State Route 710 North Environmental Study Update Online Media Briefing July 12, 2013

Size: px
Start display at page:

Download "State Route 710 North Environmental Study Update Online Media Briefing July 12, 2013"

Transcription

1 State Route 710 North Environmental Study Update Online Media Briefing July 12, 2013 Frank Quon, P.E. Executive Officer, Metro Highway Program Michelle Smith, P.E. Project Manager, Metro Highway Program

2 Background Existing No Build condition of State Route 710 North contributes to growing congestion on freeways and arterials, and poor transit operations within the study area In 2008, 2/3 rd of LA County voters approved use of Measure R funds to address the problem Environmental & Outreach contracts are underway Alternatives Analysis completed in December 2012 Five (5) alternatives advanced to draft environmental impact report/statement (Draft EIR/EIS) for further study Public participation and community outreach continues 2

3 Study Area 3

4 Purpose and Need Statement The purpose of the proposed action is to effectively and efficiently accommodate regional and local north-south travel demands in the study area (the western San Gabriel Valley and east/northeast Los Angeles) including the following considerations: Improve efficiency of the existing regional freeway and transit networks; Reduce congestion on local arterials adversely affected by regional traffic volumes; and Minimize environmental impacts related to mobile sources 4

5 Alternatives Advanced to Draft EIR/EIS 1) No Build 2) Transportation System Management (TSM)/ Transportation Demand Management (TDM) 3) Bus Rapid Transit (BRT) 4) Light Rail Transit (LRT) 5) Freeway Tunnel To review the Alternative Analysis Report visit: 5

6 No Build Alternative Includes planned improvements contained in the 2012 Southern California Association of Governments (SCAG) Regional Transportation Plan (RTP) through 2035 Provides the baseline against which all of the build alternatives are compared

7 TSM/TDM Build Alternative Update Transit Enhancements ITS Improvements Active Transportation Systems DRAFT DRAFT Local Street and Intersection Improvements DRAFT DRAFT 7 7

8 Bus Transit Enhancement Expanded peak period bus service New fare collection technologies considered DRAFT 8

9 Intelligent Transportation Systems Improvements San Gabriel Valley Traffic Signal Forum Measures Signal synchronization Signal optimization Transit signal priority DRAFT 9

10 Active Transportation Systems Pedestrian and bike facility enhancements to support access to transit facilities Coordinating with local agencies DRAFT 10

11 Local Street & Intersection Improvements 27 intersection improvements 7 local street segments Modify Fair Oaks and SR 110 interchange Extend St. John from Del Mar to California Valley to Mission Connector DRAFT 11 11

12 Other Build Alternatives BRT LRT FREEWAY TUNNEL 12

13 BRT Update Improve service, speed and quality Intersection improvements Improve fare collection technology Peak period bus only lanes Station amenities Signal priority Improve access and connectivity to regional system Enhanced by feeder service 13

14 LRT Update Portal now south of Valley Grade separated maintenance yard over Valley Shifted line away from CSULA hydrogen station Shifted approach to Fillmore (reduce property for station) Widen Mednik within ROW for LRT columns Agency coordination (fire, power, railroads, responders, CHP) Feeder service 14

15 Freeway Tunnel Update Evaluate double bore with/without tolls; single bore with tolls; trucks and no trucks Agency coordination with fire, responders, CHP, power, railroads, flood control district CHP enforcement area Develop O&M building concepts Identify potential haul disposal sites Feeder service for express bus 15

16 Study Reporting and Documentation (Sampling) 16

17 Technical Studies Process Steps Prepare draft technical studies Caltrans/Metro review of draft studies Prepare final studies for Caltrans/Metro approval Presentation of key findings to stakeholders Approved technical studies used to prepare Draft EIR/EIS 17

18 Environmental Study Process Schedule 18

19 Outreach Engagement Technical Advisory Committee Stakeholder Outreach Advisory Committee Community Liaison Councils Community Meetings Briefings for Elected Officials, City Councils, Community Based Organizations, Academic Institutions, Employment Centers One on One Briefings Roundtable Discussions Participation in community events Media (radio and print media; interviews and editorials) Social media platforms; website postings and videos 19

20 All Communities Convening Information Sessions Thursday, July 18, PM Los Angeles Presbyterian Church 2241 N. Eastern Avenue, El Sereno, CA Saturday, July 20, :30-11:30 AM* Blair High School 1201 S. Marengo Avenue, Pasadena, CA Tuesday, July 23, PM Langley Senior Center 400 W. Emerson Avenue, Monterey Park, CA *Live webcast at 10:00 am 20

21 Stay Connected and Involved (855) 4-SR / (855) toll free sr710study@metro.net 21

SR 710 North Study. Technical Advisory Committee Meeting No. 16 August 13, 2014 Stakeholder Outreach Advisory Committee Meeting No. 12 August 14, 2014

SR 710 North Study. Technical Advisory Committee Meeting No. 16 August 13, 2014 Stakeholder Outreach Advisory Committee Meeting No. 12 August 14, 2014 SR 710 North Study Technical Advisory Committee Meeting No. 16 August 13, 2014 Stakeholder Outreach Advisory Committee Meeting No. 12 August 14, 2014 1 1 1 Agenda Public Outreach Activities Project Report

More information

State Route 710 North Draft EIR/EIS Public Hearing Presentation. April 11 and 14, 2015; May 6 and 7, 2015

State Route 710 North Draft EIR/EIS Public Hearing Presentation. April 11 and 14, 2015; May 6 and 7, 2015 State Route 710 North Draft EIR/EIS Public Hearing Presentation April 11 and 14, 2015; May 6 and 7, 2015 1 1 1 Presentation Outline Rules of Engagement Community Outreach Activities Background Purpose

More information

INTELLIGENT TRANSPORTATION SYSTEMS APPENDIX

INTELLIGENT TRANSPORTATION SYSTEMS APPENDIX INTELLIGENT TRANSPORTATION SYSTEMS APPENDIX Southern California Association of Governments ADOPTED APRIL 2012 INTELLIGENT TRANSPORTATION SYSTEMS Introduction 1 Existing System Description 1 Existing System

More information

STAFF REPORT. Steven A. Preston, FAICP, City Manager

STAFF REPORT. Steven A. Preston, FAICP, City Manager m... " bl. Public Works Department STAFF REPORT Date: To: From: Subject: June 16, 2015 Steven A. Preston, FAICP, City Manager Daren Grilley, PE, Public Works Director/City Engineer Armine Chaparyan, Community

More information

Richard Clarke Executive Director Program Management. Capital Program Management

Richard Clarke Executive Director Program Management. Capital Program Management Richard Clarke Executive Director Program Management Capital Program Management Department Overview > Transit, Highway Programs, and Regional Rail o Transit Deliver construction projects on-time and within

More information

Presentation to the Streets and Freeways Subcommittee

Presentation to the Streets and Freeways Subcommittee Presentation to the Streets and Freeways Subcommittee Michael Cano, Deputy Executive Officer March 2019 LA County Goods Movement: Updates 2 2018: Highly successful year for Goods Movement in LA County

More information

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence. THE PROJECT A freeway segment ranked 6th worst in the Nation, with levels of congestion, pollution and accidents that are simply unacceptable and which have Statewide and National implications. Executive

More information

SR 710 Environmental Study

SR 710 Environmental Study SR 710 Environmental Study Alternatives Analysis s Technical Advisory Committee Meeting No. 5 May 9, 2012 1 1 Agenda > Recap of TAC Meeting No. 4 > Recommended alternative concepts for conceptual engineering

More information

Connected Corridors I-210 Pilot Project. California Highway Patrol

Connected Corridors I-210 Pilot Project. California Highway Patrol Connected Corridors I-210 Pilot Project California Highway Patrol April 22, 2014 Agenda 2 Introductions Project Overview Project Schedule Project Outreach CHP Involvement Next Steps Caltrans and CHP 3

More information

FACT SHEETS SAN BERNARDINO COUNTY

FACT SHEETS SAN BERNARDINO COUNTY FACT SHEETS SAN BERNARDINO COUNTY WHAT IS THE REGIONAL TRANSPORTATION PLAN/ SUSTAINABLE COMMUNITIES STRATEGY (RTP/SCS) Every four years the Southern California Association of Governments (SCAG) prepares

More information

Truck Management ` Strategies in Los Angeles

Truck Management ` Strategies in Los Angeles Truck Management ` Strategies in Los Angeles Susan Bok, AICP Senior Transportation Planner Los Angeles Department of Transportation NACTO Chicago Workshop May 11-12, 2009 Context Population Downtown LA

More information

Regional Connector Transit Corridor Project Draft Environmental Impact Statement/ Draft Environmental Impact Report

Regional Connector Transit Corridor Project Draft Environmental Impact Statement/ Draft Environmental Impact Report Los Angeles County Metropolitan Transportation Authority Regional Connector Transit Corridor Project Draft Environmental Impact Statement/ Draft Environmental Impact Report Public Scoping Meeting 1 Agenda!

More information

Funding Intelligent Transportation Systems in the Los Angeles Region

Funding Intelligent Transportation Systems in the Los Angeles Region Funding Intelligent Transportation Systems in the Los Angeles Region 2017 ITS California Annual Meeting Ed Alegre, PTP Los Angeles County Metropolitan Transportation Authority (Metro) Los Angeles Region

More information

FACT SHEETS LOS ANGELES COUNTY

FACT SHEETS LOS ANGELES COUNTY FACT SHEETS LOS ANGELES COUNTY WHAT IS THE REGIONAL TRANSPORTATION PLAN/ SUSTAINABLE COMMUNITIES STRATEGY (RTP/SCS) Every four years the Southern California Association of Governments (SCAG) prepares a

More information

Final Congestion Management Process

Final Congestion Management Process Final Congestion Management Process 2015 Prepared by Tulare County Association of Governments 210 N. Church St., Suite B Visalia, California 93291 1. Introduction: What Is Congestion? Congestion can generally

More information

Goods Movement COLLABORATIVE AND PLAN. Arthur L. Dao, Alameda CTC Executive Director ALAMEDA COUNTY TRANSPORTATION COMMISSION. September 17, 2015

Goods Movement COLLABORATIVE AND PLAN. Arthur L. Dao, Alameda CTC Executive Director ALAMEDA COUNTY TRANSPORTATION COMMISSION. September 17, 2015 ALAMEDA COUNTY TRANSPORTATION COMMISSION Goods Movement COLLABORATIVE AND PLAN A presentation to the California Marine Affairs and Navigation Conference Arthur L. Dao, Alameda CTC Executive Director 1

More information

I-710 Project Committee Meeting

I-710 Project Committee Meeting Los Angeles County Metropolitan Transportation Authority I-710 Project Committee Meeting January 29, 2009 Meeting Expectations Review I-710 planning context Concur on a port cargo forecast scenario to

More information

West Santa Ana Branch Transit Corridor. Draft EIS/EIR Scoping Meeting June 2017

West Santa Ana Branch Transit Corridor. Draft EIS/EIR Scoping Meeting June 2017 West Santa Ana Branch Transit Corridor Draft EIS/EIR Scoping Meeting June 2017 Agenda > Welcome and Introductions > Purpose of Scoping > Timeline and Process > Environmental Approach and Methodology >

More information

Northwest State Route 138 Corridor Improvement Project

Northwest State Route 138 Corridor Improvement Project Northwest State Route 138 Corridor Improvement Project Los Angeles County, CA DISTRICT 7- LA- 138 (PM 0.0/36.8); DISTRICT 7- LA- 05 (PM 79.5/83.1); DISTRICT 7- LA- 14 (PM 73.4/74.4) 265100/ 0700001816

More information

Pasadena Unified School District (PUSD), Board of Education 351 S. Hudson Ave Pasadena, CA 91109

Pasadena Unified School District (PUSD), Board of Education 351 S. Hudson Ave Pasadena, CA 91109 Date: May 25, 2016 To: Subject: Pasadena Unified School District (PUSD), Board of Education 351 S. Hudson Ave Pasadena, CA 91109 West Pasadena Resident s Association (WPRA) Requests that the PUSD Reconsider

More information

South Bay Metro Green Line Extension

South Bay Metro Green Line Extension Meeting Agenda Project overview and update Recap of the Scoping Meetings Progress on the project alternative and proposed station locations Meeting Schedule 6:00 Open House 6:30 Presentation 7:15 Public

More information

TECHNICAL MEMORANDUM I-710 EIR/EIS INITIAL FEASIBILITY ANALYSIS (IFA) TECHNICAL APPENDIX WBS TASK ID:

TECHNICAL MEMORANDUM I-710 EIR/EIS INITIAL FEASIBILITY ANALYSIS (IFA) TECHNICAL APPENDIX WBS TASK ID: FINAL REPORT TECHNICAL MEMORANDUM I-710 EIR/EIS INITIAL FEASIBILITY ANALYSIS (IFA) TECHNICAL APPENDIX WBS TASK ID: 165.10.09 Prepared for Los Angeles County Metropolitan Transportation Authority December

More information

Connected Corridors. I-210 Pilot Project. Advancing Traffic Control through Big Data & Connectivity. IPAM Program UCLA.

Connected Corridors. I-210 Pilot Project. Advancing Traffic Control through Big Data & Connectivity. IPAM Program UCLA. Connected Corridors I-210 Pilot Project Advancing Traffic Control through Big Data & Connectivity IPAM Program UCLA October 7, 2015 Samson Teshome, P.E., PMP Pilot TMS Corridor Manager California DOT,

More information

Planning Commission Study Session. Presentation

Planning Commission Study Session. Presentation Planning Commission Study Session Presentation Traffic Model Operation and Summary of the Rail Corridor Plan Traffic Study Results Traffic Model Background Examples of Analysis Techniques Traffic Study

More information

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS 6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS 6.1 MODEL RUN SUMMARY NOTEBOOK The Model Run Summary Notebook (under separate cover) provides documentation of the multiple

More information

West Santa Ana Branch Transit Corridor. Draft EIS/EIR Scoping Interagency Meeting June 19, 2017

West Santa Ana Branch Transit Corridor. Draft EIS/EIR Scoping Interagency Meeting June 19, 2017 West Santa Ana Branch Transit Corridor Draft EIS/EIR Scoping Interagency Meeting June 19, 2017 Agenda > Welcome and Introductions > Purpose of Interagency Scoping > Timeline and Process > Agency Coordination

More information

Westside Subway Extension

Westside Subway Extension Los Angeles County Metropolitan Transportation Authority Westside Subway Extension Community Update Meeting August 2009 Purpose of Tonight s Meeting Summary of Comments from Public Scoping Update on Alternatives

More information

Welcome High Desert Corridor

Welcome High Desert Corridor Los Angeles County Metropolitan Transportation Authority Welcome High Desert Corridor Open House Meetings 6 8pm Monday, July 15, Lake Los Angeles Elementary School Tuesday, July 16, Stater Bros Stadium

More information

House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions. March 28, 2016

House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions. March 28, 2016 House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions March 28, 2016 US Highway 70 Main highway route from I-40 & I-95 to the Global TransPark and the Port of Morehead

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Downtown & Mid-Corridor Project Status Update Meeting Holman United Methodist Church Thursday, July 23, 2009 Phase 1 Project Description 8.6 mile corridor from Downtown

More information

Metro Gold Line Eastside Extension Review Advisory Committee May 11, 2006

Metro Gold Line Eastside Extension Review Advisory Committee May 11, 2006 Review Advisory Committee May 11, 2006 1 Ramona Opportunity High School/ Indiana Station Status 2 Ramona Opportunity High School/ Indiana Station Status 1. On April 19, 2006, Metro held an Indiana Station

More information

PREPARED TESTIMONY OF LEE LISECKI. Q. Please state your name, professional position, and business address.

PREPARED TESTIMONY OF LEE LISECKI. Q. Please state your name, professional position, and business address. Application 06-12-005 et al. Exhibit Date: August, 2008 PREPARED TESTIMONY OF LEE LISECKI Q. Please state your name, professional position, and business address. A. My name is Lee Lisecki. I am a principal

More information

THIS PAGE INTENTIONALLY LEFT BLANK.

THIS PAGE INTENTIONALLY LEFT BLANK. THIS PAGE INTENTIONALLY LEFT BLANK. DRAFT ENVIRONMENTAL IMPACT STATEMENT/ENVIRONMENTAL IMPACT REPORT LEAD AGENCIES: Federal Transit Administration, U.S. Department of Transportation and Los Angeles County

More information

Future Build Alternative Traffic Forecasts and Level of Service Analysis

Future Build Alternative Traffic Forecasts and Level of Service Analysis 4.2.10 Future Build Alternative Traffic Forecasts and Level of Service Analysis For the five Build Alternatives, study intersections within one mile of potential station locations were analyzed, as it

More information

A Presentation to: Project Advisory Group Meeting #7

A Presentation to: Project Advisory Group Meeting #7 A Presentation to: Project Advisory Group Meeting #7 June 10, 2015 Agenda Introductions Action items from last PAG meeting (March 25, 2015) Public involvement update April Public Meetings Elected Official

More information

Intent to Prepare an Environmental Impact Statement for the South Bay Metro

Intent to Prepare an Environmental Impact Statement for the South Bay Metro DEPARTMENT OF TRANSPORTATION Federal Transit Administration Intent to Prepare an Environmental Impact Statement for the South Bay Metro Green Line Extension Transit Corridor, Southwestern Portion of Los

More information

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report Notice of Preparation For Link Union Station (Link US) Project Joint Environmental Impact Statement and Environmental Impact Report Date: May 27, 2016 To: Subject: Project Title: From: All Interested Agencies,

More information

ALAMEDA CORRIDOR EAST San Gabriel Valley

ALAMEDA CORRIDOR EAST San Gabriel Valley ALAMEDA CORRIDOR EAST San Gabriel Valley San Pedro Bay ports: 40% of nation s imports; 30% of exports. ACE Trade Corridor: 21% of waterborne containers entering/exiting the U.S. 81 trains/day (2009) 141

More information

Strategic Transportation Plan FOCUS ON TRANSIT

Strategic Transportation Plan FOCUS ON TRANSIT Strategic Transportation Plan FOCUS ON TRANSIT Presented to: Gateway Cities Service Council Presented by: Jerry Wood, GCCOG Director of Transportation and Engineering COG2013\2013 - POWER POINTS for JRW

More information

ACTIVE TRANSPORTATION ADVISORY COMMITTEE. Memphis MPO March 30, 2015

ACTIVE TRANSPORTATION ADVISORY COMMITTEE. Memphis MPO March 30, 2015 ACTIVE TRANSPORTATION ADVISORY COMMITTEE Memphis MPO March 30, 2015 Agenda Welcome & Introductions Announcements and Briefings Livability 2040: Regional Transportation Plan Congestion Management Process

More information

Eastside Transit Corridor Phase 2

Eastside Transit Corridor Phase 2 Eastside Transit Corridor Phase 2 Community Meeting, June 22, 2016 Page 1 Purpose of Tonight s Meeting Page 2 Update on Metro Board directed Technical Study (Nov. 2014) SR-60 Alternative Washington Blvd

More information

Progress Report Regional Express & Bus Rapid Transit Program

Progress Report Regional Express & Bus Rapid Transit Program Progress Report Regional Express & Bus Rapid Transit Program ST Express Bus routes serve urban centers in Snohomish, King, and Pierce. March 2018 Prepared by Project Control & VE l Design, Engineering

More information

Kentucky River Area Development District

Kentucky River Area Development District Kentucky River Area Development District Regional Transportation Planning Committee DRAFT Regional Goals & FY 2016 Approved: August 12, 2015 KYTC MISSION STATEMENT: To provide a safe, secure, and reliable

More information

Update and Status Report for the Comprehensive Transportation Plan. December 2, 2011

Update and Status Report for the Comprehensive Transportation Plan. December 2, 2011 Update and Status Report for the Comprehensive Transportation Plan December 2, 2011 Overview Comprehensive Transportation Plan (CTP) and Outreach CTP Framework and Program of Projects Alternative Transportation

More information

AGENCY MEETING. I-10E Planning & Environmental Linkages Meeting #1 TxDOT Houston District

AGENCY MEETING. I-10E Planning & Environmental Linkages Meeting #1 TxDOT Houston District AGENCY MEETING I-10E Planning & Environmental Linkages Meeting #1 TxDOT Houston District January 25, 2018 WELCOME TxDOT Project Manager: Grant Chim, P.E. Agenda 1 Introductions / Purpose of Meeting 2 What

More information

Appendix O Congestion Management Program REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY

Appendix O Congestion Management Program REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY Appendix O Congestion Management Program REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY 2014 REGIONAL CONGESTION MANAGEMENT PROGRAM 2014 RTP/SCS APPENDIX O SAN JOAQUIN COUNCIL OF GOVERNMENTS

More information

DRAFT SCOPE OF WORK SOUTHEAST LOS ANGELES COUNTY (SR-91/I-605/I-405) FREEWAY CORRIDORS MAJOR CORRIDORS STUDY

DRAFT SCOPE OF WORK SOUTHEAST LOS ANGELES COUNTY (SR-91/I-605/I-405) FREEWAY CORRIDORS MAJOR CORRIDORS STUDY DRAFT SCOPE OF WORK SOUTHEAST LOS ANGELES COUNTY (SR-91/I-605/I-405) FREEWAY CORRIDORS MAJOR CORRIDORS STUDY 1 SCOPE OF WORK Southeast Los Angeles County (SR-91/I-605/I-405) FREEWAY CORRIDORS STUDY I.

More information

Project Deliverable 4.1.3a Individual City Report - City of Claremont

Project Deliverable 4.1.3a Individual City Report - City of Claremont Pomona Valley ITS Project Project Deliverable 4.1.3a Individual City Report - City of Claremont Prepared by: May 1, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS INDIVIDUAL

More information

Metro Board Action: Motion 22.1

Metro Board Action: Motion 22.1 Los Angeles County Metropolitan Transportation Authority Metro Board Action: Motion 22.1 Implementation Update presented to the Corridor Advisory Committee March 17, 2016 Background Motion 22.1 October

More information

Vicinity Map. Interstate 605 (I-605) and State Route 91 (SR-91) in Los Angeles County

Vicinity Map. Interstate 605 (I-605) and State Route 91 (SR-91) in Los Angeles County 07 - LA - 605 - PM 2.87/PM 6.36 07 - LA - 91 - PM 14.10/PM 19.81 Vicinity Map N On Routes Interstate 605 (I-605) and State Route 91 (SR-91) in Los Angeles County I-605 between Excelsior Dr UC (PM 6.36)

More information

3.0 REVIEW OF PREVIOUS STUDIES

3.0 REVIEW OF PREVIOUS STUDIES 3.0 REVIEW OF PREVIOUS STUDIES This section of the highlights the significant features from previous plans and studies that could impact the development of the I-20 East Transit Initiative. Much of the

More information

High Desert Corridor Draft EIS/EIR Public Hearings

High Desert Corridor Draft EIS/EIR Public Hearings High Desert Corridor Draft EIS/EIR Public Hearings Agenda > Registration/Open House (6pm 6:30pm) > Draft EIS/EIR Presentation (6:30pm 7pm) > Public Comment (7pm 8:30pm) Purpose of Today s Hearing > Provide

More information

Strategic Transportation Plan. Presented to: ECO-Rapid Transit Board of Directors Presented by: Gill V. Hicks, Cambridge Systematics, Inc.

Strategic Transportation Plan. Presented to: ECO-Rapid Transit Board of Directors Presented by: Gill V. Hicks, Cambridge Systematics, Inc. Strategic Transportation Plan Presented to: ECO-Rapid Transit Board of Directors Presented by: Gill V. Hicks, Cambridge Systematics, Inc. June 11, 2014 1 Local Solutions for all Gateway Cities Communities

More information

Final Land Use and Development Opportunities Report 5.0 Environmental Impact/Environmental Consequences

Final Land Use and Development Opportunities Report 5.0 Environmental Impact/Environmental Consequences Figure 5-6. Century City 1/4-Mile Station Area August 16, 2010 Page 5-14 Figure 5-7. Wilshire/Westwood 1/4-Mile Station Area August 16, 2010 Page 5-15 Alternative 1 would be constructed underneath existing

More information

Purpose and Organization PROGRAM ENVIRONMENTAL IMPACT REPORT. Native American Consultation Workshop

Purpose and Organization PROGRAM ENVIRONMENTAL IMPACT REPORT. Native American Consultation Workshop PROGRAM ENVIRONMENTAL IMPACT REPORT Native American Consultation Workshop A Presentation by the Southern California Association of Governments October, 2015 Purpose and Organization Introduction Draft

More information

Section 11: Transportation Strategies Toolbox

Section 11: Transportation Strategies Toolbox Section 11: Transportation Strategies Toolbox A transportation strategies toolbox was developed to provide a systematic approach to identify potential strategies that address corridor transportation needs.

More information

Metro Blue Line Improvements & Project Update

Metro Blue Line Improvements & Project Update Metro Blue Line Improvements & Project Update February 9, 2018 MBL Operational Improvements - External Metro & LADOT coordination to identify traffic signal and intersection treatments aimed at increasing

More information

Stakeholder Summit Presentation

Stakeholder Summit Presentation Stakeholder Summit Presentation May 7, 2018 Do the vision, goals, and initiatives in the Vision 2028 Plan address the key trends and survey results? How do you see Vision 2028 relating back to your work?

More information

6.2.2 Environmental Consequences and Mitigation Measures

6.2.2 Environmental Consequences and Mitigation Measures 6.2 6.2.1 Introduction The existing conditions, regulatory setting, and methods of analysis for transportation under CEQA are described in Chapter 3, NEPA and CEQA Analysis. Impacts that would result from

More information

Executive Summary. What is the Regional Transportation Commission of Southern Nevada?

Executive Summary. What is the Regional Transportation Commission of Southern Nevada? Executive Summary What is the Regional Transportation Commission of Southern Nevada? With more than 2 million people living in Southern Nevada and another 39 million tourists visiting our community annually,

More information

Los Angeles County Congestion Reduction Demonstration Project

Los Angeles County Congestion Reduction Demonstration Project Los Angeles County Congestion Reduction Demonstration Project frequently asked questions update #1 /august 2008 Los Angeles County Metropolitan Transportation Authority (Metro), California Department of

More information

Fairfax Transportation Committee I-66 Multimodal Improvements Inside the Beltway. January 20, 2015

Fairfax Transportation Committee I-66 Multimodal Improvements Inside the Beltway. January 20, 2015 Fairfax Transportation Committee I-66 Multimodal Improvements Inside the Beltway January 20, 2015 I-66 Multimodal Improvements I-66 Multimodal Study (2012 / 2013) Tolling element Multimodal solutions Future

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: Traffic congestion in the Corpus Christi Metropolitan area is not as much a function of population growth as the function of the increase in single occupant trips. Using census data, the

More information

III. ENVIRONMENTAL IMPACT ANALYSIS F. TRAFFIC

III. ENVIRONMENTAL IMPACT ANALYSIS F. TRAFFIC III. ENVIRONMENTAL IMPACT ANALYSIS F. TRAFFIC This section summarizes the traffic impact analysis prepared by Kaku Associates in May, 2002. Detailed calculation worksheets are contained in Appendix D to

More information

Contra Costa Transportation Authority STAFF REPORT February 15, 2017 Page 2 of 3 Background MTC is expected to seek authorization from the State Legis

Contra Costa Transportation Authority STAFF REPORT February 15, 2017 Page 2 of 3 Background MTC is expected to seek authorization from the State Legis Contra Costa Transportation Authority STAFF REPORT Meeting Date: February 15, 2017 Subject Summary of Issues Regional Measure 3 (RM3) Candidate Projects for Submittal to the Metropolitan Transportation

More information

MOBILITY AND ALTERNATIVES ANALYSIS

MOBILITY AND ALTERNATIVES ANALYSIS 6 MOBILITY AND ALTERNATIVES ANALYSIS BACK OF SECTION DIVIDER 6.0 Mobility and Alternatives Analysis Travel demand analysis provides a framework for the identification of transportation facilities and services

More information

Riverview Corridor Pre-Project Development Study

Riverview Corridor Pre-Project Development Study Riverview Corridor Pre-Project Development Study American Society of Civil Engineers - Minnesota May 25, 2016 Work in Progress; Subject to Change 1 History 2000: Major Investment Study (MIS) offered several

More information

EVALUATION OF ALTERNATIVES CARRIED FORWARD

EVALUATION OF ALTERNATIVES CARRIED FORWARD 1 EVALUATION OF ALTERNATIVES CARRIED FORWARD This chapter presents a comparative evaluation of the alternatives carried forward in this Final Environmental Impact Statement (EIS). The intent of this evaluation

More information

Performance Dashboard

Performance Dashboard Unified Corridor Investment Study Performance Dashboard Step 2 Analysis Results DRAFT Revised 10/15/18 October 2018 Project Description Three parallel routes - Highway 1, Soquel/Freedom and the Santa Cruz

More information

Air Pollution and Health: County Public Health Department Perspectives and Actions

Air Pollution and Health: County Public Health Department Perspectives and Actions Air Pollution and Health: County Public Health Department Perspectives and Actions Paul Simon, MD, MPH Director, Chronic Disease and Injury Prevention Los Angeles County Department of Public Health May

More information

CHAPTER 1 PROPOSED PROJECT

CHAPTER 1 PROPOSED PROJECT CHAPTER 1 PROPOSED PROJECT 1.1 INTRODUCTION The California Department of Transportation (Caltrans), in cooperation with the Los Angeles County Metropolitan Transportation Authority (Metro), propose to

More information

Environmental Analysis, Chapter 4 Consequences, and Mitigation

Environmental Analysis, Chapter 4 Consequences, and Mitigation Environmental Analysis, Chapter 4 4.11 Energy Resources This section summarizes the energy resources in the project area, usage associated with construction and operation of the proposed Regional Connector

More information

Welcome High Desert Corridor

Welcome High Desert Corridor Los Angeles County Metropolitan Transportation Authority Welcome High Desert Corridor Open House Meeting December 2012 Agenda for Today s Meeting Introduction Project Background Major Updates HDC Strategic

More information

10.0 Congestion Management Process

10.0 Congestion Management Process Livability 2040 Regional Transportation Plan 10-1 10.0 Congestion Management Process 10.1 CMP Summary The identification and evaluation of projects for the Livability 2040 Regional Transportation Plan

More information

Port Cargo Scenarios Reviewed

Port Cargo Scenarios Reviewed Los Angeles County Metropolitan Transportation Authority Overview of Technical Studies Presented to I-710 Corridor Advisory Committee January 21, 2009 Los Angeles County Metropolitan Transportation Authority

More information

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014 2040 Transportation Policy Plan Conversion to Performance Based Planning Basis 25 th Annual CTS Transportation Research Conference May 21, 2014 1 About the plan Long-range transportation plan for the Twin

More information

Section 4.8 Climate Change

Section 4.8 Climate Change Section 4.8 Climate Change This section summarizes the potential for climate change impacts resulting from construction and operation of the proposed Eastside Transit Corridor Phase 2 Project alternatives.

More information

Members of the Board of Directors. Laurena Weinert, Clerk of the Board

Members of the Board of Directors. Laurena Weinert, Clerk of the Board COMMITTEE TRANSMITTAL July, 06 To: From: Subject: Members of the Board of Directors Laurena Weinert, Clerk of the Board Update on the State Route Improvement Project Between Interstate 0 and Interstate

More information

Presented to : I 710 Project Committee June 30, 2011

Presented to : I 710 Project Committee June 30, 2011 Presented to : I 710 Project Committee June 30, 2011 Overview Metro s Public Private Partnership (PPP) program Traffic Effects of Tolling Trucks on I 710 Statutory Authority for Tolling Interstate Highways

More information

Tulare County Congestion Management Program

Tulare County Congestion Management Program 210 N. Church Street, Suite B. Visalia, California 93291 (559) 623-0450 FAX (559) 733-6720 www.tularecog.org Tulare County Congestion Management Program Congestion Management Process Steering Committee

More information

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018 Project Prioritization for Urban and Rural Projects 2018 TEAM CONFERENCE March 7, 2018 Challenge Limited funding for transportation improvements requires strategic selection of projects to ensure resource

More information

A long-term, comprehensive solution

A long-term, comprehensive solution A long-term, comprehensive solution Nancy Boyd CRC Project Director for Washington Portland State University Transportation Seminar April 15 2011 Frank Green April 15, 2011 CRC Structural Engineering Manager

More information

Refined Statewide California Transportation Model. Progress Report November 2009

Refined Statewide California Transportation Model. Progress Report November 2009 Refined Statewide California Transportation Model Progress Report November 2009 Study area - the State of California. Forecast trips made on a typical fall / spring weekday i.e. when schools are in session.

More information

City of Berkeley. Guidelines for Development of Traffic Impact Reports

City of Berkeley. Guidelines for Development of Traffic Impact Reports Office of Transportation (OOT) City of Berkeley Guidelines for Development of Traffic Impact Reports Office of Transportation, City of Berkeley 1 1. Overview These guidelines provide a framework to help

More information

The Metropolitan Transportation Plan. Public Meetings January 2016

The Metropolitan Transportation Plan. Public Meetings January 2016 The Metropolitan Transportation Plan for North Central Texas Public Meetings January 2016 Presentation Agenda Mobility 2040 Draft Recommendations 2016 Transportation Conformity RTC Policy Bundle Concept

More information

bg 2017 lacmta. Metro

bg 2017 lacmta. Metro Growth - Inducing Impacts for the East San Fernando Valley Transit Corridor March 2015 Prepared by the U.S. Department of Transportation Federal Transit Administration and the Los Angeles County Metropolitan

More information

Status of Projects to Reduce the Impacts of Transportation on Stormwater using Common Transportation Control Measures

Status of Projects to Reduce the Impacts of Transportation on Stormwater using Common Transportation Control Measures MEMORANDUM Campbell Cupertino Los Altos Los Altos Hills Los Gatos Milpitas Monte Sereno Mountain View Palo Alto San Jose Santa Clara Saratoga Sunnyvale Santa Clara County Santa Clara Valley Water District

More information

Comprehensive Regional Goods Movement Plan and Implementation Strategy Study Introduction and Overview

Comprehensive Regional Goods Movement Plan and Implementation Strategy Study Introduction and Overview Comprehensive Regional Goods Movement Plan and Implementation Strategy Study Introduction and Overview presented to Regional Goods Movement Steering Committee SCAG s Consulting Team: Cambridge Systematics,

More information

Transit Effectiveness Project (TEP) and Related Transit Initiatives

Transit Effectiveness Project (TEP) and Related Transit Initiatives SFMTA Municipal Transportation Agency Image: Historic Car number 1 and 162 on Embarcadero Transit Effectiveness Project (TEP) and Related Transit Initiatives SPUR Lunch Forum 02 12 2013 Presentation Overview

More information

Performance Dashboard

Performance Dashboard Unified Corridor Investment Study Performance Dashboard Step 2 Analysis Results DRAFT Revised 11/08/18 October 2018 Project Description Three parallel routes - Highway 1, Soquel/Freedom and the Santa Cruz

More information

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.1 INTRODUCTION A preliminary environmental review was performed on the proposed freeway improvements that form Concept C, which encompasses the three freeway corridors

More information

Towards a Greener Southern California: Regional Transportation Plan/ Sustainable Communities Strategy

Towards a Greener Southern California: Regional Transportation Plan/ Sustainable Communities Strategy SOUTHERN CALIFORNIA ASSOCIATION of GOVERNMENTS Towards a Greener Southern California: 2012-2035 Regional Transportation Plan/ Sustainable Communities Strategy Hasan Ikhrata Executive Director 2 SCAG Quick

More information

SR 432 RAIL REALIGNMENT AND HIGHWAY IMPROVEMENTS PROJECT ELECTED AND AGENCY OFFICIALS PROJECT BRIEFING May 14, 2014

SR 432 RAIL REALIGNMENT AND HIGHWAY IMPROVEMENTS PROJECT ELECTED AND AGENCY OFFICIALS PROJECT BRIEFING May 14, 2014 SR 432 RAIL REALIGNMENT AND HIGHWAY IMPROVEMENTS PROJECT ELECTED AND AGENCY OFFICIALS PROJECT BRIEFING May 14, 2014 History: Studies of the SR 432 rail and highway corridor began back in the late 1980s,

More information

Summary of Technical Memoranda 6a, 6b, and 7 for the Stakeholder Advisory Group. July 25, 2007

Summary of Technical Memoranda 6a, 6b, and 7 for the Stakeholder Advisory Group. July 25, 2007 1 Summary of Technical Memoranda 6a, 6b, and 7 for the Stakeholder Advisory Group July 25, 2007 2 Presentation Overview 1. Review of the Multi-County Goods Movement Action Plan (MCGMAP) study area and

More information

Regional Transit System Plan

Regional Transit System Plan Policy, Program Development & Intergovernmental Relations Committee Item III-A October 14, 2010 Regional Transit System Plan Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

South Bay Corridor Study and Evaluation for Dynamic Corridor Congestion Management (DCCM) Metro Streets and Freeways Subcommittee Meeting

South Bay Corridor Study and Evaluation for Dynamic Corridor Congestion Management (DCCM) Metro Streets and Freeways Subcommittee Meeting South Bay Corridor Study and Evaluation for Dynamic Corridor Congestion Management (DCCM) Metro Streets and Freeways Subcommittee Meeting October 17, 2013 Agenda 1. DCCM Background 2. Project Overview

More information

Pottstown Pike Congestion Mitigation Feasibility Study

Pottstown Pike Congestion Mitigation Feasibility Study Pottstown Pike Congestion Mitigation Feasibility Study Study Advisory Committee Meeting #3 November 15, 2017 Transportation Solutions Building Better Communities Agenda 1. Background Information 2. Review

More information

Goleta Ramp Metering Study

Goleta Ramp Metering Study DRAFT Technical Memorandum Goleta Ramp Metering Study Subtasks 2.1 and 2.2: Data Collection and Existing Baseline Analysis June 5, 2017 DRAFT Technical Memorandum Goleta Ramp Metering Study Subtasks 2.1

More information

VTA s BART Silicon Valley Phase II Extension

VTA s BART Silicon Valley Phase II Extension VTA s BART Silicon Valley Phase II Extension Santa Clara Community Working Group December 3, 2015 1 Agenda Follow-up Items and Work Plan New Starts Project Development & Schedule Update Construction Methods

More information

THANK YOU TO ALL THE I-210 PILOT STAKEHOLDERS FOR YOUR COMMITMENT TO THE PROJECT

THANK YOU TO ALL THE I-210 PILOT STAKEHOLDERS FOR YOUR COMMITMENT TO THE PROJECT Summer 2015 Welcome Samson! Call for Projects Application Recommended For Funding Caltrans is pleased to announce Samson Teshome as the first Corridor Manager under Caltrans innovative reorganization plan.

More information