1 City of Cupertino STAFF ONLY Building Permit Date: Permit #: PERMIT PROVISION C.3. IMPERVIOUS SURFACE DATA FORM All Project Applicants with 5,000 sq. ft. or more of impervious surface on the project site must fill out this worksheet and submit it with the development project application to the Engineering Division of the Public Works Department. Contact Public Works at (408) for guidance C.3 Regulated Projects are projects that create and/or replace 10,000 sq. ft. or more of impervious surface on the project site AND All restaurants, auto service facilities, retail gasoline outlets, and uncovered parking lot projects that create and/or replace 5,000 sq. ft. or more of impervious surface on the project site. All applicants with C.3 Regulated projects must reserve a minimum of 4% of developable surface area for the placement of storm water treatment facilities unless an alternative storm water treatment plan is approved by the Public Works Engineer. Note: For restaurants, uncovered parking lots, auto service facilities and retail gasoline outlets that What is an Impervious Surface? receive final discretionary approval on or after December 1, 2011, the threshold will be reduced to 5,000 sq. An ft. impervious surface is a covering or pavement that prevents the land s natural ability to absorb and infiltrate rainfall/stormwater. Impervious surfaces include, but are not limited to rooftops, 1. walkways, General paved Information: patios, driveways, parking lots, storage areas, concrete and asphalt, and any other continuous watertight pavement or covering. Pervious pavement, underlain with pervious soil or pervious storage material (e.g., drain rock), that infiltrates rainfall at a rate equal to or greater than surrounding unpaved areas OR that stores and infiltrates the water quality design volume specified in Provision C.3.d of the Municipal Regional Stormwater Permit (MRP), is not considered an impervious surface. Date: APN # - - Project Location: (address) Project Name: Cross Streets Applicant Name: Applicant s Ph #: Engineer: Engineer s Ph #: Project Phase(s): of Project Description: Project Type (check all that apply): New Development Redevelopment Public Commercial Industrial Auto Service (SIC code) Uncovered Parking ( , 5541, , ) Residential Restaurant Mixed Use Retail Gas Outlet Other If Residential, does the project consist of a single-family home that is not part of a larger common plan of development? Yes No If yes, stop here and return sheet 1 only to the Engineering Division of the Public Works Department. SCVURPPP C.3. Data Form Page 1 of 4 November 2011

2 Project Watershed/Receiving Water (creek): 2. Project Size: a. Total Site Area: acre Impervious Area Roof Parking Sidewalks and Streets c. Total Impervious Area d. Total new and replaced impervious area Pervious Area Landscaping Pervious Paving Other (e.g. Green Roof) e. Total Pervious Area b. Total Site Area Disturbed: acre (including clearing, grading, or excavating) Existing Area (ft 2 Proposed Area (ft 2) ) Total Post-Project Replaced New Area (ft 2 ) f. Percent Replacement of Impervious Area in Redevelopment Projects (Replaced Total Impervious Area Existing Total Impervious Area) x 100% = % 3. State Construction General Permit Applicability: a. Is #2.b. equal to 1 acre or more? Yes, applicant must obtain coverage under the State Construction General Permit (i.e., file a Notice of Intent and prepare a Stormwater Pollution Prevention Plan) (see for details). No, applicant does not need coverage under the State Construction General Permit. 4. MRP Provision C.3 Applicability: a. Is #2.d. equal to 10,000 sq. ft. or more, or 5,000 sq. ft. or more for restaurants, auto service facilities, retail gas outlets, and uncovered parking? (*Note that for public projects, the 5,000 sq. ft. threshold does not take effect until 12/1/12.) Yes, C.3. source control, site design and treatment requirements apply No, C.3. source control and site design requirements may apply check with local agency b. Is #2.f. equal to 50% or more? Yes, C.3. requirements (site design and source control, as appropriate, and stormwater treatment) apply to entire site No, C.3. requirements only apply to impervious area created and/or replaced 5. Hydromodification Management (HM) Applicability: a. Does project create and/or replace one acre or more of impervious surface AND create an increase in total impervious surface from the pre-project condition? Yes (continue) No exempt from HM, go to page 3 b. Is the project located in an area of HM applicability (green) on the HM Applicability Map? ( Yes, project must implement HM requirements No exempt from HM, go to page 3 Cupertino C.3. Data Form Page 2 of 4 November 2011

3 6. Selection of Specific Stormwater Control Measures: Site Design Measures Minimize land disturbed Minimize impervious surfaces Minimum-impact street or parking lot design Cluster structures/ pavement Disconnected downspouts Pervious pavement Green roof Microdetention in landscape Other self-treating area Self-retaining area Rainwater harvesting and use (e.g., rain barrel, cistern connected to roof drains) 1 Preserved open space: ac. or sq. ft.(circle one) Protected riparian and wetland areas/buffers (Setback from top of bank: ft.) Other Source Control Measures Alternative building materials Wash area/racks, drain to sanitary sewer 2 Covered dumpster area, drain to sanitary sewer 2 Sanitary sewer connection or accessible cleanout for swimming pool/spa/fountain 2 Beneficial landscaping (minimize irrigation, runoff, pesticides and fertilizers; promotes treatment) Outdoor material storage protection Covers, drains for loading docks, maintenance bays, fueling areas Maintenance (pavement sweeping, catch basin cleaning, good housekeeping) Storm drain labeling Other Treatment Systems None (all impervious surface drains to selfretaining areas) LID Treatment Rainwater harvest and use (e.g., cistern or rain barrel sized for C.3.d treatment) Infiltration basin Infiltration trench Exfiltration trench Underground detention and infiltration system (e.g. pervious pavement drain rock, large diameter conduit) Biotreatment 3 Bioretention area Flow-through planter Tree box with bioretention soils Other Other Treatment Methods Proprietary tree box filter 4 Media filter (sand, compost, or proprietary media) Vegetated filter strip 5 Dry detention basin 5 Other 1 Optional site design measure; does not have to be sized to comply with Provision C.3.d treatment requirements. 2 Subject to sanitary sewer authority requirements. 3 Biotreatment measures are allowed only with completed feasibility analysis showing that infiltration and rainwater harvest and use are infeasible. 4 These treatment measures are only allowed if the project qualifies as a Special Project. 5 These treatment measures are only allowed as part of a multi-step treatment process. Flow Duration Controls for Hydromodification Management (HM) Detention basin Underground tank or vault Bioretention with outlet control Other Cupertino C.3. Data Form Page 3 of 4 November 2011

4 7. Treatment System Sizing for Projects with Treatment Requirements Indicate the hydraulic sizing criteria used and provide the calculated design flow or volume: Treatment System Component Hydraulic Sizing Criteria Used 3 Design Flow or Volume (cfs or cu.ft.) 3 Key: 1a: Volume WEF Method 2b: Flow CASQA BMP Handbook Method 1b: Volume CASQA BMP Handbook Method 2c: Flow Uniform Intensity Method 2a: Flow Factored Flood Flow Method 3: Combination Flow and Volume Design Basis 8. Condition of Approval for Landscape Plans (use of native plants, tree preservation). 9. Third Party Certification A qualified consultant (that is not a member of the project team or City staff) will be required to review the treatment system sizing and design and certify the Stormwater Management Plan and/or Hydromodification Flow Control Facilities. A list of qualified consultants can be found at Name of Reviewer 10. Operation & Maintenance Information A. Property Owner s Name B. Responsible Party for Stormwater Treatment/Hydromodification Control O&M: a. Name: b. Address: c. Phone/ ******************************************************************************************************************* This section to be completed by Municipal staff. O&M Responsibility Mechanism Indicate how responsibility for O&M is assured. Check all that apply: O&M Agreement Other mechanism that assigns responsibility (describe below): STAFF ONLY - Reviewed by: Community Development Department Planning Division: Public Works Department Engineering Division: Return form to: Public Works Department Date Page 4 of 4

5 Santa Clara Valley Urban Runoff Pollution Prevention Program Infiltration/Harvesting and Use Feasibility Screening Worksheet Apply these screening criteria for C.3 Regulated Projects* required to implement Provision C.3 stormwater treatment requirements. See the Glossary (Attachment 1) for definitions of terms marked with an asterisk (*). Contact municipal staff to determine whether the project meets Special Project* criteria. If the project meets Special Project criteria, it may receive LID treatment reduction credits. 1. Applicant Info Site Address:, CA APN: Applicant Name: Phone No.: Mailing Address: 2. Feasibility Screening for Infiltration Do site soils either (a) have a saturated hydraulic conductivity* (Ksat) that will NOT allow infiltration of 80% of the annual runoff (that is, the Ksat is LESS than 1.6 inches/hour), or, if the Ksat rate is not available, (b) consist of Type C or D soils? 1 Yes (continue) No complete the Infiltration Feasibility Worksheet. If infiltration of the C.3.d amount of runoff is found to be feasible, there is no need to complete the rest of this screening worksheet. 3. Recycled Water Use Check the box if the project is installing and using a recycled water plumbing system for non-potable water use. The project is installing a recycled water plumbing system, and installation of a second non-potable water system for harvested rainwater is impractical, and considered infeasible due to cost considerations. Skip to Section Calculate the Potential Rainwater Capture Area* for Screening of Harvesting and Use Complete this section for the entire project area. If rainwater harvesting and use is infeasible for the entire site, and the project includes one or more buildings that each have an individual roof area of 10,000 sq. ft. or more, then complete Sections 4 and 5 of this form for each of these buildings. 4.1 Table 1 for (check one): The whole project Area of 1 building roof (10,000 sq.ft. min.) Table 1: Calculation of the Potential Rainwater Capture Area* The Potential Rainwater Capture Area may consist of either the entire project area or one building with a roof area of 10,000 sq. ft. or more Pre-Project Impervious surface 2 (sq.ft.), if applicable Proposed Impervious Surface 2 (IS), in sq. ft. Replaced 3 IS Created 4 IS Post-project landscaping (sq.ft.), if applicable a. Enter the totals for the area to be evaluated: b. Sum of replaced and created impervious surface: N/A N/A c. Area of existing impervious surface that will NOT be replaced by the project. N/A N/A 1 Base this response on the site-specific soil report, if available. If this is not available, consult soil hydraulic conductivity maps in Attachment 3. 2, Enter the total of all impervious surfaces, including the building footprint, driveway(s), patio(s), impervious deck(s), unroofed porch(es), uncovered parking lot (including top deck of parking structure), impervious trails, miscellaneous paving or structures, and off-lot impervious surface (new, contiguous impervious surface created from road projects, including sidewalks and/or bike lanes built as part of new street). Impervious surfaces do NOT include vegetated roofs or pervious pavement that stores and infiltrates rainfall at a rate equal to immediately surrounding, unpaved landscaped areas, or that stores and infiltrates the C.3.d amount of runoff*. 3 Replaced means that the project will install impervious surface where existing impervious surface is removed. 4 Created means the project will install new impervious surface where there is currently no impervious surface. * For definitions, see Glossary (Attachment 1). Page 1 of 3 FINAL November 2011

6 Infiltration/Harvesting and Use Feasibility Screening Worksheet 4.2 Answer this question ONLY if you are completing this section for the entire project area. If existing impervious surface will be replaced by the project, does the area to be replaced equal 50% or more of the existing area of impervious surface? (Refer to Table 1, Row a. Is the area in Column 2 > 50% of Column 1?) Yes, C.3. stormwater treatment requirements apply to areas of impervious surface that will remain in place as well as the area created and/or replaced. This is known as the 50% rule. No, C.3. requirements apply only to the impervious area created and/or replaced. 4.3 Enter the square footage of the Potential Rainwater Capture Area*. If you are evaluating only the roof area of a building, or you answered no to Question 4.2, this amount is from Row b in Table 1. If you answered yes to Question 4.2, this amount is the sum of Rows b and c in Table 1.: square feet. 4.4 Convert the measurement of the Potential Rainwater Capture Area* from square feet to acres (divide the amount in Item 4.3 by 43,560): acres. 5. Feasibility Screening for Rainwater Harvesting and Use 5.1 Use of harvested rainwater for landscape irrigation: Is the onsite landscaping LESS than 2.5 times the size of the Potential Rainwater Capture Area* (Item 4.3)? (Note that the landscape area(s) would have to be contiguous and within the same Drainage Management Area to use harvested rainwater for irrigation via gravity flow.) Yes (continue) No Direct runoff from impervious areas to self-retaining areas* OR refer to Table 11 and the curves in Appendix F of the LID Feasibility Report to evaluate feasibility of harvesting and using the C.3.d amount of runoff for irrigation. 5.2 Use of harvested rainwater for toilet flushing or non-potable industrial use: a. Residential Projects: Proposed number of dwelling units: Calculate the dwelling units per impervious acre by dividing the number of dwelling units by the acres of the Potential Rainwater Capture Area* in Item 4.4. Enter the result here: ) Is the number of dwelling units per impervious acre LESS than 100 (assuming 2.7 occupants/unit)? Yes (continue) No complete the Harvest/Use Feasibility Worksheet. b. Commercial/Industrial Projects: Proposed interior floor area: (sq. ft.) Calculate the proposed interior floor area (sq.ft.) per acre of impervious surface by dividing the interior floor area (sq.ft.) by the acres of the Potential Rainwater Capture Area* in Item 4.4. Enter the result here: Is the square footage of the interior floor space per impervious acre LESS than 70,000 sq. ft.? Yes (continue) No complete the Harvest/Use Feasibility Worksheet c. School Projects: Proposed interior floor area: (sq. ft.) Calculate the proposed interior floor area per acre of impervious surface by dividing the interior floor area (sq.ft.) by the acres of the Potential Rainwater Capture Area* in Item 4.4. Enter the result here:. Is the square footage of the interior floor space per impervious acre LESS than 21,000 sq. ft.? Yes (continue) No complete the Harvest/Use Feasibility Worksheet * For definitions, see Glossary (Attachment 1). Page 2 of 3 FINAL November 2011

7 Infiltration/Harvesting and Use Feasibility Screening Worksheet d. Mixed Commercial and Residential Use Projects Evaluate the residential toilet flushing demand based on the dwelling units per impervious acre for the residential portion of the project, following the instructions in Item 5.2.a, except you will use a prorated acreage of impervious surface, based on the percentage of the project dedicated to residential use. Evaluate the commercial toilet flushing demand per impervious acre for the commercial portion of the project, following the instructions in Item 5.2.a, except you will use a prorated acreage of impervious surface, based on the percentage of the project dedicated to commercial use. e. Industrial Projects: Estimated non-potable water demand (gal/day): Is the non-potable demand LESS than 2,400 gal/day per acre of the Potential Rainwater Capture Area? Yes (continue) No refer to the curves in Appendix F of the LID Feasibility Report to evaluate feasibility of harvesting and using the C.3.d amount of runoff for industrial use. 6. Use of Biotreatment If only the Yes boxes were checked for all questions in Sections 2 and 5, or the project will have a recycled water system for non-potable use (Section 3), then the applicant may use appropriately designed bioretention facilities for compliance with C.3 treatment requirements. The applicant is encouraged to maximize infiltration of stormwater if site conditions allow. 7. Results of Screening Analysis Based on this screening analysis, the following steps will be taken for the project (check all that apply): Implement biotreatment measures (such as an appropriately designed bioretention area). Conduct further analysis of infiltration feasibility by completing the Infiltration Feasibility Worksheet. Conduct further analysis of rainwater harvesting and use (check one): Complete the Rainwater Harvesting and Use Feasibility Worksheet for: The entire project Individual building(s), if applicable, describe: Evaluate the feasibility of harvesting and using the C.3.d amount of runoff for irrigation, based on Table 11 and the curves in Appendix F of the LID Feasibility Report Evaluate the feasibility of harvesting and using the C.3.d amount of runoff for non-potable industrial use, based on the curves in Appendix F of the LID Feasibility Report. * For definitions, see Glossary (Attachment 1). Page 3 of 3 FINAL November 2011

8 Infiltration Feasibility Worksheet Municipal Regional Stormwater Permit (MRP) Stormwater Controls for Development Projects Complete this worksheet for C.3 Regulated Projects* for which the soil hydraulic conductivity (Ksat) exceeds 1.6. Use this checklist to determine the feasibility of treating the C.3.d amount of runoff* with infiltration. Where it is infeasible to treat the C.3.d amount of runoff* with infiltration or rainwater harvesting and use, stormwater may be treated with biotreatment* measures. See Glossary (Attachment 1) for definitions of terms marked with an asterisk (*). 1. Enter Project Data. 1.1 Project Name: 1.2 Project Address: 1.3 Applicant/Agent Name: Applicant/Agent Address: Applicant/Agent Applicant / Agent Phone: 2. Evaluate infiltration feasibility. Check Yes or No to indicate whether the following conditions apply to the project. If Yes is checked for any question, then infiltration is infeasible, and you can continue to Item 3.1 without answering any further questions in Section 2. If all of the answers in Section 2 are No, then infiltration is feasible, and you may design infiltration facilities * for the area from which runoff must be treated. Items 2.1 through 2.3 address the feasibility of using infiltration facilities*, as well as the potential need to line bioretention areas. 2.1 Would infiltration facilities at this site conflict with the location of existing or proposed underground utilities or easements, or would the siting of infiltration facilities at this site result in their placement on top of underground utilities, or otherwise oriented to underground utilities, such that they would discharge to the utility trench, restrict access, or cause stability concerns? (If yes, attach evidence documenting this condition.) Yes No Is there a documented concern that there is a potential on the site for soil or groundwater pollutants to be mobilized? (If yes, attach documentation of mobilization concerns.) Are geotechnical hazards present, such as steep slopes, areas with landslide potential, soils subject to liquefaction, or would an infiltration facility need to be built less than 10 feet from a building foundation or other improvements subject to undermining by saturated soils? (If yes, attach documentation of geotechnical hazard.) Respond to Questions 2.4 through 2.8 only if the project proposes to use an infiltration device* Do local water district or other agency's policies or guidelines regarding the locations where infiltration may occur, the separation from seasonal high groundwater, or setbacks from potential sources of pollution prevent infiltration devices from being implemented at this site? (If yes, attach evidence documenting this condition.) Would construction of an infiltration device require that it be located less than 100 feet away from a septic tank, underground storage tank with hazardous materials, or other potential underground source of pollution? (If yes, attach evidence documenting this claim.) * See Glossary (Attachment 1) for definitions. 1 FINAL November 2011

9 Infiltration Feasibility Worksheet Yes No Is there a seasonal high groundwater table or mounded groundwater that would be within 10 feet of the base of an infiltration device* constructed on the site? (If yes, attach documentation of high groundwater.) Are there land uses that pose a high threat to water quality including but not limited to industrial and light industrial activities, high vehicular traffic (i.e., 25,000 or greater average daily traffic on a main roadway or 15,000 or more average daily traffic on any intersecting roadway), automotive repair shops, car washes, fleet storage areas, or nurseries? (If yes, attach evidence documenting this claim.) Is there a groundwater production well within 100 feet of the location where an infiltration device would be constructed? (If yes, attach map showing the well.) 3. Results of Feasibility Determination Infeasible Feasible 3.1 Based on the results of the Section 2 feasibility analysis, infiltration is (check one): If "FEASIBLE" is indicated for Item 3.1, then the amount of stormwater requiring treatment must be treated with infiltration (or rainwater harvest and use, if feasible). Infiltration facilities* may be designed for the area from which runoff must be treated. If INFEASIBLE is checked for item 3.1, then the applicant may use appropriately designed biotreatment facilities* for compliance with C.3 treatment requirements. The applicant is encouraged to maximize infiltration of stormwater if site conditions allow. Name of Applicant (Print) Name of Applicant (Sign) Date * See Glossary (Attachment 1) for definitions. 2 FINAL November 2011

10 Rainwater Harvesting and Use Feasibility Worksheet Municipal Regional Stormwater Permit (MRP) Stormwater Controls for Development Projects Complete this worksheet for all C.3 Regulated Projects* for which the project density exceeds the screening density* provided by municipal staff. Use this worksheet to determine the feasibility of treating the C.3.d amount of runoff* with rainwater harvesting and use for indoor, non-potable water uses. Where it is infeasible to treat the C.3d amount of runoff with either harvesting and use or infiltration, stormwater may be treated with biotreatment* measures. See Glossary (Attachment 1) for definitions of terms marked with an asterisk (*). Complete this worksheet for the entire project area. If the project includes one or more buildings that each individually has a roof area of 10,000 square feet or more, complete a separate copy of this form for each of these buildings. 1. Enter Project Data. 1.1 Project Name: Project Address: Applicant/Agent Name: Applicant/Agent Address: (For projects with a potential non-potable water use other than toilet flushing, skip to Question 5.1) 1.5 Project Type: 1.6 If residential or mixed use, enter # of dwelling units: Enter square footage of non-residential interior floor area.: 1.7 Potential rainwater capture area*: sq.ft. 1.8 If it is a Special Project*, indicate the percentage of LID treatment* reduction: percent (Item 1.8 applies only to entire project evaluations, not individual roof area evaluations.) 1.9 Total potential rainwater capture area that will require LID treatment: 0 sq.ft. (This is the total rain capture area remaining after any Special Project LID treatment reduction is applied.) 2. Calculate Area of Self-Treating Areas, Self-Retaining Areas, and Areas Contributing to Self-Retaining Areas. (For areas within the Potential Rain Capture Area only) 2.1 Enter square footage of any self-treating areas* in the area that is being evaluated: sq.ft. 2.2 Enter square footage of any self-retaining areas* in the area that is being evaluated: sq.ft. 2.3 Enter the square footage of areas contributing runoff to self-retaining area*: sq.ft. 2.4 TOTAL of Items 2.1, 2.2, and 2.3: - sq.ft. 3. Subtract credit for self-treating/self-retaining areas from area requiring treatment. 3.1 Subtract the TOTAL in Item 2.4 from the potential rainwater capture area in Item 1.9: - sq.ft. 3.2 Convert the remaining area required for treatment in Item 3.1 from square feet to acres: 0.00 acres 4. Determine feasibility of use for toilet flushing based on demand 4.1 Project's dwelling units per acre of adjusted potential rain capture area (Divide the number in 1.5 by the number in 3.2) dwelling units/acre 4.2 Non-residential interior floor area per acre of adjusted potential rain capture area (Divide the number in 1.6 by the number in 3.2) Note: formulas in Items 4.1 and 4.2 are set up, respectively, for a residential or a non-residential project. Do not use these pre-set formulas for mixed use projects. For mixed use projects, evaluate the residential toilet flushing demand based on the dwelling units per acre for the residential portion of the project (use a prorated acreage, based on the percentage of the project dedicated to residential use). Then evaluate the commercial toilet flushing demand per acre for the commercial portion of the project (use a prorated acreage, based on the percentage of the project dedicated to commercial use). Int. non-res. floor area/acre * See definitions in Glossary (Attachment 1) 1 FINAL November 2011

11 Rainwater Harvesting and Use Feasibility Worksheet 4.3 Refer to the applicable countywide table in Attachment 2. Identify the number of dwelling units per impervious acre needed in your Rain Gauge Area to provide the toilet flushing demand required for rainwater harvest feasibility. dwelling units/acre 4.4 Refer to the applicable countywide table in Attachment 2. Identify the square feet of non-residential int. nonres. floor interior floor area per impervious acre needed in your Rain Gauge Area to provide the toilet flushing demand required for rainwater harvest feasibility. area/acre Check Yes or No to indicate whether the following conditions apply. If Yes is checked for any question, then rainwater harvesting and use is infeasible. As soon as you answer "Yes", you can skip to Item 6.1. If No is checked for all items, then rainwater harvesting and use is feasible and you must harvest and use the C.3.d amount of stormwater, unless you infiltrate the C.3.d amount of stormwater* Is the project's number of dwelling units per acre of adjusted area requiring treatment (listed in Item 4.1) LESS than the number identified in Item 4.3? Is the project's square footage of non-residential interior floor area per acre of adjusted area requiring treatment (listed in Item 4.2) LESS than the number identified in Item 4.4? Yes No Yes No 5. Determine feasibility of rainwater harvesting and use based on factors other than demand. 5.1 Does the requirement for rainwater harvesting and use at the project conflict with local, state, or federal ordinances or building codes? Yes No 5.2 Would the technical requirements cause the harvesting system to exceed 2% of the Total Project Cost, or has the applicant documented economic hardship in relation to maintenance costs? (If so, attach an explanation.) Yes No 5.3 Do constraints, such as a slope above 10% or lack of available space at the site, make it infeasible to locate on the site a cistern of adequate size to harvest and use the C.3.d amount of water? (If so, attach an explanation.) Yes No 5.4 Are there geotechnical/stability concerns related to the surface (roof or ground) where a cistern would be located that make the use of rainwater harvesting infeasible? (If so, attach an explanation.) Yes No 5.5 Does the location of utilities, a septic system and/or heritage trees* limit the placement of a cistern on the site to the extent that rainwater harvesting is infeasible? (If so, attach an explanation.) Yes No Note 1: It is assumed that projects with significant amounts of landscaping will either treat runoff with landscape dispersal (self-treating and self-retaining areas) or will evaluate the feasibility of havesting and using rainwater for irrigation using the curves in Appendix F of the LID Feasibility Report. 6. Results of Feasibility Determination Based on the results of the feasibility analysis in Item 4.4 and Section 5, rainwater harvesting/use is 6.1 (check one): Infeasible Feasible If "FEASIBLE" is indicated for Item 6.1 the amount of stormwater requiring treatment must be treated with harvesting/use, unless it is infiltrated into the soil. If "INFEASIBLE" is checked for Item 6.1, then the applicant may use appropriately designed bioretention *,1 facilities for compliance with C.3 treatment requirements. If Ksat > 1.6 in./hr., and infiltration is unimpeded by subsurface conditions, then the bioretention facilities are predicted to infiltrate 80% or more average annual runoff. If Ksat < 1.6, maximize infiltration of stormwater by using bioretention if site conditions allow, and remaining runoff will be discharged to storm drains via facility underdrains. If site conditions preclude infiltration, a lined bioretention area or flow-through planter may be used. Applicant (Print) Applicant (Sign) Date * See definitions in Glossary (Attachment 1) 2 FINAL November 2011

12 Project Name: Project Address: Applicant/Developer Name: Special Projects Worksheet 1. Special Project Determination: Special Project Category A Does the project have ALL of the following characteristics? No (continue) Located in a municipality s designated central business district, downtown core area or downtown core zoning district, neighborhood business district or comparable pedestrian-oriented commercial district, or historic preservation site and/or district 1 ; Creates and/or replaces 0.5 acres or less of impervious surface; Includes no surface parking, except for incidental parking for emergency vehicle access, ADA access, and passenger or freight loading zones; Has at least 85% coverage of the entire site by permanent structures. The remaining 15% portion of the site may be used for safety access, parking structure entrances, trash and recycling service, utility access, pedestrian connections, public uses, landscaping and stormwater treatment. Special Project Category B Yes complete Section 2 of the Special Project Worksheet Does the project have ALL of the following characteristics? Located in a municipality s designated central business district, downtown core area or downtown core zoning district, neighborhood business district or comparable pedestrian-oriented commercial district, or historic preservation site and/or district 1 ; Creates and/or replaces an area of impervious surface that is greater than 0.5 acres, and no more than 2.0 acres; Includes no surface parking, except for incidental parking for emergency access, ADA access, and passenger or freight loading zones; Has at least 85% coverage of the entire site by permanent structures. The remaining 15% portion of the site may be used for safety access, parking structure entrances, trash and recycling service, utility access, pedestrian connections, public uses, landscaping and stormwater treatment; Minimum density of either 50 dwelling units per acre (for residential projects) or a Floor Area Ratio (FAR) of 2:1 (for commercial or mixed use projects) No (continue) Yes complete Section 2 of the Special Project Worksheet Special Project Category C Does the project have ALL of the following characteristics? At least 50% of the project area is within 1/2 mile of an existing or planned transit hub 2 or 100% within a planned Priority Development Area 3 ; The project is characterized as a non-auto-related use 4 ; and Minimum density of either 25 dwelling units per acre (for residential projects) or a Floor Area Ratio (FAR) of 2:1 (for commercial or mixed use projects) No Yes complete Section 2 of the Special Project Worksheet 1 And built as part of a municipality s stated objective to preserve/enhance a pedestrian-oriented type of urban design. 2 Transit hub is defined as a rail, light rail, or commuter rail station, ferry terminal, or bus transfer station served by three or more bus routes. (A bus stop with no supporting services does not qualify.) 3 A planned Priority Development Area is an infill development area formally designated by the Association of Bay Area Government s / Metropolitan Transportation Commission s FOCUS regional planning program. 4 Category C specifically excludes stand-alone surface parking lots; car dealerships; auto and truck rental facilities with onsite surface storage; fast-food restaurants, banks or pharmacies with drive-through lanes; gas stations; car washes; auto repair and service facilities; or other auto-related project unrelated to the concept of transit oriented development. 1 Final November 2011

13 Special Projects Worksheet 2. LID Treatment Reduction Credit Calculation: Category Impervious Area Created/Replaced (acres) Site Coverage (%) Project Density or FAR Density/Criteria Allowable Credit (%) A N.A. N.A. 100% Applied Credit (%) B Res 50 DU/ac or FAR 2:1 50% Res 75 DU/ac or FAR 3:1 75% Res 100 DU/ac or FAR 4:1 100% C Location credit (select one) 5 : Within ¼ mile of transit hub 50% Within ½ mile of transit hub 25% Within a planned PDA 25% Density credit (select one): Res 30 DU/ac or FAR 2:1 10% Res 60 DU/ac or FAR 4:1 20% Res 100 DU/ac or FAR 6:1 30% Parking credit (select one): 10% at-grade surface 10% parking 6 No surface parking 20% TOTAL TOD CREDIT = 5 To qualify for the location credit, at least 50% of the project s site must be located within the ¼ mile or ½ mile radius of an existing or planned transit hub, as defined on page 1, footnote 2. A planned transit hub is a station on the MTC s Regional Transit Expansion Program list, per MTC s Resolution 3434 (revised April 2006), which is a regional priority funding plan for future transit stations in the San Francisco Bay Area. To qualify for the PDA location credit, 100% of the project site must be located within a PDA, as defined on page 1, footnote 3. 6 The at-grade surface parking must be treated with LID treatment measures. 2 Final November 2011

Special Projects. Appendix. Table of Contents. J.1 Introduction

Special Projects. Appendix. Table of Contents. J.1 Introduction Appendix J Special Projects Table of Contents J.1: Introduction J.2: Category A: Small Infill Projects J.3: Category B: High Density Projects J.4: Category C: Transit-Oriented Development J.5: Calculating

More information

Background / Regulatory Requirements

Background / Regulatory Requirements Chapter 2 Background / Regulatory Requirements This Chapter summarizes the impacts of development on stormwater quality and quantity and explains the postconstruction stormwater control requirements for

More information

Sizing Calculations and Design Considerations for LID Treatment Measures

Sizing Calculations and Design Considerations for LID Treatment Measures SCVURPPP C.3 Workshop December 18, 2012 Sizing Calculations and Design Considerations for LID Treatment Measures Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program

More information

C.3 and C.6 Development Review Checklist Municipal Regional Stormwater Permit (MRP) Stormwater Controls for Development Projects

C.3 and C.6 Development Review Checklist Municipal Regional Stormwater Permit (MRP) Stormwater Controls for Development Projects Municipal Regional Stormwater Permit (MRP) Stormwater Controls for Development Projects City of Brisbane 50 Park Place Brisbane, CA 94005 (415) 508-2120 www.brisbaneca.org Project Information I.A Enter

More information

C.3 and C.6 Development Review Checklist Municipal Regional Stormwater Permit (MRP) Stormwater Controls for Development Projects

C.3 and C.6 Development Review Checklist Municipal Regional Stormwater Permit (MRP) Stormwater Controls for Development Projects Municipal Regional Stormwater Permit (MRP) Stormwater Controls for Development Projects CITY OF HALF MOON BAY 501 MAIN STREET PHONE: (650) 726-8250 FAX: (650) 726-8261 WEB: www.hmbcity.com Project Information

More information

Municipal Regional Stormwater Permit Provision C.3 Model Conditions of Approval

Municipal Regional Stormwater Permit Provision C.3 Model Conditions of Approval County Government Center P 650.599.1514 555 County Center, 5 th Floor F 650.363.7882 Redwood City, CA 94063 flowstobay.com ATTACHMENT 1 Municipal Regional Stormwater Permit Provision C.3 Model Conditions

More information

C.3 and C.6 Development Review Checklist Municipal Regional Stormwater Permit (MRP) Stormwater Controls for Development Projects

C.3 and C.6 Development Review Checklist Municipal Regional Stormwater Permit (MRP) Stormwater Controls for Development Projects Municipal Regional Stormwater Permit (MRP) Stormwater Controls for Development Projects COUNTY OF SAN MATEO Planning & Building Department 455 County Center, 2 nd Floor Redwood City, CA 94063 BLD: 650-599-7311/PLN:

More information

Determining the Feasibility/Infeasibility of Infiltration, Evapotranspiration and Rainwater Harvest and Use

Determining the Feasibility/Infeasibility of Infiltration, Evapotranspiration and Rainwater Harvest and Use Determining the Feasibility/Infeasibility of Infiltration, Evapotranspiration and Rainwater Harvest and Use Jill C. Bicknell, P.E., EOA, Inc. Assistant Program Manager Santa Clara Valley Urban Runoff Pollution

More information

Evaluating the Feasibility of Infiltration and Rainwater Harvesting and Use

Evaluating the Feasibility of Infiltration and Rainwater Harvesting and Use Evaluating the Feasibility of Infiltration and Rainwater Harvesting and Use Presented by Laura Prickett, EOA, Inc. Prepared by Jill Bicknell, EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention

More information

Tips for Preparing/Reviewing Storm Water Control Plans (SWCP)

Tips for Preparing/Reviewing Storm Water Control Plans (SWCP) Tips for Preparing/Reviewing Storm Water Control Plans (SWCP) Kristin Kerr, P.E. EOA, Inc. San Mateo Countywide Water Pollution Prevention Program June 21, 2017 Presentation Outline Important Resources

More information

I.A. Enter Project Data (For C.3 Regulated Projects, data will be reported in the municipality s stormwater Annual Report.)

I.A. Enter Project Data (For C.3 Regulated Projects, data will be reported in the municipality s stormwater Annual Report.) Municipal Regional Stormwater Permit (MRP 2.0) Stormwater Controls for Development Projects City of Berkeley Public Works Dept. Engineering Division I. Applicability of C.3 and C.6 Stormwater Requirements

More information

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP) NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP) For: (Insert Project Name) (Site Address or Tract/Lot Number) Prepared for: (Insert Owner/Developer Name) (Insert Address) (Insert City, State, ZIP) (Insert

More information

Stormwater Control Plan for Post Construction Requirements Exhibit 4

Stormwater Control Plan for Post Construction Requirements Exhibit 4 Stormwater Control Plan for Post Construction Requirements Exhibit 4 Application Submittal Where directions state Done that means no additional information or forms below that point needs to be filled

More information

Stormwater Treatment Measure Sizing and Design Considerations SMCWPPP C.3 Workshop June 21, 2017

Stormwater Treatment Measure Sizing and Design Considerations SMCWPPP C.3 Workshop June 21, 2017 Stormwater Treatment Measure Sizing and Design Considerations SMCWPPP C.3 Workshop June 21, 2017 Jill Bicknell, P.E., EOA, Inc. Presentation Overview Sizing/Design of Self Treating and Self Retaining Areas

More information

Infiltration Guidelines

Infiltration Guidelines Appendix E Infiltration Guidelines As a stormwater management method, infiltration means retaining or detaining water within soils to reduce runoff. Infiltration can be a cost-effective method to manage

More information

Guidance on Determining Feasibility and Sizing of Rainwater Harvesting Systems

Guidance on Determining Feasibility and Sizing of Rainwater Harvesting Systems SANTA CLARA VALLEY URBAN RUNOFF POLLUTION PREVENTION PROGRAM Appendix I Guidance on Determining Feasibility and Sizing of Rainwater Harvesting Systems Table of Contents I.1 Introduction I.2 Rainwater Harvesting/Use

More information

Guidance on Determining Feasibility and Sizing of Rainwater Harvesting Systems

Guidance on Determining Feasibility and Sizing of Rainwater Harvesting Systems Appendix I Guidance on Determining Feasibility and Sizing of Rainwater Harvesting Systems Table of Contents I.1 Introduction... I-1 I.2 Rainwater Harvesting/Use Feasibility Guidance... I-2 I.3 Determining

More information

County of Los Angeles - Department of Public Works

County of Los Angeles - Department of Public Works GENERAL PROJECT INFORMATION County of Los Angeles - Department of Public Works Building and Safety/Land Development Division LOW IMPACT DEVELOPMENT REVIEW SHEET (2017 Los Angeles County Building Code,

More information

Provision C.3 in MRP 2 The Future is Here! An Update on New Stormwater Permit Requirements

Provision C.3 in MRP 2 The Future is Here! An Update on New Stormwater Permit Requirements Provision C.3 in MRP 2 The Future is Here! An Update on New Stormwater Permit Requirements Jill Bicknell, P.E., EOA, Inc. Assistant Program Manager Santa Clara Valley Urban Runoff Program Outline of Presentation

More information

Non-Priority Projects WQMP Preparation Guidance Manual

Non-Priority Projects WQMP Preparation Guidance Manual Non-Priority Projects WQMP Preparation Guidance Manual December 2005 Table of Contents 1.0 Introduction... 1 2.0 Requirements for Development Projects...1 3.0 WQMP Preparation... 2 3.1 Cover Page... 2

More information

PRIORITY WATER QUALITY MANAGEMENT PLAN (WQMP)

PRIORITY WATER QUALITY MANAGEMENT PLAN (WQMP) PRIORITY WATER QUALITY MANAGEMENT PLAN (WQMP) For: () (Site address or tract/lot number) Prepared for: (Insert Owner/Developer Name) (Insert Address) (Insert City, State, ZIP) (Insert Telephone) Prepared

More information

June 2017 C.3 Workshop Sizing Example. Section II.B Sizing Volume-Based Treatment Measures based on the Adapted CASQA Stormwater BMP Handbook Approach

June 2017 C.3 Workshop Sizing Example. Section II.B Sizing Volume-Based Treatment Measures based on the Adapted CASQA Stormwater BMP Handbook Approach SANTA CLARA VALLEY URBAN RUNOFF POLLUTION PREVENTION PROGRAM June 2017 C.3 Workshop Sizing Example Section II. Sizing for Volume-Based Treatment Measures Section II.B Sizing Volume-Based Treatment Measures

More information

City of Beverly Hills Low Impact Development (LID) Fact Sheet

City of Beverly Hills Low Impact Development (LID) Fact Sheet On May 18, 2015, the City of Beverly Hills amended its Stormwater and Urban Runoff Pollution Control Ordinance (Article 5 Chapter 4 Title 9 of the Beverly Hills Municipal Code) to include Low Impact Development

More information

Water Quality Management Plan (WQMP)

Water Quality Management Plan (WQMP) Water Quality Management Plan (WQMP) Project Name: Prepared for: Insert Owner/Developer Name-then TAB. Insert Address 1 then press ENTER to insert Address 2 or TAB to next field. Insert City, State, ZIP-then

More information

2011 Guidance Manual for Development Stormwater Quality Control Measures

2011 Guidance Manual for Development Stormwater Quality Control Measures CITY OF MODESTO STORMWATER MANAGEMENT PROGRAM 2011 Guidance Manual for Development Stormwater Quality Control Measures Prepared for NPDES Permit No. CAS083526; Order R5-2008-0092 This page intentionally

More information

Outline of Presentation. Update on Current and Future Stormwater Permit Requirements. Green Streets Report. Green Streets Report

Outline of Presentation. Update on Current and Future Stormwater Permit Requirements. Green Streets Report. Green Streets Report Outline of Presentation SMCWPPP C.3 Workshop Update on Current and Future Stormwater Permit Requirements, Year in Review: C.3 Requirements for FY 13-14 (Regional Submittals) Issue Focus: Special Projects

More information

Sizing Criteria Worksheets and Examples

Sizing Criteria Worksheets and Examples Appendix B Sizing Criteria Worksheets and Examples This Appendix provides sizing criteria worksheets and examples to illustrate the correct procedures for determining the water quality design flow and

More information

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017 MS4 Programs: Quality, the Other Stormwater Q Dan Bounds, PE, D.WRE IAFSM March 9, 2017 MS4 Rule and Regulations MS4 Municipal Separate Storm Sewer System A conveyance or system of conveyances (catch basins,

More information

Pollutant Sources/Source Controls Checklist A-7

Pollutant Sources/Source Controls Checklist A-7 A P P E N D I X 7 Pollutant Sources/Source Controls Checklist A-7 Stormwater Pollutant Sources/Source Controls Checklist How to use this worksheet (also see instructions on Checklist for Regulated Projects):

More information

Design Handbook. Low Impact Development Best Management Practices

Design Handbook. Low Impact Development Best Management Practices Design Handbook for Low Impact Development Best Management Practices Prepared by: 9/2011 Riverside County Flood Control and Water Conservation District 1995 Market Street Riverside, CA 92501 TABLE OF CONTENTS

More information

STORMWATER C.3 GUIDEBOOK

STORMWATER C.3 GUIDEBOOK STORMWATER C.3 GUIDEBOOK OCTOBER 2012 TABLE OF CONTENTS Glossary of Terms 5 Definitions 5 Abbreviations and Acronyms 16 Introduction 17 Plan Ahead to Avoid the Three Most Common Mistakes 18 Chapter 1:

More information

Stormwater Control Plan Report

Stormwater Control Plan Report Stormwater Control Plan Report (SWCP) HILLSDALE TERRACE 2700, 2728, 2790 South El Camino Real San Mateo, CA APN: 039-352-060, 039-352-070, 039-352-090 Stormwater Control Plan Report February 18, 2015 Prepared

More information

Bruce Wolfe, Executive Officer California Regional Water Quality Control Board San Francisco Bay Region 1515 Clay Street, Suite 1400 Oakland, CA 94612

Bruce Wolfe, Executive Officer California Regional Water Quality Control Board San Francisco Bay Region 1515 Clay Street, Suite 1400 Oakland, CA 94612 December 1, 2010 Bruce Wolfe, Executive Officer California Regional Water Quality Control Board San Francisco Bay Region 1515 Clay Street, Suite 1400 Oakland, CA 94612 Subject: Proposal / LID Treatment

More information

HYDROLOGY REPORT AND CALCULATIONS FOR 2131 SANDHILL ROAD MENLO PARK, CA

HYDROLOGY REPORT AND CALCULATIONS FOR 2131 SANDHILL ROAD MENLO PARK, CA HYDROLOGY REPORT AND CALCULATIONS FOR 2131 SANDHILL ROAD MENLO PARK, CA HYDROLOGY REPORT AND CALCULATIONS FOR 2131 SANDHILL ROAD MENLO PARK, CALIFORNIA August 2016 SANDIS PROJECT NO. 215102 Prepared by:

More information

Chapter 3 Dispersion BMPs

Chapter 3 Dispersion BMPs Chapter 3 Dispersion BMPs 3.1 BMP L611 Concentrated Flow Dispersion 3.1.1 Purpose and Definition Dispersion of concentrated flows from driveways or other pavement through a vegetated pervious area attenuates

More information

Appendix A. Stormwater Pollutant Sources/Source Controls Checklist

Appendix A. Stormwater Pollutant Sources/Source Controls Checklist Appendix A. Stormwater Pollutant Sources/Source Controls Checklist How to use this worksheet (also see instructions on page -6 of the Stormwater Technical Guide):. Review Column and identify which of these

More information

Water Quality Management Plan (WQMP)

Water Quality Management Plan (WQMP) Water Quality Management Plan (WQMP) Project Name: Prepared for: Insert Owner/Developer Name-then TAB. Insert Address 1 then press ENTER to insert Address 2 or TAB

More information

Engineering Division 701 Laurel Street Menlo Park, CA Phone: (650) Fax: (650)

Engineering Division 701 Laurel Street Menlo Park, CA Phone: (650) Fax: (650) Engineering Division 701 Laurel Street Menlo Park, CA 94025 Phone: (650) 330-6740 Fax: (650) 327-5497 Source Control Measures Guidance and List The City of Menlo Park with the assistance of the San Mateo

More information

Storm Water - Priority Development Project Submittal

Storm Water - Priority Development Project Submittal Storm Water - Priority Development Project Submittal Project Summary Information Project Name Project Address Form I-2a Assessor's Parcel Number(s) Permit Application Number Project Watershed (Hydrologic

More information

TECHNICAL GUIDANCE DOCUMENT APPENDICES

TECHNICAL GUIDANCE DOCUMENT APPENDICES XIV.4. Harvest and Use BMP Fact Sheets (HU) HU-1: Above-Ground Cisterns Cisterns are large rain barrels. While rain barrels are less than 100 gallons, cisterns range from 100 to more than 10,000 gallons

More information

Stormwater Bio-Infiltration Pilot Project Concept Proposal Submitted by

Stormwater Bio-Infiltration Pilot Project Concept Proposal Submitted by Concept Proposal Submitted by Public Works Department 1947 Center Street, Fourth Floor Berkeley, CA 94704 December 17, 2009 Executive Summary The s Public Works Department submits this concept proposal

More information

POST- CONSTRUCTION STANDARDS PLAN

POST- CONSTRUCTION STANDARDS PLAN City of West Sacramento Community Development Engineering Division 1110 West Capitol Avenue, West Sacramento, CA 95691 916-617-4645 http:/cityofwestsacramento.org/city/depts/comdev/engineering/default.asp

More information

Appendix A Stormwater Site Plan Report Short Form

Appendix A Stormwater Site Plan Report Short Form Appendix A Stormwater Site Plan Report Short Form The Stormwater Site Plan Report Short Form may be used for projects that trigger only Minimum Requirements #1-#5. These projects typically fall within

More information

E.12. POST CONSTRUCTION STORM WATER MANAGEMENT PROGRAM Phase II Small MS4 General Permit DWQ - February 5, 2013

E.12. POST CONSTRUCTION STORM WATER MANAGEMENT PROGRAM Phase II Small MS4 General Permit DWQ - February 5, 2013 E.12. POST CONSTRUCTION STORM WATER MANAGEMENT PROGRAM Phase II Small MS4 General Permit 2013-0001-DWQ - February 5, 2013 E.12.a. Post-Construction Measures Permittees shall regulate development to comply

More information

APPENDIX N Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

APPENDIX N Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports APPENDIX N N.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan

More information

Latest MWELO Updates + Storm Water Requirements Kliffs Notes New Storm Water Permit and BMP Design Manual: Impacts on Future Development Presented

Latest MWELO Updates + Storm Water Requirements Kliffs Notes New Storm Water Permit and BMP Design Manual: Impacts on Future Development Presented Latest MWELO Updates + Storm Water Requirements Kliffs Notes New Storm Water Permit and BMP Design Manual: Impacts on Future Development Presented by: Kenneth Kozlik, Fuscoe Engineering San San Diego Diego

More information

SUPPORTING DOCUMENT STORMWATER BEST MANAGEMENT PRACTICE (BMP) INFEASIBILITY WORKSHEET FOR ON-SITE STORMWATER MANAGEMENT

SUPPORTING DOCUMENT STORMWATER BEST MANAGEMENT PRACTICE (BMP) INFEASIBILITY WORKSHEET FOR ON-SITE STORMWATER MANAGEMENT SUPPORTING DOCUMENT STORMWATER BEST MANAGEMENT PRACTICE (BMP) INFEASIBILITY WORKSHEET FOR ON-SITE STORMWATER MANAGEMENT All Best Management Practices (BMPs) are considered feasible until demonstrated otherwise.

More information

City of Santa Clarita Project-Specific Urban Stormwater Mitigation Plan

City of Santa Clarita Project-Specific Urban Stormwater Mitigation Plan Project-Specific Urban Stormwater Mitigation Plan The purpose of this checklist is to assist developers and project engineers in the preparation of a uniform and comprehensive Project-Specific Urban Stormwater

More information

1. Type of application: 2. Brief description of application:* 3. Project site: 4. Assessor s parcel number(s):

1. Type of application: 2. Brief description of application:* 3. Project site: 4. Assessor s parcel number(s): Application Received ved By: Application #: Application WE WILL NOT ACCEPT INCOMPLETE SUBMITTALS!! 1. Type of application: Boundary Adjustment Check one or more Subdivision Conditional Use Permit Administrative

More information

1. Review Column 1 and identify which of these potential sources of stormwater pollutants apply to your site. Check each box that applies.

1. Review Column 1 and identify which of these potential sources of stormwater pollutants apply to your site. Check each box that applies. How to use this worksheet (also see instructions in Section G of the 0 SMR WQMP Template):. Review Column and identify which of these potential sources of stormwater pollutants apply to your site. Check

More information

MODEL STORMWATER MANAGEMENT GUIDELINES FOR INFRASTRUCTURE NEW DEVELOPMENT AND REDEVELOPMENT

MODEL STORMWATER MANAGEMENT GUIDELINES FOR INFRASTRUCTURE NEW DEVELOPMENT AND REDEVELOPMENT SALMON-SAFE INC. MODEL STORMWATER MANAGEMENT GUIDELINES FOR INFRASTRUCTURE NEW DEVELOPMENT AND REDEVELOPMENT MAY 2018 Introduction Polluted stormwater is the largest threat to the health of the Pacific

More information

SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM. Source Control Measures Guidance and Model List

SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM. Source Control Measures Guidance and Model List SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM Source Control Measures Guidance and Model List The San Mateo Countywide Stormwater Pollution Prevention Program (STOPPP) has developed a model

More information

POST-CONSTRUCTION STANDARDS PLAN. 777 Cypress Ave., Redding, CA Tel

POST-CONSTRUCTION STANDARDS PLAN. 777 Cypress Ave., Redding, CA Tel POST-CONSTRUCTION STANDARDS PLAN 777 Cypress Ave., Redding, CA 96001 Tel 530-225-4421 http://www.cityofredding.org/stormwatermanagement TABLE OF CONTENTS Contents 1 Introduction and Regulatory Requirements

More information

Philadelphia Water Department. Stormwater Regulations Update. BIA & Fox Rothschild LLP

Philadelphia Water Department. Stormwater Regulations Update. BIA & Fox Rothschild LLP Philadelphia Water Department Stormwater Regulations Update BIA & Fox Rothschild LLP May 13, 2015 1 Overview Upcoming Regulatory Changes Procedural Improvement Stormwater Management Guidance Manual v3.0

More information

MODEL STORMWATER MANAGEMENT GUIDELINES FOR ULTRA-URBAN REDEVELOPMENT

MODEL STORMWATER MANAGEMENT GUIDELINES FOR ULTRA-URBAN REDEVELOPMENT SALMON-SAFE INC. MODEL STORMWATER MANAGEMENT GUIDELINES FOR ULTRA-URBAN REDEVELOPMENT MAY 2018 Introduction Polluted stormwater is the largest threat to the health of the Pacific Northwest s urban watersheds.

More information

CITY OF MIDDLETOWN STORM WATER UTILITY ADJUSTMENT AND CREDIT POLICY

CITY OF MIDDLETOWN STORM WATER UTILITY ADJUSTMENT AND CREDIT POLICY CITY OF MIDDLETOWN STORM WATER UTILITY ADJUSTMENT AND CREDIT POLICY JANUARY 2006 1 SECTION 1 - INTRODUCTION The City of Middletown established a Storm Water Utility on September 6 th, 2005, with the passage

More information

Engineering Division 701 Laurel Street Menlo Park, CA Phone: (650) Fax: (650)

Engineering Division 701 Laurel Street Menlo Park, CA Phone: (650) Fax: (650) Engineering Division 701 Laurel Street Menlo Park, CA 94025 Phone: (650) 330-6740 Fax: (650) 327-5497 GRADING AND DRAINAGE GUIDELINES FOR SINGLE FAMILY HOME PROJECTS It is the responsibility of the property

More information

EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1)

EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1) 525 Golden Gate Avenue, 11th Floor San Francisco, CA 94102 EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1) The following example Stormwater Management Plans (SMPs) are provided

More information

10/16/2013. The Big Picture of LID and Green Infrastructure. Learning Objectives

10/16/2013. The Big Picture of LID and Green Infrastructure. Learning Objectives Low impact development (LID) the basic idea behind LID is to manage stormwater in a way that imitates the natural hydrology of a site. Details Matter Selection, Design, and Implementation of Low Impact

More information

Appendix J: The Project Stormwater Control Plan by Lea & Braze Engineering, Inc.

Appendix J: The Project Stormwater Control Plan by Lea & Braze Engineering, Inc. Appendix J: The Project Stormwater Control Plan by Lea & Braze Engineering, Inc. STORMWATER CONTROL PLAN 23 LOT SUBDIVISION ON PROCTOR ROAD CASTRO VALLEY, CALIFORNIA Owner/Developer: Hue Tran 4584 Ewing

More information

LOW IMPACT DEVELOPMENT ( LID ) STANDARDS

LOW IMPACT DEVELOPMENT ( LID ) STANDARDS LOW IMPACT DEVELOPMENT ( LID ) STANDARDS January 9, 2013 Prepared By Truong Huynh, PE, CBO Superintendent of Building & Safety, Acting OVERVIEW Part I LID Applicability and Requirements Part II Plan Check

More information

City of Glendale Stormwater Management Plan Checklist

City of Glendale Stormwater Management Plan Checklist City of Glendale Stormwater Management Plan Checklist Project: Title of Plan: Date: Date of Plan: Reviewer: Most Recent Revision: Criteria Yes No Identify a SWMP Administrator and an alternate - The SWMP

More information

Santa Margarita Region of Riverside County

Santa Margarita Region of Riverside County Santa Margarita Region of Riverside County Water Quality Management Plan (WQMP), Hydromodification Management Plan (HMP) Program Training Presented by: Daniel Apt, CPSWQ, CPESC Vice President Kevin Villarama

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

Stakeholder Meeting #1

Stakeholder Meeting #1 Santa Clara Basin Stormwater Resource Plan Stakeholder Meeting #1 October 4, 2017 Jill Bicknell, P.E. SCVURPPP Presentation Overview Background SCVURPPP Green Infrastructure Stormwater Resource Plan (SWRP)

More information

Operation and Maintenance

Operation and Maintenance Chapter 8 Operation and Maintenance This Chapter summarizes the operation and maintenance requirements for stormwater treatment and hydromodification management measures. 8.1 Summary of O&M Requirements

More information

New Draft Model BMP Design Manual for San Diego Region

New Draft Model BMP Design Manual for San Diego Region New Draft Model BMP Design Manual for San Diego Region Public Input 2013 Storm Water Permit June 10, 2014 & June 11, 2014 1 Welcome Sign-In Refreshments Sponsor Break Q&A and Input 2 Outline of Presentation

More information

Water Resources Management Plan

Water Resources Management Plan B u r n s v i l l e M i n n e s o t a Water Resources Management Plan - Volume Control / Infiltration Worksheet This Appendix contains a worksheet and related information that can be used for evaluating

More information

APPENDIX C. RECOMMENDED BMPs for SITE PLANNING, POST-CONSTRUCTION, and REDEVELOPMENT/INFILL

APPENDIX C. RECOMMENDED BMPs for SITE PLANNING, POST-CONSTRUCTION, and REDEVELOPMENT/INFILL APPENDIX C RECOMMENDED BMPs for SITE PLANNING, POST-CONSTRUCTION, and REDEVELOPMENT/INFILL Site Planning BMPs Minimize Storm Water Runoff Pervious Drainage System Reduce Area of Impervious Surface Site

More information

Worksheets from Orange County Technical Guidance Document ( )

Worksheets from Orange County Technical Guidance Document ( ) Worksheets from Orange County Technical Guidance Document (5-19-2011) : Table 2.7: Infiltration BMP Feasibility Worksheet 1 Provide basis: Infeasibility Criteria Yes No Would Infiltration BMPs pose significant

More information

Design Example Residential Subdivision

Design Example Residential Subdivision Design Example Residential Subdivision Rhode Island Stormwater Design and Installation Standards Manual December 2010 Public Training March 22, 2010 Richard Claytor, P.E. 508-833-6600 Appendix D: Site

More information

CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND

CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND BMP RAM BMP Type Definitions 1 CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND USES AND OWNERSHIP STRUCTURAL BMP TYPE OTHER NAMES

More information

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water Storm Water Permitting Requirements for Construction Activities John Mathews Storm Water Program Manager Division of Surface Water Why Permit Storm Water? Impacts During Construction Not an issue until

More information

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated)

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Hydrology Study Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Prepared for San Mateo Real Estate & Construction March 9, 21 Rev. 1 11-8-211 Rev.

More information

Chapter 3: Post Construction Water Quality Best Management Practices

Chapter 3: Post Construction Water Quality Best Management Practices Chapter 3: Post Construction Water Quality Best Management Practices 3.1 Introduction to Stormwater Quality Under the regulations governing the NPDES Stormwater Phase II program, Montgomery County is required

More information

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) / Town of Friday Harbor PO Box 219 / Friday Harbor / WA / 98250 (360) 378-2810 / fax (360) 378-5339 / www.fridayharbor.org LAND CLEARING, GRADING, OR FILLING PERMIT APPLICATION APPLICATION DATE GRD No. APPLICANT/FRANCHISE

More information

Low Impact Development and Municipal Stormwater Permits in Southern California: What, Where, Why, and How

Low Impact Development and Municipal Stormwater Permits in Southern California: What, Where, Why, and How Low Impact Development and Municipal Stormwater Permits in Southern California: What, Where, Why, and How Matt A. Yeager, D.Env San Bernardino County Stormwater Program Coastal Coalition April 24, 2008

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

City of Charlottesville Water Resources Protection Program

City of Charlottesville Water Resources Protection Program City of Charlottesville Water Resources Protection Program Stormwater Utility Fee Credits Manual Your guide to reducing stormwater utility fees and protecting our City s water resources. City of Charlottesville,

More information

3.4 Harvest and Use BMPs

3.4 Harvest and Use BMPs 3.4 Harvest and Use BMPs Type of BMP Treatment Mechanisms Minimum Tributary Drainage Area Other Names LID Harvest and Use Volume Reduction This BMP is generally limited by the cistern / detention storage

More information

Modeling Infiltration BMPs

Modeling Infiltration BMPs Modeling Infiltration BMPs CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) 696-4150 www.thcahill.com Design Goals for Calculations 1. Mitigate Peak Rates 2-Year to 100-Year 2. No Volume

More information

15A NCAC 02H.1005 STORMWATER REQUIREMENTS: COASTAL COUNTIES

15A NCAC 02H.1005 STORMWATER REQUIREMENTS: COASTAL COUNTIES 1 1 1 1 1 1 1 1 0 1 0 1 1A NCAC 0H.0 STORMWATER REQUIREMENTS: COASTAL COUNTIES (a) The following definitions are applicable to this rule: (1) Built upon area as defined in Session Law 00- means that portion

More information

Water Quality Management Plan

Water Quality Management Plan Water Quality Management Plan For El Centro Aquatic Center Park Avenue between 4 th Street and 6 th Street August 5, 216 Prepared by Arsalan Dadkhah, Ph.D., PE (RCE 4156) D-MAX Engineering, Inc. 722 Trade

More information

If you have any questions during the review of the enclosed materials, please call me at (207) or me at

If you have any questions during the review of the enclosed materials, please call me at (207) or  me at October 21, 2016 Ms. Amanda Lessard Town Planner Town of Windham 8 School Road 04062 RE: Response to Comments - Minor Site Plan Application Dear Ms. Lessard: St.Germain Collins has prepared responses to

More information

EROSION CONTROL AND GRADING PERMIT APPLICATION

EROSION CONTROL AND GRADING PERMIT APPLICATION EROSION CONTROL AND GRADING PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT 1735 MONTGOMERY STREET OROVILLE, CA 95965 530-538-2420 FAX (530) 5382426 www.cityoforoville.org APPLICATION DATE PERMIT FEE

More information

Class V Well Definition

Class V Well Definition UIC and Green Infrastructure What is Green Infrastructure (GI)? GI is the interconnected network of open spaces and natural areas, such as greenways, wetlands, parks, forest preserves and native plant

More information

WATER QUALITY MANAGEMENT PLAN PROCEDURES

WATER QUALITY MANAGEMENT PLAN PROCEDURES CITY OF COLTON PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION 160 S. 10 TH STREET, COLTON, CA 92324 http://www.ci.colton.ca.us/ WATER QUALITY MANAGEMENT PLAN PROCEDURES I. GENERAL WATER QUALITY MANAGEMENT

More information

Boise City Public Works General Drainage Plan Review Requirements Checklist

Boise City Public Works General Drainage Plan Review Requirements Checklist Boise City Public Works General Drainage Plan Review Requirements Checklist Development Name Bldg. Permit # Drainage Reviewer Site Address Initial Review Date ODI Number Designer Company Name Treated Acres

More information

CITY OF ENCINITAS STORMWATER INTAKE FORM AND PRIORITY DEVELOPMENT PROJECT STORMWATER QUALITY MANAGEMENT PLAN (SWQMP)

CITY OF ENCINITAS STORMWATER INTAKE FORM AND PRIORITY DEVELOPMENT PROJECT STORMWATER QUALITY MANAGEMENT PLAN (SWQMP) CITY OF ENCINITAS STORMWATER INTAKE FORM AND PRIORITY DEVELOPMENT PROJECT STORMWATER QUALITY MANAGEMENT PLAN (SWQMP) FOR: [PROJECT NAME] [APPLICATION/PERMIT NUMBER(S)] [SITE ADDRESS] [ENCINITAS, CA 92024]

More information

Operation & Maintenance Document Templates

Operation & Maintenance Document Templates Appendix G Operation & Maintenance Document Templates The following templates are provided to assist project applicants in preparing stormwater treatment measure maintenance plans, which municipalities

More information

Resolution No. R ATTACHMENT 1 POST-CONSTRUCTION STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT PROJECTS IN THE CENTRAL COAST REGION

Resolution No. R ATTACHMENT 1 POST-CONSTRUCTION STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT PROJECTS IN THE CENTRAL COAST REGION POST-CONSTRUCTION STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT PROJECTS IN THE CENTRAL COAST REGION July 12, 2013 CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD CENTRAL COAST REGION 895 Aerovista

More information

STORMWATER MANAGEMENT REPORT FOR. Chick-Fil-A S Ferdon Blvd, Crestview FL. February 10 th, 2017

STORMWATER MANAGEMENT REPORT FOR. Chick-Fil-A S Ferdon Blvd, Crestview FL. February 10 th, 2017 STORMWATER MANAGEMENT REPORT FOR Chick-Fil-A 3000 S Ferdon Blvd, Crestview FL February 10 th, 2017 PROJECT #010014-01-047 954.712.7482 www.bowmanconsulting.com Table of Contents Introduction.1 Project

More information

3.10 Hydrology and Water Quality. Environmental Setting

3.10 Hydrology and Water Quality. Environmental Setting 3.10 Hydrology and Water Quality This section describes the potential hydrology and water quality impacts associated with the proposed changes to the approved project. Environmental Setting This section

More information

NPDES - PCSM. National Pollutant Discharge Elimination System Post Construction Stormwater Management Permit Preparation

NPDES - PCSM. National Pollutant Discharge Elimination System Post Construction Stormwater Management Permit Preparation NPDES - PCSM National Pollutant Discharge Elimination System Post Construction Stormwater Management Permit Preparation Jim Pillsbury PE, Kathy Hamilton RLA Engineer s Workshop March 17-18, 2016 WCD 2015

More information

Village of Northbrook, Illinois Stormwater Pollution Prevention Plan Public Works and Fleet Maintenance Garage Facilities

Village of Northbrook, Illinois Stormwater Pollution Prevention Plan Public Works and Fleet Maintenance Garage Facilities Village of Northbrook, Illinois Stormwater Pollution Prevention Plan Public Works and Fleet Maintenance Garage Facilities Village of Northbrook, Illinois Stormwater Pollution Prevention Plan Public Works

More information

HMP 101 Hydromodification Management Plan for Santa Clara Valley Guidance for Local Implementation

HMP 101 Hydromodification Management Plan for Santa Clara Valley Guidance for Local Implementation HMP 101 Hydromodification Management Plan for Santa Clara Valley Guidance for Local Implementation Jill C. Bicknell, P.E., EOA, Inc. Assistant Program Manager EOA, Inc. GeoSyntec Consultants Presentation

More information

G. HYDROLOGY Existing Conditions

G. HYDROLOGY Existing Conditions G. HYDROLOGY Existing Conditions Surface Water Runoff This section is based on the hydrology and drainage analysis for the proposed Project, which was prepared by KPFF Consulting Engineers and is attached

More information

Permeable Pavement Facilities and Surfaces

Permeable Pavement Facilities and Surfaces Permeable Pavement Facilities and Surfaces This checklist is intended to highlight items critical to the performance of permeable pavement facilities and surfaces that need to be addressed in the design

More information