1 ` SUBMISSION OF FORM I & IA TOWARDS GETTING PRIOR ENVIRONMENTAL CLEARANCE (EC) For M/s. PRAKRUTHI INFRA & SHELTERSS (INDIA) PVT LTD (Residential Apartment Construction Project) Sy.. 298/1 & 2 Vepagunta, Gosala Road, Ramaraju Layout, Bindra Nagar, Mithilapuri VUDA Colony, Madhurawada, Visakhapatnam Submitted to STATE ENVIRONMETNAL IMPACT ASSESSMENT AUTHORITY (SEIAA) O/o. AP POLLUTION CONTROL BOARD, HYDERABAD. Prepared& Submitted by Enviro House, Block B, B-1, IDA, Auto Nagar, Visakhapatnam Ph: , Telex: , svenviro_labs@yahoo.co.in B.O:2-53, Mahipala St., Yanam , Ph: , Cell: QCI 123& Recognized by MOE&F, New Delhi.

2 FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project(s) M/s. PRAKRUTHI INFRA & SHELTERS 2. S.. in the schedule 8 (a) 3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number of wells to be drilled. (INDIA) PVT LTD Construction of Residential project in an area of Sq.mts Total Built up Area Sq.mts. 4. New/Expansion/Modernization New Construction of Residential Building 5. Existing Capacity/Area etc. NIL 6. Category of Project i.e. A or B Category B 7. Does it attract the general condition? If yes, please specify. 8. Does it attract the specific condition? If yes, please specify. 9. Location Plot/Survey/Khasra. Village Tehsil District State 10. Nearest Railway Station/Airport along with distance in kms. 11. Nearest Town, City, District Headquarters along with distance in kms. Sy.. 298/1 & 2 Ramaraju Layout Bindra Nagar, Mithilapuri VUDA Colony Madhurawada Andhra Pradesh Visakhapatnam Railway station at km/ Visakhapatnam Airport at 15.35Kms Visakhapatnam City at 15.0 Kms, 12. Village Panchayats, Zilla Parishad, Municipal GVMC Corporation, Local body (complete postal addresses with telephone nos. to be given) 13. Name of the applicant M/s. Prakruthi Infra & Shelters (India) Pvt Ltd Mr. I. K. Venu Gopala Reddy Managing Director 14. Registered Address Plot : 403, Chillapalli Complex, Near

3 15. Address for correspondence: Name Designation (Owner/Partner /CEO) Pin code Telephone. Fax. 16. Details of Alternative Sites examined, if any. Location of these sites should be shown on a topo sheet. 17. Interlinked Projects Nil 18. Whether separate application of interlinked project has been submitted? Ravindra Bharathi School, Diamond Park Junction, Dwarka Nagar, 1 st Lane, Visakhapatnam -16 Mr. I. K Venu Gopala Reddy Managing Director engvizag@prakruthishelters.com Availability of basic infrastructure necessary for the construction project & demand for housing purpose as it is facilitated for general requirements like educational institutes, Transportation, etc, no alternate site is examined. NA 19. If yes, date of submission NA 20. If no, reason NA 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. i. The Forest (Conservation) Act, 1980? ii. The Wildlife (Protection) Act, 1972? iii. The C.R.Z. tification, 1991? 22. Whether there is any Government Order/Policy relevant /relating to the site? NA NA NA Nil 23. Forest land involved (hectares) Nil 24. Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? a) Name of the Court b) Case. c) Orders/directions of the Court, if any and its relevance with the proposed project. Nil

4 (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.. Information/Checklist confirmation 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? / Details thereof (with approximate quantities /rates, wherever possible) with source of information data The land earmarked for Construction of Residential Building project with an site area of about Sq. mtrs and the total built up area is Sq.mts area. This land is sufficient for construction of Residential and associated other utilities. A total of Sq. mtrs of land is available and is sufficient for the construction activity. Total Built up area = Sq.mts Further the above land is barren land. Therefore no change in land use / land cover / topography. The land is barren and developed land. vegetation or building existing in this land for clearance. 1.3 Creation of new land uses? extra new land will be used. The 1.4 Pre-Construction investigations e.g. bore houses, soil testing? project is having Sq. Mtrs of land and the total built up area is Sq.mts. In this land only the proposed project will be constructed. For the total area of Sq.Mts already ground water and soil testing carried. 1.5 Construction works? Structures comprises of two & three bed room flats, water storage tanks, DG Set

5 room, Sewage Treatment Plant, etc. The main components of the civil works for the proposed plant include the construction of bed rooms, foundations and structures, Sewage Treatment Plant, 1.6 Demolition works? The site is leveled one and not contains 1.7 Temporary sites used for construction works Or housing of construction workers? 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including mining or tunneling? etc. any temporary / permanent structures. Therefore no demolition work will be carried. Local manpower will be utilized for the construction work. Therefore no temporary site used for construction works. BUILDINGS Residential Building Sewage Treatment Plant Water Storage Tank DG Set Room mining or tunneling activity Reclamation works? reclamation work 1.11 Dredging? t applicable 1.12 Offshore structures? t applicable 1.13 Production and manufacturing processes? 1.14 Facilities for storage of goods or materials? 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? -- Cement storage Building materials storage Liquid effluents The waste water generated from the proposed project will be in the form of sanitary waste water only and which will be routed to sewage treatment plant and thereby reuse and for firefighting if surplus to local municipal sewerage

6 1.16 Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during Construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? 1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? network. Waste water Generation KLD Solid waste Municipal waste 461kg/day DISPOSAL: Disposed to local municipal dumping site - Kapulauppada Dumping site Majority of manpower will be recruited from local people only. Therefore no housing scheme proposed. The site is well connected to roadway. new road, rail or sea traffic required. t applicable. transport routes will be changed. t required to divert transmission lines / pipelines. t applicable 1.22 Stream crossings? stream crossings are required Abstraction or transfers of water form ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or run-off? GVMC and Ground water from the existing bore well will be used to meet the water requirements of KLD for drinking purpose. change in water bodies and no changes occur in drainage pattern. As the proposed unit is Construction of Apartments it does not emit any process

7 effluent Transport of personnel or materials During construction activity, private for construction, operation or tippers will be used for supply of metal, decommissioning? sand, cement and iron Long-term dismantling or dismantling work will be carried in decommissioning or restoration the project. works? 1.27 Ongoing activity during decommissioning activity proposed. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? There would be a marginal influx of people since the apartment consists of residing flats Introduction of alien species? Loss of native species or genetic diversity? native species will be destroyed. As the proposed project will be constructed in barren land. Therefore no chance of loss of native species or generic diversity occurs Any other actions? The housing project proposed to develop green belt all along the all sides of boundary wall. 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are nonrenewable or in short supply): Details thereof (with approximate S.. Information/Checklist confirmation / quantities / rates, wherever possible) with source of information data 2.1 Land especially undeveloped or The present status of land is barren and agricultural land (ha) 2.2 Water (expected source & competing users) unit: KLD non-agricultural. During construction Domestic& construction 100.0/day During operation Domestic m 3 /day 2.3 Minerals (MT) t applicable 2.4 Construction material stone, aggregates, sand / soil (expected Stone aggregates 7000 m 3 (foundation work)

8 source MT) 2.5 Forests and timber (source MT) The timber that is required is procured from the approved local contractors. 2.6 Energy including electricity and fuels Electricity will be supplied by (source, competing users) Unit: fuel APEPDCL. (MT), energy (MW) Diesel for DG Sets 100 Litres/Day 2.7 Any other natural resources (use appropriate standard units) other natural sources other than the above mentioned will be used. 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.. Information/Checklist confirmation / 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? 3.3 Affect the welfare of people e.g., by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., Details thereof (with approximate quantities /rates, wherever possible) with source of information data There are no materials that are being utilized in the construction programme which endanger human health or water supply. There is no possibility for occurrence of disease vectors as there are no water bodies or stagnant water. te: as per the studies / literature available, no such diseases were occurred from similar type of units. Living conditions will escalate therefore welfare of the people will be on positive side Any other causes? -- --

9 4. Production of solid wastes during construction or operation or commissioning (MT/month) S.. Information/Checklist confirmation / Details thereof (with approximate quantities /rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes Municipal waste (domestic and or commercial wastes) 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Municipal solid waste 461 kg/day STP Sludge 10.0 Kgs/day Used Batteries 02s. Waste Oil 100 LPA Disposal: Garbage to the Local municipal dumping yard Kapuluppada dumping site. There will not be any hazardous waste generation. 4.4 Other industrial process wastes Since it is construction project, no 4.5 Surplus product t applicable. 4.6 Sewage sludge or other sludge from effluent treatment process/industrial activity involved. Sludge (10.0 kgs/day) generated from sewage treatment plant will be disposed locally as manure. 4.7 Construction or demolition wastes There is no demolition and as such the construction debris does not arise. 4.8 Redundant machinery or equipment redundant machinery would be available for disposal. 4.9 Contaminated soils or other materials soil / material will be contaminated Agricultural wastes agricultural waste will be generated Other solid wastes t applicable.

10 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.. Information/Checklist confirmation 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources / Details thereof (with approximate quantities /rates, wherever possible) with source of information data It is proposed to Construct Residential Apartments and does not involve any manufacturing process. 5.2 Emissions from production processes This is not manufacturing facility 5.3 Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including plant and equipment 5.5 Dust or odours from handling of materials including construction materials, sewage and waste The transportation of construction materials will be taken with due care to safeguard against dust emissions by coverage as well as by sprinkling water during construction phase. The only emission from construction activities is of concrete miller. It will run on HSD. Remaining all the equipment like vibrator, etc, will operates on power. Dust will arise from construction materials. Proper care will be taken during handling of material. During unloading of metal, water will be sprayed. Emissions will be controlled positively. 5.6 Emissions from incineration of waste incinerator proposed. 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources Nil open air burning.

11 6. Generation of ise and Vibration, and Emissions of Light and Heat: S.. Information/Checklist confirmation / 6.1 From operation of equipment e.g. engines, ventilation plant, crushers Details thereof (with approximate quantities /rates, wherever possible) with source of information data The DG sets will be established with silencers and the buildings are also being constructed with noise absorbing materials. DG set will be operated only during power interruption and as a stand by unit in emergency. crushers or ventilators are proposed. 6.2 From industrial or similar processes It is proposed to Construct Residential Apartments and does not involve any manufacturing process. 6.3 From construction or demolition There is no demolition is proposed in the complex and is no possibility of noise development. 6.4 From blasting or piling blasting or piling operation required. 6.5 From construction or operational traffic From lighting or cooling systems The lighting and cooling systems are designed as per the notification of the National Building code. 6.7 From any other sources t applicable.

12 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S.. Information/Checklist confirmation / 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water 7.4 From any other sources? Nil 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? Details thereof (with approximate quantities /rates, wherever possible) with source of information data hazardous materials will be stored. The domestic wastewater will be routed to sewage treatment plant. deposition of pollutant emitted to air into the land or into water is envisaged. pollutants will be built up in the environment. Therefore no risk from any source.

13 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S.. Information/Checklist confirmation / 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Details thereof (with approximate quantities /rates, wherever possible) with source of information data Small quantity of HSD will be stored in the site for running the DG/concrete mixer during construction. The HSD will be stored in a secured place. 8.2 From any other causes Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc) The project designed under earthquake resistance and other NBC design practices followed for construction activity.

14 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S.. Information/Checklist confirmation / 9.1 Lead to development of supporting utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, Waste or waste water treatment, etc.) Housing development Extractive industries Supply industries Other 9.2 Lead to after-use of the site, which could have an impact on the environment Details thereof (with approximate quantities /rates, wherever possible) with source of information data supply or ancillary units required for this project. The required material will be purchased directly from vendors. impact will occur. (Based on literature / standby of existing plants) 9.3 Set a precedent for later developments such cases. 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects cumulative effects will occur.

15 (III) Environmental Sensitivity S.. Area 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground waters Name/ Identity Aerial distance (within 15 km.) Proposed project location boundary Kambalakonda Reserve Forest at 1.43Kms Bay of Bengal at 2.81 Kms, Meghadri reservoir at 7.95 kms and Kambalakonda Reserve Forest at 1.43Kms ne within 15 km radius. Bay of Bengal at 2.81Kms 5 State, National boundaries ne within 15kms radius 6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas NH Kms ne within 15kms radius 7 Defense installations ne within 15 km Aerial distance from proposed plant site. 8 Densely populated or built-up area Pothinamallayapalem at 0.45Kms 9 Areas occupied by sensitive manmade land uses (Hospitals, schools, places of worship, community facilities) 10 Areas containing important, high quality or scarce resources Hospitals and schools are located at a distance of 0.5 kms (Ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or ne within 15 km aerial distance from ne within 15 km aerial distance from proposed plant site.

16 environmental damage. (Those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems (Earthquakes, subsidence, landslides, erosion, flooding for extreme or adverse climatic conditions) proposed plant site. The site falls in Seismic Zone -III

17

18

19

20 STANDARD TEMPLATE FOR EVALUATION OF PROJECT

21 STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS/ ACTIVITIES:- S. Information required Information to be furnished by the proponents 1 Name of the project or activity M/s. PRAKRUTHI INFRA & SHELTERS (INDIA) PVT LTD 2 Name of the organization/owner. Mr. I. K VENU GOPALA REDDY Managing Director 3 Address for communication Plot : 403, Chillapalli Complex, Near Ravindra Bharathi School, Diamond Park Junction, Dwarka Nagar, 1 st Lane, Visakhapatnam Telephone numbers Mobile: ID of the organization or contact person engvizag@prakruthishelters.com 6 Location of the Proposed project or activity PRAKRUTHI INFRA & 7 Appraisal Category (B2 or B1) B 2 8 Nearest habitation and distance from the project or activity SHELTERS (INDIA) PVT LTD Sy.: 298/1 & 2, Ramaraju Layout, Bindra Nagar, Mithilapuri VUDA colony, Madhurawada, Visakhapatnam Pothinamallaya Palem at a distance of 0.45 km 9 Installed capacity / Production Capacities Construction of Residential 10 Specify the Fuel (Coal / CNG / biomass/others) and quantity required project in an area of Sq.mts Total Built-up area is Sq.mts Diesel for Generators of capacity 1x300 KVA 11 Details of Land use/land Cover Enclosed in conceptual plan

22 12 Occupancy, ownership of the land in which the activity is proposed: (Government land / Private land / Forest land /Revenue land /Temple land /leased land/ land belongs to other Department) 13 If it is a Forest land, the following details shall be furnished: Own land forest area covers under the proposed site area. (Whether it is a Reserved forest / Protected forest/demarcated forest/ National Parks/Sanctuaries/any land in possession of Forest Department.) (The village map with Sy.. indicating nearest forest boundary line from the site shall be enclosed) 14 Total investment of the project/activity. Rs Crores a. Funds allocated for EMP (capital cost and recurring cost per annum) 15 Brief description of the project with special reference to specific pollution and its control measures. 16 Compliance report on the following : i. Status of compliance of the conditions and environmental safeguards stipulated in the earlier clearance letters. Rs. 3.4 Crores Enclosed t applicable ii. Details of the court cases, if any, pending in any Court of Law against the project as well as any directions passed by the Court relating to the project directly or indirectly. iii. Details of the notices, if any, given to the project under Section 5 of the Environmental (Protection) Act, 1986 and Section 18 of the Air (Prevention & Control of Pollution) Act, NIL NIL 17 Whether the project attracts the provisions laid under the OM dt issued by the MoE&F, GOI, w.r.t. violation of EIA tification, 2006 and its amendments thereof? (/) Present stage and status of the project: Construction not yet started 18 Name of the Consultant: SV Enviro Labs & Consultants, Auto Nagar, Visakahapatnam