1 GreenStep Cities Workshop Xcel Energy Rebates: Commercial Program Overview Mike Meyers, Xcel Energy

2 Commitment from Leadership Our energy conservation programs are especially valuable because they give our customers options to save energy and money and to make their own contribution to environmental stewardship. Ben Fowke Xcel Energy Chairman, President and CEO

3 Economic Impacts Lower energy bills Lower Rate, Power plants are expensive to build Lower operating and maintenance costs Increased efficiency of operation Lower energy-efficiency project costs Faster paybacks Lower up-front costs Higher return on investment Increased lifetime savings Environmental Impacts Reduce emissions Since 2005, we have reduced CO2 emissions by nearly 10% lbs Co2 / kwh lbs Co2 / therm Pollution prevention Avoid new power plants More than 3,000 Megawatts of power saved 10 mid-sized power plants

4 Xcel Energy MN Conservation Programs History (Since 1990) Number of Rebates given: Over 35,000 Total Rebate Dollars: Over $160,000,000 Largest Rebate: $1,450,000

5 What Customers Accomplished in 2013 More than 494 Million kwh Saved That s enough energy to power over 60,000 Twin Cities homes for a year

6 Cost to Avoid CO2 $700 $600 $500 Dollars per Ton of CO2 Avoided High: $698 Mid: $489 Low: $279 $400 $300 $200 $100 High: $29 Mid: $23 Low: $17 High: $60 Mid: $54 Low: $48 High: $209 Mid: $175 Low: $140 $0 Efficiency Wind Large Solar Small Solar Per kwh

7 Types of Programs For both Electric and Gas Prescriptive / Fixed Rebates (Commonly used Equipment) Custom ($400 per KW saved or $5 per Dth) Holistic Programs Studies / Audits Rate Savings

8 Electrical Business Programs Lighting Efficiency Cooling Efficiency Motor Efficiency Fluid System Optimization Foodservice Equipment Computer Efficiency Custom Efficiency Data Center Efficiency Energy Design Assistance Energy Efficient Buildings Efficiency Controls Process Efficiency Recommissioning Turn Key Services

9 Spotlight on energy savings with lighting efficiency Lighting can account for up to 44% of your energy costs New options are more efficient, more aesthetically pleasing and have shorter paybacks than ever

10 Lighting Efficiency Prescriptive Rebates Retrofit rebates for existing facilities of any size One-to-one equipment change outs Now Including many new LED applications** New construction rebates (new or major renovations) Choose options that are more efficient than the standard Lighting Controls Occupancy, Motion or Photo Sensors Lighting Studies For over lit or miss lit applications

11 Parking garage lighting can be energy efficient, keeping costs down High-efficiency fluorescent (HIF) technology improvements make HIF an attractive solution for parking garage lighting More energy efficient than high-intensity discharge (HID) systems Suffer less light output degradation over time Offer better dimming operations, longer life Provide virtually instant start-up and restrike Have better color rendition LED technology making rapid progress for even better energy savings and performance Prices coming down Some Prescriptive Rebates now available

12 Fifth Street Towers reduced energy use more than 60% converting to HIF lighting Customer Fifth Street Towers Location Downtown Minneapolis Project scope Converted 314 fixtures in two parking garages from metal halide and high pressure sodium to 2- and 3-lamp T8 fluorescent fixtures Financial summary: $46,000 Project cost $26,690 Xcel Energy rebate $22,395/year Estimated energy savings Reduction in energy use 0.9 years Payback term

13 Cooling Efficiency Rebate main system components Prescriptive rebates Fixed rebates for purchasing common energy efficient equipment Rebates available on a $/ton basis Qualifying prescriptive equipment: DX Units (split systems, condensing units and rooftop units) Demand side economizers Packaged terminal air conditioners (PTAC s) Water source heat pumps Air cooled chillers VFD retrofits on chillers Anti-sweat heat controller Zero loss energy door

14 Motor Efficiency Variable Frequency Drives (VFD's) Prescriptive VFD s (on most Pumps or Fans) 1 to 200 HP ($400 to $8,000) Custom VFD s (non Pump or Fan application or Greater then 200 HP) Individually Determined ($400/KW saved) Prescriptive Motor Retrofit Rebates 1 to 500 HP ($30 to $13,500) Must meet or exceed NEMA Premium standards

15 Fluid System Optimization Compressed Air Loss Leaks and waste rob your production needs by at least 50%, and leaks are too expensive to ignore

16 Fluid System Optimization Prescriptive Products <50hp VSD compressors New $100/hp Early retirement $100/hp + $ to 1, same hp No loss air drains $200/drain Cycling refrigerated dryers $2/Rated CFM Dew point demand controls on heatless desiccant dryers $1,500/ea Mist eliminators $3/Rated CFM

17 Compressed Air Supply Side Study Study Funding Levels 10hp 49hp systems* get $250 plus $20/hp 50hp 199hp Systems* get $2,000 plus $20/hp 200hp 499hp Systems* get $3,000 plus $20/hp 500hp Systems* and larger get $4,000 plus $20/hp (capped at $25,000) Min operating hours/year Excludes back up compressors One every 5 years

18 Foodservice Equipment Rebates apply to new equipment only. Rebates are available to Xcel Energy business customers. Must be an electric customer for electric rebates and a gas customer for gas rebates. Prescriptive rebates available for equipment purchased on/after the approval of the program (July 23, 2012).

19 Foodservice Electric Equipment Electric Equipment Requirements Demand controlled Combo or electric ventilation only customer Rebate $400 lump sum for all fans under 5 hp $120 per exhaust fan hp for fans equal to or greater than 5 hp but less than 7.5 hp Dishwasher (electric water heating) Electric water heating, Energy Star $100 per exhaust fan hp for fans 7.5 hp and greater $250 low temperature without booster heater $250 high temperature with primary and booster heating using Xcel Energy electricity Hot food holding cabinets $125 high temperature with either primary or booster water heating using Xcel Energy electricity Electric, Energy Star $400

20 Efficiency Controls rebates Energy Management Systems (EMS) and Automated Building Controls Control Lighting, Heating, Cooling, Ventilation, etc. Add new system to building Add control points to existing system Microprocessor-based controlling Model-based analysis Rebate: up to $400 per kw saved, $5 per Dth saved Payback: between 9 months and 10 years Preapproval required prior to purchase/install To participate EMS preapproval application, project worksheet

21 Custom Efficiency Program Rebates for energy-saving projects not covered by our prescriptive equipment programs Rebates are up to $400 per kw saved and $5 per MCF saved ($0.50 per therm) Written pre-approval is required prior to equipment purchase

22 Custom Efficiency - Examples Building Envelope (new windows, insulation, etc.) Non-ENERGY STAR rated LED Retrofit, LED Display signs Ventilation Controls, Demand Control Ventilation Free Cooling Outdoor parking lot lighting Motors > 500 HP, VFD s > 200 HP, or VFD s for Non Fan or Pumping Applications

23 Energy Design Assistance (EDA) Helps Owners and Design Team make materials and equipment selections based on energy savings, Project costs and simple paybacks. Incentives to Design Team for participation Implementation incentives to owner after project completion. DOE 2 Energy Modeling Optional Enhanced Track with more services Assistance with LEED, SB2030 and other certifications.

24 Energy Efficient Buildings (EEB) Any size building can apply, but mainly intended for buildings less than 50,000 square feet. Application due prior to bidding equipment Construction documents, submittals, and equipment specs are reviewed and a preliminary incentive amount is given. Onsite verification after construction completion will determine final incentive amount.

25 Studies Evaluate energy usage Identify and qualify opportunities Build a business case for improvements Taking the Next Step Did you know, that on average, 30% of your energy bill is wasted?

26 Turn Key Services ASHRAE Level I Assessments $600-$1300 Whole building plus utility bill review Energy savings, potential rebates, paybacks Engineering Study of major system or process $700-$3500 Implementation Services FREE! Data Center Efficiency Any size, new and existing data centers may qualify Study IT, facility or whole system Data center study funding Up to 75% of study costs, not to exceed $25,000 Pre-approval is required

27 Recommissioning Studies Up to 75% of the study cost, not to exceed $25,000 Preapproval is required Tune up existing building systems and controls rather than replacing them Optimize HVAC operations Fine-tune time of day schedules Improve indoor air quality Reduce equipment wear and tear Many measures are low/no cost with paybacks less than one year Potential savings of 5 to 20 percent Implementation Up to 60% of the project cost $400/kW or implied kw (kwh/8760) $5/Dth for Xcel Energy natural gas customers Rebates are available for measures with paybacks between 9 months -15 years Extra bonus available for measures implemented within 9 months of study approval

28 Load Management Saver s Switch 15% off residential, or discount of $5 per ton for business electric energy and fuel cost charges June through September Cycles central AC off and on at 15 minute intervals during peak demand days (hot summer days) Electric Rate Savings Business customers receive up to 63% savings on demand charges if they agree to reduce their electric demand during peak demand periods 28

29 Your first step contact us! Contact the Business Solutions Center We have a dedicated team of Energy Efficiency Specialist available to help you find the right rebate for your project Call EnergyEfficiency@xcelenergy.com