1 FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT ( SQ. M) AT ANAMOL LIFE STYLE RESIDENTIAL CUM COMMERCIAL BUILDING S. No. 206, O.P. NO. 129, F.P. NO. 129 OF D.T.P.S. NO. 241, NANA CHILODA, GANDHINAGAR, GUJARAT Developed By: TRIMURTI CORPORATION S. No. 206, OPP. KALASH BUNGLOW, NANA CHILODA, GANDHINAGAR, GUJARAT M , E Mail- ashishjpatel1979@yahoo.com 1

2 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the project/s RESIDENTIAL BUILDING (BUILDING & CONSTRUCTION) 2 S. No. In the schedule 8 (a) 3 Proposed capacity/area/length/tonnage to be Residential Cum Commercial Building Project handled/command area/lease Total Built up Area: Sq. m. area/number of wells to be drilled Total FSI Area : Sq. m Please refer Annexure - I 4 New/Expansion/Modernization New 5 Existing Capacity/Area etc. Net Area: 7593 Sq. m 6 Category of Project i.e. A or B B 7 Does it attract the general condition? No If yes, please specify 8 Does it attract the specific condition? No If yes, please specify 9 Location Plot/Survey/Khasra No. S. No. 206, O.P. No. 129, F. P. No. 129 of D.T.P.S. No. 241 Village At: Nana Chiloda Tehsil Gandhinagar District Gandhinagar State 10 Nearest railway station / air port along with distance in kms. 11 Nearest Town, city, District Headquarters along with distance in kms 12 Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal addresses with Gujarat Railway Station: Ahmedabad Kalupur km Airport : Ahmedabad 4.12 km Ahmedabad 0.5 km At: Nana Chiloda Dist: Gandhinagar telephone nos. to be given) 13 Name of applicant TRIMURTI CORPORATION Project Developer 2

3 14 Registered Address S. No. 206, O.P. No. 129, F. P. No. 129 of D.T.P.S. No. 241, Nana Chiloda, Gandhinagar GANDHINAGAR, GUJARAT 15 Address for correspondence Name TRIMURTI CORPORATION Project Developer Designation (Owner/Partner/CEO) Partner Address S. No. 206, Opp. Kalash Bunglow, Nana Chiloda, Gandhinagar GANDHINAGAR, GUJARAT Pin Code Telephone No. (M) Fax No Details of Alternative Sites examined, No if any. Location of this site should be shown on a topo sheet. 17 Interlinked Projects No 18 Whether separate application of - interlinked project has been submitted? 19 If yes, date of submission - 20 If no, reason - 21 Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation Act, 1980? (b) The Wildlife (Protection) Act, 1972? The C.R.Z Notification, 1991? 22 Whether there is any Government No Order/Policy relevant/relating to the site? 23 Forest land involved (hectare) None 24 Whether there is any litigation None pending against the project and/ or land in which the project is propose to be set up? 3

4 (a) Name of the Court (b) Case No. (c) Orders/direction of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of project involving action, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information /checklist confirmation YES/NO Details thereof (with No. approximate quantities/rate, wherever possible) with source of information data 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of local land use plan) No The proposed residential building project will be developed at S. No. 206, O.P. No. 129, F. P. No. 129 of D.T.P.S. No. 241, Nana Chiloda, Gandhinagar, GUJARAT 1.2 Clearance of existing land, vegetation and buildings? 1.3 Creation of new land use? 1.4 Pre-construction investigation e.g. bore house, soil testing? Yes The soil analysis report is carried out and enclosed. 1.5 Construction work Yes The proposed project is comprise of residential building [Basement + HP+ GF + 14] 1.6 Demolition works? 1.7 Temporary sites used for construction works or housing of construction works? 1.8 Above ground building, structures or earth works including liner structures, cut and ill or excavations Yes Total Built Up Area for the proposed building is sq. m These buildings are low rise building as per GDCR Norms. 1.9 Underground works including mining or tunneling? 1.10 Reclamation works? 1.11 Dredging? 1.12 Offshore structures? 1.13 Production and manufacturing processes? No It is a construction and building project. 4

5 1.14 Facilities for storage of goods or materials? 1.15 Facility for treatment or disposal of solid waste or liquid effluent? Yes Yes Construction materials like steel, cement, sand, bricks etc will be procured from local market and will be temporarily stored at site. Wastewater AUDA sewerage line is the mode of disposal of sewage at the time of operation phase. Please refer Annexure II 1.16 Facility for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction or operation? 1.18 New road rail. Air waterborne or other transport infrastructure including new or altered routes and station, ports airport etc Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? 1.21 Impoundment, damming. Culver ting. Realignment or other changes to the hydrology of watercourses or aquifers? Solid waste: The total solid waste generated during the operation phase will be transported regularly to the nearest collection point designated by the AUDA. Yes Road traffic will increase due to the various construction activities and also in the operation phase because of increased population due to proposed project. Yes AUDA water supply line is the source of water during operation phase Stream crossing? 1.23 Abstraction or transfer of water from No ground or surface waters? During operation phase the whole water requirement will be met through AUDA water supply. 2 Nos. of percolation well will be constructed for the ground water recharging as per the GDCR Norms Changes in water bodies or the land Yes The project involves construction 5

6 Surface affecting drainage or run-off? 1.25 Transport of personnel or material for construction, operation or Decommissioning? 1.26 Long-term dismantling, decommissioning, or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? of paved areas and hence the quantity of runoff will increase due to infiltration. This runoff will be collected through a well designed surface water drain and will be used for recharging aquifers. Yes Transportation of construction material will be by truck Introduction of alien species? 1.30 Loss of native species or genetic diversity? 1.31 Any other actions? 2. Use of Natural resources for construction or operation of the project (such as land, water material or energy any resources which are non-renewable or in short supply): Sr. No. Information/checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data 2.1 Land especially undeveloped or agricultural land (ha) 2.2 Water (expected source & competing users) Yes The residential building will be constructed on undeveloped land. Yes During operation phase the whole water requirement will be met through AUDA water supply line. Please refer Annexure II for water consumption. 2.3 Minerals 2.4 Construction material-stone, aggregates, and/soil (expected source- MT) 2.5 Forests and timber (sources MT) Yes Wood will be used for the 6

7 2.6 Energy including electricity and fuels (source, competing users) Units. Fuel (MT) energy (MW) 2.7 Any other natural resources (appropriate standards units) furniture. Yes The project would required about 650 KW electric power during operation phase which is sourced from Torrent Power Ltd. 3. Uses, Storage, Transport, Handling or production of substances or materials, which could be harmful to production to human health or the environment or raise concern about actual or perceived risks to human health Sr. No. Information/checklist confirmation 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora fauna and water supplies) 3.2 Changes in occurrence of diseases of affect disease vectors (e.g. insect or water borne disease) 3.3 After the welfare of people (e.g. by changing living condition? 3.4 Vulnerable groups of people who could be affected by the projects e.g. hospital patients, children, the elderly etc. Yes/No Details there of (with approximate quantities/rates, Wherever possible) with source of information data Yes During operation phase, direct indirect employment will be generated which will uplift the socio economic of the area. 3.5 Any other cause 4. Production of solid waste during construction or operation or decommissioning MT/month): Sr. No. Information/checklist Yes/No Details there of (with confirmation approximate quantities/rates, Wherever possible) with source of information data 4.1 Spoil, overburden or mine waste 4.2 Municipal waste (domestic and or Yes The Municipal solid waste commercial wastes) generated during operation phase will consist of: Organic Waste: Waste vegetable and food 7

8 Inorganic waste: Papers, cartons, thermocol, plastic, polythene bags, glasses etc. The solid waste generated will be approximately 1500 kgs/month. The recyclable waste will be sold off to recyclers. The non recyclers solid waste generated will be transferred to the nearest collection point of AUDA. 4.3 Hazardous waste (as per Hazardous waste Management rules) 4.4 Other industrial process waste 4.5 Surplus project 4.6 Sewage sludge or other sludge from effluent treatment Yes Yes, sewage sludge will generate as the entire quantity of sewage will be treated in STP and part of the treated sewage will be reused as flushing and part of the treated sewage will be disposed off into sewerage line of AUDA. 4.7 Construction or demolition waste 4.8 Redundant machinery or equipment 4.9 Contaminated soils or other materials 4.10 Agriculture waste 4.11 Other solid waste 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr): Sr. No. Information/checklist Yes/No Details there of (with confirmation approximate quantities/rates, Wherever possible) with 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources source of information data 5.2 Emission from production processes 5.3 Emissions from materials handling 8

9 including storage or transport rules) 5.4 Emissions from construction activities including plants and equipment 5.5 Dust or orders from handling of materials including construction materials, sewage and waste Yes Carbon filter and STP is proposed and controlled the odor from sewage as part of it will discharge to drainage line of AUDA. 5.6 Emissions from incineration of waste 5.7 Emission from burning of waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources 6. Generation of Noise, vibration, Emissions of Lights and Heat. Sr.No. Information/checklist Yes/No Details there of (with confirmation approximate quantities/rates, Wherever possible) with source of information data 6.1 From operation of equipment e.g. engines, ventilation plant, crushers. 6.2 From Industrial or similar processes 6.3 From construction or demolition 6.4 From blasting or piling 6.5 From construction or operational traffic Yes During operational activities noise will be generated due to traffic but there will not be any significant increase in the noise due to the proposed project. 6.6 From lighting or cooling system 6.7 From any other sources 7. Risk of accidents during construction or operation of the Project, which could affect human or the environment. Sr. No. Information/checklist confirmation 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes/No Details there of (with approximate quantities/rates, Wherever possible) with source of information data Yes Sewage sludge will generate as the entire quantity of sewage will be treated in STP and part of the treated sewage will be reused as flushing and part of 9

10 the treated sewage will be disposed off into sewerage line of AUDA. 7.3 By deposition of pollutants emitted to air, into the land or into water 7.4 From any other source 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No All EMS components shall run round the clock, and in case of failure of any of the system there will be safe storage arrangement, which will help for safe storage of waste/effluent. In case of closed till the system gets operational. 8. Risk of accidents during construction or operation of the project, which could affect human of the environment Sr. No. Information/checklist confirmation 8.1 From explosions, spillages, handling, use or production of hazardous substances Yes/No Details there of (with approximate quantities/rates, Wherever possible) with source of information data 8.2 From any other causes 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landsides, cloudburst Yes Project area is categorized in the Seismic Zone III which is classified as having a fairly medium probability of earthquake shocks. etc.)? 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality. Sr. No. Information/checklist confirmation Yes/No Details there of (with approximate 9.1 Lead to development of supporting facility ancillary development or development stimulated by the project which could have impact on the environment e.g. Supporting infrastructure quantities/rates, Wherever possible) with source of information data Yes This is a building and construction project which will lead to the further development of surrounding area. 10

11 (roads, power supply, wastewater treatment, etc. Housing development Supply industry Others 9.2 Lead to after-use of the site, which could have impact on the environment. 9.3 Set a precedent for later development 9.4 Have cumulative effects due to proximity to other existing or planned project with similar effects. (II) Environmental Sensitivity Sr.No. Areas Name /Iden 1. Areas protected under international conventions, national or local legislation for their ecological landscape, cultural or other related value 2 Areas which are important or sensitive for ecological reasons Wetlands, waster courses or other water bodies coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting foraging, resting, over wintering, migration. 4 Inland, coastal, marine or underground waters Aerial distance (with 15 km) proposed project location tity boundary 5 States, National boundaries 6 Routes or facilities used by the public - Public transportation for access to recreation or other tourist, pilgrim areas] 7 Defense installations 8 Densely populated or built-up area 9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) 10 Areas containing important, high quality or scarce resources (ground water 11

12 resources, surface resource, forestry, agriculture, fisheries tourism, minerals) 11 Areas already subjected to pollution or environmental damage (Those where existing legal environmental standards are exceeded.) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems.(earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climates condition) III) Proposed Terms of Reference for EIA studies: As per the EIA Notification, 14 th September 2006 of MoEF, New Delhi, no EIA required as the built up area is < 1,50,000/- Sq. m. even though it will be conducted as the TOR issued by SEAC. I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost. Date: October 24, 2016 Place: Gandhinagar PARTNER Signature of the applicant (Project Proponent / Authorized Signatory) Name: TRIURTI CORPORATION (ANMOL LIFE STYLE) Full Address: S.No. 206, Nana Chiloda, Opp. KALASH Bungalow, Gandhinagar 12

13 ANNEXURE I AREA STATEMENT Net Plot Area 6010 m 2 Common Plot Area Required m 2 Common Plot Area Provided m 2 Built up Area, Ground Floor m 2 Built up Area m 2 Built up Area, FSI Used m 2 Non FSI Area 0.00 m 2 Nos. of Blocks 6 Blocks G + 7 Nos. of Flats 178 units Nos. of Commercial Units 18 units Total Parking Area Required for Res m 2 Total Parking Area Proposed for Res m 2 Total Parking Area Required for Com m 2 Total Parking Area Proposed for Com m 2 Area for Thick Plantation m 2 No. of Trees Planning 91 Nos. Percolation well 2 Dust Bin 20 nos. of 80 Lit Capacity for Residential 2 nos. of 80 Lit Capacity for Residential Max. Height of the Building m 13

14 ANNEXURE II WATER AND WASTEWATER DETAILS Water and Wastewater Details (Operation Phase) Source: AUDA Sr. No. 1 Domestic Purpose Water Consumption (KL/day) Wastewater Generation (KL/day) Remarks Residential 160unit x 5 person x 135 Lit/day = KL/day Commercial 18 unit x 3 person x 45 Lit/day = 2.43 KL/day Wastewater will be 80% of the requirement 2 Greenbelt Treated - - sewage Total Mode of Disposal: Domestic wastewater generation will be treated in proposed STP and par of the treated sewage shall be reused as flushing and gardening and part of the treated sewage shall be disposed off through AUDA drainage line. 14

15 ANNEXURE IIII SITE PLAN 15

16 16

17 ANNEXURE IV PLANT LAYOUT 17

18 18

19 19