1 (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1

2 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY 3.0 INTRODUCTION OF THE PROJECT /BACKGROUND INFORMATION 4.0 PROJECT DESCRIPTION 4.0 AVAILABLITY OF RAW MATERIAL 5.0 SELECTION OF SITE & LOCATION OF STONE MINE 6.0 PLANNING BRIEF 7.0 EXISTING INFRASTRUCTURE 8.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN 9.0 PROJECT SCHEDULE & COST ESTIMATES 10.0 ANALYSIS OF PROPSAL (FINAL RECOMMENDATION) 2

3 1.0 INTRODUCTION 1.1 Preamble Black Trap is base of all types of Building works, Construction of Road, Construction of Cement Concrete road, The need of Stone in all fields are very essential as it is a compulsory material for all types of construction, and Industries fields. Stone Mines are providing employments to the local Labour in Rural area, as the labour of rural area have no any work for labour, They are Unemployed, Thus this existing mine is providing work to many labours and it is a good employment. 2.0 Executive Summary Makwana Dineshbhai Khimjibhai is an existing mine, as the demand of black stones in all sectors are highly necessary, and this project is providing and fulfil all demands of black stones in complete around area. About hectare of land is under possession of Makwana Dineshbhai Khimjibhai At, Village : Tithava, Taluka : Wankaner, Dist : Morbi. As per the statuary obligation this project needs environmental clearance from department of Environment and forest dept. (GPCB ) Gujarat. For grant of lease and to start quarrying operations (production) Accordingly project proponent has submitted form 1, prefeasibility report and copy of Approval letter from department of mines and geology Gujarat, to the state level environmental assessment authority of Gujarat constituted by MOEF, GOI for issuing environmental clearance, as per EIA, September notification. 3

4 3.0 Introduction of the Project/Background information : 3.1 Name of the existing unit :Makwana Dineshbhai Khimjibhai Registered Office :Makwana Dineshbhai Khimjibhai At & Post : Lajai-1 Ta : Morbi, Dist : Morbi, Location of existing unit : Village : Tithava Govt. Sr. No. 1046/1, Taluka :Wankaner. Dist : Morbi. Name of partners :Makwana Dineshbhai Khimjibhai 3.2 Brief description of nature of the project : It is a Black Stone Quarrying, it contains black stone rubble which is used in building construction and construction of infrastructures and road, railways etc. 3.3 Demand - Supply Gap : As black trap is used as raw material in construction of building and infrastructure projects, the demand of black trap is increasing day by day. In past, demand was not too much but now a days due to rapid industrialization and urbanization its demand increasing with pace of time. At present, demand of black trap is more than the supply. 3.4 Imports vs. Indigenous Production : In Morbi of Gujarat, a number of black trap mines are there. There is abundance of black trap in the area; it had become a major source of economy in the area/region. 4

5 3.5 Export Possibility : N.A. 3.6 Domestic / Export Markets : Black trap produced is used locally as well as circulated in nearby area. So clearly there is a huge market of black trap in the domestic area. 3.7 Employment Generation (Direct and Indirect) due to the project : By this mining project of black trap in the area, peoples will get employment, The project will directly generate the employment for the local people and indirectly for the others. Also the marketing of the product will generate the employment for peoples. By this project, approximately Skilled labours-3 and Unskillled-10 to 15 labours will be on project site. 4.0 Project Description : 4.1 Type of project including interlinked and interdependent project if any : No other project is interlinked with this mining project. 4.2 Location (map showing general location, specific location and project boundary & project site layout) with co-ordinates The area has been marked on Google map including the mining lease location. This comprises the mining lease on Govt. Sr. No. 1046/1 Paiky, near village : Tithava, Taluka : Wankaner, Dist : Morbi of Gujarat location of the mining lease is as under. 5

6 6

7 The geographical location of the project is as follows : Latitude (N) 22 37'41.50"N 22 37'44.29"N 22 37'46.36"N 22 37'43.31"N Longitude (E) 70 53'12.71"E 70 53'10.94"E 70 53'13.94"E 70 53'15.74"E 4.3 Details of alternate sites, considered and the basis of selecting the existing site, particularly the environmental considerations gone into should be highlighted : No alternative site was examined, because this is a existing mine manufacturing unit. 4.4 Size or magnitude of operation : B category manual. It is open mining project and production capacity is 5000 MT/Month. 4.5 Project description with process details (a schematic diagram/flow chart showing the project layout, components of the project etc. is given below: Open cast mining Site preparation Fencing OB Removal Drilling and Blasting Stone Breaking by manual Transportation to the end use 7

8 4.6 Raw material required along with estimated quantity, likely source, marketing area of final products. Mode of transport of raw materials And finished products : The estimated quantity is approx MT/Month. Raw material is being purchased from lease holders of black trap. Marketing area is city area of Morbi, Rajkot, and rural area nearby. Mode of transportation is by tractors and dumpers. 4.7 Resource optimization / recycling and reuse envisaged in the project. If any, should be briefly outlined : N.A. 4.8 Availability of water its source, Energy/power requirement and source should be given : Total water requirement in the project is about 3.0 KLD for drinking & domestic use, dust suppression and plantation. Drinking water is brought by water tanker from nearby City : Morbi. Diesel will be used in dumpers and tractors. Nearby City : Wankaner is well electrified and taluka center. 4.9 Quantity of wastes to generated (liquid and solid) and scheme for their Management/disposal : N.A Schematic representations of the feasibility drawing which give information of EIA purpose : According to MOEF mining project containing area 5 Ha. are considered in category B 2. Schematic representations of the feasibility is as under. 8

9 Project Concept and Site selection Form 1 pre-feasibility project report with existing TOR to MOEF (EAC) Scoping by SEAC (site visit by sub group of SEAC, if necessary Category B 2 - EIA not required Appraisal and recommended by SEAC Approval by SEIAA Display on the SPCB/UTPCC website & project proponent website 5.0 Site Analysis : 5.1 Connectivity : Mine site is well connected with road transport. Nearest railway station is at Amasar Railway Station (5.45 km) in of mine site. State Highway S.H. No.319 (0.50 km). Nearest highway is a National Highway No. 27 Passes in about (7.16 km). 5.2 Land Form - Land use and land Ownership : The area of lease is Ha. The lease area forms part of Govt. land is involved in leased area. No forest land. Details are given in below table. 9

10 S. Type of Area in Near Tehsil District State No. Land (Ha.) Village 1 Black trap mine Govt. Sr. No. 1046/ Tithava Wankaner Morbi Gujarat 5.3 Topography (Google image) : The lease area is situated near by city : Tithava. Topographically, the area is almost flat area. 10

11 11

12 5.4 Existing land use pattern (agriculture, non -agriculture, forest, water bodies including area under CRZ), shortest distances from the periphery of the project to periphery of the forests, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the HFL of the river), CRZ. In case of notified industrial area, a copy of the Gazette notification should be given: Nearest Sensitive Area a) Reserve Forest Name Distance from the Project within 10 kms There is no reserve or protected forest within 10.0 km of lease area. b) National Park There is no c) Wild life national park or Sanctuary wild life sanctuary within 10.0 km of lease area. 12

13 d) Eco sensitive areas There is no eco sensitive area within 10.0 km of lease area e) Water source Ground water No big water reservoir is within 10.0 km of lease area. The grounder water level is 30 to 50 mt. deep The project is located in seismic zone-iv. There is no flood. cloudburst and landslide reported so far. f) CRZ N.A. There is no C.R.Z. within km periphery of lease area. 13

14 5.5 Existing infrastructure : 1.Nearest railway station Amasar is at Railway Station ( 5.45 km) in of mine site. 2.State Highway S. H. No. 319 (0.50km). 3. Nearest highway is a National Highway No. 27 Passes in about (7.16 km). 5.6 Soil classification : Soil of the region falls within Average rain fall zone of mm. The soils are sandy loam, shallow depth reddish-black soils. 5.7 Climatic data from secondary sources : Morbi has a tropical climate. In winter there is much more rainfall in Morbi than in summer. The Köppen-Geiger climate classification is As. The average annual temperature in Morbi is 27 C. About 521 mm of precipitation falls annually. 14

15 1. Climate graph - Year Temperature graph - Year Climate table 15

16 5.8 Social Infrastructure available : N.A. 6.0 Planning Brief : 6.1 Planning Concept (type of industries, facilities, transportation etc.) Town and country planning development authority classification : No industries and town planning programmers in the existing area. 6.2 Population projection : No Human settlements near project area. 6.3 Land use planning (breakup along with green belt etc) : Details will be given in land use pattern of quarry plan. 6.4 Assessment of Infrastructure Demand (Physical & Social) : There is no large infrastructure demand near to existing area. 6.5 Amenities / Facilities : Not applicable as it is a small project. 7.0 Existing Infrastructure : 7.1 Industrial Area (processing Area) : --NA Residential Area (Non Processing Area) : --NA Green Belt : The plant will follow the norms and will be in process to developing 33% green belt in lease area. 7.4 Social Infrastructure : N.A. 7.5 Connectivity (Traffic and Transportation Road/Rail/Metro/Water ways etc) : Well connected with Road/Rail. No metro and water ways. 7.6 Drinking Water Management (Source & Supply of water) : Drinking water will be procured from tube well existing nearby. 7.7 Sewage system : The domestic waste water will be treated in the septic tank followed by soak pit. 7.8 Industrial waste management : --NA-- 16

17 7.9 Solid waste management : --NA Power Requirement & Supply / Source : --NA Rehabilitation and Resettlement (R & R) Plan : Policy to be adopted (Central / State) in respect of the project affected persons including home outstees, land outstees and landless labourers (a brief outline to be given) : --NA Project Schedule & Cost Estimates : 9.1 Likely date of start of construction and likely date of completion (Time schedule for the project to be given) : It is an existing project & applied for renewal. 9.2 Estimated project cost along with analysis in terms of economic viability of the project : Project cost No. Particulars Amounts (Rs.) 1 Trolley and tanker based tractors 2,25,000/- 2 Mining Equipments 1,00,000/- 3 Safety Equipments 75,000/- Total 4,00,000/- The existing cost of the project is Rs lacs and it is economically 10.0 Analysis of proposal (Final Recommendation) : Financial and social benefits with special emphasis on the benefit to the local people including population, if any, in the area : This project has created employment potential for approximately about 10 to 15 local people. THANKS 17