Presented by: Ben Brown, PE

Size: px
Start display at page:

Download "Presented by: Ben Brown, PE"

Transcription

1 Presented by: Ben Brown, PE

2 What is Automated Machine Guidance?

3 What is mmgps? Automated Machine Guidance (AMG) The Use of Global Positioning System (GPS) technology to guide and control construction equipment AMG for Paving and Milling Topcon s system is mmgps Trimble s system is Trimble 3D Leica s system is PaveSmart 3D Accuracy is increased through secondary receiving station Trimble, Topcon and Leica use robotic total station Topcon can also use Positioning Zone Laser GPS sensors integrate with the machine s electronic controls 3D project model loaded into control box. Sensors adjust screed and mill elevations to match the model at a given location

4 Asphalt Paver 3D-mmGPS 1. PZS MC Sensor 2. Slope Sensor 3. GX-60 Control Box 4. MC-R3 GPS Receiver

5 AMG paving operation

6 Milling 3D-mmGPS 1. Hydraulic Valve Assembly 2. MC-R3 GPS Receiver 3. PZS-MC Sensor 4. Slope Sensor 5. GX-60 Control Box

7 AMG Control box attached to milling machine

8 AMG milling operation

9 AMG milling operation with Positioning Zone Laser station in foreground

10 OOCEA Project SR 417 Widening from SR 528 to Curry Ford Road

11 OOCEA Project SR 417 Widening from SR 528 to Curry Ford Road Before After

12 Why Automated Machine Guidance? Project design required cross-slope and profile correction Transition from 2 lanes to 3 lanes plus auxiliary required modification of cross-slope Existing profile deficiencies to be corrected Pavement optimization required complexity 43 Milling control point transitions SB (12 inside to outside) 46 Milling control point transitions NB (11 inside to outside) Limit to production Opportunity to introduce errors Increase pavement joints Quality control and quantity tracking more difficult Project anticipated significant quantity for overbuild asphalt 8,203.4 TN at $61.50/TN for a total cost of $504, Overbuild quantity is estimated but not limited contractually Significant thickness of overbuild posed constructability challenge Extensive overbuild presented a potential quality concern Overbuild would replace sound pavement to be milled out

13

14 Why Automated Machine Guidance? Milling Details

15 Why Automated Machine Guidance? Milling Details

16 Why Automated Machine Guidance? Milling Control Points

17 Why Automated Machine Guidance? Project design required cross-slope and profile correction Transition from 2 lanes to 3 lanes plus auxiliary required modification of cross-slope Existing profile deficiencies to be corrected Pavement optimization required complexity 43 Milling control point transitions SB (12 inside to outside) 46 Milling control point transitions NB (11 inside to outside) Limit to production Opportunity to introduce errors Increase pavement joints Quality control and quantity tracking more difficult Project anticipated significant quantity for overbuild asphalt 8,203.4 TN at $61.50/TN for a total cost of $504, Overbuild quantity is estimated but not limited contractually Significant thickness of overbuild posed constructability challenge Extensive overbuild presented a potential quality concern Overbuild would replace sound pavement to be milled out

18 How to implement AMG Contract modified to allow for automated machine guidance Replace FDOT Standard Spec. 327 Milling of Existing Asphalt Pavement Specify milling to establish required elevation +- ¼ Replaced fixed depth milling pay items with variable depth pay items Significant survey effort required for final surface design You will be modeling the final surface in 3D, so better initial information will give better results and more accurate quantity estimates You will build the project from the model down rather than from existing up In our case, hard shots were collected every 25 along all existing lane lines Develop Model of proposed surface Model existing pavement surface Model proposed pavement surface Export both models into a table Use table to confirm that cuts/ fills constructible Must determine maximum allowable cut (must maintain structural integrity) Special attention required at bridge approaches and ramp convergence Compare adjacent lanes for potential drop-off violations between lanes Change the proposed model and confirm again until all parties satisfied Cooperation of Owner, Contractor and Engineer of Record a must Only proceed when all parties have buy-in of model

19 Confirming the Model Table created from the output of the models to compare elevations of the proposed surface to the existing pavement elevations.

20 How to execute AMG? Approved model is loaded into control box Confirm proper configuration of gear and base station Proceed with work Technician loads model into control box Confirm proper grades with rover Confirm accurate elevations with preplaced grade markers in shoulder Surveyor confirms grade of milled surface while Inspector confirms cross-slope

21 How to monitor AMG Typical Milling Limerock Base When the milled surface is within the red lines, meaning all the friction course has been removed and the minimum thickness of structural asphalt has been maintained, asphalt paving operations should proceed immediately behind the mill.

22 How to monitor AMG Overbuild Section Limerock Base When the milled surface is above the top red line, meaning the mill has aired out or failed to remove all the friction course, a second pass with the milling machine is required to remove all friction coarse before asphalt paving operations should proceed. Areas under this scenario will require an overbuild course for leveling before structural asphalt can be placed.

23 How to monitor AMG Undercut Section Limerock Base When the milled surface is below the bottom red line, meaning the remaining structural asphalt is too thin to provide the minimum structural value, a second pass with the milling machine is required to remove additional structural asphalt and base to be replaced with structural asphalt. Areas under this scenario two lifts of structural asphalt will be required.

24 How to monitor AMG? Milling machine used to remove base material to be replaced with asphalt, so that the required structural number for the roadway will be maintained.

25 What were the benefits? Ride Quality is excellent All transitions are machine guided Quality of the pavement was improved Required overbuild pavement was greatly reduced. Most asphalt placed in uniform lifts. Where overbuild was needed, the paver was equipped with AMG Milling and Paving phased efficiently Working from the model allowed paving operations to work the length of the project in a circuit. Improved safety with only a single MOT set up each night Paving operations completed in fewer shifts Less impact to customers Less overhead and inspection cost Reduction in the use of overbuild Anticipated quantity of 8,203.4 TN was reduced to 2500TN At $61.50/TN this resulted in savings of over $350,000

26 Text Completed Slide SR 417 Project Lorem ipsum dolor sit amet Consetetur sadipscing elitr Sed diam nonumy eirmod tempor Invidunt ut labore et dolore magna Aliquyam erat, sed diam voluptua At vero eos et accusam et justo duo Et ea rebum Stet clita kasd gubergren No sea takimata sanctus est Lorem ipsum dolor sit amet Invidunt ut labore et dolore magna Aliquyam erat, sed diam voluptua

27 Presented by: Ben Brown, PE Questions?

Final Project. Programming for Engineers Winter Andreas Rau, Saarland University

Final Project. Programming for Engineers Winter Andreas Rau, Saarland University Final Project Programming for Engineers Winter 2015 Andreas Rau, Saarland University The Final Project Groups of 2 Students Design & Implement a Complete Arduino Project (Hard- & Software) Deadline: Tuesday,

More information

MEDIA KIT TOP500 & Green500

MEDIA KIT TOP500 & Green500 March 2018 MEDIA KIT TOP500 & Green500 Contact: advertising@ top500.org TOP500 NEWS Unique perspectives on the latest announcements, technology developments, and other happenings in HPC. Unbiased reporting

More information

Oregon Folklife Network Traditional Arts Apprenticeship Program Guidelines and Application

Oregon Folklife Network Traditional Arts Apprenticeship Program Guidelines and Application Oregon Folklife Network Traditional Arts Apprenticeship Program Guidelines and Application The OFN documents, supports, and celebrates Oregonʼs traditional art forms and cultural practices. We strive to

More information

SellingYourHome. with the professionals

SellingYourHome. with the professionals SellingYourHome the contents 2 OUR MARketing See how our marketing gives your home a competitive advantage in a cluttered marketplace. 4 DigitAL MARketing 90% of all home buyers use the internet to search

More information

The Dash that changed a culture. Henrique Gomes, Sr Business Analytics Manager Alex Cordon, Sr Geospatial and Innovation Manager CDS

The Dash that changed a culture. Henrique Gomes, Sr Business Analytics Manager Alex Cordon, Sr Geospatial and Innovation Manager CDS The Dash that changed a culture Henrique Gomes, Sr Business Analytics Manager Alex Cordon, Sr Geospatial and Innovation Manager CDS Oracle 2016 OracleBIWA BIWA Summit Summit 2016 Speaker Bio Who Am I Devoted

More information

When times are hard you need a partner you can rely on

When times are hard you need a partner you can rely on When times are hard you need a partner you can rely on The strongest partners under the sun 1 The strongest partners under the sun 2 Our goal to support our fellow professionals Together, the sky's the

More information

THE CHIP CARD SYSTEM FOR UNIVERSITIES

THE CHIP CARD SYSTEM FOR UNIVERSITIES THE CHIP CARD SYSTEM FOR UNIVERSITIES Pay for everything with your chip card photocopies, printouts, canteen, library and open doors and lockers Lorem ipsum dolor sit amet, consetet sadipscing elitr, sed

More information

The influence and control of gases and their blends during sintering of carbon steel parts

The influence and control of gases and their blends during sintering of carbon steel parts The influence and control of gases and their blends during sintering of carbon steel parts Guido Plicht, Air Products GmbH, Anna Wehr- Aukland, Rana Ghosh, Diwakar Garg, Don Bowe, Air Products and Chemicals

More information

Biomolecules in Action

Biomolecules in Action MATERIALS & TECHNOLOGY_Nanosensors Biomolecules in Action Techniques that provide insights into the nanoworld continue to garner Nobel Prizes. However, none of those methods has made it possible to observe

More information

Brand Guideline 2016

Brand Guideline 2016 Brand Guideline 2016 Table of Contents 1.0 Introduction 1.01 Overview 1.02 The AJW Brand Elements 1.03 Brand Attributes 1.04 The Guideline 1.05 The Tool Kit 2.0 Brand Architecture 2.01 Overview 2.02 Level

More information

PCCP Pavement Structures, 3D Modeling and Machine Control

PCCP Pavement Structures, 3D Modeling and Machine Control PCCP Pavement Structures, 3D Modeling and Machine Control Design-Build P3 Project Contracting Entity: Infrastructure Development Partners Contract Value: $95.03 M Contract Completion Date: December 2015

More information

MARKETING & PR PACK PARTNER WITH THE UK S N O 1 SPECIALIST IN TRAVEL TO LATIN AMERICA

MARKETING & PR PACK PARTNER WITH THE UK S N O 1 SPECIALIST IN TRAVEL TO LATIN AMERICA MARKETING & PR PACK PARTNER WITH THE UK S N O 1 SPECIALIST IN TRAVEL TO ABOUT JOURNEY WHY ADVERTISE WITH JOURNEY? Having won numerous awards, including most recently Tour Operator of the Year in Food and

More information

BLUE ANGEL Logo Guidelines

BLUE ANGEL Logo Guidelines Edition: August 2017 Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety German Environment Agency Environmental Label Jury RAL ggmbh Contents Introduction 1 THE ENVIRONMENTAL

More information

Automated Machine Guidance

Automated Machine Guidance House Select Committee on Strategic Planning and Long Term Funding Solutions October 24, 2016 Automated Machine Guidance Lamar Sylvester, PE State Construction Engineer Automated Machine Guidance (AMG)

More information

Release 10 11/7/

Release 10 11/7/ 1-1 1-2 We want to build quality roadways but what is quality? Who is the customer? If you are an aggregate or binder supplier your customer is the asphalt producer. If you produce asphalt mix and sell

More information

Trenton M. Clark, P.E. Director of Engineering Virginia Asphalt Association

Trenton M. Clark, P.E. Director of Engineering Virginia Asphalt Association Trenton M. Clark, P.E. Director of Engineering Virginia Asphalt Association Representatives of VDOT (consultant or inspector) must be familiar with the VDOT Road and Bridge Specifications as well as Special

More information

THE AUSTRIAN DRAVA MANAGEMENT IN THE RELATION TO THE INTERNATIONAL RIVER CORRIDOR

THE AUSTRIAN DRAVA MANAGEMENT IN THE RELATION TO THE INTERNATIONAL RIVER CORRIDOR THE AUSTRIAN DRAVA MANAGEMENT IN THE RELATION TO THE INTERNATIONAL RIVER CORRIDOR ALEXANDER ZINKE, Environment Consultant and External Project Expert of BMLFUW (Federal Ministry for Agriculture, Forestry,

More information

Suggested Best Practices for PAVER OPERATORS

Suggested Best Practices for PAVER OPERATORS Suggested Best Practices for PAVER OPERATORS Safety operates the paver using "Best Practices" procedures, to produce the highest-quality pavement possible. 1. Select a paving speed that balances delivery,

More information

2011 Regional Asphalt Meetings. Frequently Asked Questions

2011 Regional Asphalt Meetings. Frequently Asked Questions 2011 Regional Asphalt Meetings Frequently Asked Questions Quiet Pavement Questions 1. Based on the data from the SR 234 site, the decibel difference between the dense graded and PFC was only 1 dba. Is

More information

1. Evolution of Screeds in the USA A. Fixed Screeds with Hydraulic Strike-off, Becoming Obsolete B. Rear Mount Screeds with & without strikeoff C. Fro

1. Evolution of Screeds in the USA A. Fixed Screeds with Hydraulic Strike-off, Becoming Obsolete B. Rear Mount Screeds with & without strikeoff C. Fro 1. Evolution of Screeds In the US 2. Inline Pave (Hot on Hot) 3. Spray Paver Technology 4. RCC, CTB & Applications 5. Foam Mix and Recycling 6. Narrow & Medium Width High Quality Pavement 7. Navitronic

More information

Meant to be used as modules for smaller text amounts. Copy/paste the box(es) you want and replace with your own text.

Meant to be used as modules for smaller text amounts. Copy/paste the box(es) you want and replace with your own text. TEXT BOXES Meant to be used as modules for smaller text amounts. Copy/paste the box(es) you want and replace with your own text. Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod

More information

Specifying Asphalt Pavement the ODOT Way

Specifying Asphalt Pavement the ODOT Way Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Specifying Asphalt Pavement the ODOT Way David Miller, P.E. Office of Pavement Engineering Workshop on Design and Rehabilitation

More information

Phone

Phone www.synergypositioning.co.nz info@synergypositioning.co.nz Phone 0800 867 266 Topcon Enterprise Solutions Engineering Real-time data for up-to-the-minute design, management, and inspection. The global

More information

Intelligent Compaction A Brief Summary

Intelligent Compaction A Brief Summary Intelligent Compaction A Brief Summary Forest Park, GA September 17, 2009 Presented by: Todd Mansell, Sakai America, Inc. Intelligent Compaction The Vision* IC is an emerging technology that allows greater

More information

COMPARISON REPORT CATERPILLAR JOBSITE INFORMATION STUDY. Study Prepared: June 2016

COMPARISON REPORT CATERPILLAR JOBSITE INFORMATION STUDY. Study Prepared: June 2016 COMPARISON REPORT CATERPILLAR JOBSITE INFORMATION STUDY Study Prepared: June 2016 THE ROAD TO PROFITABILITY: A PAYOFF COMPARISON OF TRADITIONAL VS. TECHNOLOGY UTILIZATION IN ROAD CONSTRUCTION Written by:

More information

GPS-Guided Machine Control Using Autodesk Land Desktop By: Harry Ward, PE - Of: OutSource Inc.

GPS-Guided Machine Control Using Autodesk Land Desktop By: Harry Ward, PE - Of: OutSource Inc. December 2-5, 2003 MGM Grand Hotel Las Vegas GPS-Guided Machine Control Using Autodesk Land Desktop By: Harry Ward, PE - Of: OutSource Inc. Code CV23-1 Class Description: Harry Ward, PE Harry Ward, PE,

More information

AASHTO. Automated Cross-Slope and Drainage Path Method

AASHTO. Automated Cross-Slope and Drainage Path Method Automated Cross-Slope and Drainage Path Method Presentation Outline: Contributing factors to Hydroplaning Traditional and Automated Survey Methods Multi-Purpose Survey Vehicle (MPSV) and Subsystems Automated

More information

PAVEMENT DESIGN MEMORANDUM

PAVEMENT DESIGN MEMORANDUM PAVEMENT DESIGN MEMORANDUM FOR SR 70 (15TH STREET EAST) ROUNDABOUT MANATEE COUNTY FINAL SUBMITTAL FPID 435090-1-52-01 PREPARED FOR: FLORIDA DEPT. OF TRANSPORTATION DISTRICT 1 FEBRUARY 16, 2018 PREPARED

More information

Average Spread Rate =

Average Spread Rate = State Of Florida Department Of Transportation Asphalt Roadway - Daily Report of Quality Control Date Page No. of 675-030-20 MATERIALS 07/02 Fin. Project ID: Material No.: Type of Mix: Mix Design No.: Intended

More information

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center Traffic Management Guide to Concrete Overlay Solutions December 5, 2014 ACPA Annual Meeting Dale S. Harrington P.E. Representing CP Tech Center Traffic Management- Concrete Overlays Traffic Management

More information

NYSDOT TRANSPORTATION MAINTENANCE DIVISION PAVING PROJECT QUALITY ASSURANCE ASSESSMENT Rating Guidelines (Revision #1)

NYSDOT TRANSPORTATION MAINTENANCE DIVISION PAVING PROJECT QUALITY ASSURANCE ASSESSMENT Rating Guidelines (Revision #1) NYSDOT TRANSPORTATION MAINTENANCE DIVISION PAVING PROJECT QUALITY ASSURANCE ASSESSMENT Rating Guidelines (Revision #1) INTRODUCTION The condition assessment is intended to be performed from a customer

More information

Materials and Surfacing - Organization and Functions

Materials and Surfacing - Organization and Functions Materials and Surfacing - Organization and Functions Organization & Functions Page 1 Materials and Surfacing. Organization: Chief Materials and Surfacing Engineer 1. Materials 2. Pavement Design 3. Surfacing

More information

Design and Construction of Concrete Overlays. By: James K. Cable, P.E. Cable Concrete Consultation

Design and Construction of Concrete Overlays. By: James K. Cable, P.E. Cable Concrete Consultation Design and Construction of Concrete Overlays By: James K. Cable, P.E. Cable Concrete Consultation PCC OVERLAY AGENDA Current design & construction features What is needed in a PCC overlay set of plans?

More information

APPENDIX 1. Roadway Daily QC Report. Asphalt Plant Level 1

APPENDIX 1. Roadway Daily QC Report. Asphalt Plant Level 1 APPENDIX 1 Roadway Daily QC Report Asphalt Plant Level 1 State Of Florida Department Of Transportation Asphalt Roadway - Daily Report of Quality Control Date Page No. of 675-030-20 MATERIALS 07/02 Fin.

More information

Design of rural and urban roads contributes a lot towards safety of users. Identify some low-cost

Design of rural and urban roads contributes a lot towards safety of users. Identify some low-cost COST EFFECTIVE DESIGNS TO IMPROVE HIGHWAY SAFETY Author: Brent T Allman, E.I.T. Construction Engineering Arizona State University Responding to the following Topic: Design of rural and urban roads contributes

More information

Roadway Profile Testing in North Carolina

Roadway Profile Testing in North Carolina Roadway Profile Testing in North Carolina PAST PERFORMANCE AND LESSONS LEARNED PRESENTED BY CHRISTOPHER BACCHI, TRIMAT MATERIALS TESTING, INC AND NILESH SURTI, NCDOT Why is Pavement Smoothness Important?

More information

FTBA 2018 Construction Conference Major Projects Update

FTBA 2018 Construction Conference Major Projects Update FTBA 2018 Construction Conference Major Projects Update Bill Jones, P.E. FDOT District 7 Director of Transportation Development 1 2 3 FUNDED PROJECTS Howard Frankland Bridge Industry Forum September 2018

More information

KNIME for the Masses: Flexible & Scalable Deployment of KNIME-Workflows. Nils Weskamp

KNIME for the Masses: Flexible & Scalable Deployment of KNIME-Workflows. Nils Weskamp KNIME for the Masses: Flexible & Scalable Deployment of KNIME-Workflows Nils Weskamp Overview Background & Motivation Issues and challenges Technical compatibility: Web Service Web Service Software licenses

More information

2018 ACEC OF FLORIDA FICE OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM

2018 ACEC OF FLORIDA FICE OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM 2018 ACEC OF FLORIDA FICE OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM A. District: 1 2 3 4 5 6 7 TPK C.O. B. Nomination Category: (Select only one category) Outstanding Major Project

More information

Whitetopping: The Overlay Choice

Whitetopping: The Overlay Choice Whitetopping: The Overlay Choice The Worldwide Leader in Concrete Paving Technology A GOMACO GHP-2800 is slipforming the new concrete overlay on top of existing asphalt. HW-051210 D13 Whitetopping Project:

More information

State of New Jersey Department of Transportation

State of New Jersey Department of Transportation State of New Jersey Department of Transportation Special Provisions For State Aid Projects Chris Christie Governor Richard T. Hammer Acting Commissioner Kim Guadagno Lt. Governor Edition 011 SPECIAL PROVISIONS

More information

IMPROVING I 81 IN MARYLAND

IMPROVING I 81 IN MARYLAND IMPROVING I 81 IN MARYLAND April 25, 2017 Stephen A. Bucy, P.E. Improving I 81 in Maryland Overview: Facts SHA s Comprehensive I 81 Strategy Current Phase 1 Widening Project Update Closing Improving I

More information

Flexible Pavement Preservation Industry Perspective Rod Birdsall, P.E. PRDOT PP Conference

Flexible Pavement Preservation Industry Perspective Rod Birdsall, P.E. PRDOT PP Conference F Flexible Pavement Preservation Industry Perspective Rod Birdsall, P.E. PRDOT PP Conference 11.15.2011 ASMG Family of Companies ASMG Locations Outline of Presentation What is Pavement Preservation Why

More information

Pre-Conference Workshop: Changing Methods in Pavement Data Collection

Pre-Conference Workshop: Changing Methods in Pavement Data Collection Pre-Conference Workshop: Changing Methods in Pavement Data Collection AUlloa@dynatest.com KKeifer@dynatest.com Alvaro Ulloa-Calderon, PhD Kurt Keifer, PhD, PE 2014 NWPMA Conference Seattle, WA October

More information

**************************************************************************

************************************************************************** USACE / NAVFAC / AFCEC / NASA UFGS-32 01 16.71 (February 2017) ------------------------------ Preparing Activity: USACE Superseding UFGS-32 01 16.17 (August 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

**************************************************************************

************************************************************************** USACE / NAVFAC / AFCEC / NASA UFGS-32 01 16.71 (February 2017) ------------------------------ Preparing Activity: USACE Superseding UFGS-32 01 16.17 (August 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

36 JASPER THPMAS ROAD CRAWFORDVILLE, FL.

36 JASPER THPMAS ROAD CRAWFORDVILLE, FL. N ARRAN RD. N US 319 CRAWFORDVILLE HWY SR 61 SHADEVILLE RD. WAKULLA HARVEY MILL ROAD US 319 PREBLE-RISH INC CIVIL SURVEYING SITE PLANNING 36 JASPER THPMAS ROAD CRAWFORDVILLE, FL. 32327 GENERAL NOTES: 1.

More information

City of Regina Standard Construction Specification SECTION 2350 PLACEMENT OF ASPHALTIC CONCRETE SURFACE 1.0 GENERAL. 1.1 Scope

City of Regina Standard Construction Specification SECTION 2350 PLACEMENT OF ASPHALTIC CONCRETE SURFACE 1.0 GENERAL. 1.1 Scope 1.0 GENERAL 1.1 Scope 2.0 PRODUCTS 1.1.1 The work shall consist of placing asphaltic concrete to a compacted thickness conforming to the lines, grades, and cross-sections as shown on the plan or as designated

More information

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN P401: ITEM 254 - PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN P402: ITEM 254 - PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, AS PER PLAN P403: ITEM 304 - AGGREGATE BASE, AS PER PLAN P404: DELETED P405:

More information

EFFECT OF AGGREGATE GRADATION ON MEASURED ASPHALT CONTENT

EFFECT OF AGGREGATE GRADATION ON MEASURED ASPHALT CONTENT NCAT Report 93-01 EFFECT OF AGGREGATE GRADATION ON MEASURED ASPHALT CONTENT By Prithvi S. Kandhal Stephen A. Cross April 1993 Paper presented at the Annual Meeting of the Transportation Research Board

More information

Webinar on: Concrete Overlay Design Details and Joints. Dale S. Harrington P.E. March 5, 2015

Webinar on: Concrete Overlay Design Details and Joints. Dale S. Harrington P.E. March 5, 2015 Webinar on: Concrete Overlay Design Details and Joints Dale S. Harrington P.E. March 5, 2015 System of Concrete Overlays Concrete Overlays Bonded Overlay System Unbonded Overlay System Concrete Pavements

More information

Project Scope of Work Contract Time Percentage of contract time added, excluding weather and holidays = 13.0% (<20%)

Project Scope of Work Contract Time Percentage of contract time added, excluding weather and holidays = 13.0% (<20%) Summary Report All Electronic Tolling (AET) Phase 6B Veterans Expressway (SR 589) from Gunn Hwy to Dale Mabry Hwy CEI Senior Project Engineer: Jeffrey James, P.E. Metric Engineering, Inc. 615 Crescent

More information

November 29, CITY OF PLANT CITY Purchasing Division (813)

November 29, CITY OF PLANT CITY Purchasing Division (813) November 29, 2018 CITY OF PLANT CITY Purchasing Division (813) 659-4270 IFB 18-014UM-LG 12-inch Water Transmission Main-Franklin St., Hancock St. and Terrace Drive West ADDENDUM No. 3 *Bidders are required

More information

Steel halls from Losberger a variety of possibilities

Steel halls from Losberger a variety of possibilities Steel halls from Losberger a variety of possibilities Losberger offers a wide range of steel halls The question of whether a steel hall should be built using a modular system or as a solid construction

More information

Section 502. HMA CRACK TREATMENT

Section 502. HMA CRACK TREATMENT 502.01 Section 502. HMA CRACK TREATMENT 502.01. Description. This work consists of treating cracks in Hot Mix Asphalt (HMA) surfaces using either a saw or rout and seal process or an overband process.

More information

Stringless Concrete Slip Form Paving Using GPS Controlled Spreaders

Stringless Concrete Slip Form Paving Using GPS Controlled Spreaders Stringless Concrete Slip Form Paving Using GPS Controlled Spreaders Copyright June 2009 Gulf Surveyors Group, Inc. Reprinted and posted for MachineControlOnline.com with Permission Construction stakeout

More information

CONTRACT No.: E8M79 Date: 06/30/14 Page 1 of 5

CONTRACT No.: E8M79 Date: 06/30/14 Page 1 of 5 Page 1 of 5 FLORIDA S TURNPIKE ENTERPRISE (FTE) Construction Engineer: Pete Nissen, P.E. Assistant Construction Engineer: Bill Sears, P.E. FDOT Design William Sloup, P.E. GEC Design Terry Miller, P.E.

More information

Social Media Predictions for 2014!

Social Media Predictions for 2014! Social Media Predictions for 2014! A project of UNC JOMC 490.003 Managing Online CommuniBes and Social Media November 2014 Table of Contents! Part 1: Growth 03 Legere soluta temporibus pri in, nam ei elitr

More information

IGGA Guide Specification: Conventional Diamond Grinding of City Streets Introduction

IGGA Guide Specification: Conventional Diamond Grinding of City Streets Introduction IGGA Guide Specification: Conventional Diamond Grinding of City Streets Introduction This standard developed, by the International Grooving and Grinding Association (IGGA), specifies the procedures for

More information

Paving Equipment - Manufactures Perspective

Paving Equipment - Manufactures Perspective Agenda: 1. Differences in equipment - Road paving VS Airport Paving Principles of Screed Compaction Vibratory, Compaction & High Compaction Screeds Surface Texture and Density Wide Paving Eliminate Joints

More information

IGGA Guide Specification: Conventional Diamond Grinding for Pavement Preservation Introduction

IGGA Guide Specification: Conventional Diamond Grinding for Pavement Preservation Introduction IGGA Guide Specification: Conventional Diamond Grinding for Pavement Preservation Introduction This standard developed, by the International Grooving and Grinding Association (IGGA), specifies the procedures

More information

} SURVEY SR 429 STANDARD CLEARING & GRUBBING LIMITS OF FRICTION COURSE 8" 8" 8" 8" 12' VARIES 24'-36' VARIES VARIES * 4' SHLDR. PAVT.

} SURVEY SR 429 STANDARD CLEARING & GRUBBING LIMITS OF FRICTION COURSE 8 8 8 8 12' VARIES 24'-36' VARIES VARIES * 4' SHLDR. PAVT. } SURVEY SR 429 { CONST. SR 429 (WEKIVA PKWY) R/W (15 MIN.) 0'-10.4' R/W (15 MIN.) STANDARD CLEARING & GRUBBING 24'-36' 24'-48' 94' BORDER (2-30.) (2-30.) 94' BORDER 10' 4' 10' NATURAL GROUND, MAX. CUT

More information

SR 600 (US 92) Concrete Slab Replacement Reconstruction Project with Precast Pre-Stressed. Florida Department of Transportation District Five

SR 600 (US 92) Concrete Slab Replacement Reconstruction Project with Precast Pre-Stressed. Florida Department of Transportation District Five SR 600 (US 92) Concrete Slab Replacement Reconstruction Project with Precast Pre-Stressed Florida Department of Transportation District Five Project Overview Location SR 600 / US 92, Volusia County FPN:

More information

SEAUPG ANNUAL MEETING NOVEMBER 13, 2013

SEAUPG ANNUAL MEETING NOVEMBER 13, 2013 Trenton M. Clark, P.E. Virginia Asphalt Association David White Superior Paving Corporation Current system is approximately 5,230 ln mi Pavement types Flexible Jointed Concrete Continuously Reinforced

More information

DESIGN BULLETIN #77/2013 AMENDMENTS TO PAVEMENT DESIGN MANUAL. Re: Updated Requirements for Agency Practice, Design Inputs and Design Report Contents

DESIGN BULLETIN #77/2013 AMENDMENTS TO PAVEMENT DESIGN MANUAL. Re: Updated Requirements for Agency Practice, Design Inputs and Design Report Contents DESIGN BULLETIN #77/2013 AMENDMENTS TO PAVEMENT DESIGN MANUAL Re: Updated Requirements for Agency Practice, Design Inputs and Design Report Contents Introduction This design bulletin provides a number

More information

Night Work Specification

Night Work Specification 1.0 HOURS OF WORK Night Work Specification Night time hours are defined as per the Tender documents. 2.0 TRAFFIC CONTROL PLAN Prior to the start of work the Contractor shall submit 4 bound copies of a

More information

SECTION ASPHALT CONCRETE

SECTION ASPHALT CONCRETE SECTION 02740 ASPHALT CONCRETE PART 1. GENERAL 1.01 SECTION INCLUDES A. Work includes but is not limited to the following: 1.02 RELATED SECTIONS 1. Provide all material, labor, and equipment to prepare

More information

THE UNIVERSITY OF SYDNEY. Interpretive Signs Issue A

THE UNIVERSITY OF SYDNEY. Interpretive Signs Issue A THE UNIVERSITY OF SYDNEY Interpretive Signs Issue A 05.1.007 INTERPRETIVE SIGNS IN1 Pavement Interpretive Sign 3 IN Wall Mounted Interpretive Sign 5 IN3 Fee Standing Interpretive Sign 8 IN1 Pavement Interpretive

More information

Design-Build and Design-Bid-Build

Design-Build and Design-Bid-Build Design-Build and Design-Bid-Build Comparison of Overall Cost and Time Question: How does the total cost and time to deliver a $55,000,000 and 814 day design-build project compare to using design-bid-build

More information

Special Provision No. 399F02 January 2017 CONSTRUCTION SPECIFICATION FOR TEMPORARY HOT MIX PAVEMENT

Special Provision No. 399F02 January 2017 CONSTRUCTION SPECIFICATION FOR TEMPORARY HOT MIX PAVEMENT TEMPORARY HOT MIX PAVEMENT - Item No. Special Provision No. 399F02 January 2017 CONSTRUCTION SPECIFICATION FOR TEMPORARY HOT MIX PAVEMENT 1.0 SCOPE This Special Provision covers the requirements for the

More information

Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011

Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011 Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011 General Provisions and Specifications - These provisions and specifications shall

More information

CISCA INDUSTRY UPDATE CEILINGS & INTERIOR SYSTEMS CONSTRUCTION PROFESSIONALS EVERY WEEK MEDIA KIT

CISCA INDUSTRY UPDATE CEILINGS & INTERIOR SYSTEMS CONSTRUCTION PROFESSIONALS EVERY WEEK MEDIA KIT REACH2,500 MEDIA KIT CEILINGS & INTERIOR SYSTEMS CONSTRUCTION PROFESSIONALS EVERY WEEK CISCA INDUSTRY UPDATE A MANY WAYS TO DELIVER YOUR MESSAGE TO THIS MARKET B C ADVERTISING OPTIONS C1 B1 A LEADERBOARD

More information

Asphalt Pavement Recycling: US Experience. PSWNA Meeting Warsaw, Poland October 28, 2011

Asphalt Pavement Recycling: US Experience. PSWNA Meeting Warsaw, Poland October 28, 2011 Asphalt Pavement Recycling: US Experience PSWNA Meeting Warsaw, Poland October 28, 2011 2 Rebecca S. McDaniel, PE, PhD Technical Director North Central Superpave Center Purdue University West Lafayette,

More information

Solutions - for Non-Users Site. Tams Mullins Spectra Measuring Systems 6/10/09

Solutions - for Non-Users Site. Tams Mullins Spectra Measuring Systems 6/10/09 An Introduction to Heavy Highway Solutions - for Non-Users Site Positioning Tams Mullins Spectra Measuring Systems 6/10/09 SMS Company Summary Over 50 years of experience in the surveying and construction

More information

THE IGLTA enewsletter LGBT TOURISM INDUSTRY PROFESSIONALS EVERY WEEK MEDIA KIT. International Gay & Lesbian Travel Association

THE IGLTA enewsletter LGBT TOURISM INDUSTRY PROFESSIONALS EVERY WEEK MEDIA KIT. International Gay & Lesbian Travel Association REACH3,000 THE IGLTA enewsletter MEDIA KIT LGBT TOURISM INDUSTRY PROFESSIONALS EVERY WEEK International Gay & Lesbian Travel Association A MANY WAYS TO DELIVER YOUR MESSAGE B TO THIS MARKET C F ADVERTISING

More information

APMA NEWSBRIEF MEDIA KIT PODIATRISTS

APMA NEWSBRIEF MEDIA KIT PODIATRISTS REACH10,500 semi-weekly APMA NEWSBRIEF MEDIA KIT PODIATRISTS A B MANY WAYS TO DELIVER YOUR MESSAGE TO THIS MARKET C G ADVERTISING OPTIONS A LEADERBOARD This premier position provides your company with

More information

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this

More information

CONSTRUCTION SPECIFICATION FOR HOT IN-PLACE RECYCLING AND HOT IN-PLACE RECYCLING WITH INTEGRAL OVERLAY

CONSTRUCTION SPECIFICATION FOR HOT IN-PLACE RECYCLING AND HOT IN-PLACE RECYCLING WITH INTEGRAL OVERLAY ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 332 SEPTEMBER 1996 CONSTRUCTION SPECIFICATION FOR HOT IN-PLACE RECYCLING AND HOT IN-PLACE RECYCLING WITH INTEGRAL OVERLAY 332.01 SCOPE 332.02 REFERENCES

More information

ANSWERS TO QUESTIONS RECEIVED THROUGH 11:00 A.M. ON JANUARY 4, 2019:

ANSWERS TO QUESTIONS RECEIVED THROUGH 11:00 A.M. ON JANUARY 4, 2019: ADDENDUM NO. PROJECT NO. 3-9-07 PAGE 2 ANSWERS TO QUESTIONS RECEIVED THROUGH :00 A.M. ON JANUARY, 209: Q# Plan sheet 2 has a note MAINTENANCE OF TRAFFIC (LOCAL ROADS) which relates to bid item 22 and calls

More information

< ~ -n~rtz, Concrete Engineer Office of Materials

< ~ -n~rtz, Concrete Engineer Office of Materials Minnesota Department of Transportation MEMO Office of Materials Mailstop 645 1400 Gervais Avenue Maplewood, MN 55109 'stribution 57, 612, 618, 650 ~ < ~ -n~rtz, Concrete Engineer Office of Materials Implementation

More information

COMPOSITE PAVEMENT OVERLAY

COMPOSITE PAVEMENT OVERLAY COMPOSITE PAVEMENT OVERLAY PROJECT: US 130 MAIN STREET TO US ROUTE 1 2018 NJ Asphalt Paving Conference NUSRAT S MORSHED, P.E. PAVEMENT DESIGN Acknowledgement Robert Blight Supervising Engineer, Pavement

More information

Reclaimed Asphalt Pavement (RAP)

Reclaimed Asphalt Pavement (RAP) Reclaimed Asphalt Pavement (RAP) 1 What is RAP An asphalt material removed from the road that is intended to be reused on the roadway. RAP could be used as base course material, shouldering material, and

More information

Over the Alps with NAVITRONIC Basic and Swiss Precision

Over the Alps with NAVITRONIC Basic and Swiss Precision Use of the new VÖGELE 3D control system for wheeled pavers. Over the Alps with NAVITRONIC Basic and Swiss Precision Use of the new VÖGELE 3D control system for wheeled pavers. Over the Alps with NAVITRONIC

More information

$1,314, SW King Street and SW Mauldin Ave Bid Opening 5/3/2018 Company Name Amount. Anderson Columbia. Curt s Construction

$1,314, SW King Street and SW Mauldin Ave Bid Opening 5/3/2018 Company Name Amount. Anderson Columbia. Curt s Construction Bid No. 2018-3 Columbia County Board of County Commissioners SW King Street and SW Mauldin Ave Bid Opening 5/3/2018 Company Name Amount Anderson Columbia C.A. Boone Construction Curt s Construction 1,187,141.78

More information

B HOT MIX, HOT LAID ASPHALTIC CONCRETE OPSS 313

B HOT MIX, HOT LAID ASPHALTIC CONCRETE OPSS 313 B 313-1 OPSS 313 313-1.1 GENERAL HL,, Mixture, and/or Mix, is hot mixed, hot laid asphaltic concrete, used for pavement construction and other uses. 1. HL 1 This dense graded surface course mix is used

More information

SEAUPG Jacksonville, Florida November 14-16, 2017

SEAUPG Jacksonville, Florida November 14-16, 2017 Florida Department of TRANSPORTATION Topics of Discussion Overview of APT Program ACCELERATED PAVEMENT TESTING RESEARCH Performance of Asphalt Pavements Constructed Using Different Compaction Levels November

More information

Concrete Overlays. ACPA Pennsylvania Chapter. ACPA Pennsylvania Chapter. Versatile & Sustainable Solutions. Reasons to Consider a Concrete Overlay

Concrete Overlays. ACPA Pennsylvania Chapter. ACPA Pennsylvania Chapter. Versatile & Sustainable Solutions. Reasons to Consider a Concrete Overlay Overlays February 22, 2012 ACPA Pennsylvania Chapter Overlays John M. Becker, P.E. ACPA Penn Chapter February 22, 2012 One of 25 state paving associations affiliated with ACPA National Comprised of approximately

More information

Rehabilitation of the Blue Ridge Parkway with FDR and AC Overlay. Michael Walters FHWA EFLHD October 7, 2014

Rehabilitation of the Blue Ridge Parkway with FDR and AC Overlay. Michael Walters FHWA EFLHD October 7, 2014 Rehabilitation of the Blue Ridge Parkway with FDR and AC Overlay Michael Walters FHWA EFLHD October 7, 2014 HISTORY Existing pavement on Parkway very deteriorated Repair options were heavy patching and

More information

SERVING THE CONSTRUCTION AND MINING INDUSTRIES

SERVING THE CONSTRUCTION AND MINING INDUSTRIES SERVING THE CONSTRUCTION AND MINING INDUSTRIES 3D SITE MANAGEMENT 3D MACHINE CONTROL OFFICE MANAGEMENT SYSTEM SITE CONNECTIVITY GPS LANDFILL SYSTEMS GPS DRILL SYSTEMS HAUL TRUCK MANAGEMENT For more information

More information

Reconstruction of Motorway in Full-Road Width Across 12m

Reconstruction of Motorway in Full-Road Width Across 12m SUPER 2100-2 with SB 250 TP1 Fixed-Width Screed in operation on the German A 61 motorway. Reconstruction of Motorway in Full-Road Width Across 12m SUPER 2100-2 with SB 250 TP1 Fixed-Width Screed in operation

More information

BOCA Project Suitability, Design and Construction

BOCA Project Suitability, Design and Construction BOCA Project Suitability, Design and Construction Bonded Concrete Overlay of Asphalt Pavements Mechanistic-Empirical Design Guide (BCOA ME) B C O A University of Pittsburgh Julie M. Vandenbossche, P.E.,

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.05 EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 The bid opening date is Thursday March 15, 2018 at 11:00 a.m. The following changes

More information

ACCP NEWSBRIEF PULMONARY, CRITICAL CARE, AND SLEEP PROFESSIONALS EVERY WEEK MEDIA KIT

ACCP NEWSBRIEF PULMONARY, CRITICAL CARE, AND SLEEP PROFESSIONALS EVERY WEEK MEDIA KIT REACH17,000 MEDIA KIT PULMONARY, CRITICAL CARE, AND SLEEP PROFESSIONALS EVERY WEEK ACCP NEWSBRIEF A B MANY WAYS TO DELIVER YOUR MESSAGE TO THIS MARKET C F ADVERTISING OPTIONS A LEADERBOARD This premier

More information

PAVING SLABS ON AGGREGATE BED FOR ROOF PLAZA DECKS

PAVING SLABS ON AGGREGATE BED FOR ROOF PLAZA DECKS SECTION 32 14 13.16 PAVING SLABS ON AGGREGATE BED FOR ROOF PLAZA DECKS (1995 MasterFormat Section 02784) Note: This guide specification for the U.S. is for paving slabs used as ballast and/or paving on

More information

MAGNET Mobile Exchange is a free utility that connects to MAGNET Enterprise. Exchange any kind of file with the office.

MAGNET Mobile Exchange is a free utility that connects to MAGNET Enterprise. Exchange any kind of file with the office. MAGNET Field is a powerful and intuitive field application software that enables users to collect survey mapping data and perform construction and road layout using total stations, levels, and GPS. MAGNET

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

MEMORANDUM: INITIAL CONCEPTS SUMMARY

MEMORANDUM: INITIAL CONCEPTS SUMMARY MEMORANDUM: INITIAL CONCEPTS SUMMARY INTRODUCTION This memo presents a summary of initial concepts that have been identified as development of the project study has progressed, along with a recommendations

More information

JOB BB0414 PORTER RD. HWY. 112/71B WIDENING & INTCHNG. IMPVTS. (S) AUGUST 10, 2016

JOB BB0414 PORTER RD. HWY. 112/71B WIDENING & INTCHNG. IMPVTS. (S) AUGUST 10, 2016 JOB BB0414 PORTER RD. HWY. 112/71B WIDENING & INTCHNG. IMPVTS. (S) AUGUST 10, 2016 Is it allowable to substitute the WF beams to Plate Girders on Bridge 05692? The substitution of a plate girder with flanges

More information

SECTION 503 TEMPORARY PAVEMENT RESTORATION

SECTION 503 TEMPORARY PAVEMENT RESTORATION SECTION 503 TEMPORARY PAVEMENT RESTORATION 503-1 DESCRIPTION: This work consists of furnishing, placing, compacting, and maintaining a temporary pavement surface suitable for driving in accordance with

More information

logo Slimming World the Logo Full colour Single colour black Special offers

logo Slimming World the Logo Full colour Single colour black Special offers Logo the Slimming World Please always use the Slimming World logo as shown, complete with the strapline touching hearts, changing lives. To ensure that colours are consistent the following 4-colour breakdown

More information