1 112th SEIAA Meeting Agenda SEIAA Meeting number: 112 Meeting Date July 27, Discussion Item: 01 Open Exhibition Centre and Parkland at Sector 5&8, PCNTDA, Pune : The Development Plan of Pimpri- Chinchwad New Town comprises of 45 sectors of which, Sectors 5&8 are allocated for Industrial Exhibition Centre. Master plan for Exhibition and Convention Centre at International scale was prepared and approved in The work of development was proposed to be executed in phases, from year However, the development of the entire project of Industrial exhibition and convention centre of International scale with allied facilities and activities are not viable until the necessary infrastructure and connectivity such as the proposed Metro and BRT are in place. Hence there is no proposal at present to proceed with full-fledged the development of the project. Meanwhile, since Pimpri-Chinchwad area lacks a well-planned venue with provision of essential amenities as well as well-organized parking for the conduct of Exhibitions and public events at local level, PCNTDA has demarcated out of the total land of Sector 5&8, an area of Ha to create Open exhibition centre and Parkland. The proposed work of Open Exhibition Centre and Parkland includes landscaping and tree plantation, development of access roads and parking lot, street and area lighting, construction of compound wall, substations and toilet blocks. The total built up area proposed to be constructed is 297 sqmt. In this regard, the following decisions have been undertaken to date.- 31st meeting of the SEAC-III (NQN-MMR) held from 10 August to 13 August, 2015 : During the meeting PP explained the proposal for the development of area proposed for Open exhibition which is proposed to be developed in next ten years. PP was advised the prior Environmental Clearance for the activities to be carried out before starting the work on site. 44th meeting of the SEAC-III (NQN-MMR) held from 28 March to 31 March, 2016 : During discussion committee noted that PP is not ready with their Proposal. It was advised to make project proposal and submit CS if they wish to apply for Environmental clearance for proposed development 52nd Meeting of the SEAC-III (NQN-MMR) held from 29 August to 1 September,2016 : During the meeting PP informed that PP proposes open exhibition Centre having construction of toilets blocks only of about 300 sqmt. area which less than 20,000 sqmt and total plot area of development is ha. which is less than 50 hq. Hence the PP was asked to submit an affidavit stating the same. After deliberation committee opined that as per provisions of EIA ification, 2006 at present, EC is not for the proposed project. SEAC III decided to refer the proposal to SEIAA to take further decision as per above findings of committee. In view of above SEIAA decided that no prior environmental clearance as per the provisions of EIA ification, 2006 is required as the total built up area proposed to be constructed is 297 sqmt. Hence the proposal was delisted. ****** Discussion Item: 02 Order passed by Hon ble Madras High Court on : SEIAA noted the Order passed by Hon ble Madras High Court on in W.P.No of and WMP 12134/. It was noted that the respondent is prohibited from taking any further action pursuant to ification of Ministry of Environment and Forest and Climate Change. S.O. 804 (E) dated The ification dated envisaged certain protocols for dealing with the proposals violating the provisions of EIA ification, The Authority took note of this and decided to follow the procedure adopted previously for dealing with the proposals under violation. ****** Page 1 of 346

2 112th SEIAA Meeting Agenda SEIAA Meeting number: 112 Meeting Date July 27, Subject: CRZ Clearance for Environment Clearance for Proposed construction of Ro Ro Jetty ( Vasai- Bhayander) Dist. Palghar by MMB 1.Name of Project 2.Type of institution 3.Name of Project Proponent 4.Name of Consultant 5.Type of project 6.New project/expansion in existing project/modernization/diversification in existing project 7.If expansion/diversification, whether CRZ Clearance has been obtained for existing project Proposed construction of Ro Ro Jetty ( Vasai- Bhayander) Dist. Palghar by MMB Government Chief Executive Officer,Maharashtra Maritime Board,Indian Mercantile Chambers,3rd Floor,Ramjibhai Kamani Marg,Ballard Estate, Mumbai STUP Consultants Pvt. Ltd. Others New Project 8.Location of the project 339, 35, 36 9.Taluka 10.Village 11.Area of the project 12.IOD/IOA/Concession/Plan Approval 13.e on the initiated work (If ) 14.LOI / NOC / IOD from MHADA/ Other approvals (If ) 15.Total Plot Area (sq. m.) Deductions 17.Net Plot area 18.Proposed Built-up Area (FSI & Non-FSI) 19.Total ground coverage (m2) 20.Ground-coverage Percentage (%) (e: Percentage of plot not open to sky) Palghar and Thane Vasai and Bhayandar Mira Bhayandar Municipal Corporation and Vasai-Virar Municipal Corporation IOD/IOA/Concession/Plan Approval : Approved Built-up Area: 0.0 a) FSI area (sq. m.): b) Non FSI area (sq. m.): c) Total BUA area (sq. m.): 21.Estimated cost of the project number 22. of buildings & its configuration Building Name & number of floors Height of the building (Mtrs) of tenants and shops 24. of expected residents / users 25.Tenant density per hectare 26.Height of the building(s) Page 2 of 346

3 27.Right of way (Width of the road from the nearest fire station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all around the building excluding the width for the plantation 29.Existing structure (s) if any 30.Details of the demolition with disposal (If ) 31.Production Details Product Existing (MT/M) Proposed (MT/M) Total (MT/M) 1 Dry season: Source of water 32.Total Water Requirement Fresh water (CMD): Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): Excess treated water Page 3 of 346

4 Wet season: Details of Swimming pool (If any) Particula rs Water Requirem ent Domestic Source of water Fresh water (CMD): Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): Excess treated water 33.Details of Total water consumed Consumption (CMD) Loss (CMD) Effluent (CMD) Existing Proposed Total Existing Proposed Total Existing Proposed Total Applicable 34.Rain Water Harvesting (RWH) Applicable Applicable Level of the Ground water table: Size and no of RWH tank(s) and Quantity: Location of the RWH tank(s): Quantity of recharge pits: Size of recharge pits : (Capital cost) : Applicable Applicable Applicable Applicable Applicable (O & M cost) : Details of UGT tanks if any : Applicable 35.Storm water drainage Natural water drainage pattern: Quantity of storm water: Size of SWD: Page 4 of 346

5 Sewage and Waste water Waste generation in the Pre Construction and Construction phase: Waste generation in the operation Phase: Mode of Disposal of waste: Area requirement: (Capital cost and O&M cost): Parameters Sewage generation in KLD: STP technology: Capacity of STP (CMD): Location & area of the STP: (Capital cost): (O & M cost): Waste generation: 36.Solid waste Management Disposal of the construction waste debris: Dry waste: Wet waste: Hazardous waste: Biomedical waste (If ): STP Sludge (Dry sludge): Others if any: Dry waste: Wet waste: Hazardous waste: Biomedical waste (If ): STP Sludge (Dry sludge): Others if any: Location(s): Area for the storage of waste & other material: Area for machinery: Capital cost: O & M cost: 1 Amount of effluent generation (CMD): Capacity of the ETP: 37.Effluent Charecterestics Unit Applicable Inlet Effluent Charecterestics Outlet Effluent Charecterestics Effluent discharge standards (MPCB) Page 5 of 346

6 Amount of treated effluent recycled : Amount of water send to the CETP: Membership of CETP (if require): e on ETP technology to be used Disposal of the ETP sludge 38.Hazardous Waste Details Description Cat UOM Existing Proposed Total Method of Disposal 1 Section & units Applicable Applicable Applicable Applicable 39.Stacks emission Details Fuel Used with Quantity 1 Stack No. Applicable Height from ground level (m) Applicable 40.Details of Fuel to be used Applicable Internal diameter (m) Applicable Type of Fuel Existing Proposed Total Temp. of Exhaust Gases 1 41.Source of Fuel 42.Mode of Transportation of fuel to site 43.Green Belt Development Total RG area : No of trees to be cut : of trees to be planted : List of proposed native trees : Timeline for completion of plantation : 44. and list of trees species to be planted in the ground Name of the plant Common Name Quantity Characteristics & ecological importance 1 45.Total quantity of plants on ground 46. and list of shrubs and bushes species to be planted in the podium RG: Name C/C Distance Area m Energy Page 6 of 346

7 Power requirement: Source of power supply : During Construction Phase: (Demand Load) DG set as Power back-up during construction phase During Operation phase (Connected load): During Operation phase (Demand load): Transformer: DG set as Power back-up during operation phase: Fuel used: Details of high tension line passing through the plot if any: 48.Energy saving by non-conventional method: 49.Detail calculations & % of saving: Energy Conservation Measures Saving % 1 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Applicable (Capital cost and O&M cost): Capital cost: O & M cost: 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Attributes Parameter Total Cost per annum (Rs. In Lacs) 1 Air SOx, NOx, CO, HC 12 Lacs 2 Water BOD, COD, DO, NO2, NO3 5 Lacs 3 Soil Mg, Ca, Cl, PO4, SO4 5 Lacs Component b) Operation Phase (with Break-up): Description Capital cost Rs. In Lacs Operational and Maintenance cost (Rs. in Lacs/yr) 1 Air SOx, NOx, CO, HC 12 Lacs Page 7 of 346

8 2 Water BOD, COD, DO, NO2, NO3 5 Lacs 3 Soil Mg, Ca, Cl, PO4, SO4 5 Lacs 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Description Status Location No Information Available Parking details: Applicable Nos. of the junction to the main road & design of confluence: and area of basement: and area of podia: Total Parking area: Area per car: Area per car: of 2- Wheelers as approved by competent authority: of 4- Wheelers as approved by competent authority: Public Transport: Width of all Internal roads (m): Storage Capacity in MT Applicable Maximum Quantity of Storage at any point of time in MT Applicable 52.Any Other Information 53.Traffic Management Consumption / Month in MT Applicable Source of Supply Applicable CRZ/ RRZ clearance obtain, if any: Distance from Protected Areas / Critically Polluted areas / Eco-sensitive areas/ inter-state boundaries Category as per schedule of EIA ification sheet Means of transportation MCZMA has recommended the project to SEIAA during 115th Meeting dated 17 January, 12 Km 7 (e) Page 8 of 346

9 Court cases pending if any Other Relevant Informations Have you previously submitted Application online on MOEF Website. Date of online submission No - Brief information of the project by SEAC/MCZMA Specific Conditions by SEAC/MCZMA: Granted Specific Conditions by SEIAA: DECISION OF SEAC/MCZMA SEIAA DECISION FIL RECOMMENDATION SEIAA have decided to grant the proposal for CRZ Clearance subject to above conditions Page 9 of 346

10 112th SEIAA Meeting Agenda SEIAA Meeting number: 112 Meeting Date July 27, Subject: CRZ Clearance for Proposed Construction of RO RO Jetties at Narangi-Kharawadashri, Tal. & Dist. palghar by MMB 1.Name of Project 2.Type of institution 3.Name of Project Proponent 4.Name of Consultant 5.Type of project 6.New project/expansion in existing project/modernization/diversification in existing project 7.If expansion/diversification, whether CRZ Clearance has been obtained for existing project Proposed Construction of RO RO Jetties at Narangi-Kharawadashri, Tal. & Dist. palghar by MMB Government Chief Executive Officer,Maharashtra Maritime Board,Indian Mercantile Chambers,3rd Floor,Ramjibhai Kamani Marg,Ballard Estate, Mumbai STUP Consultants Pvt. ltd. Others 8.Location of the project Taluka 10.Village 11.Area of the project 12.IOD/IOA/Concession/Plan Approval 13.e on the initiated work (If ) 14.LOI / NOC / IOD from MHADA/ Other approvals (If ) 15.Total Plot Area (sq. m.) 16.Deductions 17.Net Plot area 18.Proposed Built-up Area (FSI & Non-FSI) 19.Total ground coverage (m2) 20.Ground-coverage Percentage (%) (e: Percentage of plot not open to sky) New Project Palghar Narangi and Kharawadashri Panchayat IOD/IOA/Concession/Plan Approval : Approved Built-up Area: sq.m. a) FSI area (sq. m.): b) Non FSI area (sq. m.): c) Total BUA area (sq. m.): 21.Estimated cost of the project number 22. of buildings & its configuration Building Name & number of floors Height of the building (Mtrs) of tenants and shops 24. of expected residents / users 25.Tenant density per hectare 26.Height of the building(s) Page 10

11 27.Right of way (Width of the road from the nearest fire station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all around the building excluding the width for the plantation 29.Existing structure (s) if any 30.Details of the demolition with disposal (If ) 10 m 31.Production Details Product Existing (MT/M) Proposed (MT/M) Total (MT/M) 1 Dry season: Source of water 32.Total Water Requirement Fresh water (CMD): Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): Excess treated water Page 11

12 Wet season: Details of Swimming pool (If any) Particula rs Water Requirem ent Domestic Source of water Fresh water (CMD): Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): Excess treated water 33.Details of Total water consumed Consumption (CMD) Loss (CMD) Effluent (CMD) Existing Proposed Total Existing Proposed Total Existing Proposed Total Applicable 34.Rain Water Harvesting (RWH) Applicable Applicable Level of the Ground water table: Size and no of RWH tank(s) and Quantity: Location of the RWH tank(s): Quantity of recharge pits: Size of recharge pits : (Capital cost) : Applicable Applicable Applicable Applicable Applicable (O & M cost) : Details of UGT tanks if any : Applicable 35.Storm water drainage Natural water drainage pattern: Quantity of storm water: Size of SWD: Page 12

13 Sewage and Waste water Waste generation in the Pre Construction and Construction phase: Waste generation in the operation Phase: Mode of Disposal of waste: Area requirement: (Capital cost and O&M cost): Parameters Sewage generation in KLD: STP technology: Capacity of STP (CMD): Location & area of the STP: (Capital cost): (O & M cost): Waste generation: 36.Solid waste Management Disposal of the construction waste debris: Dry waste: Wet waste: Hazardous waste: Biomedical waste (If ): STP Sludge (Dry sludge): Others if any: Dry waste: Wet waste: Hazardous waste: Biomedical waste (If ): STP Sludge (Dry sludge): Others if any: Location(s): Area for the storage of waste & other material: Area for machinery: Capital cost: O & M cost: 1 Amount of effluent generation (CMD): Capacity of the ETP: 37.Effluent Charecterestics Unit Applicable Inlet Effluent Charecterestics Outlet Effluent Charecterestics Effluent discharge standards (MPCB) Page 13

14 Amount of treated effluent recycled : Amount of water send to the CETP: Membership of CETP (if require): e on ETP technology to be used Disposal of the ETP sludge 38.Hazardous Waste Details Description Cat UOM Existing Proposed Total Method of Disposal 1 Section & units Applicable Applicable Applicable Applicable 39.Stacks emission Details Fuel Used with Quantity 1 Stack No. Applicable Height from ground level (m) Applicable 40.Details of Fuel to be used Applicable Internal diameter (m) Applicable Type of Fuel Existing Proposed Total Temp. of Exhaust Gases 1 41.Source of Fuel 42.Mode of Transportation of fuel to site 43.Green Belt Development Total RG area : No of trees to be cut : of trees to be planted : List of proposed native trees : Timeline for completion of plantation : 44. and list of trees species to be planted in the ground Name of the plant Common Name Quantity Characteristics & ecological importance 1 45.Total quantity of plants on ground 46. and list of shrubs and bushes species to be planted in the podium RG: Name C/C Distance Area m Energy Page 14

15 Power requirement: Source of power supply : During Construction Phase: (Demand Load) DG set as Power back-up during construction phase During Operation phase (Connected load): During Operation phase (Demand load): Transformer: DG set as Power back-up during operation phase: Fuel used: Details of high tension line passing through the plot if any: 48.Energy saving by non-conventional method: 49.Detail calculations & % of saving: Energy Conservation Measures Saving % 1 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Applicable (Capital cost and O&M cost): Capital cost: O & M cost: 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Attributes Parameter Total Cost per annum (Rs. In Lacs) 1 Air SOx, NOx, CO, HC 12 Lacs 2 Water 3 Soil Component ph, BOD, COD, DO, Conductivity, NO2, NO3, NH4 ph, Conductivity, Salinity, SO4, PO4, Ca, Mg, Fe, Cl, No2, No3 b) Operation Phase (with Break-up): Description Capital cost Rs. In Lacs 5 L:acs 5 Lacs Operational and Maintenance cost (Rs. in Lacs/yr) Page 15

16 1 Air SOx, NOx, CO, HC 12 Lacs 2 Water 3 Soil ph, BOD, COD, DO, Conductivity, NO2, NO3, NH4 ph, Conductivity, Salinity, SO4, PO4, Ca, Mg, Fe, Cl, No2, No3 5 L:acs 5 L:acs 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Description Status Location No Information Available Parking details: Applicable Nos. of the junction to the main road & design of confluence: and area of basement: and area of podia: Total Parking area: Area per car: Area per car: of 2- Wheelers as approved by competent authority: of 4- Wheelers as approved by competent authority: Storage Capacity in MT Applicable Maximum Quantity of Storage at any point of time in MT Applicable 52.Any Other Information 53.Traffic Management Consumption / Month in MT Applicable Source of Supply Applicable Public Transport: Width of all Internal roads (m): CRZ/ RRZ clearance obtain, if any: Distance from Protected Areas / Critically Polluted areas / Eco-sensitive areas/ inter-state boundaries Means of transportation MCZMA has recommended the project to SEIAA duirng 117th Meeting on 5th April, 15 Km Page 16

17 Category as per schedule of EIA ification sheet Court cases pending if any Other Relevant Informations Have you previously submitted Application online on MOEF Website. Date of online submission 7 (e) No - Brief information of the project by SEAC/MCZMA Specific Conditions by SEAC/MCZMA: Granted Specific Conditions by SEIAA: DECISION OF SEAC/MCZMA SEIAA DECISION FIL RECOMMENDATION SEIAA have decided to grant the proposal for CRZ Clearance subject to above conditions Page 17

18 112th SEIAA Meeting Agenda SEIAA Meeting number: 112 Meeting Date July 27, Subject: CRZ Clearance for Proposed Repairs and Strengthening of Passenger jetty at Versova, Mumbai Sub urb 1.Name of Project 2.Type of institution 3.Name of Project Proponent 4.Name of Consultant 5.Type of project 6.New project/expansion in existing project/modernization/diversification in existing project 7.If expansion/diversification, whether CRZ Clearance has been obtained for existing project Repairs and Strengthening of Passenger jetty at Versova, Mumbai Sub urb Government Chief Executive Officer,Maharashtra Maritime Board,Indian Mercantile Chambers,3rd Floor,Ramjibhai Kamani Marg,Ballard Estate, Mumbai Maharashtra Maritime Board others Existing 8.Location of the project 12 9.Taluka 10.Village 11.Area of the project 12.IOD/IOA/Concession/Plan Approval 13.e on the initiated work (If ) 14.LOI / NOC / IOD from MHADA/ Other approvals (If ) 15.Total Plot Area (sq. m.) 16.Deductions 17.Net Plot area 18.Proposed Built-up Area (FSI & Non-FSI) 19.Total ground coverage (m2) 20.Ground-coverage Percentage (%) (e: Percentage of plot not open to sky) Andheri Versova corporation IOD/IOA/Concession/Plan Approval : Approved Built-up Area: 400 a) FSI area (sq. m.): b) Non FSI area (sq. m.): c) Total BUA area (sq. m.): 21.Estimated cost of the project number 22. of buildings & its configuration Building Name & number of floors Height of the building (Mtrs) of tenants and shops 24. of expected residents / users 25.Tenant density per hectare 26.Height of the building(s) 5000 Page 18

19 27.Right of way (Width of the road from the nearest fire station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all around the building excluding the width for the plantation 29.Existing structure (s) if any 30.Details of the demolition with disposal (If ) Production Details Product Existing (MT/M) Proposed (MT/M) Total (MT/M) 1 Dry season: Source of water 32.Total Water Requirement Fresh water (CMD): Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): Excess treated water Page 19

20 Wet season: Details of Swimming pool (If any) Particula rs Water Require ment Source of water Fresh water (CMD): Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): Excess treated water 33.Details of Total water consumed Consumption (CMD) Loss (CMD) Effluent (CMD) Existing Proposed Total Existing Proposed Total Existing Proposed Total Domestic 34.Rain Water Harvesting (RWH) Level of the Ground water table: Size and no of RWH tank(s) and Quantity: Location of the RWH tank(s): Quantity of recharge pits: Size of recharge pits : (Capital cost) : (O & M cost) : Details of UGT tanks if any : 35.Storm water drainage Natural water drainage pattern: Quantity of storm water: Size of SWD: Page 20

21 Sewage and Waste water Waste generation in the Pre Construction and Construction phase: Waste generation in the operation Phase: Mode of Disposal of waste: Area requirement: (Capital cost and O&M cost): Parameters Sewage generation in KLD: STP technology: Capacity of STP (CMD): Location & area of the STP: (Capital cost): (O & M cost): Waste generation: 36.Solid waste Management Disposal of the construction waste debris: Dry waste: Wet waste: Hazardous waste: Biomedical waste (If ): STP Sludge (Dry sludge): Others if any: Dry waste: Wet waste: Hazardous waste: Biomedical waste (If ): STP Sludge (Dry sludge): Others if any: Location(s): Area for the storage of waste & other material: Area for machinery: Capital cost: O & M cost: 37.Effluent Charecterestics Unit Inlet Effluent Charecterestics Outlet Effluent Charecterestics Effluent discharge standards (MPCB) 1 Amount of effluent generation (CMD): Capacity of the ETP: Page 21

22 Amount of treated effluent recycled : Amount of water send to the CETP: Membership of CETP (if require): e on ETP technology to be used Disposal of the ETP sludge 38.Hazardous Waste Details Description Cat UOM Existing Proposed Total Method of Disposal 1 Section & units 39.Stacks emission Details Fuel Used with Quantity Stack No. Height from ground level (m) Internal diameter (m) Temp. of Exhaust Gases 1 40.Details of Fuel to be used Type of Fuel Existing Proposed Total 1 41.Source of Fuel 42.Mode of Transportation of fuel to site 43.Green Belt Development Total RG area : No of trees to be cut : of trees to be planted : List of proposed native trees : Timeline for completion of plantation : 44. and list of trees species to be planted in the ground Name of the plant Common Name Quantity Characteristics & ecological importance 1 45.Total quantity of plants on ground 46. and list of shrubs and bushes species to be planted in the podium RG: Name C/C Distance Area m Energy Page 22

23 Power requirement: Source of power supply : During Construction Phase: (Demand Load) DG set as Power back-up during construction phase During Operation phase (Connected load): During Operation phase (Demand load): Transformer: DG set as Power back-up during operation phase: Fuel used: Details of high tension line passing through the plot if any: 48.Energy saving by non-conventional method: 49.Detail calculations & % of saving: Energy Conservation Measures Saving % 1 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed (Capital cost and O&M cost): Capital cost: O & M cost: 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Attributes Parameter Total Cost per annum (Rs. In Lacs) 1 Component b) Operation Phase (with Break-up): Description Capital cost Rs. In Lacs Operational and Maintenance cost (Rs. in Lacs/yr) 1 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Page 23

24 Description Status Location Storage Capacity in MT Maximum Quantity of Storage at any point of time in MT Consumption / Month in MT Source of Supply Means of transportation No Information Available Parking details: Nos. of the junction to the main road & design of confluence: and area of basement: and area of podia: Total Parking area: Area per car: Area per car: of 2- Wheelers as approved by competent authority: of 4- Wheelers as approved by competent authority: Public Transport: Width of all Internal roads (m): CRZ/ RRZ clearance obtain, if any: Distance from Protected Areas / Critically Polluted areas / Eco-sensitive areas/ inter-state boundaries 52.Any Other Information 53.Traffic Management yes Category as per schedule of EIA ification sheet Court cases pending if any Other Relevant Informations Have you previously submitted Application online on MOEF Website. No Page 24

25 Date of online submission - Brief information of the project by SEAC/MCZMA DECISION OF SEAC/MCZMA Specific Conditions by SEAC/MCZMA: Granted SEIAA DECISION Specific Conditions by SEIAA: FIL RECOMMENDATION SEIAA have decided to grant the proposal for CRZ Clearance subject to above conditions Page 25

26 112th SEIAA Meeting Agenda SEIAA Meeting number: 112 Meeting Date July 27, Subject: CRZ Clearance for Proposed extension and repairs of passenger jetty at Dombivali,Dist Thane by MMB 1.Name of Project 2.Type of institution 3.Name of Project Proponent 4.Name of Consultant 5.Type of project 6.New project/expansion in existing project/modernization/diversification in existing project 7.If expansion/diversification, whether CRZ Clearance has been obtained for existing project 8.Location of the project 9.Taluka 10.Village 11.Area of the project 12.IOD/IOA/Concession/Plan Approval 13.e on the initiated work (If ) 14.LOI / NOC / IOD from MHADA/ Other approvals (If ) Proposed extension and repairs of passenger jetty at Dombivali,Dist Thane By MMB Government Chief Executive Officer,Maharashtra Maritime Board,Indian Mercantile Chambers,3rd Floor,Ramjibhai Kamani Marg,Ballard Estate, Mumbai Maharashtra Maritime Board others Existing Yes 20, Dombivlili Kalyan Dombivali (Mothagaon) Corporation IOD/IOA/Concession/Plan Approval : Approved Built-up Area: Total Plot Area (sq. m.) Deductions 17.Net Plot area 18.Proposed Built-up Area (FSI & Non-FSI) 19.Total ground coverage (m2) 20.Ground-coverage Percentage (%) (e: Percentage of plot not open to sky) a) FSI area (sq. m.): b) Non FSI area (sq. m.): c) Total BUA area (sq. m.): 21.Estimated cost of the project number 22. of buildings & its configuration Building Name & number of floors Height of the building (Mtrs) of tenants and shops 24. of expected residents / users 25.Tenant density per hectare 26.Height of the building(s) Page 26

27 27.Right of way (Width of the road from the nearest fire station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all around the building excluding the width for the plantation 29.Existing structure (s) if any 30.Details of the demolition with disposal (If ) 7 yes 31.Production Details Product Existing (MT/M) Proposed (MT/M) Total (MT/M) 1 Dry season: Source of water 32.Total Water Requirement Fresh water (CMD): Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): Excess treated water Page 27

28 Wet season: Details of Swimming pool (If any) Particula rs Water Require ment Source of water Fresh water (CMD): Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): Excess treated water 33.Details of Total water consumed Consumption (CMD) Loss (CMD) Effluent (CMD) Existing Proposed Total Existing Proposed Total Existing Proposed Total Domestic 34.Rain Water Harvesting (RWH) Level of the Ground water table: Size and no of RWH tank(s) and Quantity: Location of the RWH tank(s): Quantity of recharge pits: Size of recharge pits : (Capital cost) : (O & M cost) : Details of UGT tanks if any : 35.Storm water drainage Natural water drainage pattern: Quantity of storm water: Size of SWD: Page 28

29 Sewage and Waste water Waste generation in the Pre Construction and Construction phase: Waste generation in the operation Phase: Mode of Disposal of waste: Area requirement: (Capital cost and O&M cost): Parameters Sewage generation in KLD: STP technology: Capacity of STP (CMD): Location & area of the STP: (Capital cost): (O & M cost): Waste generation: 36.Solid waste Management Disposal of the construction waste debris: Dry waste: Wet waste: Hazardous waste: Biomedical waste (If ): STP Sludge (Dry sludge): Others if any: Dry waste: Wet waste: Hazardous waste: Biomedical waste (If ): STP Sludge (Dry sludge): Others if any: Location(s): Area for the storage of waste & other material: Area for machinery: Capital cost: O & M cost: 37.Effluent Charecterestics Unit Inlet Effluent Charecterestics Outlet Effluent Charecterestics Effluent discharge standards (MPCB) 1 Amount of effluent generation (CMD): Capacity of the ETP: Page 29

30 Amount of treated effluent recycled : Amount of water send to the CETP: Membership of CETP (if require): e on ETP technology to be used Disposal of the ETP sludge 38.Hazardous Waste Details Description Cat UOM Existing Proposed Total Method of Disposal 1 Section & units 39.Stacks emission Details Fuel Used with Quantity Stack No. Height from ground level (m) Internal diameter (m) Temp. of Exhaust Gases 1 40.Details of Fuel to be used Type of Fuel Existing Proposed Total 1 41.Source of Fuel 42.Mode of Transportation of fuel to site 43.Green Belt Development Total RG area : No of trees to be cut : of trees to be planted : List of proposed native trees : Timeline for completion of plantation : 44. and list of trees species to be planted in the ground Name of the plant Common Name Quantity Characteristics & ecological importance 1 45.Total quantity of plants on ground 46. and list of shrubs and bushes species to be planted in the podium RG: Name C/C Distance Area m Energy Page 30

31 Power requirement: Source of power supply : During Construction Phase: (Demand Load) DG set as Power back-up during construction phase During Operation phase (Connected load): During Operation phase (Demand load): Transformer: DG set as Power back-up during operation phase: Fuel used: Details of high tension line passing through the plot if any: 48.Energy saving by non-conventional method: 49.Detail calculations & % of saving: Energy Conservation Measures Saving % 1 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed (Capital cost and O&M cost): Capital cost: O & M cost: 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Attributes Parameter Total Cost per annum (Rs. In Lacs) 1 Component b) Operation Phase (with Break-up): Description Capital cost Rs. In Lacs Operational and Maintenance cost (Rs. in Lacs/yr) 1 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Page 31

32 Description Status Location Storage Capacity in MT Maximum Quantity of Storage at any point of time in MT Consumption / Month in MT Source of Supply Means of transportation No Information Available Parking details: Nos. of the junction to the main road & design of confluence: and area of basement: and area of podia: Total Parking area: Area per car: Area per car: of 2- Wheelers as approved by competent authority: of 4- Wheelers as approved by competent authority: Public Transport: Width of all Internal roads (m): CRZ/ RRZ clearance obtain, if any: Distance from Protected Areas / Critically Polluted areas / Eco-sensitive areas/ inter-state boundaries 52.Any Other Information 53.Traffic Management yes MCZMA in 116 Meeting Category as per schedule of EIA ification sheet Court cases pending if any Other Relevant Informations Have you previously submitted Application online on MOEF Website. crz 2 No Page 32

33 Date of online submission - Brief information of the project by SEAC/MCZMA DECISION OF SEAC/MCZMA Specific Conditions by SEAC/MCZMA: Granted SEIAA DECISION Specific Conditions by SEIAA: FIL RECOMMENDATION SEIAA have decided to grant the proposal for CRZ Clearance subject to above conditions Page 33

34 112th SEIAA Meeting Agenda SEIAA Meeting number: 112 Meeting Date July 27, Subject: CRZ Clearance for Proposed extension and repairs of passenger jetty at Pimplas,Dist Thane by MMB 1.Name of Project 2.Type of institution 3.Name of Project Proponent 4.Name of Consultant 5.Type of project 6.New project/expansion in existing project/modernization/diversification in existing project 7.If expansion/diversification, whether CRZ Clearance has been obtained for existing project 8.Location of the project 9.Taluka 10.Village 11.Area of the project 12.IOD/IOA/Concession/Plan Approval 13.e on the initiated work (If ) 14.LOI / NOC / IOD from MHADA/ Other approvals (If ) Proposed extension and repairs of passenger jetty at Pimplas Dist Thane By MMB Government Chief Executive Officer,Maharashtra Maritime Board,Indian Mercantile Chambers,3rd Floor,Ramjibhai Kamani Marg,Ballard Estate, Mumbai Maharashtra Maritime Board others Existing Yes 11 Pimplas Bhiwandi Pimplas Corporation IOD/IOA/Concession/Plan Approval : Approved Built-up Area: Total Plot Area (sq. m.) Deductions 17.Net Plot area 18.Proposed Built-up Area (FSI & Non-FSI) 19.Total ground coverage (m2) 20.Ground-coverage Percentage (%) (e: Percentage of plot not open to sky) a) FSI area (sq. m.): b) Non FSI area (sq. m.): c) Total BUA area (sq. m.): 21.Estimated cost of the project number 22. of buildings & its configuration Building Name & number of floors Height of the building (Mtrs) of tenants and shops 24. of expected residents / users 25.Tenant density per hectare 26.Height of the building(s) Page 34

35 27.Right of way (Width of the road from the nearest fire station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all around the building excluding the width for the plantation 29.Existing structure (s) if any 30.Details of the demolition with disposal (If ) 7 yes 31.Production Details Product Existing (MT/M) Proposed (MT/M) Total (MT/M) 1 Dry season: Source of water 32.Total Water Requirement Fresh water (CMD): Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): Excess treated water Page 35

36 Wet season: Details of Swimming pool (If any) Particula rs Water Require ment Source of water Fresh water (CMD): Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): Excess treated water 33.Details of Total water consumed Consumption (CMD) Loss (CMD) Effluent (CMD) Existing Proposed Total Existing Proposed Total Existing Proposed Total Domestic 34.Rain Water Harvesting (RWH) Level of the Ground water table: Size and no of RWH tank(s) and Quantity: Location of the RWH tank(s): Quantity of recharge pits: Size of recharge pits : (Capital cost) : (O & M cost) : Details of UGT tanks if any : 35.Storm water drainage Natural water drainage pattern: Quantity of storm water: Size of SWD: Page 36

37 Sewage and Waste water Waste generation in the Pre Construction and Construction phase: Waste generation in the operation Phase: Mode of Disposal of waste: Area requirement: (Capital cost and O&M cost): Parameters Sewage generation in KLD: STP technology: Capacity of STP (CMD): Location & area of the STP: (Capital cost): (O & M cost): Waste generation: 36.Solid waste Management Disposal of the construction waste debris: Dry waste: Wet waste: Hazardous waste: Biomedical waste (If ): STP Sludge (Dry sludge): Others if any: Dry waste: Wet waste: Hazardous waste: Biomedical waste (If ): STP Sludge (Dry sludge): Others if any: Location(s): Area for the storage of waste & other material: Area for machinery: Capital cost: O & M cost: 37.Effluent Charecterestics Unit Inlet Effluent Charecterestics Outlet Effluent Charecterestics Effluent discharge standards (MPCB) 1 Amount of effluent generation (CMD): Capacity of the ETP: Page 37

38 Amount of treated effluent recycled : Amount of water send to the CETP: Membership of CETP (if require): e on ETP technology to be used Disposal of the ETP sludge 38.Hazardous Waste Details Description Cat UOM Existing Proposed Total Method of Disposal 1 Section & units 39.Stacks emission Details Fuel Used with Quantity Stack No. Height from ground level (m) Internal diameter (m) Temp. of Exhaust Gases 1 40.Details of Fuel to be used Type of Fuel Existing Proposed Total 1 41.Source of Fuel 42.Mode of Transportation of fuel to site 43.Green Belt Development Total RG area : No of trees to be cut : of trees to be planted : List of proposed native trees : Timeline for completion of plantation : 44. and list of trees species to be planted in the ground Name of the plant Common Name Quantity Characteristics & ecological importance 1 45.Total quantity of plants on ground 46. and list of shrubs and bushes species to be planted in the podium RG: Name C/C Distance Area m Energy Page 38

39 Power requirement: Source of power supply : During Construction Phase: (Demand Load) DG set as Power back-up during construction phase During Operation phase (Connected load): During Operation phase (Demand load): Transformer: DG set as Power back-up during operation phase: Fuel used: Details of high tension line passing through the plot if any: 48.Energy saving by non-conventional method: 49.Detail calculations & % of saving: Energy Conservation Measures Saving % 1 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed (Capital cost and O&M cost): Capital cost: O & M cost: 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Attributes Parameter Total Cost per annum (Rs. In Lacs) 1 Component b) Operation Phase (with Break-up): Description Capital cost Rs. In Lacs Operational and Maintenance cost (Rs. in Lacs/yr) 1 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Page 39

40 Description Status Location Storage Capacity in MT Maximum Quantity of Storage at any point of time in MT Consumption / Month in MT Source of Supply Means of transportation No Information Available Parking details: Nos. of the junction to the main road & design of confluence: and area of basement: and area of podia: Total Parking area: Area per car: Area per car: of 2- Wheelers as approved by competent authority: of 4- Wheelers as approved by competent authority: Public Transport: Width of all Internal roads (m): CRZ/ RRZ clearance obtain, if any: Distance from Protected Areas / Critically Polluted areas / Eco-sensitive areas/ inter-state boundaries 52.Any Other Information 53.Traffic Management yes MCZMA in 116 Meeting Category as per schedule of EIA ification sheet Court cases pending if any Other Relevant Informations Have you previously submitted Application online on MOEF Website. crz 2 No Page 40

41 Date of online submission - Brief information of the project by SEAC/MCZMA DECISION OF SEAC/MCZMA Specific Conditions by SEAC/MCZMA: Granted SEIAA DECISION Specific Conditions by SEIAA: FIL RECOMMENDATION SEIAA have decided to grant the proposal for CRZ Clearance subject to above conditions Page 41

42 112th SEIAA Meeting Agenda SEIAA Meeting number: 112 Meeting Date July 27, Subject: CRZ Clearance for Proposed extension and repairs of passenger jetty at Velhele,Dist Thane by MMB 1.Name of Project 2.Type of institution 3.Name of Project Proponent 4.Name of Consultant 5.Type of project 6.New project/expansion in existing project/modernization/diversification in existing project 7.If expansion/diversification, whether CRZ Clearance has been obtained for existing project 8.Location of the project 9.Taluka 10.Village 11.Area of the project 12.IOD/IOA/Concession/Plan Approval 13.e on the initiated work (If ) 14.LOI / NOC / IOD from MHADA/ Other approvals (If ) Proposed extension and repairs of passenger jetty at Velhele Dist Thane By MMB Government Chief Executive Officer,Maharashtra Maritime Board,Indian Mercantile Chambers,3rd Floor,Ramjibhai Kamani Marg,Ballard Estate, Mumbai Maharashtra Maritime Board others Existing Yes 10 Velhele Bhiwandi Velhele other IOD/IOA/Concession/Plan Approval : Approved Built-up Area: Total Plot Area (sq. m.) Deductions 17.Net Plot area 18.Proposed Built-up Area (FSI & Non-FSI) 19.Total ground coverage (m2) 20.Ground-coverage Percentage (%) (e: Percentage of plot not open to sky) a) FSI area (sq. m.): b) Non FSI area (sq. m.): c) Total BUA area (sq. m.): 21.Estimated cost of the project number 22. of buildings & its configuration Building Name & number of floors Height of the building (Mtrs) of tenants and shops 24. of expected residents / users 25.Tenant density per hectare 26.Height of the building(s) Page 42

43 27.Right of way (Width of the road from the nearest fire station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all around the building excluding the width for the plantation 29.Existing structure (s) if any 30.Details of the demolition with disposal (If ) 7 yes 31.Production Details Product Existing (MT/M) Proposed (MT/M) Total (MT/M) 1 Dry season: Source of water 32.Total Water Requirement Fresh water (CMD): Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): Excess treated water Page 43

44 Wet season: Details of Swimming pool (If any) Particula rs Water Require ment Source of water Fresh water (CMD): Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): Excess treated water 33.Details of Total water consumed Consumption (CMD) Loss (CMD) Effluent (CMD) Existing Proposed Total Existing Proposed Total Existing Proposed Total Domestic 34.Rain Water Harvesting (RWH) Level of the Ground water table: Size and no of RWH tank(s) and Quantity: Location of the RWH tank(s): Quantity of recharge pits: Size of recharge pits : (Capital cost) : (O & M cost) : Details of UGT tanks if any : 35.Storm water drainage Natural water drainage pattern: Quantity of storm water: Size of SWD: Page 44

45 Sewage and Waste water Waste generation in the Pre Construction and Construction phase: Waste generation in the operation Phase: Mode of Disposal of waste: Area requirement: (Capital cost and O&M cost): Parameters Sewage generation in KLD: STP technology: Capacity of STP (CMD): Location & area of the STP: (Capital cost): (O & M cost): Waste generation: 36.Solid waste Management Disposal of the construction waste debris: Dry waste: Wet waste: Hazardous waste: Biomedical waste (If ): STP Sludge (Dry sludge): Others if any: Dry waste: Wet waste: Hazardous waste: Biomedical waste (If ): STP Sludge (Dry sludge): Others if any: Location(s): Area for the storage of waste & other material: Area for machinery: Capital cost: O & M cost: 37.Effluent Charecterestics Unit Inlet Effluent Charecterestics Outlet Effluent Charecterestics Effluent discharge standards (MPCB) 1 Amount of effluent generation (CMD): Capacity of the ETP: Page 45

46 Amount of treated effluent recycled : Amount of water send to the CETP: Membership of CETP (if require): e on ETP technology to be used Disposal of the ETP sludge 38.Hazardous Waste Details Description Cat UOM Existing Proposed Total Method of Disposal 1 Section & units 39.Stacks emission Details Fuel Used with Quantity Stack No. Height from ground level (m) Internal diameter (m) Temp. of Exhaust Gases 1 40.Details of Fuel to be used Type of Fuel Existing Proposed Total 1 41.Source of Fuel 42.Mode of Transportation of fuel to site 43.Green Belt Development Total RG area : No of trees to be cut : of trees to be planted : List of proposed native trees : Timeline for completion of plantation : 44. and list of trees species to be planted in the ground Name of the plant Common Name Quantity Characteristics & ecological importance 1 45.Total quantity of plants on ground 46. and list of shrubs and bushes species to be planted in the podium RG: Name C/C Distance Area m Energy Page 46

47 Power requirement: Source of power supply : During Construction Phase: (Demand Load) DG set as Power back-up during construction phase During Operation phase (Connected load): During Operation phase (Demand load): Transformer: DG set as Power back-up during operation phase: Fuel used: Details of high tension line passing through the plot if any: 48.Energy saving by non-conventional method: 49.Detail calculations & % of saving: Energy Conservation Measures Saving % 1 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed (Capital cost and O&M cost): Capital cost: O & M cost: 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Attributes Parameter Total Cost per annum (Rs. In Lacs) 1 Component b) Operation Phase (with Break-up): Description Capital cost Rs. In Lacs Operational and Maintenance cost (Rs. in Lacs/yr) 1 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Page 47

48 Description Status Location Storage Capacity in MT Maximum Quantity of Storage at any point of time in MT Consumption / Month in MT Source of Supply Means of transportation No Information Available Parking details: Nos. of the junction to the main road & design of confluence: and area of basement: and area of podia: Total Parking area: Area per car: Area per car: of 2- Wheelers as approved by competent authority: of 4- Wheelers as approved by competent authority: Public Transport: Width of all Internal roads (m): CRZ/ RRZ clearance obtain, if any: Distance from Protected Areas / Critically Polluted areas / Eco-sensitive areas/ inter-state boundaries 52.Any Other Information 53.Traffic Management yes MCZMA in 116 Meeting Category as per schedule of EIA ification sheet Court cases pending if any Other Relevant Informations Have you previously submitted Application online on MOEF Website. crz 2 No Page 48

49 Date of online submission - Brief information of the project by SEAC/MCZMA DECISION OF SEAC/MCZMA Specific Conditions by SEAC/MCZMA: Granted SEIAA DECISION Specific Conditions by SEIAA: FIL RECOMMENDATION SEIAA have decided to grant the proposal for CRZ Clearance subject to above conditions Page 49

50 112th SEIAA Meeting Agenda SEIAA Meeting number: 112 Meeting Date July 27, Subject: CRZ Clearance for Proposed Strengthening of existing sloping ramp & approach near Chai Pani Hotel at Varsova Mumbai by MMB. 1.Name of Project 2.Type of institution 3.Name of Project Proponent 4.Name of Consultant 5.Type of project 6.New project/expansion in existing project/modernization/diversification in existing project 7.If expansion/diversification, whether CRZ Clearance has been obtained for existing project 8.Location of the project 9.Taluka 10.Village 11.Area of the project 12.IOD/IOA/Concession/Plan Approval 13.e on the initiated work (If ) 14.LOI / NOC / IOD from MHADA/ Other approvals (If ) Proposed Strengthening of existing sloping ramp & approach near Chai Pani Hotel at Varsova Mumbai by MMB. Government Chief Executive Officer,Maharashtra Maritime Board,Indian Mercantile Chambers,3rd Floor,Ramjibhai Kamani Marg,Ballard Estate, Mumbai Maharashtra Maritime Board others Existing Yes 01 Versova Andheri Versova Corporation IOD/IOA/Concession/Plan Approval : Approved Built-up Area: Total Plot Area (sq. m.) Deductions 17.Net Plot area 18.Proposed Built-up Area (FSI & Non-FSI) 19.Total ground coverage (m2) 20.Ground-coverage Percentage (%) (e: Percentage of plot not open to sky) a) FSI area (sq. m.): b) Non FSI area (sq. m.): c) Total BUA area (sq. m.): 21.Estimated cost of the project number 22. of buildings & its configuration Building Name & number of floors Height of the building (Mtrs) of tenants and shops 24. of expected residents / users 25.Tenant density per hectare 26.Height of the building(s) Page 50