COUNTY OF SANTA CLARA CALGREEN NON-RESIDENTIAL CHECKLIST

Size: px
Start display at page:

Download "COUNTY OF SANTA CLARA CALGREEN NON-RESIDENTIAL CHECKLIST"

Transcription

1 1850 COUNTY OF SANTA CLARA CALGREEN NON-RESIDENTIAL CHECKLIST The rovisions of individual sections of Chater 5 aly to newly constructed buildings, building additions of 1,000 square feet or greater, and/or building alterations with a ermit valuation of $200,000 or above er A code section will be designated by a banner to indicate where the code section only alies to newly constructed buildings (N) or to additions and/or alterations (A). When the code section alies to both, no banner will be used. New Buildings < 25,000 SF (MAND), 25,000 SF (MAND + TIER 1) County Amendments in Italics. Project Data: Address: APN: Owner: Directions to Alicant: Incororate this form onto the lans and comlete the Plan Check Review Data found in the table below. Date: REFERENCE ( Comliance or detail ) Agency PLANNING AND DESIGN: MANDATORY S Storm water ollution revention lan Bicycle Parking Short-term bicycle arking Long-term bicycle arking Designated Parking Parking stall marking a Electrical Vehicle (EV) charging. At least 5 ercent of the total arking saces, but not less than one, shall be caable of suorting future electric vehicle suly equiment (EVSE). (N) Single charging sace requirements. When only a single charging sace is required, a raceway is required to be installed at the time of construction and shall be installed in accordance with the California Electrical Code. (N)

2 Plan Check Review Data ( or detail ) Agency 7b c Buildings with more than 100 new arking saces. Install Level 2 EVSE to service one (1) ercent of the total number of arking saces. The ercentage calculated shall be rounded u to the next whole number. The EVSE shall be located within the arking area. (N) Shared Parking. When arking is rovided to new buildings from shared arking lots, including existing and new arking lots, the requirements of this section may be met through the installation of re-wiring and/or EVSE among both the existing and new arking lots. (N) Light ollution Reduction (N) Grading and Paving PLANNING AND DESIGN: TIER 1 S 10 A A Designated Parking for fuel-efficient vehicles (10% of total saces) Cool Roof for reduction of heat island effect Comly with one elective measure ENERGY EFFICIENCY: MANDATORY S Building meets or exceeds the requirements of the California Energy Efficiency Standards WATER EFFICIENCY & CONSERVATION: MANDATORY S New buildings or additions in excess of 50,000 square feet/submeter Excess comsumtion Water Conserving lumbing fixtures and fittings Water Closets

3 ( or detail ) Agency Urinals Single Showerheads Multile Showerheads Areas of additions or alteration Standards for lumbing fixtures and fittings Water Budget Outdoor otable water use Irrigation Design Irrigation controllers WATER EFFICIENCY & CONSERVATION: TIER 1 S 27 A % Savings (Plumbing Fixtures) 28 A Potable Water Reduction (Tier 1) 29 Comly with one elective measure

4 Plan Check Review Data or detail ) Agency ( MATERIAL CONSERVATION & RESOURCE EFFICIENCY: MANDATORY S Weather rotection Moisture control Srinklers Entries and oenings Flashing Construction Waste management Construction Waste management lan Waste management comany Waste stream reduction alternative on of the waste management lan Excavated soil and land clearing debris Additions shall rovide recycling areas on site (A) Commissioning (N) Owner's Project Requirements (N)

5 Plan Check Review Data or detail ) Agency ( MATERIAL CONSERVATION & RESOURCE EFFICIENCY: MANDATORY S Basis of Design (N) Commissioning Plan (N) Systems manual (N) Systems oerations training (N) Commissioning reort (N) Testing and adjusting Systems Procedures HVAC balancing Reorting Oerations and maintenance manual Insections and reorts MATERIAL CONSERVATION & RESOURCE EFFICIENCY: TIER 1 S 56 A Recycled Content - Tier 1 57 A Enhanced construction waste reduction- 65% 58 Comly with one elective measure

6 or detail ) Agency ( ENVIRONMENTAL QUALITY: MANDATORY S Firelace Woodstoves (as alicable) Temorary Ventilation Covering of duct oenings and rotection of mechanical equiment during construction Finish Material ollutant control Adhesives, sealants, caulks Paints and Coatings Aerosol aints and coatings Verification Caret systems Caret Cushion Caret adhesive Comosite Wood Products on

7 or detail ) Agency ( ENVIRONMENTAL QUALITY: MANDATORY S Reslient flooring systems Verificiation of comliance Filters Indoor moisture control Outside air delivery Carbon dioxide monitoring Acoustical Control Exterior Noise Transmission Prescritive Method Noise Exosure where noise contours are not readily available Performance Method Site features and on Interior Sound Transmission Ozone deletion and global warming red CFCs Halons Suermarket refrigerant leak reduction ENVIRONMENTAL QUALITY: TIER 1 S 89 A Resilient floor systems 90 A Thermal Insulation 91 Comly with one elective measure