Check list for construction Project of EC [Category 8(a)]:

Size: px
Start display at page:

Download "Check list for construction Project of EC [Category 8(a)]:"

Transcription

1 Check list for construction Project of EC [Category 8(a)]: Provide authenticated (with stamp & Signature) hard copy of this check-list during submission of hard copy of ToR application. Sr. no. Checklist Point Remark Yes/No Page no./ Annexure 1 Covering letter signed by the applicant Yes Page 1 2 Completed Application From-1 in all respect with each page signed by the applicant Yes Annexure-1 (Total Pages:17) 3 Completed From-IA duly signed by the applicant 4 Full size project plant showing plot area statement, layout plan, building wise & floor wise built up area table + FSI area table + Floor area table 5 Authentic land ownership document showing ownership of the land by the applicant. Yes Annexure 2 (Total Pages:9) Yes Annexure 3 (Total Pages:5) Yes Annexure 4 (Total Pages:3) Notarized consent of other land owners (if required) 5 (A): Consent of land owners other than the project proponent, if required. 6 Details of earlier Environmental Clearance obtained for the project site along with compliance report for the conditions stipulated in earlier Environmental Clearance order. NA -

2 6(A) : Notarized undertaking for compliance of the stipulated terms & conditions in the EC Order and for compliance of the Office memorandum no. J-11011/618/2010 IA-II(I) dated 30/05/2012 and J-11013/41/2006 IA.II(I) dated 20/10/2009 published by MoEF &CC. 7 Details on violation of EIA Notification ,if any for the proposed project site, if yes, then detailed submitted or not. No - 8 Project details submitted by the project Proponent. (29 points format) 9 Project details submitted by the project Proponent. Yes Annexure 5 (Total Pages:4) Yes Annexure 6 i. Water balance details. ii. Management Plan including storage, reuse& disposal of top soil, excavated earth, construction debris, steel scrap & parking material iii. Solid waste generation & mode of treatment, reuse & disposal iv. Parking area provision for the Project. v. Typical Floor Plan vi. Energy & water conservation measures, details of green building measures proposed vii. Fire fighting measure proposed viii. Environment management application details & Phase

3 wise/year wise implementation details ix. Tree & lawn covered area with number & type of trees to be planted &year wise implementation details. x. Copy of permission obtained from the Airports Authority of India for the proposed building height xi. Permission or authentic supporting documents showing availability of the proposed FSI to the project. 10 Notarized undertaking stating that the details & facts submitted along with the application from are true and abiding to me/us. Yes Annexure 7 Stamp &Signature of Applicant: Date:

4 STANDARD FORMAT SEAC CONSTRUCTION Sr. Particulars Details 1. Proposal is for Residential Building Project 2. Type of Project New Construction Projects and Industrial Estates 3. Project / Activity 8 (a) [8(a) or 8(b)] 4. Name of the GUJARAT HOUSING BOARD project 5. Name of Developer GUJARAT HOUSING BOARD GHB, S. NO. 61/1, 63/1, 63/2 & 64-PAIKY PMAY, TARSAMIYA, BHAVNAGAR, GUJARAT 6. Estimated Project Cost (Rs. In Crores) 7. Whether construction work has been initiated at site? If yes, details thereof 8. Site Coordinates M , E Mail- exnraj.ghb@gmail.com Rs Crore No 21 44'45.71"N, 72 9'44.09"E 21 44'41.46"N, 72 9'50.77"E 21 44'37.98"N, 72 9'48.28"E 21 44'42.32"N, 72 9'41.67"E 9. Project Details Total Land / Plot Area (m 2 ): FSI area used (m 2 ): Total BUA (m 2 ): Permissible Proposed FSI Area, (m 2 ) Ground Coverage, (m 2 ) Common Plot Area, (m 2 ) Max. building height, (m) Building Details of Buildings: 28 of Blocks: 28 Scope of buildings/blocks: HP + 3 of Residential Units:896 of Commercial Units:00 Details of amenities if any: -

5 Sr. Particulars 11. of expected residents / users 12. Water & waste water details during construction phase 13. Water & waste water details during operation phase 14. Status of water supply and drainage line 15. Solid waste Management Details 4480 person Water requirement (KL/day): 10.0 KL/day Source of water: Tanker. Waste water generation quantity (KL/day): 2.4 KL/day Soak pit. Details of reuse of water, if any: No Source of water: Bore well Total water requirement (KL/day): Fresh water requirement (KL/day): Source of water: BMC Waste water generation quantity (KL/day): Mode of disposal: Sewage to be generated will be treated in the proposed onsite STP. Treated sewage will be reused for gardening and flushing within premises and remaining quantity of treated sewage will be discharged into the drainage line of BMC. In case of STP provision, capacity of STP: 484 KL/day Provision of dual plumbing system (Yes/No): Yes Purposes for treated sewage utilization: Gardening & flushing Quantity of treated sewage to be reused: 1. Flushing (KL/day): Gardening (KL/day): 4.0 Quantity and type (treated/untreated) of sewage to be discharged: Sewage to be generated will be treated in the proposed onsite STP. Treated sewage will be reused for gardening and flushing within premises and remaining quantity of treated sewage will be discharged into the drainage line of BMC. Mode of disposal: As above. Water supply: BMC Drainage line: BMC Construction Phase: Description Generation Quantity to be reused (kg/day) Mode of Disposal / Reuse Top Soil 9200 (m3) 100 % reuse For garden development Other excavated earth Construction debris (m 3 ) 50 % reuse for back filling % reuse for internal road sub base Send to the nearest collection point of BMC Send to the nearest collection point of BMC Steel scrap 200 (kg) -- Sell to Actual Users

6 Sr. Particulars Details Discarded packing materials 100 KG -- Sell to Actual Users Total Solid Waste shall 40 workers x 500 gm/person/day = ) 20 kg/day Operation Phase: Type of waste Generation Quantity (Kg/day) Dry waste & Wet waste Mode of waste collection 142 Organic waste and In organic waste will be collected in different buckets. Mode of Disposal / Reuse The recyclable waste will be sold off to recyclers. The non-recyclable solid waste to be generated will be transferred to the nearest collection point of BMC. Details of segregation if to be done: collection of organic and inorganic waste will be in different buckets and it will be subsequently collected by for disposal to OWC site in premises. Capacity and no. of community bins to be placed within premises: No of Bins: 112; Volume of Bins: 80 Lit each Landfill site where waste will be ultimately disposed by local authority: Bio degradable waste will be composed &Non-biodegradable waste will be sold to the authored vendor Parking Details Total parking area requirement for the project as per GDCR: m 2 Total number of CPS requirement for the project as per NBC: 448nos. Total Parking area provided (m 2 ) & of CPS: m 2 &198.5 CPS Parking area provided in hollow plinth (m 2 ) & of CPS: 17. Traffic Management Parking area provided in Basement (m 2 ) & of CPS: - Parking area provided as open surface (m 2 ) & of CPS: 6095 m 2 &165CPS Width of adjacent public roads: 15.24, 9.0,5 m. Number of Entry & Exit provided on approach road/s: 2gate will be provided. Width of Entry & Exit provided on approach road/s:9 m Minimum width of open path all around the buildings for easy access of fire tender (excluding the width for the plantation): 4 m. Width of all internal roads: 6.0, 7.0 &9 m 18. Details of Use of transformers & motors having minimum efficiency of 85%, use of

7 Sr. Particulars Green Building measures proposed. 19. Energy Requirement, Source and Conservation 20. Fire and Safety Measures 21. Details CFL lights in common areas, use of light colours for walls & ceiling to reduce the light absorption & to minimize cooling requirement, rain water harvesting through ground water recharge etc. Power supply: by UGVCL Maximum demand:1550kw Connected load: KW Source : UGVCL Energy saving measures: Use of transformers & motors having minimum efficiency of 85%, use of CFL lights in common areas, use of light colours for walls & ceiling to reduce the light absorption & to minimize cooling requirement etc. 20 nos. of Solar light will provide. DG Sets: Not proposed. Fire extinguishers at various locations and easily accessible, to keep printed board showing important telephone number of fire, ambulance, hospital etc. training to the workers on safety aspects, first aid box at identified places within premises, doctor & ambulance services, provision of PPE S like helmet, gumboot/safety shoes, safety net, safety goggles etc. Common Underground water tank and fire tank of 25 KL DG set will be provided for emergency. Nearest Fire Control Station is Municipal Fire Station, Bhavnagar far from the site 5.9 km by road and takes 15 min time to reach at site by Ghogha Rd Details on staircase Type & no. of buildings of floors Floor area (m 2 ) of staircase Width of the staircase(m) Travel distance (m) 1 GF < Rain Water Level of the Ground water table: 120 m Harvesting & dimensions of RWH tank(s): 2 of 25 kl each (5*4*2.5) (RWH) and depth of percolations wells: 8 no. & 50m depth Details on Pre-treatment facilities : Filtration & removal of oil & grease 23. Green area details Tree covered area (m 2 ): 1200 Area covered by shrubs and bushes (m 2 ): 50 Lawn covered area (m 2 ): 7.02 Total Green Area (m 2 ): Green Area % of plot area: 6.0 % of trees and species to be planted: 760 trees. 24. Budgetary Total 42lacsis proposed for municipal solid waste collection & disposal,

8 Sr. Particulars allocation for Environmental Management Plan (Rs. in lacs) 25. Proposed dust control measures during the construction phase 26. Eco friendly building material usage details. 27. Details on Corporate Environment Responsibility (Rs in Lacks) 28. Details on amenities to be provided to the construction workers. 29. Documents related to land possession. Details sewage disposal charges, green belt development & rain water harvesting. Water sprinkling, loose construction material will be covered with tarpaulin while storage & transportation etc. Use of earth blocks, fly ash and Fal-G (fly ash, lime and gypsum) as alternative materials for construction of wall in-place of clay bricks with cement mortar etc. Flay ash cement (PPC) for flooring and masonry work: as maximum as possible Fly ash bricks for masonry work: as maximum as possible Pavers block for internal roads of the building facilities. Fund of Rs Cr. (2 % of capital investment (56.6 Cr.) considering the green field project) will be allocated for the activities related to education & skill development, health, water & sanitation, infrastructure development and other social welfare activities. Drinking water, doctor service, financial support to workers children for education & food, safety appliances, sanitary facility etc documents and Permission letter enclosed.