Harman Finochem Limited Private Mr. Bhupinder Singh Manhas sd engineering services pvt. ltd. Others

Size: px
Start display at page:

Download "Harman Finochem Limited Private Mr. Bhupinder Singh Manhas sd engineering services pvt. ltd. Others"

Transcription

1 To, Mr. Bhupinder Singh Manhas at Plot No. N-24, Additional Patalganaga, MIDC, Panvel, Dist. Raigad Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:August 9, 2017 Subject: Sir, Environment Clearance for Proposed production of API`s and Bulk drug of capacity MT/Month at Plot No. N-24, Additional Patalganga, MIDC, Panvel, Raigad This has reference to your communication on the above mentioned subject. The proposal was considered as per the EIA Notification , by the State Level Expert Appraisal Committee-I, Maharashtra in its th meeting and recommend the project for prior environmental clearance to SEIAA. Information submitted by you has been considered by State Level Environment Impact Assessment Authority in its 112th meetings. 2. It is noted that the proposal is considered by SEAC-I under screening category 5(f), B as per EIA Notification Brief Information of the project submitted by you is as below :- 1.Name of Project 2.Type of institution 3.Name of Project Proponent 4.Name of Consultant 5.Type of project 6.New project/expansion in existing project/modernization/diversification in existing project 7.If expansion/diversification, whether environmental clearance has been obtained for existing project 8.Location of the project 9.Taluka 10.Village 11.Area of the project 12.IOD/IOA/Concession/Plan Approval 13.Note on the initiated work (If applicable) 14.LOI / NOC / IOD from MHADA/ Other approvals (If applicable) 15.Total Plot Area (sq. m.) 16.Deductions 17.Net Plot area Harman Finochem Limited Private Mr. Bhupinder Singh Manhas sd engineering services pvt. ltd. Others New Project Plot No. N-24, Additional Patalganaga, MIDC, Panvel, Dist. Raigad Panvel Chavane Additional MIDC IOD/IOA/Concession/Plan Approval : Approved Built-up Area: Sq. mtrs Sq. mtrs Sq. mtrs. SEIAA-EC Page 1 of 15

2 18 (a).proposed Built-up Area (FSI & Non-FSI) 18 (b).approved Built up area as per DCR 19.Total coverage (m2) Ground-coverage Percentage (%) (Note: Percentage of plot not open to sky) FSI area (sq. m.): Non FSI area (sq. m.): Total BUA area (sq. m.): Approved FSI area (sq. m.): Approved Non FSI area (sq. m.): Date of Approval: 50% 21.Estimated cost of the project SEIAA-EC Page 2 of 15

3 Serial 22.Production Details Product Existing (MT/M) Proposed (MT/M) Total (MT/M) 1 Allopurinol Bisoprolol Hemifumerate Chlorpheniramine Maleate Divalproex Sodium Fenofibrate Ketamine Hydrochloride Lidocaine Base Lidocaine Hydrochloride Methylcobalamin Phenytoin Phenytoin Sodium Propofol Salbutamol Sulphate Sitagliptin Phosphate Anhydrous Sitagliptin Phosphate Monohydrate Valproic Acid Valsartan Total Dry season: Source of water 23.Total Water Requirement MIDC Fresh water (CMD): Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Under water tank(cmd): Fire fighting - Overhead water tank(cmd): Not applicable Excess treated water Not applicable SEIAA-EC Page 3 of 15

4 Wet season: Details of Swimming pool (If any) Source of water MIDC Fresh water (CMD): Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Under water tank(cmd): Fire fighting - Overhead water tank(cmd): Not applicable Excess treated water Not applicable Not Applicable, It is a API Manufacturing Industry SEIAA-EC Page 4 of 15

5 Particula rs Water Require ment 24.Details of Total water consumed Consumption (CMD) Loss (CMD) Effluent (CMD) Existing Proposed Total Existing Proposed Total Existing Proposed Total Domestic Industrial Process Cooling tower & thermopa ck Gardening Fresh water requireme nt Rain Water Harvesting (RWH) Level of the Ground water table: Size and no of RWH tank(s) and Quantity: Location of the RWH tank(s): Quantity of recharge pits: Size of recharge pits : Budgetary allocation (Capital cost) : Budgetary allocation (O & M cost) : Details of UGT tanks if any : 3.7 mtrs- 7.3 mtrs. No. of Tank - 1 No., Size 100 cubic meter Near main gate/ Parking area 3-4 Nos. Approx. 3 m x 3 m x 3 m Approx. 40 lakhs Approx. 6-8 lakhs/ year Yes- 1 No., Area sq. mtrs. 26.Storm water drainage Natural water drainage pattern: Quantity of storm water: Size of SWD: Storm Water Drainage- Through MIDC drain 421 cubic meter per hour 1.5 sq. mtr. hume pipe x 150 mtrs. SEIAA-EC Page 5 of 15

6 27.Sewage and Waste water Sewage generation in KLD: STP technology: Capacity of STP (CMD): Location & area of the STP: Budgetary allocation (Capital cost): Budgetary allocation (O & M cost): 18 MBBR (Moving Bed Biofilm Reactor) / SBR (Sequential Batch Reactor) Technology 1 No., 25 CMD Near Effluent treatment Plant, Area sq. mtrs. Approx. 25 lakhs Approx. 10 lakhs/ year SEIAA-EC Page 6 of 15

7 Waste generation in the Pre Construction and Construction phase: Waste generation in the operation Phase: Mode of Disposal of waste: Area requirement: Budgetary allocation (Capital cost and O&M cost): Waste generation: 28.Solid waste Management Disposal of the construction waste debris: Dry waste: Wet waste: Hazardous waste: Biomedical waste (If applicable): STP Sludge (Dry sludge): Others if any: Dry waste: Wet waste: Hazardous waste: Biomedical waste (If applicable): STP Sludge (Dry sludge): Others if any: Location(s): Area for the storage of waste & other material: Area for machinery: Capital cost: O & M cost: During Construction- Waste debris and During operation phase- Boiler Ash Use for refilling and leveling of Land Boiler Ash - 2 Tons/ Day, E- Waste, Battery Waste Details are mentioned in point No. 45 (Hazardous Waste Details) 0.2 MT/ Month Boiler Ash Disposal - Sale to brick mfg. industry/ Cement Industry, E- Waste- Shall be dispose through authorized vendor, Battery Waste- Disposal by back to supplier Not Applicable Shall be through CHWTSDF/ Co processing through cement industry/ Sale to authorised recycler Shall be used as manure for gardening Near ETP / STP Approx. 400 Sq. mtrs. Approx. 15 lakhs Approx. 70 lakhs/ Anum SEIAA-EC Page 7 of 15

8 Serial Parameters 29.Effluent Charecterestics Unit Inlet Effluent Charecterestics Outlet Effluent Charecterestics Effluent discharge standards (MPCB) 1 ph COD mg/ lit <250 3 BOD mg/ lit <100 4 TDS mg/ lit < TSS mg/ lit <100 Amount of effluent generation (CMD): 210 Capacity of the ETP: 250 Amount of treated effluent recycled : Amount of water send to the CETP: Membership of CETP (if require): Note on ETP technology to be used Disposal of the ETP sludge 205 including domestic effluent It is Zero discharge industry. But if MPCB permits industry will send 205 CMD effluent to PRIA CETP YES (PRIA CETP) High polluted stream treated through Stripper column and Multiple effect evaporator followed by agitated thin film dryer. Low polluted streams will be treated through conventional ETP comprises with Primary, Secondary and Tertiary treatment. Through Common Hazardous Waste Treatment Storage and disposal facility / Co processing through cement Industry SEIAA-EC Page 8 of 15

9 Serial 1 30.Hazardous Waste Details Description Cat UOM Existing Proposed Total Method of Disposal Spent Oil / waste & process residue containing oil 2 Spent Solvents /5.2 Kgs/ day Kgs/ Month As per generation As per generation 3 Distillation Residue 20.3 Kg/ day Spent Catalyst/ Spent Carbon 28.2 Kg/ day Discarded Containers 33.3 Nos/Month Serial Sludge from waste water treatment Inorganic and MEE Sludge Oil & Grease skimming residue Section & units 1 Boiler (5 TPH - 1 No.) 2 Boiler (5 TPH - 1 No.) 3 4 Serial D.G. Set (1500 KVA- 1 No.) Process stack/ scrubber 34.3 Kgs/ day Kgs/ day Through authorised recycler/ reprocessor sale to authorised recycler/reprocessor Cement Industry / CHWTSDF Cement Industry / CHWTSDF Sale to authorised dealer Cement Industry / CHWTSDF Cement Industry / CHWTSDF 34.4 Kgs/ day CHWTSDF 31.Stacks emission Details Fuel Used with Quantity Furnace Oil Kgs/ Hr. Coal kgs/hr. OR Briquette 800 Kgs/ Hr. Stack No. 1 No. Combine Combine Stack Height from level (m) 44 (Combine Stack ht.) Combine stack Internal diameter (m) Temp. of Exhaust Gases deg. cent Combine Stack dia 180 deg. cent geg. cent 3 25 mtrs. each 32.Details of Fuel to be used Type of Fuel Existing Proposed Total 1 Furnace Oil OR 316 kgs/ hr. 316 kgs/ hr. 2 Coal OR 650 kgs/ hr. 650 kgs/ hr. 3 Briquette 800 kgs/ hr. 800 kgs/ hr. 4 HSD 300 litrs/ hr. 300 litrs/ hr. 33.Source of Fuel 34.Mode of Transportation of fuel to site Local Vendor Road 35.Energy SEIAA-EC Page 9 of 15

10 Power requirement: Serial Source of power supply : During Construction Phase: (Demand Load) DG set as Power back-up during construction phase During Operation phase (Connected load): During Operation phase (Demand load): Transformer: DG set as Power back-up during operation phase: Fuel used: Details of high tension line passing through the plot if any: MIDC 700 KW 1500 KW 1500 KW 1500 KVA Shall be provided 1500 KVA Furnace Oil 300 Litrs/ Hr. Energy saving by non-conventional method: 36.Detail calculations & % of saving: Energy Conservation Measures Saving % 1 37.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Fuel Stack attached to Bolier (5TPH - 2 Nos.) D.G. Set (1500 KVA) Process stack / Scrubber- 3 Nos. Budgetary allocation (Capital cost and O&M cost): Serial Capital cost: O & M cost: Stack with height 44 mtrs. with inbuilt bag filter Stack with height 33 mtrs. with acoustic enclosure Stack with height 25mtrs. 38.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Attributes Parameter Total Cost per annum (Rs. In Lacs) 1 SEIAA-EC Page 10 of 15

11 Serial Component 1 Air pollution Control Water Pollution Control Noise Pollution Control Environmental Monitoring And Management Occupational Health and Others 6 Green Belt 7 Solid and Hazardous Waste Management b) Operation Phase (with Break-up): Description Boiler, D.G. Set and scrubber Stripper column, MEE, ATFD and ETP Acoustic enclosures and anti vibration pads Third party monitoring and parameter Analysis Medical Check up, first aid facilities and consumables Green Belt development Capital cost Rs. In Lacs Operational and Maintenance cost (Rs. in Lacs/yr) Transport and disposal Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Description Status Location Methanol Toluene Acetone Furnace Oil Iso Propyl alcohol Sulphuric Acid Hydrochloric Acid Storage Capacity in MT Maximum Quantity of Storage at any point of time in MT Consumption / Month in MT Source of Supply Local Local Local Local Local Local Local Hydrogen Cylinder Gas above Local Thionyl Chloride Valeryl Chloride Ortho phospheric acid Local Local Local Means of transportation Road (tankers) Road(tankers) Road (tankers/ drums) Road(tankers) Road(tankers/ drums) Road(tankers) Road(tankers) Road(cylinder) Road(drums) Road(drums) Road(drums/ carboys) SEIAA-EC Page 11 of 15

12 Caustic Lye No Information Available 40.Any Other Information Local Road(tankers) SEIAA-EC Page 12 of 15

13 CRZ/ RRZ clearance obtain, if any: Distance from Protected Areas / Critically Polluted areas / Eco-sensitive areas/ inter-state boundaries Category as per schedule of EIA Notification sheet Court cases pending if any Other Relevant Informations Have you previously submitted Application online on MOEF Website. Date of online submission 5(f), B We have already paid EC scrutiny fees Rs. 3 lakhs vide UTR No. ALLA (Allahabad Bank dated ) Yes The proposal has been considered by SEIAA in its 112th meeting & decided to accord environmental clearance to the said project under the provisions of Environment Impact Assessment Notification, 2006 subject to implementation of the following terms and conditions: Specific Conditions: General Conditions: I II III IV V VI VII VIII IX X XI XII XIII XIV XV (i)pp to achieve Zero Discharge ; PP shall ensure that there is no increase in the effluent load to CETP. 73 TPH boiler should have stack height of 68m and flue gases shall be passed through an ESP of 99.9% efficiency before being led into the 68 m stack. No additional land shall be used /acquired for any activity of the project without obtaining proper permission. PP to take utmost precaution for the health and safety of the people working in the unit as also for protecting the environment. Proper Housekeeping programmers shall be implemented. In the event of the failure of any pollution control system adopted by the unit, the unit shall be immediately put out of operation and shall not be restarted until the desired efficiency has been achieve. A stack of adequate height based on DG set capacity shall be provided for control and dispersion of pollutant from DG set. (If applicable). A detailed scheme for rainwater harvesting shall be prepared and implemented to recharge water. Arrangement shall be made that effluent and storm water does not get mixed. Periodic monitoring of water shall be undertaken and results analyzed to ascertain any change in the quality of water. Results shall be regularly submitted to the Maharashtra Pollution Control Board. Noise level shall be maintained as per standards. For people working in the high noise area, requisite personal protective equipment like earplugs etc. shall be provided. The overall noise levels in and around the plant are shall be kept well within the standards by providing noise control measures including acoustic hoods, silencers, enclosures, etc. on all sources of noise generation. The ambient noise levels shall confirm to the standards prescribed under Environment (Protection) Act, 1986 Rules, Green belt shall be developed & maintained around the plant periphery. Green Belt Development shall be carried out considering CPCB guidelines including selection of plant species and in consultation with the local DFO/ Agriculture Dept. Adequate safety measures shall be provided to limit the risk zone within the plant boundary, in case of an accident. Leak detection devices shall also be installed at strategic places for early detection and warning. Occupational health surveillance of the workers shall be done on a regular basis and record maintained as per Factories Act. SEIAA-EC Page 13 of 15

14 XVI XVII XVIII XIX XX XXI XXII XXIII XXIV XXV XXVI (The company shall make the arrangement for protection of possible fire hazards during manufacturing process in material handling. The project authorities must strictly comply with the rules and regulations with regard to handling and disposal of hazardous wastes in accordance with the Hazardous Waste (Management and Handling) Rules, 2003 (amended). Authorization from the MPCB shall be obtained for collections/treatment/storage/disposal of hazardous wastes. Regular mock drills for the on-site emergency management plan shall be carried out. Implementation of changes / improvements required, if any, in the on-site management plan shall be ensured. A separate environment management cell with qualified staff shall be set up for implementation of the stipulated environmental safeguards. Separate funds shall be allocated for implementation of environmental protection measures/emp along with item-wise breaks-up. These cost shall be included as part of the project cost. The funds earmarked for the environment protection measures shall not be diverted for other purposes and year-wise expenditure should reported to the MPCB & this department The project management shall advertise at least in two local newspapers widely circulated in the region around the project, one of which shall be in the marathi language of the local concerned within seven days of issue of this letter, informing that the project has been accorded environmental clearance and copies of clearance letter are available with the Maharashtra Pollution Control Board and may also be seen at Website at Project management should submit half yearly compliance reports in respect of the stipulated prior environment clearance terms and conditions in hard & soft copies to the MPCB & this department, on 1st June & 1st December of each calendar year. A copy of the clearance letter shall be sent by proponent to the concerned Municipal Corporation and the local NGO, if any, from whom suggestions/representations, if any, were received while processing the proposal. The clearance letter shall also be put on the website of the Company by the proponent. The proponent shall upload the status of compliance of the stipulated EC conditions, including results of monitored data on their website and shall update the same periodically. It shall simultaneously be sent to the Regional Office of MoEF, the respective Zonal Office of CPCB and the SPCB. The criteria pollutant levels namely; SPM, RSPM. SO2, NOx (ambient levels as well as stack emissions) or critical sectorai parameters, indicated for the project shall be monitored and displayed at a convenient location near the main gate of the company in the public domain. The project proponent shall also submit six monthly reports on the status of compliance of the stipulated EC conditions including results of monitored data (both in hard copies as well as by ) to the respective Regional Office of MoEF, the respective Zonal Office of CPCB and the SPCB. The environmental statement for each financial year ending 31st March in Form-V as is mandated to be submitted by the project proponent to the concerned State Pollution Control Board as prescribed under the Environment (Protection) Rules, 1986, as amended subsequently, shall also be put on the website of the company along with the status of compliance of EC conditions and shall also be sent to the respective Regional Offices of MoEF by . SEIAA-EC Page 14 of 15

15 4. The environmental clearance is being issued without prejudice to the action initiated under EP Act or any court case pending in the court of law and it does not mean that project proponent has not violated any environmental laws in the past and whatever decision under EP Act or of the Hon ble court will be binding on the project proponent. Hence this clearance does not give immunity to the project proponent in the case filed against him, if any or action initiated under EP Act. 5. In case of submission of false document and non-compliance of stipulated conditions, Authority/ Environment Department will revoke or suspend the Environment clearance without any intimation and initiate appropriate legal action under Environmental Protection Act, The Environment department reserves the right to add any stringent condition or to revoke the clearance if conditions stipulated are not implemented to the satisfaction of the department or for that matter, for any other administrative reason. 7. Validity of Environment Clearance: The environmental clearance accorded shall be valid as per EIA Notification, 2006, and amendments by MoEF&CC Notification dated 29th April, In case of any deviation or alteration in the project proposed from those submitted to this department for clearance, a fresh reference should be made to the department to assess the adequacy of the condition(s) imposed and to incorporate additional environmental protection measures required, if any. 9. The above stipulations would be enforced among others under the Water (Prevention and Control of Pollution) Act, 1974, the Air (Prevention and Control of Pollution) Act, 1981, the Environment (Protection) Act, 1986 and rules there under, Hazardous Wastes (Management and Handling) Rules, 1989 and its amendments, the public Liability Insurance Act, 1991 and its amendments. 10. Any appeal against this Environment clearance shall lie with the National Green Tribunal (Western Zone Bench, Pune),New Administrative Building, 1stFloor, D-, Wing, Opposite Council Hall, Pune, if preferred, within 30 days as prescribed under Section 16 of the National Green Tribunal Act, Copy to: 1. SHRI AND. B. KULKARNI, CHAIRMAN-SEIAA 2. SHRI UMAKANT DANGAT, CHAIRMAN-SEAC-I 3. SHRI M.M.ADTANI, CHAIRMAN-SEAC-II 4. SHRI ANIL.D. KALE. CHAIRMAN SEAC-III 5. SECRETARY MOEF & CC 6. IA- DIVISION MOEF & CC 7. MEMBER SECRETARY MAHARASHTRA POLLUTION CONTROL BOARD MUMBAI 8. REGIOL OFFICE MOEF & CC GPUR 9. REGIOL OFFICE MPCB RAIGAD 10. REGIOL OFFICE MIDC RAIGAD 11. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD 12. COLLECTOR OFFICE RAIGAD SEIAA-EC Page 15 of 15