1 777 Bay Street, 2 nd Floor Toronto, Ontario, M5G 2E5 T: F: W: 777, rue Bay, 2 e etage Toronto, Ontario, M5G 2E5 T: TC: W: BMEC Authorization Number Date of Issuance May 30, 2013 BMEC Application A Date of Effectiveness August 2, 2013 Date of Expiration August 2, 2018 AUTHORIZATION REPORT Infiltrator Systems Inc. ARC 18 Chamber System 1. Applicant 2. Manufacturing Facilities Infiltrator Systems Inc. 4 Business Park Road PO. Box 768 Old Saybrook, Connecticut USA Infiltrator Systems Inc Rockwell Road Winchester, Kentucky USA Tel: Fax: Tel: Fax Infiltrator Systems Inc Enterprise Drive Winchester, Kentucky USA Tel: Fax Description The Infiltrator Systems Inc. ARC 18 Chamber System is intended for use in a sewage system in lieu of stone and distribution pipe in absorption trenches and in filter beds. The Infiltrator Systems Inc. ARC 18 chamber is made from injection-molded polyethylene. The chambers are connected end-to-end using a built-in latch mechanism. Infiltrator Systems Inc. Page 1 of 9

2 Each individual Infiltrator Systems Inc. ARC 18 chamber has a bottom width of mm and a height of mm and a length of 1524 mm. The side walls of the Infiltrator Systems Inc. ARC 18 chamber are louvered. The ARC 18 chambers are closed at the ends of a trench with snap-on end plates. Specification Infiltrator Systems Inc. ARC 18 Chamber Material High Density Polyethylene Connections Built in latch Bottom width (mm) Height (mm) Length (mm) End Plates Snap on Strength (IAPMO rating) H Authorization Requested The applicant sought authorization for use of the Infiltrator Systems Inc. ARC 18 Chamber System as an alternative to the construction of stone and distribution pipe in absorption trenches and in filter beds as required by Section 8.7. of Division B of the Building Code. The applicant requested that the Infiltrator Systems Inc. ARC 18 Chamber System be used to replace stone and distribution pipe in absorption trenches and filter beds that are gravity fed, dosed, and pressurized. This Authorization supersedes BMEC BioDiffuser : ARC 18 Chamber System, which was valid, and authorized for use from August 7, 2008 to August 1, Note 1: For the purposes of this authorization, dosed means a system in which effluent is pumped to the leaching bed either by pump or siphon, but the effluent is not pressurized within the leaching bed. 5. Assessment Reports and assessments provided by the applicant show that if the Infiltrator Systems Inc. ARC 18 Chamber System is designed, performance tested, installed and maintained in accordance with the limitations in the manufacturer's instructions and the conditions stated in this authorization, a level of performance will be provided as required by the Building Code, for absorption trenches in soil, in leaching bed fill or in a filter bed, whether gravity fed, pressurized or dosed. Reports submitted and reviewed: 1. Shop Drawings, Arc, by Infiltrator ARC 18 Chamber and End Cap, dated ; Infiltrator Systems Inc. Page 2 of 9

3 2. Shop Drawings, Arc, by Infiltrator Biodiffuser Bio2 Chamber Specifications, dated 6/19/12; 3. Shop Drawings, Infiltrator Systems Inc., Infiltrator Systems Inc. Quick4 Equalizer 24 Chamber Detail, dated 1/25/2013; 4. Manufacturer s Information, Arc, by Infiltrator. The ARC 18 Chamber by Infiltrator, undated; 5. Letter Report, Zukun Plan, Updated ADS ARC-18 Chamber Specification, with ARC 18 Specification Sheet, dated February 8, 2008; 6. Test Report, NSF Engineering & Research Services H-10 Load Testing of the ARC 18 Chamber to IAPMO Standard PS , dated March 27, 2008; 7. Test Report, NSF Engineering & Research Services Load Testing of the ARC 18 Chamber, dated March 26, 2008; 8. Standard, International Association of Plumbing and Mechanical Officials, Material and Property Standard for Plastic Leaching Chamber, IAPMO PS , version PS Plas Leach Cham; 9. Listing, IAPMO Research and Testing, Inc., Certificate of Listing: Infiltrator Systems, Inc. Plastic Leaching Chamber, dated July 2012; 10. Presentation, Infiltrator, Application for Replacement Authorization ARC 18 Chamber System, undated; 11. Installation Manual, Arc by Infiltrator, Installation Guide: Arc 18 & Arc 24 Chamber, dated June 2012; 12. Letter Report, Van Harten Surveying Inc., BMEC Application Infiltrator Inc. ARC 18 Chamber System with drawings, dated February 4, 2013; 13. Report, Ontario Rural Wastewater Centre, Review of Chamber Systems and Their Potential Use in Ontario for On-site Wastewater Treatment Systems, dated May 2001; 14. Article, Small Flows Quarterly, Surface Failure Rates of Chamber and Traditional Aggregate-Laden Trenches in Oregon, Fall 2002 Volume 3, Number 4; 15. Paper, Pergamon, Hydraulic and Purification Behaviours and Their Interactions During Wastewater Treatment in Soil Infiltration Systems, Vol. 35, No. 4, pp , 2001; Infiltrator Systems Inc. Page 3 of 9

4 16. Paper, Environmental Science & Engineering Division Colorado School of Mines, Field Evaluation of Wastewater Soil Absorption Systems with Aggregate-Free and Aggregate-Laden Infiltrative Surfaces, final May 11, 2000; 17. Paper, Presented at 2009 NOWRA Technical Conference, Longevity of Conventional Gravel and Reduced Area Chamber Distribution Systems Installed in the Town of Cumberland, Maine 1975 to 1988, undated; 18. Letter Report, Van Harten Surveying Inc., BMEC Application Infiltrator Inc. ARC 18 Chamber System with drawings, dated March 11, 2013; 19. Letter Report, Van Harten Surveying Inc., BMEC Application Infiltrator Inc. ARC 18 Chamber System with drawings ; dated April 17, 2013; 20. Letter Report, Infiltrator Systems Inc., ARC 18 chamber Response to March 22, 2013 Comments, dated April 17, 2013; and 21. Approval from Other Jurisdictions: a. Saskatchewan, Ministry of Health, Approval of ARC 18, ARC 24 and ARC 36 model wastewater Effluent Chambers, with Section 7 Chamber Systems, dated October 6, 2008; b. Colorado, Colorado Department of Public Health and Environment, ADS model Leaching Chamber (Models Arc 18, Arc 24, Arc 36 and Arc 36HC) Approval for use in Colorado and Allowable Field Size, dated April 14, 2010; c. Florida, Florida Onsite Sewage Treatment and Disposable Systems Alternative Drainfield Products as of March 29, 2012, effective 01/17/2012; d. Maine, Department of Health and Human Services, Product Registration, ADS Arc 18 and ARC 24 and Side Port Coupler, with Section CMR 241 attachment, dated January 21, 2009; e. Massachusetts, Department of Environmental Protection, Modified Certification For General Use: BioDiffuser and ARC Chambers, with attachment, dated March 14, 2012; f. Minnesota, Minnesota Pollution Control Agency, Product Registration process Notice of Propriety Distribution Product Listing, Dated March 30, 2010; g. New Jersey, Appendix 1 to TWA SG, updated 11/04/2010; h. New York, Department of Health, Re; ARC 18 Graveless Chamber, dated September 22, 2008; i. Oregon, Department of Environmental Quality, ADS ARC 18 Plastic leaching Chamber, dated August 26, 2008; j. Rhode Island, Department of Environmental Management, Revised RIDEM Certification for ARC 18, ARC 24, ARC 36 AND ARC 36 HC with attachment, dated March 19, 2012; and k. Vermont, Department of Environmental Conservation, Innovative/Alternative System Approval with Attachment, expiration date September 1, Infiltrator Systems Inc. Page 4 of 9

5 6. Authorization The Infiltrator Systems Inc. ARC 18 Chamber System is authorized for use in sewage systems within the scope of Part 8 of Division B of the Building Code, as an alternative to stone and distribution pipes in absorption trenches and in filter beds, that are gravity fed, dosed (non-pressurized distribution system) and pressurized, and when installed in accordance with the manufacturer s recommendations, and with the terms and conditions contained in A and B below; all other requirements of the Building Code apply: A. Specific Terms and Conditions 1. This Authorization is valid only for Infiltrator Systems Inc. ARC 18 Chamber System; 2. This Authorization expires on August 2, 2018; 3. The Infiltrator Systems Inc. ARC 18 chamber shall be manufactured to IAPMO Standard H-10 loading; 4. When the Infiltrator Systems Inc. ARC 18 chamber is installed in lieu of distribution piping and stone, the length of the chamber system shall satisfy the requirements of Article , of Division B of the Building Code; 5. When the Infiltrator Systems Inc. ARC 18 chamber is installed in lieu of distribution piping and stone, the leaching beds must satisfy the general construction requirements specified in Articles , , and , of Division B of the Building Code; 6. The minimum clearance distances required by Article , of Division B of the Building Code for distribution piping shall be met by the Infiltrator Systems Inc. ARC 18 Chamber; 7. When installed in lieu of distribution piping and stone in absorption trenches, the trenches for the Infiltrator Systems Inc. ARC 18 chamber shall be: (d) (e) approximately the same length and not more than 30 m in length, a minimum width of 500 mm, at least 600 mm and not more than 900 mm in depth, centred not less than 1600 mm apart, at least 900 mm at all points on the bottom of the trench, above the high ground water table, rock or soil with a percolation time greater than 50 minutes, and Infiltrator Systems Inc. Page 5 of 9

6 (f) (g) backfilled, after installation of the Infiltrator Systems Inc. ARC 18 chamber with leaching bed fill, so as to ensure that after the leaching bed fill settles, the surface of the leaching bed will not form any depressions, and backfilled with a soil that does not contain heavy clay, silt or debris, and is manually compacted along the sides of the chamber to provide lateral support. 8. When installed in lieu of distribution piping and stone in filter beds, the lines of Infiltrator Systems Inc. ARC 18 chamber shall be evenly spaced over the surface of the filter medium to which the sewage effluent is applied, and the filter bed shall meet the following requirements: the filter medium shall meet the requirements of Subsection Filter Beds of Division B, of the Building Code, the surface of the filter bed shall be at least 900 mm above the high ground water table, rock or soil with a percolation time greater than 50 minutes per centimetre as per Clause (1)(e), of Division B, of the Building Code. 9. When used in gravity fed conditions, the Infiltrator Systems Inc. ARC 18 chamber shall be installed in compliance with all the above-stated Specific Terms and Conditions and be: (d) (e) installed level over the length of the trench, securely connected, chamber to chamber, using the built-in latch, free of structural damage and used full length (not cut), equipped with end caps installed on both ends, and equipped with a built-in splash plate at the inlet end of each chamber line, to prevent soil scouring. 10. Where the sewage effluent is dosed to the leaching bed by pumps or a siphon, the Infiltrator Systems Inc. ARC 18 chamber shall be installed to comply with all the above-stated Specific Terms and Conditions and: the effluent is pumped to a header line or distribution box prior to entering the chambers, and, Infiltrator Systems Inc. Page 6 of 9

7 a volume of effluent within the range of litres per metre of Infiltrator Systems Inc. ARC 18 chamber must be pumped within a time period not exceeding 15 minutes, to meet the requirements of Sentence (4), of Division B of the Building Code. 11. Where the sewage effluent is distributed through a pressurized system, the Infiltrator Systems Inc. ARC 18 chamber shall be installed: to comply with Specific Terms and Conditions numbers 1. through 10. above, and with a minimum 38 mm diameter pipe extending over the entire length of each trench, and such pipe: i. being specified by the manufacturer as acceptable for pressurized installations, ii. having minimum 6 mm diameter orifices, spaced over its length to ensure even distribution of effluent, iii. being supported in a manner as to ensure self-draining and prevent freezing of its contents, iv. having clean-outs installed at the downstream end of each chamber line, to allow the system to be serviced, and, v. receiving effluent from a treatment unit equipped with an effluent filter on the outlet, such effluent filter to be installed and sized in accordance with the manufacturer s recommendations. 12. The Infiltrator Systems Inc. ARC 18 chamber shall be installed in accordance with the, Installation Guide: Arc 18 & Arc 24 Chamber ; in the event where there is a conflict between provisions of this BMEC Authorization Report, the Building Code, and the Installation Guide, the most restrictive requirement shall prevail; and 13. The Infiltrator Systems Inc. ARC 18 Chamber System shall comply with the requirements of Article of Division B of Ontario s 2012 Building Code effective January 1, B. General Conditions 1. The use of the Infiltrator Systems Inc. ARC 18 Chamber System as described in Section 3. and the Specific Terms and Conditions set out in Section 6.A. must comply with: the Building Code Act, 1992, (the Act ) as amended or re-enacted, except as specifically authorized herein, the Building Code as amended or remade, and Infiltrator Systems Inc. Page 7 of 9

8 all other applicable legislation. 2. A copy of this Authorization shall accompany each application for a building permit and shall be maintained on the site of the construction with the building permit. 3. The Applicant specified in Section 1. shall promptly notify the BMEC of: the failure of the Applicant to comply with any of the Specific Terms and Conditions set out in Section 6.A., the failure of the material, system or building design that is the subject matter of this Authorization to (i) (ii) comply with any of the Specific Terms and Conditions set out in Section 6.A., or provide a satisfactory level of performance in situ, or the occurrence of any of the events described in General Conditions 6.B.4.,, (e) or (f). 4. BMEC may amend or revoke this Authorization at any time on its own initiative, or at the request of the Applicant specified in Section 1. without restricting the foregoing, the BMEC may amend or revoke this Authorization where it determines that: any change has been made to: (i) the name of the Applicant specified in Section 1, (ii) the address or other contact name information of the Applicant specified in Section 1, (iii) the ownership of the Applicant specified in Section 2, (iv) the manufacturing facilities specified in Section 2, (v) (vi) the material, system, or building design that is the subject matter of this Authorization, or a test method relevant to this Authorization, the Applicant has failed to comply with any of the terms and conditions set out in this Authorization, in the opinion of the BMEC, the use of the material, system or building design authorized herein provides an unsatisfactory level of performance in situ, Infiltrator Systems Inc. Page 8 of 9

9 (d) (e) (f) (g) in the opinion of the BMEC, amendment or revocation of the Authorization is appropriate on the basis of potential danger to public health and safety, the Act or Building Code has been amended, re-enacted or remade in a manner relevant to this Authorization, this Authorization was issued on mistaken, false or incorrect information, or a revision of an editorial nature is appropriate. 5. Effective Date This Authorization is effective as of August 2, Dated at Toronto this 30 th day of May 2013 BUILDING MATERIALS EVALUATION COMMISSION Edward Link, P. Eng. Chair, Building Materials Evaluation Commission Infiltrator Systems Inc. Page 9 of 9