1 (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance) Name of the Project: KRUTI ONELLA Sahyog Rekha Infraproject LLP Location / site alternatives Survey no. 47/P & 48/1, R.K Park, Mavdi Road, Rajkot. under consideration: Size of the Project: Total Land Area: m 2 Total Built Up Area: m 2 Total F.S.I. Area: m 2 Expected cost of the project: Total Cost of project: Rs. 200 Crore approx. Contact Information: Mr. Satish Belani Mobile: rekhacons1995@yahoo.co.in Screening Category: B, 8 (a) 8 (a) Building and construction Projects ( > sq. meter and < sq. meter of built up area) (II) Basic Information Item Details 1 Name of the project/s KRUTI ONELLA 2 S. in the schedule 8(a) Building and Construction Project 3 Proposed capacity/area/length/tonnage to be handled/command area/lease area/number of wells to be drilled Total Land Area: m 2 Total Built Up Area: m 2 Total F.S.I. Area: m 2 4 New/Expansion/Modernization New 5 Existing Capacity/Area etc t applicable. Currently it is open land 6 Category of Project i.e. A or B B 7 8 Does it attract the General Condition? If yes, please specify Does it attract the Specific Condition? If yes, please specify Kruti Onella (Sahyog Rekha Infraproject LLP) Page 1

2 Item Details Location 9 Plot/Survey/Khasra Village Tehsil District Survey no. 47/P & 48/, R.K Park, Mavdi Rajkot Rajkot State Nearest railway station/airport along with distance in kms Nearest Town, City, District Headquarters along with distance in kms Village Panchayats, ZillaParishad, Municipal corporation/local body (complete postal addresses with telephone numbers be given) Gujarat Bhaktinagar Railway Station 3.19 km Rajkot Airport: 6.1 km Site is in urban area of Rajkot Rajkot Municipal Corporation (West Zone Office 3.1 km) Behind Big Bazaar, 150 Feet Ring Road, Chandra Park Raod, Rajkot Ph: Name of applicant Sahyog Rekha Infraproject LLP 14 Registered Address Address for correspondence: Name Kruti Onella Survey no.47/p & 48/1, R.K Park, Mavdi Road, Rajkot. Mr. Satish Belani 806, Dhanrajni Complex, Dr. Yagnik Road, Rajkot Mr. Satish Belani 15 Designation (owner/partner/ceo) Address Pin Code Designated Partner Sahyog Hospital, Near Vishveshvar temple, Mavdi Main Road, Rajkot. rekhacons1995@yahoo.co.in Telephone Fax Details of alternate sites examined if any. Location of these sites should be shown ne Kruti Onella (Sahyog Rekha Infraproject LLP) Page 2

3 on a Topo Sheet Item Details 17 Interlinked projects ne 18 Whether separate application for interlinked projects have been submitted t Applicable 19 If yes, date of submission t Applicable 20 If no, reason t Applicable Whether the proposal involves approval/clearance under: If yes, details of the same and their status to be given. (a) The Forest (Conservation)Act, 1980? (b) The Wildlife (Protection)Act, 1972? (c) The C.R.Z. tification, 1991? Whether there is any Government Order/Policy relevant/relating to the site? ne of these t Applicable 23 Forest land involved (hectares) ne 24 Whether there is any litigation pending against the project and / or land in which the project is proposed to be set up? (a) Name of the Court (b) Case (c) Orders/directions of the Court, if any and its relevance with the proposed project ne Kruti Onella (Sahyog Rekha Infraproject LLP) Page 3

4 (III)Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Information/Checklist confirmation / quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) It is planned to construct multi-use residential cum commercial building in open land; resulting in permanent change in land use. There will be different activities carried out; like: Construction material handling & storage, construction waste disposal. Construction waste will be utilized for leveling in low lying areas and excavated soil will be used for green belt area development. There will be no change in land cover or topography because of construction activities. 1.2 Clearance of existing land, vegetation and buildings? It is an open land 1.3 Creation of new land uses? Open land to be converted to constructed area. 1.4 Pre-construction investigations e.g. bore houses, soil testing? Detailed Soil investigation carried out 1.5 Construction works? 1.6 Demolition works? There will be construction activities done for Residential & Commercial apartments. Currently it is open land. So, there will not be any demolition works required. 1.7 Temporary sites used for construction works or Housing of construction workers? Local labour to be employed 1.8 Above ground buildings, structures or Earthworks including linear structures, cut and fill or excavations These are routine activities involved in construction projects. 1.9 Underground works including mining or tunneling? t Applicable Kruti Onella (Sahyog Rekha Infraproject LLP) Page 4

5 Information/Checklist confirmation / quantities /rates, wherever possible) with source of information data 1.10 Reclamation works? t Applicable 1.11 Dredging? t Applicable 1.12 Offshore structures? t Applicable 1.13 Production and manufacturing processes? t Applicable 1.14 Facilities for storage of goods or materials? Required temporary storage for construction material like Cement, Steel, bricks, tiles, electrical goods etc Facilities for treatment or disposal of solid waste or liquid effluents? Approximately, KL/Day ( KLD from residential and 8.4 from commercial) of domestic wastewater will be generated and it will be treated in separate STPs located in the basement of the project. Treated sewage will be drained to Nagar Palika. Approximately, kg/day solid waste will be generated during construction phase and kg/day municipal solid waste will be generated during Operation phase. It will be disposed to municipal solid waste disposal facility 1.16 Facilities for long term housing of operational workers? Local labour to be employed 1.17 New road, rail or sea traffic during construction or operation? Construction material like, Bricks, Cement, Aggregate, Sand, and Reinforcement, Wood etc to be brought to site at appropriate point of time from local suppliers New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? t Applicable 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic t Applicable Kruti Onella (Sahyog Rekha Infraproject LLP) Page 5

6 Information/Checklist confirmation / movements? quantities /rates, wherever possible) with source of information data 1.20 New or diverted transmission lines or pipelines? t Applicable 1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? t Applicable 1.22 Stream crossings? t Applicable 1.23 Abstraction or transfers of water form ground or surface waters? We will use Bore well water during construction phase; and during operation phase we will obtain water supply connection from Rajkot Municipal corporation Changes in water bodies or the land surface affecting drainage or run-off? Due care has been taken while planning the grading at site. For rainwater management, slope will be provided in such a way that water passes through trench and recharged to percolation wells Transport of personnel or materials for construction, operation or decommissioning? Construction material like, Bricks, Cement, Aggregate, Sand, and Reinforcement, Wood etc to be brought to site at appropriate point of time Long-term dismantling or decommissioning or restoration works? t Applicable 1.27 Ongoing activity during decommissioning which could have an impact on the environment? decommissioning activity 1.28 Influx of people to an area in either temporarily or permanently? Permanent housing for approx 3168 people. Shops/Offices for approximately 210 people Introduction of alien species? Loss of native species or genetic diversity? Any other actions? -- Kruti Onella (Sahyog Rekha Infraproject LLP) Page 6

7 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Information/checklist confirmation / quantities /rates, wherever possible) 2.1 Land especially undeveloped or agricultural land (ha) 2.2 Water (expected source & competing users) unit: KLD Total m 2 open land to be used KLD and KLD water will be used During Construction and Operation Phase Respectively. Domestic water will be obtained through Bore well water during construction phase; and during operation phase, we will obtain water supply connection from Rajkot Municipal corporation. 2.3 Minerals (MT) t Applicable 2.4 Construction material stone, aggregates, sand / soil (expected source MT) 2.5 Forests and timber (source MT) t Applicable Approx. quantity of construction material Ready Mix Concrete m 3 Cement: 300 m 3 Sand: 3500 m 3 Bricks 12 lacs Renforcement 6500 MT Glass 2000 m 2 Aluminium frame 4 MT These will be procured from various suppliers. 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources (use appropriate standard units) During construction phase, 80 KW power and during operation phase 2000 KW power will be require. Power connection will be taken from PGVCL. t Applicable 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Kruti Onella (Sahyog Rekha Infraproject LLP) Page 7

8 Information/Checklist confirmation / quantities/rates, wherever possible) 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. t Applicable t Applicable t Applicable t Applicable 3.5 Any other causes t Applicable 4. Production of solid wastes during construction or operation or decommissioning (MT/month) N o. Information/Checklist confirmation / quantities/rates, wherever possible) 4.1 Spoil, overburden or mine wastes t Applicable 4.2 Municipal waste (domestic and or commercial wastes) Approximately, kg/day solid waste will be generated during construction phase and kg/day municipal solid waste will be generated during Operation phase. It will be disposed to municipal solid waste disposal facility 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) t Applicable 4.4 Other industrial process wastes t Applicable 4.5 Surplus product t Applicable Kruti Onella (Sahyog Rekha Infraproject LLP) Page 8

9 4.6 Sewage sludge or other sludge from effluent treatment Sewage will be treated in the STP and the residue will be discharged into drainage line of Nagar Palika. 4.7 Construction or demolition wastes Construction waste to be used for filling inside the site only 4.8 Redundant machinery or equipment t Applicable 4.9 Contaminated soils or other materials t Applicable 4.10 Agricultural wastes t Applicable 4.11 Other solid wastes t Applicable 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) Information/Checklist confirmation / quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil fuels t Applicable from stationary or mobile sources 5.2 Emissions from production processes t Applicable 5.3 Emissions from materials handling During Material handling, storage and including storage or transport transportation activities, concentration of dust will be increased however, it will be controlled by water sprinkling and windshield barriers. 5.4 Emissions from construction activities including plant and equipment During construction activities, concentration of dust will be increased however, it will be controlled by water sprinkling and windshield barriers. 5.5 Dust or odours from handling of materials including construction materials, sewage and waste t Applicable 5.6 Emissions from incineration of waste t Applicable 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) t Applicable 5.8 Emissions from any other sources t Applicable Kruti Onella (Sahyog Rekha Infraproject LLP) Page 9

10 6. Generation of ise and Vibration, and Emissions of Light and Heat: Information/Checklist confirmation / quantities/rates, wherever possible) 6.1 From operation of equipment e.g. engines, ventilation plant, crushers Construction machinery will generate noise and vibration. However, it will be controlled by green belt development. 6.2 From industrial or similar processes t Applicable 6.3 From construction or demolition Construction machinery will generate noise and vibration. However, the effect will be local and negligible. 6.4 From blasting or piling blasting is proposed 6.5 From construction or operational traffic Transportation of material for construction will generate some noise and dust. 6.6 From lighting or cooling systems t Applicable 6.7 From any other sources t Applicable 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: Information/Checklist confirmation / quantities/rates, wherever possible) 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) t Applicable Sewage will be treated into the STP provided within the project and the recycled water will be used within the project. 7.3 By deposition of pollutants emitted to air into the land or into water 7.4 From any other sources t Applicable t Applicable Kruti Onella (Sahyog Rekha Infraproject LLP) Page 10

11 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? t Applicable 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment N o. Information/Checklist confirmation / quantities/rates, wherever possible) 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances t Applicable 8.2 From any other causes t Applicable 8.3 Could the project be affected by natural disasters causing environmental damage (e.g.floods, earthquakes, landslides, cloudburst etc)? Beyond human control. However, guidelines of state/city disaster control team would be followed. 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality Information/Checklist confirmation / quantities/rates, wherever possible) 9.1 Lead to development of supporting facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) housing development extractive industries supply industries other t Applicable 9.2 Lead to after-use of the site, which could have an impact on the environment 9.3 Set a precedent for later developments t Applicable t Applicable Kruti Onella (Sahyog Rekha Infraproject LLP) Page 11

12 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects t Applicable (II) Environmental Sensitivity Areas Name/ Identity Aerial distance (within 15 km.) Proposed project location boundary 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration t Applicable t Applicable t Applicable 4 Inland, coastal, marine or underground waters t Applicable 5 State, National boundaries t Applicable 6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas -- 7 Defense installations t Applicable 8 Densely populated or built-up area Rajkot Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) Areas already subjected to pollution or environmental damage. (those where existing Few schools and worship/community places t Applicable t Applicable Kruti Onella (Sahyog Rekha Infraproject LLP) Page 12

13 12 legal environmental standards are exceeded) Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) t Applicable I hereby give an undertaking that the data and information given information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. Date: 24/08/2017 Place: Rajkot Navin Belani (Designated Partner) Address: Kruti Onella Plot 47/P & 48/1, R.K Park, Mavdi Road, Rajkot. Kruti Onella (Sahyog Rekha Infraproject LLP) Page 13