1 ATTACHMENT G.2 Environmental Management Programme Environmental Management Programme

2 Elanco Animal Health Ireland Ltd Environmental Management Programme, 2010 Project Rationale Details of Project Update 2010 AER Status Overall objective: Electrical consumption per unit output: Reduce electricity energy usage kwh Reduce Energy (kwh usage per unit output) kwh Usage compared to 2007 fiqures by ~3% Efficiency Loss: 6.0% Reduce electricity Energy efficient lighting upgrades in the Warehouse areas of Complete consumption the Main Production building. Deliver min % energy Energy efficient lighting upgrades saving per fitting Reduce electricity Installation of a new chilled water loop with variable speed consumption drives (VSD). New system will deliver ~ 15% reduction in Chilled water upgrade electrical consumption Overall Objective: Oil consumption per unit output: Reduce oil usage by ~ 2% (Litres L (0.13 kg C02 eq.) Reduce Carbon oil per unit output) compared to L (0.11 kg C02 eq.) Emissions 2007 fiqures Efficiency Loss: 21.7% Reduce energy Steam trap survey Performed by an approved vendor and report issued. Completed consumption (oil) Recommendations to be implemented as part of the EMP Overall recycling rate. based on Waste consumption perunit output: total quantities across all waste kg stream increased to 20.16% in kg 2008 compared to 16.85% in Efficiency Loss: 14.3% Reduce Waste 2007 Total quantities diverted in 2010 were 2.20 tons compared to 0.79 in The decrease was due to the designated waste vendor no longer being able to receive & process this type of Divert used Tyvek gowns from waste stream. An alternative waste contractor was sourced in landfill for reuse! recycling 2010 Total quantities of plastics diverted in 2010 were 5.61 tons Divert 25% of plastic (& compared to 9.82 in A significant increase (91 %) was packaging) waste currently going realised through greater process activities which yield this type to landfill for recyclinq of waste stream. Tarqet achieved & exceeded Total quantities diverted in 2010 were 5.74 tons compared to Divert used paper from landfill for 7.28 in Significant increases realised through greater reuse! recycling employee awareness. More dedicated receptacles being Completed Completed Completed

3 Elanco Animal Health Ireland Ltd Environmental Management Programme, 2010 Sign/Date: rolled out and improved reporting accuracy. Total quantities diverted in 2010 were tons compared to Completed Divert used cardboard packaging in This is an increase of 6.3% and is ahead of from landfill for reuse/ recycling increases in Production output of 3.8% Overall objective: Energy Increase employee awareness of monitoring & resource use (water, electricity & Awareness fuel oil) Awareness Generate & distribute monthly Issued by Site Energy Manager on a monthly basis Ongoing report of utility/oil use Water consumption per unit output: Overall objective: L Water Develop & roll out a site water L Conservation conservation program Efficiency Gain: 3.2% Draft water conservation policy in place for the site & water 25% usage diagram. Water consumption is metered & monitored. Complete Develop water conservation Conservations projects have been identified and will be rolled policy & water usage diagram inc. out in Mass balance timeline: 2012 mass balance. Monitor water Conservation usage ra<-vf EHS Officer Sign/Date: --_~==- Engineering Manager ~~_-_- 'O=--\ 'Ji::::.;v~L-:...;\ '\~ _

4 Elanco Animal Health Ireland Ltd Environmental Management Programme, Project Rationale Details of Project % Target Completion Responsibility Overall objective: 20% 20% 20% 20% 20% Energy Council Reduce electricity energy usage (kwh usage per unit output) Reduce energy compared to 2007 figures by 15% usage over the term of the EMP Reduce electricity 50% 50% N\A N\A N\A Engineering consumption Install energy efficient lighting Manager Reduce electricity Upgrade Compressed air system: 100% N\A N\A N\A N\A Engineering consumption Install variable speed Manager compressors (2) Energy Carry out comprehensive survey N\A 100% N\A N\A N\A Engineering conservation of the compressed air system to Manager measure identify leaks Energy N\A 50% 50% N\A N\A Engineering conservation Carry out repairslfix leaks based Manager measure on compressed air survey Reduce electricity 100% N\A N\A N\A N\A Engineering consumption Upgrade chilled water system Manager HVAC set-back: Install and 20% 20% 20% 20% 20% Engineering validate control systems & Manager Reduce electricity Reduce air changes in grade 0 consumption areas N\A 50% 50% N\A% N\A Engineering Manager Energy conservation measure Implement actions from the building energy (rating) report (BER)

5 Project Rationale Details of Project % Target Completion Responsibility Overall Objective: 20% 20% 20% 20% 20% Energy Council Reduce oil usage by 10% (Litres oil per unit output) compared to Reduce carbon 2007 figures over the term of the emissions EMP Reduce energy Steam trap survey: Repair & 50% 50% NIA NIA NIA Engineering consumption (oil) replace leakinq traps ManaQer Reduce energy Manage central heating: Install 100% NIA NIA NIA NIA Engineering consumotion (oill thermostatic controls Manaoer Overall objective: Reduce non- NIA 25% 25% 25% 25% EHS Officer hazardous waste by 10% (kgs Reduce waste /0 waste per unit output compared landfill to 200in over the term of the EMP Reduce waste for Overall objective: NIA 25% 25% 25% 25% EHS Officer thermal treatment Reduce hazardous chemical wastes by 5% (kgs waste per unit output) compared to the 2008 Fioure over the term of the EMP Implement a monitoring system NIA 50% 50% NIA NIA EHS Officer for chemical waste generation & draft a plan to make reductions Overall objective: Reduce bio- NIA 25% 25% 25% 25% EHS Officer hazardous waste by 5% (kgs waste per unit output compared to 200in over the term of the EMP Overall objective: 20% 20% 20% 20% 20% Energy Council Increase employee awareness of resource use (water, electricity & fuel oil) Generate & distribute monthly NIA 100% NIA NIA NIA Energy report of utility/oil use Manager - Etoneo

6 Project Rationale Details of Project % Target Completion Responsibility Include energy awareness 100% NIA NIA NIA NIA EHS Officer training on induction for new employees. 100% NIA NIA NIA NIA EHS Officer/Energy Annual enerqy awareness day Council Introduce detailed electricity 25% 25% 25% 25% NIA Engineering Energy consumption monitoring in the Manager monitoring Main Plant Water Develop water conservation 25% 75% NIA NIA NIA Engineering Conservation policy & water usage diagram inc. Manager (Identify future mass balance. Monitor water opportunities for usage water conservation) 5tellamune: New purpose built NIA 100% NIA NIA NIA facility for the manufacture of bioloqical vaccines Energy efficiency HVAC: Utilise variable speed NIA 100% NIA NIA NIA Stellamune drives (VSDl Proiect Team Energy efficiency HVAC: 100% leak testing of NIA 100% NIA NIA NIA Stellamune ductina Proiect Team Energy efficiency Lighting: Utilise efficient lighting NIA 100% NIA NIA NIA Stellamune throuqhout and PIR's in corridors Proiect Team Energy Insulation: Cladding & insulation NIA 100% NIA NIA NIA Stellamune Conservation will have low U-Values in Project Team compliance with the Part L of the Buildina Reaulations Energy Insulation: Extensive lagging of NIA 100% NIA NIA NIA Stellamune Conservation internal equipment (skid) pipe- Project Team work - Elonco_.

7 Energy Air Handling Units (AHU): Air N\A 100% N\A N\A N\A Stellamune Conservation recirculation of circa 20% Project Team Water Water Cooling: Design will N\A 100% N\A N\A N\A Stellamune Conservation incorporate recirculation systems Project Team in a closed loop Sign/date: ---::--:--~-=-~-::-::-=:..-.:..._'--~_--::~-=--r-~-=-=l...<...-_s_o_::jl.t:aj t( EHS Officer / Sign/date: --c::? 0 \ djl. I l Engineering Manager