pudloo up area 9 Areas occupied by sensitive Yes man made land uses District hospital is at (hospitals, schools, places Nagaur. of worship, community Community health centers facilities) is at Merta city Government colleges are at Nagaur and Senior Secondary School is at nearby villages. 10 Areas containing important, Yes Lime Stone is abundantly high quality or scarce available in this area. Thus resources, surface only mining industry is resources, forestry, the chief source of agriculture, fisheries, income. tourism, minerals) 11 Areas already subjected to ne within 15 km pollution or environmental radius. damage (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause The study area of the lease area falls in Zone II the project to present of the Seismic Map. environmental problems There has been no (Earthquakes, subsidence, incidence of landslide, 19

21 landslides, erosion, flooding or extreme or adverse climatic conditions) earthquake or flooding. (IV) Proposed Term of Reference for EIA Studies The lease area of Limestone is situated near Village Pundloo, Tehsil Merta city, District Nagaur, Rajasthan in an area of hectare. The production capacity of the lease is TPA. As the project in reference to the EIA notification Sep, 2006 and its amendments December, 2009, April, 2011, September 2013 & December 2013 I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. Place: Divya Gehlot (Mine Owner) Date: 20