1 Comparative Analysis of Lao PDR s Legal Framework and Environment Safeguards in the Environmental Safeguards Objectives: To ensure the environmental soundness and sustainability of projects and to support the integration of environmental considerations into the project decision-making process Key Element (1) Ensure the environmental soundness and sustainability of projects Environmental Protection Law Article 4 Explanation of Terminologies (new) Defined terms used in this law shall have following meanings: 5. Environmental Impact Assessment means a process of studying, surveying, data analysis and anticipation of both positive and negative impacts on social and natural environment caused by various projects in short and long term, along with taking appropriate methods and measures to protect, avoid and mitigate those environmental impacts. Forestry Law 2007 Article 6. Principles of protection, development and utilization of forests and Forestlands Protection, development and utilization of forests and Forestlands shall be implemented according to the following principles: 5. Ensuring effective, efficient and sustainable utilization of forests and Forestlands without negative impacts on the environment. Ministerial Instruction No. 8029/MONRE on the Process of Initial Environmental Examination of the Investment Projects and Activities (IEE Instruction 2013) 1.1 Objectives of the Instruction This Instruction aims to ensure the uniformity in the conductance of the Initial Environmental Examination by every 1 All text in Column B is direct citation from the legal instruments. Citations to non-legally-binding policies and guidelines are in Column C. In this analysis, the words shall and must are interpreted to mean that an action is mandatory; the word may is interpreted to mean that an action is discretionary. 2 Full denotes that the national legal instruments are in complete harmony with the corresponding Objective, Scope and Trigger, Principle or Key Element thereof. Partial denotes that the national legal instruments are in partial harmony with the corresponding Objective, Scope and Trigger, Principle or Key Element; and No denotes that no legal requirement can be found that corresponds to the particular Objective, Scope and Trigger, Principle or Key Element. It is intended that the referenced text of the national legal instruments be sufficiently clear to demonstrate the findings of Full or No without further explanation, except in those instances where an explanation would appear necessary and is given. A finding of Partial normally requires the explanation provided. 3 Unofficial translation 4 Unofficial translation 1 As of August 2016

2 Key Element (2) Support the integration of environmental considerations into the project decision-making process Investment Projects and Activities of a public and private both domestic and foreign enterprises which operate business in Lao PDR that cause or are likely to cause environmental and social impacts. Those Investment Projects and Activities shall conduct the efficient Initial Environmental Examination Process, contribute to the sustainable socio economic development of the country Environmental Protection Law 2012 Article 4 Explanation of Terminologies (new) Defined terms used in this law shall have following meanings: 5. Environmental Impact Assessment means a process of studying, surveying, data analysis and anticipation of both positive and negative impacts on social and natural environment caused by various projects in short and long term, along with taking appropriate methods and measures to protect, avoid and mitigate those environmental impacts. IEE Instruction Environmental Compliance Certificate Environmental Compliance Certificate is the certificate approving the IEE Report and ESMMP of the Investment Projects and Activities that the Ministry of Natural Resources and Environment shall issue. The validity and the conditions attached to such Environmental Compliance Certificate should be undertaken as follows: - The Environmental Compliance Certificate approving the IEE Report shall be valid throughout the investment period of the Investment Projects and Activities; provided, however, such Environmental Compliance Certificate shall be terminated in case the Environmental Compliance Certificate approving the ESMMP is terminated or is not renewed; - The Project Owner shall review and revise the ESMMP to reflect the actual circumstance of each period in the Investment Projects and Activities and submit the revised ESMMP to the Ministry of Natural Resources and Environment for the approval and the renewal of the Environmental Compliance Certificate. - The Environmental Compliance Certificate shall contain certain conditions that the Project Owner shall strictly comply with; 2 As of August 2016

3 - In case that it is found that the Project Owner fails to comply with any conditions set out in the Environmental Compliance Certificate resulting in causing substantial social and environmental impacts, the Ministry of Natural Resources and Environment, in the agreement from the high-ranking authorities, shall be entitled to revoke or suspend the validity of the Environmental Compliance Certificate any time during the investment period of the Investment Projects and Activities. Also, the Ministry of Natural Resources and Environment shall be entitled to propose to the investment competent authority to consider revoking the Concession Registration. Ministerial Instruction No. 8030/MONRE on the Process of Environmental and Social Impact Assessment of the Investment Projects and Activities 2013 (ESIA Instruction 2013) 5 Instruction 2.10 of ESIA Instruction 2013 is identical to the cited provision of Instruction 2.6 of the IEE Instruction 2013, with the exception that the ESIA Instruction 2013 replaces the acronym IEE with ESIA. Scope and Triggers: Environmental safeguards are triggered if a project is likely to have potential environmental risks and impacts. IEE Instruction List of Investment Projects and Activities List of Investment Projects and Activities divides the Investment Projects and Businesses into 2 groups as follows: - Group 1: Investment Projects and Activities that are anticipated to cause the insignificant or minimal environmental and social impacts; therefore, are required to conduct an Initial Environmental Examination Process; - Group 2: Investment Projects and Activities that are anticipated to cause the significant or major environmental and social impacts; therefore, are required to conduct an Environmental and Social Impact Assessment Process. List of Investment Projects and Activities categorizing these 2 groups of Investment Projects and Activities shall be prescribed The legal regime is fully equivalent on the basis of the trigger as stated that environmental safeguards are triggered if a project is likely to have potential environmental risks and impacts. But the legal regime does not explicitly stipulate that proposed development in a national natural heritage area should be categorized in Group 2. See Principle 8, Key element 4. Amend the National Heritage Law 2005, the IEE Instruction 2013, and the ESIA Instruction 2013 to explicitly stipulate that proposed development in a national natural heritage area should be categorized in Group 2. 5 Unofficial translation 3 As of August 2016

4 separately in the Decision of the Ministry of Natural Resources and Environment. ESIA Instruction 2013 Instruction 2.2 of Ministerial Instruction No. 8030/MONRE on the Process of Environmental and Social Impact Assessment of the Investment Projects and Activities (ESIA Instruction 2013) is identical to the cited provision of Instruction 2.2 of IEE Instruction Fisheries Law 2009 Article 33. Requirements for a commercial fisheries operation Any commercial fisheries operation must satisfy the following main requirements: In certain cases, be in possession of a Report on the Environmental Impact Assessment; Law on National Heritage Article 54. Regulations on the Protection and Conservation of National Natural Heritage The protection and conservation of national natural heritage shall be carried out as follows: 1. Individuals or organizations intending to pursue socio-economic development in any national natural heritage area, in particular industrial, agricultural and infrastructural development shall obtain prior approval from the Ministry of Information and Culture and other concerned sectors; Principle 1: Use a screening process for each proposed project, as early as possible, to determine the appropriate extent and type of environmental assessment so that appropriate studies are undertaken commensurate with the significance of potential impacts and risks. Key element (1) Screen as early as possible IEE Instruction Screening of the Investment Projects and Activities Screening is the first step in the Environmental Impact Assessment process and is the important step to determine whether or not the proposed Investment Project and Activities need any Environmental Impact Assessment. The details for the screening are as follows: 6 Unofficial translation 7 Translation endorsed by the Law Committee of the National Assembly of the Lao PDR 4 As of August 2016

5 - The Project Owner shall apply the List of Investment Projects and Activities as the reference for the screening to determine which level of the Environmental Impact Assessment, the Project Owner shall conduct; - In case the Investment Projects and Activities are not categorized in any group in the List of Investment Projects and Activities, the Provincial/Capital Department of Natural Resources and Environment shall apply a separate criteria to compare the environmental and social impacts by taking relevant information as specified in the investment application to conduct further screening to determine which level of the Environmental Impact Assessment such Investment Projects and Activities shall conduct or the Environmental Impact Assessment is not required; Key element (2) Determine the appropriate extent and type of environmental assessment so that appropriate studies are undertaken commensurate with the significance of potential impacts and risks. ESIA Instruction 2013 Instruction 2.1 of ESIA Instruction 2013 is identical to the cited provision of Instruction 2.1 of the IEE Instruction 2013, with the exception that MONRE is responsible for ESIA, while Provincial/Capital Departments of Natural Resources and Environment are responsible for IEE. Ministerial Instruction No. 8030/MONRE on the Process of Environmental and Social Impact Assessment of the Investment Projects and Activities 2013 (ESIA Instruction 2013) 2.3 Determining the Scope of Study and Terms of Reference After the screening, if perceiving that Investment Projects and Activities that are categorized as Group 2, the Project Owner shall conduct the Environmental and Social Impact Assessment Process. Before conducting impact assessment the Project Owner shall prepare the scope of study and terms of reference as report in the designated format and in pursuant to the relevant technical guideline with the full assurance of the appropriate Public Involvement and shall submit the report to the Ministry of Natural Resources and Environment for their review and approval prior to the conductance of the Environmental and Social Impact Assessment Process. During the preparation of the Scope of Study and Terms of Reference for the conductance of the Environmental and Social Impact Assessment, the Project Owner shall pay attentions for 5 As of August 2016

6 implementation as follows: - For the determining the scope of study, the Project Owner shall clearly define the scope of the environmental and social impact that are assessed to incur from the Investment Projects and Activities and shall incorporate the material information collected that would constitute basis for the Environmental and Social Impact Assessment Process; - For the determining the terms of reference, the Project Owner shall clearly and comprehensively define the scope of works to be undertaken to achieve the result for each aspects of the scoping for the Environmental and Social Impact Assessment Process. Also see Scope and Triggers and Principle 1, Key element 1. Principle 2: Conduct an environmental assessment for each proposed project to identify potential direct, indirect, cumulative, and induced impacts and risks to physical, biological, socioeconomic (including impacts on livelihood through environmental media, health and safety, vulnerable groups, and gender issues), and physical cultural resources in the context of the project s area of influence. Assess potential trans-boundary and global impacts, including climate change. Use strategic environmental assessment where appropriate. Key element (1): Identify indirect as well as direct impacts No corresponding legal provision. No equivalence Amend the IEE Instruction 2013 and the ESIA Instruction 2013 to explicitly require identifying indirect as well as direct impacts. Key element (2) Identify cumulative impacts ESIA Instruction Principles of Environmental and Social Impact Assessment Process The Environmental and Social Impact Assessment Process shall be implemented based on the principles as follows: - The Project Owner shall conduct additional cumulative impact assessment in case its project and activities are expected to generate cumulative Environmental and Social Impacts to other investment project located in the adjacent areas; provided that such cumulative impact assessment shall be conducted pursuant to the related technical guidelines; The National Environmental and Social Sustainability of the Hydropower Sector in Lao PDR 2005 (National Hydropower 2005), which is not legally binding, supports this key element: Purpose An integrated approach to river basin management will be practiced for multiple projects planned to dam a single river. Such an approach will include addressing cumulative impacts and their mitigation 1. ENVIRONMENTAL ASSESSMENT All large hydropower projects as stipulated above [installed capacity of higher than 50 Megawatts or inundating more than 10,000 hectares of land at their fully supply level] must produce a full Environmental Impact Assessment (EIA) report and Environmental Management Plan (EMP) The EIA will include a sub-basin cumulative impact analysis. Key element (3) No corresponding legal provision. No equivalence Amend the IEE Instruction 6 As of August 2016

7 Identify induced impacts 8 Key element (4) Identify physical impacts IEE Instruction Duties and Responsibilities of the Project Owner in the Initial Environmental Examination Process In the Initial Environmental Examination Process, the Project Owner shall have the following duties and responsibilities: - to conduct study on overall physical aspects,,, which may arise from the Investment Projects and Activities 2013 and the ESIA Instruction 2013 to explicitly require identifying induced impacts. Key element (5) Identify biological impacts ESIA Instruction 2013 Instruction 2.12 of ESIA Instruction 2013 is identical to the cited provision of Instruction 2.8 of the IEE Instruction IEE Instruction Duties and Responsibilities of the Project Owner in the Initial Environmental Examination Process In the Initial Environmental Examination Process, the Project Owner shall have the following duties and responsibilities: - to conduct study on overall biological aspects which may arise from the Investment Projects and Activities Key element (6) Identify socioeconomic impacts (including on livelihood through environmental health and safety, vulnerable ESIA Instruction 2013 Instruction 2.12 of ESIA Instruction 2013 is identical to the cited provision of Instruction 2.8 of the IEE Instruction Environmental Protection Law 2012 Article 2 Environment (revised) Environment means any organic and inorganic features existing naturally or created by mankind and the positive and negative interaction and impacts on livelihood IEE Instruction Duties and Responsibilities of the Project Owner in the Initial Environmental Examination Process In the Initial Environmental Examination Process, the Project Owner shall have the following duties and responsibilities: The National Hydropower 2005, which is not legally binding, supports this key element: 2. Project-Affected People Project-affected people will be recognized as those whose assets, resource use and livelihoods, and/or social or cultural structures are involuntarily altered by the project, and will identified on the basis of social, economic, health and cultural studies and impact assessments. 8 ADB defines induced impacts as adverse and/or beneficial impacts on areas and communities from unintended but predictable developments caused by a project, which may occur later or at a different location. 7 As of August 2016

8 groups, and gender issues) - to conduct study on overall socio-economic aspects, including prediction of social impacts which may arise from the Investment Projects and Activities Key element (7) Identify impacts on physical cultural resources Key element (8) Identify impacts in the context of the project s area of influence ESIA Instruction 2013 Instruction 2.12 of ESIA Instruction 2013 is identical to the cited provision of Instruction 2.8 of the IEE Instruction No corresponding legal provision. No equivalence Amend the IEE Instruction 2013 and the ESIA Instruction 2013 to explicitly require identifying impacts on physical IEE Instruction Public Involvement of the Project-Affected Persons and the Stakeholders The Project-Affected Persons and the Stakeholders shall have the following participation in the Initial Environmental Examination Process: - to cooperate and provide information on local context of social and environmental aspects in the area of the Investment Projects and Activities and in the nearby locations to be used in the preparation of the IEE Report and ESMMP; cultural resources. Key element (9) Assess potential trans-boundary impacts ESIA Instruction 2013 Instruction 2.14 of ESIA Instruction 2013 is identical to the cited provision of Instruction 2.10 of the IEE Instruction 2013, with the exception that the ESIA Instruction 2013 replaces IEE Report and ESMMP with ESIA Report. Law on Electricity 2008 Article 40. Using Land for Electricity Project Using land for electricity project shall do: 1. Project developer must detail limit of land using impact to social and natural environment of project; ESIA Instruction Principles of Environmental and Social Impact Assessment Process The Environmental and Social Impact Assessment Process shall be implemented based on the principles as follows: The National Hydropower 2005, which is not legally binding, supports this key element: 4. Consultation 8 As of August 2016

9 Key element (10) Assess potential global impacts, including climate change - The Project Owner shall conduct additional transboundary impact assessment in case its Investment Project and Activities are expected to cause transboundary social and environmental impacts to other neighboring countries; provided that such transboundary impact assessment shall be conducted pursuant to the related regulations and technical guidelines; IEE Instruction Objectives of the Instruction This Instruction aims to ensure the uniformity in the conductance of the Initial Environmental Examination by every Investment Projects and Activities of a public and private both domestic and foreign enterprises which operate business in Lao PDR that cause or are likely to cause environmental and social impacts. Those Investment Projects and Activities shall conduct the efficient Initial Environmental Examination Process and shall mitigate and enhance the global warming adaptation. Consultations on trans-boundary impacts, if materially identified, may also be conducted with neighboring governments through processes established by the Mekong River Commission. Consultations will continue throughout project implementation. Partial equivalence Assessing climate change is an objective of the IEE Instruction 2013 and the ESIA Instruction 2013, but there is no corresponding substantive requirement in either Instruction to assess potential climate change impacts. Amend the IEE Instruction 2013 and the ESIA Instruction 2013 to explicitly require assessing climate change impacts in the event that a project may potentially create such impacts. Key element (11) Use strategic environmental assessment where appropriate ESIA Instruction 2013 Instruction 1.1 of ESIA Instruction 2013 is identical to Instruction 1.1 of IEE Instruction 2013, with the exception that the ESIA Instruction replaces the words initial environmental examination with the words environmental and social impact assessment. Environmental Protection Law 2012 Article 4 Explanation of Terminologies (new) 3. Strategic Environmental Assessment means a process of anticipating an environmental impact and including environmental protection while developing policies, strategies, and programs undertaken by sectors. Article 19 Strategic Environmental Assessment (new) A strategic environmental assessment (SEA) is a process of anticipating an impact that may affect social and natural environment, while developing policies, strategic plans, and programs, including considerations towards impacts of climate change. This impact assessment shall determine methods and measures to avoid or mitigate impacts on social and natural environment in order to accomplish sustainable development goals. 9 As of August 2016

10 While developing the policies, strategic plans, and programs, particularly of energy and mining, agriculture and forestry, industry and commerce, public works and transportation, posttelecommunication and communication, information-culture and tourism sector, a strategic environmental assessment shall be conducted, except a plan, which applies to uses of small-scale areas and subject to the Integrated Spatial Plans. By conducting the SEA, there shall be participations by organizations, local concerned authorities and people, who are directly or indirectly affected by the sectoral policies, strategic plans and programs. Principle 3. Examine alternatives to the project s location, design, technology, and components and their potential environmental and social impacts and document the rationale for selecting the particular alternative proposed. Also consider the no project alternative. Key element (1) Examine alternatives to the project s location, design, technology, and components and their potential environmental and social impacts Key element (2) Document the rationale for selecting the particular alternative proposed Key element (3) Also consider the no project alternative No corresponding legal provision. No equivalence The National Hydropower 2005, which is not legally binding, supports this key element: 1. Environmental Assessment The EIA will include a comprehensive risk analysis over the entire life-span of project, an analysis of alternatives for project structure and location, including the no-project alternative Amend the IEE Instruction 2013 and the ESIA Instruction 2013 to explicitly require examining alternatives to the project s location, design, technology, and components and their potential environmental and social impacts No corresponding legal provision. No equivalence Amend the IEE Instruction 2013 and the ESIA Instruction 2013 to explicitly require documenting the rationale for selecting the particular alternative proposed. No corresponding legal provision. No equivalence See Principle 3, Key element 1. Amend the IEE Instruction 2013 and the ESIA Instruction 2013 to explicitly require considering the no project alternative. Principle 4: Avoid, and where avoidance is not possible, minimize, mitigate, and/or offset adverse impacts and enhance positive impacts by means of environmental planning and management. Prepare an environmental management plan (EMP) that includes the proposed mitigation measures, environmental monitoring and reporting requirements, related institutional or organizational arrangements, capacity development and training measures, implementation schedule, cost estimates, and performance indicators. Key considerations for EMP preparation 10 As of August 2016

11 include mitigation of potential adverse impacts to the level of no significant harm to third parties, and the polluter pays principle. Key element (1) Partial equivalence Avoid adverse impacts where possible Key element (2) Where avoidance is not possible, minimize and/or, mitigate adverse impacts to the level of no significant harm to third parties Environmental Protection Law 2012 Article 7 Commitment in Environmental Protection (revised) Persons, households, legal entities and organizations have commitments of protecting, improving, rehabilitating, controlling, monitoring and inspecting the environment based on regulations to avoid creating impacts on the environment, causing degradation and polluting that exceeds the Pollution Control Standard and the National Environmental Quality Standard IEE Instruction Principles relating to Initial Environmental Examination Process of the Investment Projects and Activities The Initial Environmental Examination Process of the Investment Projects and Activities shall be implemented pursuant to the following principles: - The Project Owner shall ensure the implementation of the environmental and social mitigation measures as defined in the Environmental and Social Management and Monitoring Plan ESIA Instruction 2013 Instruction 1.2 of ESIA Instruction 2013 has a provision identical to the cited provision of Instruction 1.2 of IEE Instruction 2013, with the exception that the ESIA Instruction replaces the words initial environmental examination with the words environmental and social impact assessment. The Environmental Protection Law 2012 includes avoiding adverse impacts as a general commitment to environmental protection, but there is no substantive provision in the Law or in the implementing Instructions that requires this. Amend the IEE Instruction 2013 and the ESIA Instruction 2013 to explicitly require, as part of the IEE/ESIA process, documenting how a project will avoid adverse impacts. Fisheries Law 2009 Article 7. Obligations in the protection, development and exploitation aquatic fauna Any individual, juristic entity and organization has [certain] obligations in the conservation, protection, development and exploitation of aquatic fauna according to the regulations and the use of necessary measures to limit any adverse impact whether natural or man-made, on the aquatic fauna such as the discharge of pollutants into natural bodies of water Law on Electricity 2008 Article 5. State policy for electrical State promotes reducing social and environmental impact. 11 As of August 2016

12 Article 10. Electrical planning Electrical planning must: 2. Set up goals, strategy, mechanism and methods reducing impact of social and environmental from electric business; Article 15. Electricity production Electric production must limit and reduce social and environment impact. Article 16. Electricity transmission Installation of electricity transmission grid through Lao PDR must limit adverse environmental impact and people safeguard, Article 31. Environment, Social and Natural Resources Impact Assessment Environment, Social and Natural Resources Impact Assessment shall include: 1. Assessment of Environmental Impact (EIA) in each case, together with proposals methods and measures for solving or mitigation any adverse impact on the environment, ecology, society and wildlife habitats; Forestry Law 2007 Article 39. Categories of utilization of the forest and forest products Utilization of all categories of forest and forest protection shall avoid causing any negative impacts to forest and forest production areas, nature, the environment and society. Key element (3) Offset adverse impacts Article 49. Logging and harvesting of forest products Logging and harvesting of forest products in the Production Forest area shall abide by the following main principles: 6. Applying the selective cutting system to ensure natural regeneration, minimizing impacts on the natural environment and society No corresponding legal provision. No equivalence Amend the IEE Instruction 2013 and the ESIA Instruction 2013 to explicitly require as part of the IEE/ESIA process, 12 As of August 2016

13 Key element (4): Enhance positive impacts Key element (5) Prepare an environmental management plan (EMP) that includes the proposed mitigation measures documenting how a project will offset adverse impacts. No corresponding legal provision. No equivalence Amend the IEE Instruction 2013 and the ESIA Instruction 2013 to explicitly require as part of the IEE/ESIA process, documenting how a project will enhance positive impacts. Environmental Protection Law 2012 Article 4 Explanation of Terminologies (new) 10. Social and Natural Environmental Management Plan of Investment Project means a plan that consolidates various key tasks of social and natural environment, identifying methods and preventive measures, mitigation, solving of environmental impacts, which are already reported by Social and Natural Environmental Impact Assessment, and identification of organizational structures, responsibilities, time schedules and sufficient budgets for implementing the management and inspection of the social and natural environment. The National Hydropower 2005, which is not legally binding, supports this key element: 1. Environmental Assessment The EMP will include a strategy for avoiding and/or mitigation of impacts, and risks, including accidents and emergency events. The EMP will also provide cost estimates for these activities, identify their sources of funding and an implementation schedule. IEE Instruction Screening of the Investment Projects and Activities - In case any Investment Projects and Activities are screened as not being required to conduct any Environmental Impact Assessment, the Provincial/Capital Department of Natural Resources and Environment will impose certain conditions or any requirement to the Project Owner for the implementation of the environmental and social management and monitoring plan. 2.8 Duties and Responsibilities of the Project Owner in the Initial Environmental Examination Process In the Initial Environmental Examination Process, the Project Owner shall have the following duties and responsibilities: - to prepare the IEE Report including the ESMMP that defines all the protective and mitigation measures on social and environmental impacts; ESIA Instruction 2013 Instruction 2.1 of ESIA Instruction 2013 has a provision identical 13 As of August 2016

14 to the cited provision of Instruction 2.1 of IEE Instruction 2013, with the exception that MONRE is responsible for ESIA, while Provincial/Capital Departments of Natural Resources and Environment are responsible for IEE. 2.9 Environmental and Social Management and Monitoring Plan (ESMMP) In the preparation of the ESMMP, the Project Owner shall comply with the following conditions: - In case that any Investment Projects and Activities are the Investment Projects and Activities that cause a major social and environmental impacts and are the complicated Investment Projects and Activities, the Project Owner shall prepare the Environmental and Social Management and Monitoring Plan separately for the Construction Period and the Operation Period and submit those two separate plans for the Ministry of Natural Resources and Environment s review and approval, before the Project Owner can start its construction and operation. Instruction 2.12 of ESIA Instruction 2013 has a provision identical to the cited provision of Instruction 2.8 of IEE Instruction 2013, with the exception that the ESIA Instruction replaces the words IEE Report and ESMMP with the words ESIA Report which includes the ESMMP. Key element (6) Prepare an Forestry Law 2007 Article 74. Lease or concession of forestland The lease or concession of forestland shall follow the principles: 3. Formulation of an environment and social impact assessment including appropriate mitigation measures, with the approval from the concerned authorities. 4. Formulation of an action plan which focuses on preserving of water resources and the environment, land preparation, village development, promote people to participate in the production process, by applying technology, and including benefit sharing. See Principle 7, Key element As of August 2016

15 environmental management plan (EMP) that includes the proposed monitoring requirements Key element (7) Prepare an environmental management plan (EMP) that includes the proposed reporting requirements IEE Instruction Reporting Obligations Throughout the investment period of the Investment Projects and Activities, the Project Owner shall perform the following reporting obligations: - The Project Owner shall prepare and submit the report periodically such as: A monthly report, quarterly report and annually report as specified in the Environmental Compliance Certificate issued for each Investment Projects and Activities. Those reports shall include important contents as follows: + the progress, breach or omission including the results of its selfmonitoring in the implementation of mitigation measures of the environmental and social impacts as specified under the ESMMP including the conditions defined in the Environmental Compliance Certificate and other relevant contracts; + the difficulties confronted by the Project Owner during the implementation period of the environmental and social measures;.. - For accidents, emergency, incidents or any breach on the environmental aspects of the Project Owner which have occurred resulting in the severe social and environmental impacts, the Project Owner shall prepare and submit the incident report to the Provincial/Capital Department of Natural Resources and Environment within 24 hours since the Project Owner becomes aware of such incidents. An Environmental and Social Management and Monitoring Plan (ESMMP) explicitly includes monitoring. The National Hydropower 2005, which is not legally binding, supports this key element: 1. Environmental Assessment A comprehensive monitoring and evaluation framework consisting of both internal and independent or third party monitoring arrangements should also be included in the EMP. 2. Project-Affected People The plan will consider distributional effects of development activities with provision for monitoring and evaluation There is no requirement that an ESMMP contain reporting requirements, but both IIE Instruction 2013 and ESIA Instruction 2013 have detailed provisions on reporting requirements. ESIA Instruction As of August 2016

16 Key element (8) Prepare an environmental management plan (EMP) that includes related institutional or organizational arrangements Key element (9) Prepare an environmental management plan (EMP) that includes related capacity development and training measures Key element (10) Prepare an environmental management plan (EMP) that includes an implementation schedule Key element (11) Prepare an environmental management plan (EMP) that Instruction 2.19 of ESIA Instruction 2013 is identical to Instruction 2.15 of IEE Instruction 2013, with the exception that MONRE is responsible for ESIA, while Provincial/Capital Departments of Natural Resources and Environment are responsible for IEE. No corresponding legal provision. No equivalence Amend the IEE Instruction 2013 and the ESIA Instruction 2013 to explicitly require that an EMMSP must include institutional or organizational arrangements. IEE Instruction Funding Obligations of the Project Owner The Project Owner shall be obliged to provide sufficient funding for all of these budget items: including the cost for capacity building ESIA Instruction 2013 Instruction 2.12 of ESIA Instruction 2013 has a provision identical to the cited provision of Instruction 2.12 of IEE Instruction No corresponding legal provision. IEE Instruction Information Disclosure to Public - The Project Owner shall publicly disclose the information relating to budget for the implementation of mitigation measures of the environmental and social impacts as specified under the ESMMP; There is no requirement that an ESMMP contain measures for supporting capacity building, but both IIE Instruction 2013 and ESIA Instruction 2013 require this. No equivalence The National Hydropower 2005, which is not legally binding, supports this key element: 1. Environmental Assessment The EMP will also provide an implementation schedule. There is no requirement that an ESMMP contain cost estimates, but both IIE Instruction 2013 and ESIA Instruction 2013 require publicly disclosing a budget for implementing the ESMMP. Amend the IEE Instruction 2013 and the ESIA Instruction 2013 to explicitly require that an EMMSP must include an implementation schedule. 16 As of August 2016

17 includes cost estimates ESIA Instruction 2013 Instruction 2.20 of ESIA Instruction 2013 has a provision identical to the cited provision of Instruction 2.16 of IEE Instruction Key element (12) Prepare an environmental management plan (EMP) that includes performance indicators Key element (13) Consider the polluter pays principle in environmental management planning The National Hydropower 2005, which is not legally binding, supports this key element: 1. Environmental Assessment The EMP will also provide cost estimates for these activities, identify their sources of funding No corresponding legal provision. No equivalence Amend the IEE Instruction 2013 and the ESIA Instruction 2013 to explicitly require that an EMMSP must include performance indicators. Environmental Protection Law 2012 Article 6 Principles of Environmental Protection (revised) 5. Liabilities in damages of social or natural environment resulted by an offender s action, with the evidences and application of the Pollution Control Standard as the obligations of him or her. Article 96 Penal Measures (revised) Persons violating this Law as criminal offences shall be punished based on the Penal Law, depending on the seriousness degree of each case, and including remedies to all damages caused by him or her. Law on Electricity 2008 Article 31. Environment, Social and Natural Resources Impact Assessment Environment, Social and Natural Resources Impact Assessment shall include: 1. Assessment of Environmental Impact (EIA) in each case, together with proposals methods and measures for solving or mitigation any adverse impact on the environment, ecology, society and wildlife habitats; 4. Calculation of expenses for restoration of impact provided in paragraph 1 of this article shall be incorporated in to the project cost. 17 As of August 2016

18 Article 66. Points for Inspection Points for Inspection are following: 10. Payment of compensation for damage to the environment and peoples lives and property; Article 77. Fines Individuals or organizations that have violated this law shall be fined an amount equivalent to the amount of actual damage caused by any one of the following acts: 7. Failing to adhere to standards to limit adverse environmental impact; Principle 5: Carry out meaningful consultation with affected people and facilitate their informed participation. Ensure women s participation in consultation. Involve stakeholders, including affected people and concerned nongovernment organizations, early in the project preparation process and ensure that their views and concerns are made known to and understood by decision makers and taken into account. Continue consultations with stakeholders throughout project implementation as necessary to address issues related to environmental assessment. Establish a grievance redress mechanism to receive and facilitate resolution of the affected people s concerns and grievances regarding the project s environmental performance. Key element (1) Carry out meaningful consultation with affected people and facilitate their informed participation. Environmental Protection Law 2012 Article 6 Principles of Environmental Protection (revised) 3. Active participation and consultation of individuals and organizations into protection of social and natural environment; Article 48 Public Participation (new) A strategic environmental assessment, environmental action plan, social and natural environmental impact assessment, environmental management and monitoring plan, pollution control and others, shall be developed with participations by organizations, local authorities and people, who are directly or indirectly affected by investment projects or activities. IEE Instruction Principles relating to Initial Environmental Examination Process of the Investment Projects and Activities The Initial Environmental Examination Process of the Investment Projects and Activities shall be implemented pursuant to the following principles: - During the conductance of the Initial Environmental Examination, the Project Owner shall ensure strict Public Involvement and the consultation with the Project-Affected Persons and other related Stakeholders based on this Instruction, the Technical Guideline on Public Involvement and other relevant laws and regulations; The National Hydropower 2005, which is not legally binding, supports this key element: 4. Consultation Free, prior and informed consultations will be conducted with all project-affected communities, to enable public involvement in environmental and social assessment Consultations would be meaningful, balanced and transparent As much as possible, the villages will be afforded opportunities to build their skills through the involvement of independent facilitators, who will guide the process at the village-level. Comprehensive environmental education and awareness activities will also be undertaken. Every effort will be made to ensure representative participation of vulnerable groups such as women, elderly, disabled and ethnic minorities. 18 As of August 2016

19 2.4 Review of the Initial Environmental Examination Report The process for the review of the IEE Report shall be undertaken in the following steps: - The Project Owner shall submit 1 set of an application and the final version of the IEE Report including the Environmental and Social Management and Monitoring Plan with comments gathered from the village/district consultation meeting to the related Provincial/Capital Department of Natural Resources and Environment, including attaching with the minutes from every consultation signed by the minutes taker representatives of the Project Owner, and related Provincial/Capital Department of Natural Resources and Environment; The review of the IEE Report shall be completed within 40 business days from the date that the Project Owner submits every documents required The review process shall be undertaken as follows: c. The Provincial/Capital Department of the Natural Resources and Environment, in coordination with the Project Owner, shall hold the consultation meeting at the district/provincial level in due time during the review period. During such consultation meeting, the Project Owner will explain about the IEE Report. The Project- Affected Persons and the relevant Stakeholders should be at present at such consultation meeting as appropriate 2.8 Duties and Responsibilities of the Project Owner in the Initial Environmental Examination Process In the Initial Environmental Examination Process, the Project Owner shall have the following duties and responsibilities: - to conduct study including prediction of social and environmental impacts which may arise from the Investment Projects and Activities, by using information gained from consultations with the Project-Affected Persons and other Stakeholders, both at the central and local levels; - to coordinate in arranging the dissemination meetings at the local and central level to explain the development plan of the Investment Projects and Activities, the expected benefit, social and environmental impacts including summarizing and taking various minutes of comments from the Project Affected Persons 19 As of August 2016

20 gained from the consultation meetings to incorporate into the IEE Report; 2.10 Public Involvement of the Project-Affected Persons and the Stakeholders The Project-Affected Persons and the Stakeholders shall have the following participation in the Initial Environmental Examination Process: - to receive information on the development plan of the Investment Projects and Activities, the benefit to be received, the social and environmental impacts that may arise from the Investment Projects and Activities; to participate in the field inspection and to be the main party participating in the consultation meetings at all levels to give comments on the preparation and review process of the IEE Report and ESMMP; ESIA Instruction 2013 Instruction 1.2 of ESIA Instruction 2013 has a provision identical to the cited provision of Instruction 1.2 of IEE Instruction 2013, with the exceptions that the ESIA Instruction replaces the words initial environmental examination with the words environmental and social impact assessment. Instruction 2.6 of ESIA Instruction 2013 has a provision identical to the cited provision of Instruction 2.4 of IEE Instruction 2013, with the exceptions that: (1) the ESIA Instruction replaces the acronym IEE with ESIA ; and (2) MONRE is responsible for ESIA, while Provincial/Capital Departments of Natural Resources and Environment are responsible for IEE. Instruction 2.12 of ESIA Instruction 2013 has a provision identical to the cited provision of Instruction 2.8 of IEE Instruction 2013, with the exceptions that: (1) the ESIA Instruction replaces the acronym IEE with ESIA ; and (2) MONRE is responsible for ESIA, while Provincial/Capital Departments of Natural Resources and Environment are responsible for IEE. 20 As of August 2016

21 Key element (2) Ensure women s participation in consultation Key element (3) Involve stakeholders, including affected people and concerned nongovernment organizations Instruction 2.14 of ESIA Instruction 2013 is identical to the cited provision of Instruction 2.10 of IEE Instruction 2013, with the exception that the ESIA Instruction replaces the words IEE Report and ESMMP with ESIA Report. No corresponding legal provision. IEE Instruction Review of the Initial Environmental Examination Report The process for the review of the IEE Report shall be undertaken in the following steps: c. The Provincial/Capital Department of the Natural Resources and Environment, in coordination with the Project Owner, shall hold the consultation meeting at the district/provincial level in due time during the review period. During such consultation meeting, the Project Owner will explain about the IEE Report. The Project- Affected Persons and the relevant Stakeholders should be at present at such consultation meeting as appropriate No equivalence The National Hydropower 2005, which is not legally binding, supports this key element: 2. Project-Affected People The plan will consider distributional effects of development activities and the participation of vulnerable groups, including women and ethnic minorities participatory planning and adaptive management. In cases where ethnic groups are in the project area a specific plan to meet their aspirations would be prepared in consultation with these communities. Partial equivalence Neither IEE Instruction 2013 nor ESIA Instruction 2013 specifically refers to associations. The Decree on Associations 2009 appears to indicate that associations could be eligible to participate in consultations during IEE and ESIA processes. Amend the IEE Instruction 2013 and the ESIA Instruction 2013 to explicitly require ensuring women s participation in consultations for the IEE/ESIA processes. Amend the IEE Instruction 2013 and the ESIA Instruction 2013 to explicitly require ensuring associations participation in consultations for the IEE/ESIA processes. ESIA Instruction 2013 Instruction 2.6.c of ESIA Instruction 2013 is identical to the cited provision of Instruction 2.4.c of IEE Instruction 2013, with the exceptions that: (1) the ESIA Instruction replaces the acronym IEE with ESIA ; and (2) MONRE is responsible for ESIA, while Provincial/Capital Departments of Natural Resources and Environment are responsible for IEE. Decree No. 115/PM on Associations 2009 Article 3 Wordings Association, when used in this Decree, refers to associative federations, federations, councils, clubs or bodies however 21 As of August 2016

22 designated that are civil society organizations with members; Key element (4) Involve stakeholders early in the project preparation process Article 18 Rights and Duties of Associations Associations have the following rights and duties: 5. Provide advice and recommendations in their fields or sectors of activities in line with the laws and regulations; 8. Exercise other rights and perform other duties set out in the associations charters and in the laws and regulations. IEE Instruction Public Involvement of the Project-Affected Persons and the Stakeholders The Project-Affected Persons and the Stakeholders shall have the following participation in the Initial Environmental Examination Process: to participate in the field inspection and to be the main party participating in the consultation meetings at all levels to give comments on the preparation process of the IEE Report and ESMMP; 2.11 Public Involvement Process - During the process of data collection for the preparation of the IEE Report and ESMMP, the dissemination meeting shall be held for the Project-Affected Persons and the Stakeholders in various forms both in Lao language and local language to explain the development plan of the Investment Projects and Activities, the benefits to be gained and the social and environmental impacts; and to gather the comments from the Project-Affected Persons and other Stakeholders; - During the process of the preparation and review of the IEE Report and ESMMP, the consultation meetings shall be held at the village/district and district/provincial levels in consistent with the review process of the IEE Report and ESMMP to give an opportunity for the Project-Affected Persons and the Stakeholders to have comments on the first to the final IEE Report and ESMMP; ESIA Instruction 2013 Instruction 2.14 of ESIA Instruction 2013 is identical to the cited provision of Instruction 2.10 of IEE Instruction 2013, with the 22 As of August 2016

Comparative Analysis of Cambodia Legal Framework and ADB Safeguard Policy Statement: ENVIRONMENT

Comparative Analysis of Cambodia Legal Framework and ADB Safeguard Policy Statement: ENVIRONMENT Comparative Analysis of Cambodia Legal Framework and : ENVIRONMENT Policy Principle 1: Use a screening process for each proposed project, as early as possible, to determine the appropriate extent and type

More information

National Policy on Environmental and Social Sustainability of the Hydropower Sector in Lao PDR

National Policy on Environmental and Social Sustainability of the Hydropower Sector in Lao PDR National Policy on Environmental and Social Sustainability of the Hydropower Sector in Lao PDR By Xaypaseuth PHOMSOUPHA Deputy Director General Department of Energy Promotion and Development Ministry of

More information

Comparative Analysis of Armenia Legal Framework and ADB Safeguard Policy Statement

Comparative Analysis of Armenia Legal Framework and ADB Safeguard Policy Statement Comparative Analysis of Armenia Legal Framework and Policy Principle 1: Use a screening process for each proposed project, as early as possible, to determine the appropriate extent and type of environmental

More information

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country?

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country? Checklist: 16. Power Transmission and Distribution Lines(1) Confirmation of and Social (1) ESIA and Permits 1 Have ESIA reports been officially completed? Have ESIA reports been written in the official

More information

THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness PRIME MINISTER. /QĐ -TTg. Hanoi, dd..mth

THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness PRIME MINISTER. /QĐ -TTg. Hanoi, dd..mth PRIME MINISTER No: Draft 7/12/2016 /QĐ -TTg THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness 1 Hanoi, dd..mth.. 2016 DECISION On Approval of the National Action Programme on Reduction of

More information

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e) Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been

More information

Lao People's Democratic Republic Peace Independence Democracy Unity Prosperity DECREE ON ASSOCIATIONS

Lao People's Democratic Republic Peace Independence Democracy Unity Prosperity DECREE ON ASSOCIATIONS Unofficial translation Lao People's Democratic Republic Peace Independence Democracy Unity Prosperity Government No. 238 /Gov Vientiane Capital, 11 August 2017 DECREE ON ASSOCIATIONS - Pursuant to the

More information

LAO PEOPLE S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY

LAO PEOPLE S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY LAO PEOPLE S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY President s Office No. 12/PO DECREE of the PRESIDENT of the LAO PEOPLE S DEMOCRATIC REPUBLIC On the Promulgation of the Law

More information

EBRD Performance Requirement 1

EBRD Performance Requirement 1 EBRD Performance Requirement 1 Assessment and Management of Environmental and Social Impacts and Issues Introduction 1. This Performance Requirement (PR) establishes the importance of integrated assessment

More information

Review of Best Practices in Environmental Assessment Legislation in the South Asia Region and in Countries outside the Region

Review of Best Practices in Environmental Assessment Legislation in the South Asia Region and in Countries outside the Region Review of Best Practices in Environmental Assessment Legislation in the South Asia Region and in Countries outside the Region The designation of geographical entities in this book and the presentation

More information

Indonesia: Perusahaan Listrik Negara (PLN) Agency-Level Use of Country Safeguard Systems. LD 1: Equivalence Assessment of Environmental Safeguards

Indonesia: Perusahaan Listrik Negara (PLN) Agency-Level Use of Country Safeguard Systems. LD 1: Equivalence Assessment of Environmental Safeguards DRAFT FOR DISCUSSION ONLY August, 2018 Indonesia: Perusahaan Listrik Negara (PLN) Agency-Level Use of Country Systems LD 1: Equivalence Assessment of Environmental s This assessment is a work in progress,

More information

Environmental Protection Law

Environmental Protection Law Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Unofficail Translation Environmental Protection Law (Revised Version) 2013 Contents Pages Part I General Provisions Article

More information

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item.

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item. Checklist: 26. Forestry Projects(1) 1. Permits and Approvals, Explanations 2. Antipollution Measures (1) ESIA and Permits (2) Explanations to the Public (1) Air Quality (2) Water Quality (3) Waste (4)

More information

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness GOVERNMENT No. 35-2006-ND-CP SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness Hanoi, 31 March 2006 DECREE MAKING DETAILED PROVISIONS FOR IMPLEMENTATION OF THE COMMERCIAL LAW WITH RESPECT

More information

LAW OF THE REPUBLIC OF INDONESIA NUMBER 7 OF 2004 REGARDING WATER RESOURCES

LAW OF THE REPUBLIC OF INDONESIA NUMBER 7 OF 2004 REGARDING WATER RESOURCES LAW OF NUMBER 7 OF 2004 REGARDING WATER RESOURCES BY THE GRACE OF THE ALMIGHTY GOD, THE PRESIDENT OF Considering : a. that water resources is the gift of the Almighty God which gives benefits for the realization

More information

Presentation of new Draft TLD Conversion Areas

Presentation of new Draft TLD Conversion Areas Presentation of new Draft TLD Conversion Areas Lao-EU FLEGT VPA Process TWG Meeting, Crowne Plaza, 02.08.2017 Dr. Khamfeua Sirivongs, Head FLEGT Standing Office Table of Contents Development History of

More information

Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process

Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process 10 January 2018 Introduction 1. Environmental and social screening is an essential and

More information

AMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1

AMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1 AMDAL Procedure (This is only indicative and for reference purposes. This is not exhaustive and therefore, the Consultants are requested to familiarize themselves with all the laws, rules, regulations,

More information

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item Checklist: 17. Roads, Railways and Bridges(1) 1. Permits and Approvals, Explanations (1) ESIA and Permits (2) Explanations to the Public Main Check s 1 Have ESIA reports been officially completed? Have

More information

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item Checklist: 17. Roads, Railways and Bridges(1) 1. Permits and Approvals, Explanations (1) ESIA and Permits (2) Explanations to the Public Main Check s 1 Have ESIA reports been officially completed? Have

More information

Senior Minister, Minister of Environment

Senior Minister, Minister of Environment Unofficial Translation by Mr. DANH Serey, EIA Department KINGDOM OF CAMBODIA Nation Religion King MINISTRY of ENVIRONMENT N. 376 BRK.BST Phnom Penh, 02 September 2009 - - - - - - - PRAKAS (DECLARATION)

More information

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d)

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d) Checklist:. 10.Ports and Harbors (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders (3) Examination of Alternatives (1) Air Quality (2) Water

More information

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 1 Ministry of Environmental Conservation and Forestry (MOECAF) Environmental

More information

DRAFT FOR PUBLIC COMMENT Guidance Note for ESS10 Stakeholder Engagement and Information Disclosure

DRAFT FOR PUBLIC COMMENT Guidance Note for ESS10 Stakeholder Engagement and Information Disclosure The Guidance Notes provide guidance for the Borrower on the application of the Environmental and Social Standards (ESSs), which form part of the World Bank s 2016 Environmental and Social Framework. The

More information

ENVIRONMENTAL IMPACT ASSESSMENT

ENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL LAW ASSOCIATION ENVIRONMENTAL LAW FACT SHEET NO. 1 ENVIRONMENTAL IMPACT ASSESSMENT INTRODUCTION This fact sheet was produced by the Environmental Law Association to provide a plain language

More information

Appendix 4G. Key to Disclosures Corporate Governance Council Principles and Recommendations

Appendix 4G. Key to Disclosures Corporate Governance Council Principles and Recommendations Rules 4.7.3 and 4.10.3 1 Key to Disclosures Corporate Governance Council Principles and Recommendations Introduced 01/07/14 Amended 02/11/15 Name of entity Jadar Lithium Limited ABN / ARBN Financial year

More information

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles Operational Manual - Table A1 - Environmental and Social Safeguard Policies Policy and Staff Connections- World Bank Intranet WB External Site WBG Directory Help Site Map Feedback Home News & Events Countries

More information

DRAFT GUIDELINE ON PUBLIC PARTICIPATION IN MYANMAR S EIA PROCESSES CONSULTATION DRAFT

DRAFT GUIDELINE ON PUBLIC PARTICIPATION IN MYANMAR S EIA PROCESSES CONSULTATION DRAFT DRAFT GUIDELINE ON PUBLIC PARTICIPATION IN MYANMAR S EIA PROCESSES CONSULTATION DRAFT 5 April 2017 This Draft Guideline is made possible by the generous support of the American people through the United

More information

COMPLIANCE REPORT ASSESSING APPLICATION OF ARTICLE 11 b (6) OF EMISSIONS TRADING DIRECTIVE TO HYDROELECTRIC PROJECT ACTIVITIES EXCEEDING 20 MW

COMPLIANCE REPORT ASSESSING APPLICATION OF ARTICLE 11 b (6) OF EMISSIONS TRADING DIRECTIVE TO HYDROELECTRIC PROJECT ACTIVITIES EXCEEDING 20 MW COMPLIANCE REPORT ASSESSING APPLICATION OF ARTICLE 11 b (6) OF EMISSIONS TRADING DIRECTIVE TO HYDROELECTRIC PROJECT ACTIVITIES EXCEEDING 20 MW Section 1: Description of the project (Final Version of 17

More information

Category Environmental Item Main Check Items Confirmation of Environmental and Social Considerations

Category Environmental Item Main Check Items Confirmation of Environmental and Social Considerations al Checklist: 5. Non-Ferrous Metals Smelting and Refining(1) (1) ESIA and al Permits 1 Have ESIA reports been officially completed? Have ESIA reports been written in the official language or a language

More information

This document has been provided by the International Center for Not-for-Profit Law (ICNL).

This document has been provided by the International Center for Not-for-Profit Law (ICNL). This document has been provided by the International Center for Not-for-Profit Law (ICNL). ICNL is the leading source for information on the legal environment for civil society and public participation.

More information

Identity Provider Policy. Identity and Authentication Services (IA Services)

Identity Provider Policy. Identity and Authentication Services (IA Services) Identity Provider Policy Identity and Authentication Services (IA Services) Table of Contents 1 Background... 1 1.1 ehealth Ontario Identity Federation... 1 1.2 Purpose... 1 1.3 Objectives... 1 1.4 Scope

More information

Decree on Organization and Activities of the National Statistical System LAO PEOPLE S DEMOCRATIC REPUBLIC

Decree on Organization and Activities of the National Statistical System LAO PEOPLE S DEMOCRATIC REPUBLIC Decree on Organization and Activities of the National Statistical System LAO PEOPLE S DEMOCRATIC REPUBLIC 2002 Also available at: http://www.nsc.gov.la/decree140.htm --------------------------------------

More information

Saskatchewan Environmental Code. Moving Forward in Partnership

Saskatchewan Environmental Code. Moving Forward in Partnership Saskatchewan Environmental Code Moving Forward in Partnership This page has been intentionally left blank table of contents Division A: General Environmental Management and Protection A.1 Administrative

More information

ADJUSTMENTS APPROPRIATION BILL

ADJUSTMENTS APPROPRIATION BILL REPUBLIC OF SOUTH AFRICA ADJUSTMENTS APPROPRIATION BILL (As introduced in the National Assembly (proposed section 77)) (The English text is the offıcial text of the Bill) (MINISTER OF FINANCE) [B 16 2016]

More information

FEDERAL REPUBLIC OF BRAZIL (Framework) Act No , August The President of the Republic

FEDERAL REPUBLIC OF BRAZIL (Framework) Act No , August The President of the Republic FEDERAL REPUBLIC OF BRAZIL (Framework) Act No. 6.938, August 31 1981 This Act regulates the National Environmental Policy, its aims, formulation and enforcement mechanisms and other provisions. The President

More information

Charter of the Board of Directors

Charter of the Board of Directors Charter of the Board of Directors 2018 CGI GROUP INC. Proprietary Charter of the Board of Directors Important note The CGI Constitution, including the Dream, Vision, Mission, and Values of the CGI Group

More information

SUMMARY 2013 EDITION

SUMMARY 2013 EDITION SUMMARY 2013 EDITION RSAT Joint Initiative on Rapid Basin-wide Hydropower Sustainability Assessment Tool PART 1: OVERVIEW OF THE RSAT The RSAT is designed as an integrative tool to assess hydropower development

More information

Regional Guidelines for Public Participation in Environmental Impact Assessment -Cambodia, Lao PDR, Myanmar, Thailand, Vietnam-

Regional Guidelines for Public Participation in Environmental Impact Assessment -Cambodia, Lao PDR, Myanmar, Thailand, Vietnam- Regional Guidelines for Public Participation in Environmental Impact Assessment -Cambodia, Lao PDR, Myanmar, Thailand, Vietnam- August 16, 2016 October 31, 2016

More information

Law of the People s Republic of China on Administration of Foreign NGOs' Activities within China

Law of the People s Republic of China on Administration of Foreign NGOs' Activities within China In-house translation prepared by Law of the People s Republic of China on Administration of Foreign NGOs' Activities within China CONTENTS Chapter 1. General Provisions Chapter 2. Registration and Filing

More information

Sample Position Description Board of Directors

Sample Position Description Board of Directors Sample Position Description Board of Directors Duties and Expectations of a Director Purpose The hospital is committed to ensuring that it achieves standards of excellence in the quality of its governance

More information

Charter of the Board of Directors

Charter of the Board of Directors Charter of the Board of Directors 2017 CGI GROUP INC. Proprietary Charter of the Board of Directors Important note The CGI Constitution, including the Dream, Vision, Mission, and Values of the CGI Group

More information

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY UNITED NATIONS United Nations Interim Administration Mission in Kosovo UNMIK NATIONS UNIES Mission d Administration Intérimaire des Nations Unies au Kosovo UNMIK/REG/2004/22 30 June 2004 REGULATION NO.

More information

Fourth Meeting of the Conference of the Parties to the Framework Convention on the Protection and Sustainable Development of the Carpathians

Fourth Meeting of the Conference of the Parties to the Framework Convention on the Protection and Sustainable Development of the Carpathians Fourth Meeting of the Conference of the Parties to the Framework Convention on the Protection and Sustainable Development of the Carpathians UNEP/CC/COP4/DOC11/REV1 Original: English STRATEGIC ACTION PLAN

More information

ordinance on plant protection and quarantine

ordinance on plant protection and quarantine executive Committee of the National assembly The Socialist Republic of Vietnam Independence Freedom Happiness No: 36/2001/PL-UBTVQH10 ordinance on plant protection and quarantine In order to enhance State

More information

LAW on standardization. no 590-XIII dated * * * SUMMARY

LAW on standardization. no 590-XIII dated * * * SUMMARY LAW on standardization no 590-XIII dated 22.09.1995 Republished: the Official Monitor of the Republic of Moldova no 99-102/328 dated 25.05.2012 Republished: the Official Monitor of the Republic of Moldova

More information

Corporate Governance Policy of The Japan Steel Works, Ltd.

Corporate Governance Policy of The Japan Steel Works, Ltd. Corporate Governance Policy of The Japan Steel Works, Ltd. Established: November 18, 2015 Amendment: June 24, 2016 Chapter 1. General Provisions 1. Purpose The purpose of this document is to prescribe

More information

DRAFT FOR CONSULTATION OCTOBER 7, 2014

DRAFT FOR CONSULTATION OCTOBER 7, 2014 The Board has authorized the release of this document for consultation purposes to seek feedback on its content. It has not endorsed the content of the draft, and the Committee on Development Effectiveness

More information

LAW ON STANDARDS AND TECHNICAL REGULATIONS

LAW ON STANDARDS AND TECHNICAL REGULATIONS For informative purposes NATIONAL ASSEMBLY ------------------------ No: /2006/PL-UBTVQH11 SOCIALIST REPUBLIC OF VIETNAM INDEPENDENCE FREEDOM - HAPPINESS LAW ON STANDARDS AND TECHNICAL REGULATIONS Pursuant

More information

BUSINESS RESPONSIBILITY POLICY

BUSINESS RESPONSIBILITY POLICY McLeod Russel India Limited BUSINESS RESPONSIBILITY POLICY Preamble McLeod Russel India Limited (MRIL) endeavours to fulfil its social duties and undertakes to consolidate social, environmental, ethical

More information

Law of the People's Republic of China on Conserving Energy

Law of the People's Republic of China on Conserving Energy Law of the People's Republic of China on Conserving Energy (Adopted at the 28th Meeting of the Standing Committee of the Eighth National People's Congress on November 1, 1997, promulgated by Order No.

More information

For personal use only

For personal use only CORPORATE GOVERNANCE STATEMENT 31 MARCH 2017 Horseshoe Metals Limited s (the Company) Board of Directors (Board) is responsible for establishing the corporate governance framework of the Company and its

More information

LAO PEOPLE S DEMOCRATIC REPUBLIC PEACE INDEPENDECE DEMOCRACY UNITY PROSPERITY WATER SUPPLY LAW

LAO PEOPLE S DEMOCRATIC REPUBLIC PEACE INDEPENDECE DEMOCRACY UNITY PROSPERITY WATER SUPPLY LAW LAO PEOPLE S DEMOCRATIC REPUBLIC PEACE INDEPENDECE DEMOCRACY UNITY PROSPERITY WATER SUPPLY LAW This draft approved by National Assembly in September 2009. (Unofficial English Translation) 1 TABLE OF CONTENTS

More information

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Date: January 28, 2016 Location (City, Country): Jakarta, Indonesia Audience: Civil Society Organizations

More information

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Date: January 14, 2016 Location (City, Country): KIGALI, RWANDA Audience: Governments Key: C =

More information

Environmental Governance in Myanmar. U Than Aye Director Environmental Conservation Department

Environmental Governance in Myanmar. U Than Aye Director Environmental Conservation Department Environmental Governance in Myanmar U Than Aye Director Environmental Conservation Department 1 Strategy for Environmental Safeguards To work for Economic Development in Parallel with Environmental Conservation

More information

Developing a Feedback and Grievance Redress Mechanism (FGRM) for the Fiji National REDD+ Programme TERMS OF REFERENCE

Developing a Feedback and Grievance Redress Mechanism (FGRM) for the Fiji National REDD+ Programme TERMS OF REFERENCE FIJI REDD+ Readiness Program supported by FCPF/World Bank Developing a Feedback and Grievance Redress Mechanism (FGRM) for the Fiji National REDD+ Programme TERMS OF REFERENCE 1. INTRODUCTION Fiji has

More information

THE STANDING COMMITTEE OF THE NATIONAL ASSEMBLY DECIDED.

THE STANDING COMMITTEE OF THE NATIONAL ASSEMBLY DECIDED. o. 08/ST The Standing Committee Vientiane Capital, 16/01/12 DECISION Of The National Assembly Standing Committee pertaining to the sharing of revenue from timber harvested in the Production Forest Areas

More information

IUCN Standard on the Protection of Natural Habitats

IUCN Standard on the Protection of Natural Habitats IUCN Standard on the Protection of Natural Habitats July 2013 A. Introduction 1. This Standard stems from the need to protect and conserve biodiversity, maintain ecosystem functions and services, and manage

More information

THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness PRIME MINISTER. No: 419/QĐ -TTg. Hanoi, 5 April 2017

THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness PRIME MINISTER. No: 419/QĐ -TTg. Hanoi, 5 April 2017 PRIME MINISTER No: 419/QĐ -TTg THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness Hanoi, 5 April 2017 DECISION On Approval of the National Action Programme on the Reduction of Greenhouse

More information

KINGDOM OF CAMBODIA NATION RELIGION KING ************** SUB-DECREE ON COMMUNITY FORESTRY MANAGEMENT

KINGDOM OF CAMBODIA NATION RELIGION KING ************** SUB-DECREE ON COMMUNITY FORESTRY MANAGEMENT KINGDOM OF CAMBODIA NATION RELIGION KING ************** ROYAL GOVERNMENT OF CAMBODIA No: 79 Or Nor Krar. Bor Kar SUB-DECREE ON COMMUNITY FORESTRY MANAGEMENT The Royal Government of Cambodia Having seen

More information

RFP No: WB/MOF/MINIS/CS/CQS/1.1.9 (d)/2014. A. Background

RFP No: WB/MOF/MINIS/CS/CQS/1.1.9 (d)/2014. A. Background Terms of Reference for a Cumulative Impacts Assessment in Baganuur Coal Mine in Mongolia to be financed by Mining Infrastructure Investment Support Project (MINIS) RFP No: WB/MOF/MINIS/CS/CQS/1.1.9 (d)/2014

More information

Consultation Protocol of the Mikisew Cree First Nation

Consultation Protocol of the Mikisew Cree First Nation November 24, 2009 In our every deliberation we must consider the impact of our decisions on the next seven generations - author unknown Consultation Protocol of the Mikisew Cree First Nation ( the Protocol

More information

FSC Principles and Criteria for Forest Stewardship

FSC Principles and Criteria for Forest Stewardship Country/ Organization Initiative Membership Governing bodies Type and implementation approach Feedstock(s) covered Type(s) of biofuels covered Link Overview. FSC Principles and Criteria for Forest Stewardship

More information

Equal Opportunities and Diversity

Equal Opportunities and Diversity ASPIRE PEOPLE S Equal Opportunities and Diversity POLICY 1.0 General 1.1. Aspire People Ltd embraces diversity and will seek to promote the benefits of diversity in all of our business activities. We will

More information

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR Overview of Presentation 1. Objectives of the Consultancy 2. Hydropower in Myanmar 3. Draft Table of Contents 4.

More information

Building Country Safeguard Systems Briefing Note No. 2 Strengthening Country Safeguard Systems for Effective Environmental Management

Building Country Safeguard Systems Briefing Note No. 2 Strengthening Country Safeguard Systems for Effective Environmental Management Building Country Safeguard Systems Briefing Note No. 2 Strengthening Country Safeguard Systems for Effective Environmental Management Country safeguard systems are composed of the policies, practices,

More information

ENVIRONMENT ASSESSMENT TOOLS FOR IMPROVING THE SUSTAINABILITY OF DEVELOPMENT IN THE MEKONG REGION

ENVIRONMENT ASSESSMENT TOOLS FOR IMPROVING THE SUSTAINABILITY OF DEVELOPMENT IN THE MEKONG REGION ENVIRONMENT ASSESSMENT TOOLS FOR IMPROVING THE SUSTAINABILITY OF DEVELOPMENT IN THE MEKONG REGION INTRODUCTION This brief introduces the main environmental assessment tools now used in the Mekong region

More information

1 Environmental and Social Action Plan

1 Environmental and Social Action Plan 1 and Social Plan The table below constitutes the ESAP. It identifies the required actions during pre-construction, construction and operation of the project. of the actions is the responsibility of Koridori

More information

Resolution XI.3. Adjustments to the Strategic Plan for the triennium

Resolution XI.3. Adjustments to the Strategic Plan for the triennium 11 th Meeting of the Conference of the Parties to the Convention on Wetlands (Ramsar, Iran, 1971) Wetlands: home and destination Bucharest, Romania, 6-13 July 2012 Resolution XI.3 Adjustments to the Strategic

More information

CONSOLIDATION OF EMERGENCY MEASURES ACT S.Nu. 2007,c.10 In force November 8, 2007, except s.5-9 s.5-9 NIF. (Current to: August 24, 2010)

CONSOLIDATION OF EMERGENCY MEASURES ACT S.Nu. 2007,c.10 In force November 8, 2007, except s.5-9 s.5-9 NIF. (Current to: August 24, 2010) CONSOLIDATION OF EMERGENCY MEASURES ACT In force November 8, 2007, except s.5-9 s.5-9 NIF (Current to: August 24, 2010) The following provisions have been deleted for the purposes of this codification:

More information

STRATEGY OF VIETNAM TOWARDS ADDRESSING ENVIRONMENT AND CLIMATE RISKS

STRATEGY OF VIETNAM TOWARDS ADDRESSING ENVIRONMENT AND CLIMATE RISKS STRATEGY OF VIETNAM TOWARDS ADDRESSING ENVIRONMENT AND CLIMATE RISKS BUI CACH TUYEN, Assoc. Prof. Dr. Director General Vietnam Environment Administration ENVIRONMENT AND CLIMATE Vietnam has been facing

More information

Unofficial Translation. The Prime Ministerial Decree on The Organization and Functionalities of the Ministry of Agriculture and Forestry

Unofficial Translation. The Prime Ministerial Decree on The Organization and Functionalities of the Ministry of Agriculture and Forestry The Prime Minister Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity ------xxxx00000xxxx------ No.99/PM Vientiane Capital, dated 09.03.2017 The Prime Ministerial Decree on

More information

REPUBLIC OF LITHUANIA LAW ON ELECTRICITY 20 July, 2000, No. VIII 1881 as amended by 26 June, 2001, No. IX-408 Vilnius CHAPTER ONE GENERAL PROVISIONS

REPUBLIC OF LITHUANIA LAW ON ELECTRICITY 20 July, 2000, No. VIII 1881 as amended by 26 June, 2001, No. IX-408 Vilnius CHAPTER ONE GENERAL PROVISIONS Official translation REPUBLIC OF LITHUANIA LAW ON ELECTRICITY 20 July, 2000, No. VIII 1881 as amended by 26 June, 2001, No. IX-408 Vilnius CHAPTER ONE GENERAL PROVISIONS Article 1. Purpose of the Law This

More information

Official Journal of the European Union REGULATIONS

Official Journal of the European Union REGULATIONS L 21/2 REGULATIONS COMMISSION DELEGATED REGULATION (EU) 2016/98 of 16 October 2015 supplementing Directive 2013/36/EU of the European Parliament and of the Council with regard to regulatory technical standards

More information

Guidelines for reviewing laws and institutions to promote the conservation and wise use of wetlands

Guidelines for reviewing laws and institutions to promote the conservation and wise use of wetlands People and Wetlands: The Vital Link 7 th Meeting of the Conference of the Contracting Parties to the Convention on Wetlands (Ramsar, Iran, 1971), San José, Costa Rica, 10-18 May 1999 Guidelines for reviewing

More information

CHURCH & DWIGHT CO., INC.

CHURCH & DWIGHT CO., INC. CHURCH & DWIGHT CO., INC. Corporate Governance Guidelines As Amended on May 2, 2018 TABLE OF CONTENTS Page A. DIRECTOR QUALIFICATION STANDARDS...3 1. Selection of Directors...3 2. Independent Directors...4

More information

Mining & Communities

Mining & Communities Mining & Communities Supporting human rights-based development in the context of industrial mining in Guinea Abridged version of the Practical guide for civil society organizations and local authorities

More information

ARTICLE 29 DATA PROTECTION WORKING PARTY

ARTICLE 29 DATA PROTECTION WORKING PARTY ARTICLE 29 DATA PROTECTION WORKING PARTY 17/EN WP 256 Working Document setting up a table with the elements and principles to be found in Binding Corporate Rules (updated) Adopted on 29 November 2017 INTRODUCTION

More information

JAPAN BANK FOR INTERNATIONAL COOPERATION GUIDELINES FOR CONFIRMATION OF ENVIRONMENTAL AND SOCIAL CONSIDERATIONS

JAPAN BANK FOR INTERNATIONAL COOPERATION GUIDELINES FOR CONFIRMATION OF ENVIRONMENTAL AND SOCIAL CONSIDERATIONS JAPAN BANK FOR INTERNATIONAL COOPERATION GUIDELINES FOR CONFIRMATION OF ENVIRONMENTAL AND SOCIAL CONSIDERATIONS January 2015 JAPAN BANK FOR INTERNATIONAL COOPERATION 1 Preface Japan Bank for International

More information

Minerals Policy Country Profile ESTONIA

Minerals Policy Country Profile ESTONIA Minerals Policy Country Profile ESTONIA POLICY 1 POLICY 2 POLICY 3 POLICY 4 POLICY 1 POLICY 2 POLICY 3 POLICY 4 POLICY 5 POLICY 6 POLICY 7 POLICY 8 POLICY 9 POLICY 10 POLICY 11 POLICY 12 POLICY 13 POLICY

More information

Comments on CNR s report for the Government of Laos on the Xayaburi Dam June 2012

Comments on CNR s report for the Government of Laos on the Xayaburi Dam June 2012 Comments on CNR s report for the Government of Laos on the Xayaburi Dam June 2012 In April 2011, the four governments of the Mekong River Commission (MRC) Cambodia, Laos, Thailand, and Vietnam met to discuss

More information

Quality, trust and social commitment. CaixaBank's Human Rights Policy. May 2017

Quality, trust and social commitment. CaixaBank's Human Rights Policy. May 2017 CaixaBank's Human Rights Policy May 2017 Caixabank, SA, Barcelona, 2017 1 Contents 1 Introduction 2 Scope and field of application 3 Commitments and principles of conduct in 31 Our responsibility to our

More information

Rainforest Alliance GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT

Rainforest Alliance GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT Rainforest Alliance GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT July, 2017 D.R. 2017 Red de Agricultura Sostenible, A.C. This document is provided by Red de Agricultura Sostenible, A.C. (also

More information

Environment, Social and Governance (ESG) Policy AYE Finance Pvt. Ltd.

Environment, Social and Governance (ESG) Policy AYE Finance Pvt. Ltd. AYE Finance is committed to protect the environment, promote human rights and, and good governance. Environment, Social and Governance (ESG) Policy AYE Finance Pvt. Ltd. 2016 Contents 1. Policy Statement...

More information

FORESTRY AND LAND MANAGEMENT (SCOTLAND) BILL

FORESTRY AND LAND MANAGEMENT (SCOTLAND) BILL FORESTRY AND LAND MANAGEMENT (SCOTLAND) BILL EXPLANATORY NOTES INTRODUCTION 1. As required under Rule 9.3.2A of the Parliament s Standing Orders, these Explanatory Notes are published to accompany the

More information

Note: This is a draft document and does not represent a position or decision by government. Part 2: Policy for Cumulative Effects Management

Note: This is a draft document and does not represent a position or decision by government. Part 2: Policy for Cumulative Effects Management Cumulative CEF DRAFT Effects Policy (April, 2016) Framework Part 2: Policy for Cumulative Effects Management Preamble This is a draft natural resource sector policy being shared for the purpose of gaining

More information

China Airlines Co., Ltd. Corporate Social Responsibility and Sustainable Development Best Practice Principles. Chapter I General Principles

China Airlines Co., Ltd. Corporate Social Responsibility and Sustainable Development Best Practice Principles. Chapter I General Principles China Airlines Co., Ltd. Corporate Social Responsibility and Sustainable Development Best Practice Principles Approved by the 6 th meeting of the 20 th term board of directors on May 12, 2016 Approved

More information

Mekong Partnership for the Environment

Mekong Partnership for the Environment Mekong Partnership for the Environment MEKONG EIA BRIEFING : Environmental Impact Assessment Comparative Analysis In Lower Mekong Countries Authors : Matthew Baird and Dr. Richard Frankel Published in

More information

FSC INTERNATIONAL STANDARD

FSC INTERNATIONAL STANDARD Forest Stewardship Council FSC INTERNATIONAL STANDARD Forest management evaluations addendum Forest certification reports FSC-STD-20-007a (V1-0) EN ACCREDITATION Title: Document reference code: Scope:

More information

Natural Community Conservation Planning Act California Fish and Game Code Section

Natural Community Conservation Planning Act California Fish and Game Code Section Natural Community Conservation Planning Act California Fish and Game Code Section 2800-2835 2800. This chapter shall be known, and may be cited, as the Natural Community Conservation Planning Act. 2801.

More information

German Corporate Governance Code

German Corporate Governance Code [Please note: Amendments to the Code compared with the version dated November 07, 2002 are highlighted in bold print and underlined] Government Commission German Corporate Governance Code Foreword This

More information

Water Quality Standards for Surface Waters of the Ute Mountain Ute Reservation

Water Quality Standards for Surface Waters of the Ute Mountain Ute Reservation Ute Mountain Ute Tribe Water Quality Standards for Surface Waters of the Ute Mountain Ute Reservation Appendix C Anti-Degradation Implementation Policy 1. INTRODUCTION Section 301 of the Clean Water Act

More information

Brasilia Declaration of Judges on Water Justice [10 Principle Declaration]

Brasilia Declaration of Judges on Water Justice [10 Principle Declaration] Brasilia Declaration of Judges on Water Justice [10 Principle Declaration] 8 th World Water Forum Brasília (Brazil) 21 March 2018 We, the judges who administer water justice and adjudicate cases regarding

More information

Chapter 2.3: National Legislation 1

Chapter 2.3: National Legislation 1 Chapter 2.3: National Legislation 1 Module 2: Policy and Legislation Chapter 2.3: National Legislation Legislation is an important element of the institutional framework for watershed management. This

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2012R1024 EN 17.06.2014 002.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B REGULATION (EU) No 1024/2012 OF THE EUROPEAN

More information

Compliance & Enforcement Policy

Compliance & Enforcement Policy Compliance & Enforcement Policy 1.0 Introduction 1.1 About the College The Ontario College of Trades (the College ) is a professional regulatory body that regulates and promotes Ontario s 156 trades in

More information

Code of business conduct

Code of business conduct CODE OF BUSINESS CONDUCT OUR PRINCIPLES OF ACTION OUR PRINCIPLES OF ORGANIZATION OUR POLICIES Code of business conduct Code of business conduct Contents 01 Introduction 02 Compliance with laws and regulations

More information

SAN GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 2017 SAN STANDARD

SAN GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 2017 SAN STANDARD SAN GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 2017 SAN STANDARD SAN GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT Critical criterion 1.4 of the 2017 SAN Standard requires that an independent

More information

Protocol for Developing Multi-Stakeholder Group Terms of Reference and Internal Governance Rules and Procedures

Protocol for Developing Multi-Stakeholder Group Terms of Reference and Internal Governance Rules and Procedures Protocol for Developing Multi-Stakeholder Group Terms of Reference and Internal Governance Rules and Procedures February 2015 Protocol for Developing Multi-Stakeholder Group Terms of Reference and Internal

More information