1 HETERO INFRASTRUCTURE SEZ LIMITED SY. NO.S 125, 138 AND 150, N. NARASAPURAM VILLAGE, NAKKAPALLY MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH FORM I Project No March 2016 Hetero Corporate Office 7 2 A2, Industrial Estate, Sanath Nagar, Hyderabad Phone: /24/25 Fax: Mobile: E mail: jagadeeswar.v@heterodrugs.com STUDIES AND DOCUMENTATION BY TEAM Labs and Consultants B & 509, Annapurna Block, Aditya Enclave, Ameerpet, Hyderabad Phone: / , Telefax: SUBMITTED TO MINISTRY OF ENVIRONMENT, FORESTS AND CLIMATE CHANGE GOVERNMENT OF INDIA INDIRA PARYAVARAN BHAWAN, JOR BAGH ROAD, NEW DELHI

2 Hetero Infrastructure SEZ Ltd. APPENDIX I (See Paragraph 6) FORM I I) Basic Information S.No. Item Details 1 Name of the Project/s Hetero Infrastructure SEZ Ltd 2 S. No in the Schedule 1(d) A category Thermal Power Plants 3 Proposed capacity/area/length/tonnage to be handled/command area/lease area/number of wells to be drilled 6.1 MW Co generation Plant No additional land is required. 4 New/Expansion/Modernization Installation of turbine to generate 6.1 MW power utilizing steam from existing 45 TPH coal fired boiler 5 Existing Capacity/Area etc. Not Applicable 6 Category of Project i.e 'A' or 'B' A 7 Does it attract the general condition? If yes, No please specify 8 Does it attract the Specific condition? If yes, No please specify. 9 Location Plot/Survey/Khasra No. Sy. No. 125, 138 & 150 Village N. Narasapuram Village Tehsil Nakkapally Mandal District Visakhapatnam State Andhra Pradesh 10 Nearest railway station/airport along with distance in km. Railway Station: Narsipatnam 9 Km Airport : Visakhapatnam Airport 63 Km 11 Nearest Town, City, District Headquarters along Town Tuni 20 Km with distance in kms. 12 Village Panchayats, Zilla Parishad, Municipal Nakapally Panchayat Corporation, Local body (complete postal address with telephone nos. to be given) 13 Name of the Applicant Hetero Infrastructure SEZ Ltd. 14 Registered Address Hetero Infrastructure SEZ Ltd. Sy. No. 125, 138 & 150, N. Narasapuram Village, Nakkapally Mandal, Visakhapatnam District, Andhra Pradesh. 15 Address for Correspondence: Name K.V. Bhaskar Reddy Designation(Owner/Partner/CEO) Director Address Hetero Corporate Office 7 2 A2, Industrial Estate, Sanath Nagar, Hyderabad, Telangana. Pin Code E mail contact@heterodrugs.com ; kullayireddy.s@heterodrugs.com; jagadeeswar.v@heterodrugs.com Telephone Number Direct: /24/25 Form I Page 1

3 Hetero Infrastructure SEZ Ltd. Mobile: Fax No Details of alternative Sites examined, if any. Not Applicable. Location of these sites should be shown on a topo sheet. 17 Interlinked Projects Not applicable 18 Whether separate application of interlinked Not applicable project has been submitted? 19 If yes, date of submission Not applicable 20 If no, reason Not applicable 21 Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22 Whether there is any Government Order/Policy No relevant/relating to the site? 23 Forest land involved (hectares) No 24 Whether there is any location pending against the project and /or land in which the project is propose to be set up? (a) Name of the Court No (b) Case No (c) Orders/directions of the Court, if any and its relevance with the proposed project. Form I Page 2

4 Hetero Infrastructure SEZ Ltd. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? NO NO The proposal is for Installation of turbine to generate 6.1 MW power utilizing steam from existing 45 TPH coal fired boiler. 1.3 Creation of new land uses? NO Existing land use Industrial 1.4 Pre construction investigations e.g. YES Soil test done bore houses, soil testing? 1.5 Construction works? YES Construction activity involves M/C Foundation and other structures for installation of turbine. 1.6 Demolition works? NO 1.7 Temporary sites used for construction works or housing of construction NO Construction labor from local villages shall be employed. workers? 1.8 Above ground buildings, structures or YES Structural work for installation of turbine. earthworks including linear structures, cut and fill or excavations 1.9 Underground works including mining or NO No underground works like mining and tunneling. tunneling? 1.10 Reclamation works? NO 1.11 Dredging? NO 1.12 Offshore structures? NO 1.13 Production and manufacturing processes? YES Enclosed in Annexure II 1.14 Facilities for storage of goods or materials? 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? 1.16 Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure NO YES NO NO NO NO The proposal is for Installation of turbine to generate 6.1 MW power utilizing steam from existing 45 TPH coal fired boiler The proposal is for Installation of turbine to generate 6.1 MW power utilizing steam from existing 45 TPH coal fired boiler No housing proposed Form I Page 3

5 Hetero Infrastructure SEZ Ltd. leading to changes in traffic movements? 1.20 New or diverted transmission lines or NO pipelines? 1.21 Impoundment, damming, culverting, NO realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? NO 1.23 Abstraction or transfers of water form ground or surface waters? NO 1.24 Changes in water bodies or the land surface affecting drainage or run off? 1.25 Transport of personnel or materials for construction, operation or decommissioning? NO YES 1.26 Long term dismantling or NO decommissioning or restoration works? 1.27 Ongoing activity during NO decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either NO temporarily or permanently? 1.29 Introduction of alien species? NO 1.30 Loss of native species or genetic NO diversity? 1.31 Any other actions? NO The proposal is for Installation of turbine to generate 6.1 MW power utilizing steam from existing 45 TPH coal fired boiler. Existing water balance is presented in Annexure III. The construction material shall be drawn from local sources within km. There is no transport of personnel, as the construction workers shall be drawn from local villages. Form I Page 4

6 Hetero Infrastructure SEZ Ltd. 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non renewable or in short supply): S.No. Information/checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or agricultural land (ha) NO The proposal is for Installation of turbine to generate 6.1 MW power utilizing steam from existing 45 TPH coal fired boiler 2.2 Water (expected source & competing users) unit: KLD NO 2.3 Minerals (MT) NA 2.4 Construction material stone, aggregates, sand / soil (expected source MT) YES 2.5 Forests and timber (source MT) NO 2.6 Energy including electricity and fuels YES (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources (use appropriate standard units) NA The proposal is for Installation of turbine to generate 6.1 MW power utilizing steam from existing 45 TPH coal fired boiler. Existing water balance is presented in Annexure III. Will be sourced from the local villages. The required steam (high pressure) for turbine shall be met from existing 45 TPH coal fired boiler. The stepping down pressure in turbine is reused for process and effluent treatment system. Form I Page 5

7 Hetero Infrastructure SEZ Ltd. 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, which NO are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or NO affect disease vectors (e.g. insect or water borne diseases). 3.3 Affect the welfare of people e.g. by changing living conditions? NO 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., NO 3.5 Any other causes NO No sensitive receptors are present in the immediate vicinity of the site. 4. Production of solid wastes during construction or operation or decommissioning (MT/month) S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes NO 4.2 Municipal waste (domestic and or NO commercial wastes) 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) YES Hazardous waste generation during construction shall be limited to waste oils, which shall be sent to authorized recyclers. 4.4 Other industrial process wastes NO 4.5 Surplus product NO 4.6 Sewage sludge or other sludge from NO effluent treatment 4.7 Construction or demolition wastes NO Construction activity involves M/C Foundation and other structures for installation of turbine. 4.8 Redundant machinery or equipment NO 4.9 Contaminated soils or other materials NO 4.10 Agricultural wastes NO 4.11 Other solid wastes YES Waste oil from turbine. Form I Page 6

8 Hetero Infrastructure SEZ Ltd. 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources NO Emissions from existing 45 TPH coal fired boiler will be let out into atmosphere after passing through Bag filters. Details of stack emission presented in Annexure IV. 5.2 Emissions from production processes NO No process emission will generated as the proposal is for installation of turbine to generate 6.1 MW power utilizing steam from existing 45 TPH coal fired boiler. 5.3 Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including plant and equipment NO YES 5.5 Dust or odors from handling of NO materials including construction materials, sewage and waste 5.6 Emissions from incineration of waste NO 5.7 Emissions from burning of waste in NO open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources NO Dust may rise during transport of material and construction activity. The dust emissions shall be mitigated by closed construction. Form I Page 7

9 Hetero Infrastructure SEZ Ltd. 6. Generation of Noise and Vibration, and Emissions of Light and Heat: S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data with source of information data 6.1 From operation of equipment e.g. engines, ventilation plant, crushers YES Material transport and construction equipment shall be source of noise, while transfer pumps, Turbine is the source of noise during operation. 6.2 From industrial or similar processes NO 6.3 From construction or demolition YES Noise during construction shall be due to construction equipment and emergency DG sets. 6.4 From blasting or piling NO 6.5 From construction or operational traffic NO The increased traffic shall not have any significant impact. 6.6 From lighting or cooling systems NO 6.7 From any other sources NO 7.Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, use or spillage NO of hazardous materials 7.2 From discharge of sewage or other NO effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water NO 7.4 From any other sources NO 7.5 Is there a risk of long term build up of pollutants in environment from these sources? NO Form I Page 8

10 Hetero Infrastructure SEZ Ltd. 8.Risk of accidents during construction or operation of the Project, which could affect human health or the environment S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances YES 8.2 From any other causes NA 8.3 Could the project be affected by natural disasters NO causing environmental damage (e.g. Floods, earthquakes, landslides, cloudburst etc)? All Inbuilt Safety precautions will be adopted and there will not be any damage to environment or human health. 9.Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 9.1 Lead to development of supporting. facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) housing development extractive industries supply industries other YES 9.2 Lead to after use of the site, which could haven NO impact on the environment 9.3 Set a precedent for later developments NO 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects NO The project shall enhance the socio economic status of the area, improving the employment. There are no major support industries required for this plant. The baseline environmental status of the surrounding areas is within the prescribed limits as observed from the Secondary data. Form I Page 9

11 Hetero Infrastructure SEZ Ltd. (III) Environmental Sensitivity S.No. Areas Name/ Identity 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for ecological reasons Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration NA YES NA Aerial distance (within 15 km.) Proposed project location boundary Rajayyapeta RF 4.5 Km S Donevani Lakshmipuram RF 5.7 Km SW Vempadu RF 8.6 Km SW Payakaraopeta RF 9 Km NW Bay of Bengal 4 Km SE 4 Inland, coastal, marine or underground waters NO 5 State, National boundaries NO 6 Routes or facilities used by the public for access NO to recreation or other tourist, pilgrim areas 7 Defense installations NO 8 Densely populated or built up area YES Nakkapalli 4 Km N 9 Areas occupied by sensitive man made land uses (hospitals, schools, places of worship, community facilities) 10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) (IV) Proposed Terms of Reference for EIA studies Scope of Work of EIA NA NO NO NO 4 Km from the site The standard terms of reference (page 65 71) issued by the Ministry of Environment Forest and Climate change shall be followed for preparation of EIA report. Any additional study proposed by the SEAC shall also be completed. Ref: Standard Terms of Reference (TOR) for EIA/EMPO report for projects/activities requiring environmental clearance under EIA notification, 2006, MoEFCC, GOI, April Form I Page 10

12 Hetero Infrastructure SEZ Ltd. I hereby give the undertaking that data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. Date: Place: Signature of the applicant With Name and Full Address (Project Proponent/Authorized Signatory) K.V. Bhaskar Reddy Director Hetero Infrastructure SEZ Ltd. Sy. No. 125, 138 & 150, N. Narasapuram Village, Nakkapally Mandal, Visakhapatnam District, Andhra Pradesh. Form I Page 11

13 HETERO INFRASTRUCTURE SEZ LIMITED SY. NO.S 125, 138 AND 150, N. NARASAPURAM VILLAGE, NAKKAPALLY MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH ANNEXURES Project No March 2016 Hetero Corporate Office 7 2 A2, Industrial Estate, Sanath Nagar, Hyderabad Phone: /24/25 Fax: Mobile: E mail: jagadeeswar.v@heterodrugs.com STUDIES AND DOCUMENTATION BY TEAM Labs and Consultants B & 509, Annapurna Block, Aditya Enclave, Ameerpet, Hyderabad Phone: / , Telefax: SUBMITTED TO MINISTRY OF ENVIRONMENT, FORESTS AND CLIMATE CHANGE GOVERNMENT OF INDIA INDIRA PARYAVARAN BHAWAN, JOR BAGH ROAD, NEW DELHI

14 Hetero Infrastructure SEZ Ltd. Form I Annexures Location Map of Hetero Infrastructure SEZ Ltd. Page 1

15 Hetero Infrastructure SEZ Ltd. Form I Annexures Plant Layout of Hetero Infrastructure SEZ Ltd. Page 2

16 Hetero Infrastructure SEZ Ltd. Form I Annexures ANNEXURE - II M/s. Hetero Infrastructure SEZ Ltd., proposed to Install turbine to generate 6.1 MW power utilizing steam from existing 45 TPH coal fired boiler in Hetero Infrastructure SEZ Ltd., at, N. Narasapuram, Nakkapally Mandal, Visakhapatnam District, Andhra Pradesh. The proposal is for inclusion of Turbine only, and does not entail any increase in permitted pollution loads of Environment Clearance obtained, vide letter no /2007-IA.III dated Process Description The medium pressure and medium temperature steam generated in boiler will enter a multistage turbine and will cause the turbine shaft to rotate. In this process, the steam will loose its temperature and pressure. As the pressure is coming down volume will increase, thereby increasing velocity of flow in the turbine. This thermal energy getting converted to mechanical energy will rotate the turbine shaft which is rigidly coupled to generator. An electrical generator coupled to the steam turbine shaft will rotate in a magnetic field and generate electrical power of 6.1 MW at voltage of 11 KV. A small percentage of electrical power thus produced will be used in the power plant itself to energies the rotating equipment like the FD fan and ID fan of boiler, the feed water pumps, lighting etc Technical Specifications of Turbine Parameter Specification No. of Turbines 1 (one) Type Multi stage, horizontal split casing, high speed with gear box, impulse type, extraction cum Condensing with air cooled condenser Rated Output TPH process 9 bar Speed of Turbine Shaft 7556 RPM Speed of Generator Shaft 1500 RPM Gear box Provided with SF 1.4, ratio = 5,03:1 Rotation (Viewed from turbine front) Clock Wise Main steam conditions at stop valve Inlet 64 ATA, 485 C, 45 TPH steam pressure Type of Governing Electronic Page 3

17 Hetero Infrastructure SEZ Ltd. Form I Annexures Technical Specifications of Generator Parameter Specification No. Of generators 1(One) Type Three phase synchronous generator, totally enclosed air cooled with air to water heat exchanger, horizontal and indoor. Output 6.1 MW Voltage 11 KV Frequency 50 Hz Speed 1500 RPM Power Factor 0.8 No. of Poles 4 Inlet cooling water temp 32 C Excitation Brushless Excitation system ANNEXURE III: Water requirement and Wastewater Generation There shall be no addition water required for proposed installation of turbine for generation of 6.1 MW power utilizing permitted 45 TPH coal fired boiler. Water requirement and Wastewater Generation Description As per EC Utilized Balance Water Consumption (KLD) Wastewater Generated (KLD) Wastewater Treatment Facilities The effluents are segregated into three streams. High TDS effluents treated in Stripper, MEE and ATFD followed by biological treatment plant at common effluent treatment plant (CETP) of Hetero Infrastructure SEZ Ltd. The total effluent after biological treatment will be stored in Guard ponds and conduct the test for Bioassay before Marine Disposal. Wastewater from domestic usage sent to sewage treatment plant and treated wastewater reused for green belt development. Page 4

18 Hetero Infrastructure SEZ Ltd. Form I Annexures ANNEXURE IV: Existing Stack Emissions Details No additional utilities are proposed for generation of 6.1 MW power. The required steam will be met from existing 45 TPH coal fired boiler. Emission details of existing stacks are presented in following Table. S. No Stack Attached to Stack Ht (m) Stack Emission Details Dia (m) Velocity Temp Pollutant Emission Rate (g/s) (m/s) ( O C) PM SO 2 NO X 1 1X10 TPH Boiler X6 TPH Boiler X20 TPH Boiler X45 TPH Boiler* * Steam from boiler shall be used in turbine for generation of 6.1 MW power Air Pollution Control Equipment: Description Control Equipment 10 TPH Coal Fired Boiler Bag Filters 6 TPH Coal Fired Boiler Multi-Cone Cyclone Separators 20 TPH Coal Fired Boiler Bag Filters 45 TPH Coal Fired Boiler Electro Static Precipitators Page 5

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52 HETERO INFRASTRUCTURE SEZ LIMITED SY. NO.S 125, 138 AND 150, N. NARASAPURAM VILLAGE, NAKKAPALLY MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH STUDIES AND DOCUMENTATION BY TEAM Labs and Consultants QCI: MoE&F OM, List A 1, S.No.25. (An ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007 Certified Organization) B 115, Annapurna Block, Aditya Enclave Ameerpet, Hyderabad Phone: /616, Telefax: teamlabs@gmail.com