1 Engineering Department Stormwater Mission: To provide for the efficient and effective cleaning and repair of the stormwater collection system and implement the federally mandated Stormwater Pollution Prevention Program in the Richmond area of Contra Costa County. Overview Vactor Truck Storm Drain Construction This program is organized via a 20-year contract with Veolia Water North America under the direction of the City Engineer. In accordance with the City's General Plan, the goals of the Storm Sewer System Capital Program are to reduce the risk of drainage-related surface damage and protect the quality of stormwater runoff. This complies with the municipal storm sewer discharge permit issued to the City by the Regional Water Quality Control Board under the regulations mandated by the Environmental Protection Agency. The City of Richmond is responsible for constructing, as budgets and City Council priorities permit, facilities for conveying surface runoff in the City's Urban Service Area to adjacent stream channels, creeks and the San Francisco Bay. The Storm Sewer Operating Fund provides funding for capital improvement projects, street sweeping, storm system maintenance, the Storm Drain Management System (SDMS), and the federally mandated Non-Point Source Pollution Control Program through Storm Sewer Service charge fees. These charges are assessed annually on properties and collected with real property taxes. New and replacement storm drain pipelines must be designed to accommodate a ten-year storm. Storm sewer systems in newly developed areas are primarily constructed by developers as a condition of development. The CIP provides funding for projects in developed areas to enhance existing capacity and improve operations and maintenance. Storm Drain Improvements FY CIP Budget L - 1

2 Engineering Department Stormwater Program Highlights Engineering Stormwater Improvements Project Cost: $2,170,000 Funding Sources: Storm Drainage Impact Fee $ 118,800 Unfunded $ 1,861,100 Total Project Cost is $17,880,000 over the five years. The Engineering Stormwater Improvements project consists of the following projects: Potrero Blvd. Improvements This area has been identified as a hot-spot for storm sewer problems (flooding, bottlenecks, and overflows). Bayview Ave. Improvements This area has been identified as a hot-spot for storm sewer problems (flooding, bottlenecks, and overflows). Marina Way This area has been identified as a hot-spot for storm sewer problems (flooding, bottlenecks, and overflows). Project Status: This is an out-going project to improve storm water runoff. FY CIP Budget L - 2

3 Engineering Department Stormwater Performance Measurements Performance 1-yr 1 st Qtr. 2 nd Qtr. 3 rd Qtr. 4 th Qtr. CIP Project(s) Benchmarks Goal Target Target Target Target 1. New 54" Pipeline along Potrero Ave. and additional 50% 2% 10% 20% 50% Collector Inlets a) Engineering design 50% 5% 35% 50% 50% b) Plan approval 100% 0% 0% 0% 100% c) Call for bids 0% 0% 0% 0% 0% d) Construction 0% 0% 0% 0% 0% 2. New 54" Pipeline along Canal and additional 25% 5% 10% 20% 25% Collector Inlets a) Engineering design 25% 5% 10% 20% 25% b) Plan approval 0% 0% 0% 0% 0% c) Call for bids 0% 0% 0% 0% 0% d) Construction 0% 0% 0% 0% 0% = CIP Projects = Work Completion Targets = Performance Benchmarks * = Work Completed FY CIP Budget L - 3

4 City of Richmond FY FY CIP Engineering Stormwater Adopted Actuals Project No. Project Name FY FY FY FY FY FY FY Year Total S Stormwater Improvements $118,800 $2,674,000 $2,503,200 $251,900 $135,500 $5,683,400 Subtotal Engineering $118,800 $2,674,000 $2,503,200 $251,900 $135,500 $5,683,400 Total Funded $118,800 $429,100 $255,100 $251,900 $135,500 $1,190,400 Total Unfunded $4,452,100 $2,244,900 $2,248,100 $0 $0 $8,945,100 Fund No. Sources 5104 Wastewater $118,800 $429,100 $255,100 $251,900 $135,500 $1,190,400 UNF Unfunded $4,452,100 $2,244,900 $2,248,100 $0 $0 $8,945,100 Total Source Of Fund $0 $4,570,900 $2,674,000 $2,503,200 $251,900 $135,500 $10,135,500 L - 4

5 Rich Davidson Engineering - Stormwater The Engineering Stormwater Improvements project consists of the following projects: Pump Station Improvements -Veolia has identified several aging storm pump stations in need of replacement or rehabilitation. This project is needed in order to comply with necessary upgrades required as part of the City s NPDES permit. Potrero Blvd Improvements - This area has been identified as a hot-spot for storm sewer problems (flooding, bottlenecks, and over-flows). Bayview Ave Improvements - This area has been identified as a hot-spot for storm sewer problems (flooding, bottlenecks, and over-flows). Marina Way -This area has been identified as a hot-spot for storm sewer problems (flooding, bottlenecks, and overflows). Project Manager: Department Responsible: Project Description: $10,135,500 Total Estimated Cost: 1 In accordance with the City's General Plan, the goals of the Storm Sewer System Capital Program are to reduce the risk of drainage-related surface damage and protect the quality of storm water runoff. This complies with the municipal storm sewer discharge permit issued to the City by the Regional Water Quality Control Board under the regulations mandated by the Environmental Protection Agency. The City of Richmond is responsible for constructing, as budgets and City Council priorities permit, facilities for conveying surface runoff in the City's Urban Service Area to adjacent stream channels, creeks and the San Francisco Bay. Justification: Project ID: S Project Location: Various Locations Estimated Operation and Maintenance Cost: $0 Project Intent: Enhance or expand existing asset Project Type: Infrastructure Redevelopment and Improvement Estimated Start Date: 07/01/2007 Estimated Completion Date: Ongoing Engineering Stormwater Project Description Report 2008/ /13 Capital Improvement Program Richmond Project Name: L-5

6 Fund No Fund Name FY FY FY FY FY Fund No Fund Name FY FY FY FY FY $135,500 $0 Project Description Report Source Of Funding 4411 Storm Drainage Impact Fee $118,800 $429,100 $255,100 $251,900 UNF Unfunded $0 $4,452,100 $2,244,900 $2,248,100 2 L - 6

Engineering Department Stormwater

Engineering Department Stormwater Engineering Department Stormwater Prepared by:, Director Assisted by: Mary Phelps Verle Holland Steven Tam Andy Yeung Gina De la Torre Serenity Cummings Engineering Department Stormwater Mission: To provide

More information

Engineering Department Wastewater Treatment

Engineering Department Wastewater Treatment Engineering Department Wastewater Treatment Prepared by: Rich Davidson, Director Assisted by: Mary Phelps Verle Holland Steven Tam Andy Yeung Gina De la Torre Serenity Cummings Engineering Department Wastewater

More information

STORM DRAIN PROJECTS

STORM DRAIN PROJECTS STORM DRAIN PROJECTS PROJECT DESCRIPTIONS The CIP includes a general list of projects scheduled during each of the five years of the program, followed by detailed project sheets arranged by project category,

More information

REPORT TO MAYOR AND COUNCIL

REPORT TO MAYOR AND COUNCIL AGENDA ITEM NO. 2.b REPORT TO MAYOR AND COUNCIL TO THE HONORABLE MAYOR AND COUNCIL: DATE: January 10, 2012 SUBJECT: ADOPT RESOLUTION NO. 12-1, AUTHORIZING THE CONTRA COSTA COUNTY FLOOD CONTROL & WATER

More information

The Maine Drain: Stormwater Management Strategies and Solutions June 12, Portland s Approach. Michael Bobinsky, Director of Public Services

The Maine Drain: Stormwater Management Strategies and Solutions June 12, Portland s Approach. Michael Bobinsky, Director of Public Services The Maine Drain: Stormwater Management Strategies and Solutions June 12, 2013 Portland s Approach Michael Bobinsky, Director of Public Services Clean Water Clean Growth You can t build a vibrant economy

More information

SUBJECT: CITY OF SAN JOSE GREEN INFRASTRUCTURE PLAN UPDATE

SUBJECT: CITY OF SAN JOSE GREEN INFRASTRUCTURE PLAN UPDATE CITY OF CAPITAL OF SILICON VALLEY T&E AGENDA: 06/04/2018 ITEM: d (1) Memorandum TO: TRANSPORTATION AND FROM: Kerrie Romanow ENVIRONMENT COMMITTEE SUBJECT: SEE SUBJECT BELOW DATE: Approved Date Z3/Ko-yxpit'

More information

sewers ANd storm drains Storm Drain Under Construction, 1916

sewers ANd storm drains Storm Drain Under Construction, 1916 sewers ANd storm drains Storm Drain Under Construction, 1916 A d o p t e d C A p I t A L I M p R o V e M e N t p R o G R A M F I s C A L Y e A R 2 1 9 FY 219-223 Capital Improvement Program FY 218 FY 219

More information

SURFACE WATER UTILITY FEE

SURFACE WATER UTILITY FEE The Surface Water Utility Fee section of the FY2014 Budget Message provides background, impacts and actions associated with the County s prior and new surface water level of service in the unincorporated

More information

REPORT TO MAYOR AND COUNCIL

REPORT TO MAYOR AND COUNCIL Concord REPORT TO MAYOR AND COUNCIL AGENDA ITEM NO. 3 n g TO THE HONORABLE MAYOR AND COUNCIL: DATE: January 26, 200 SUBJECT: AUTHORIZING THE CONTRA COSTA COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT

More information

APPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary

APPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary APPENDIX J-3 Orcem Stormwater Management and Treatment Facilities Design Summary Stormwater Management & Treatment Facilities Design Summary INTRODUCTION KPFF Consulting Engineers has compiled this report

More information

DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS THROUGH

DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS THROUGH RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS 2018-19 THROUGH 2022-23 Project Number Stg No. Project

More information

Using GIS to Inventory and Map Rapid City, South Dakota s Major Drainage Elements

Using GIS to Inventory and Map Rapid City, South Dakota s Major Drainage Elements Using GIS to Inventory and Map Rapid City, South Dakota s Major Drainage Elements Jenifer Sorensen, PE, PhD FourFront Design, Inc. Dion Lowe, PE City of Rapid City Stormwater Program Stormwater - Definition

More information

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update February 24, 2015 Overview Wastewater Collection System Customer Base 16,276 SFR 1,968 MFR 1,364 COM/IND

More information

Rainfall Comparison Summary

Rainfall Comparison Summary Review of the July 12, 2017 Storm/Flooding Event Rainfall Comparison Summary 2010 2013 2014 2017 Event Date May 11 13 April 17 18 May 12 13 July 12-13 Rainfall Total 5.55 4.95 3.31 6.70 Basement Flooding

More information

ADDITIONS & DELETIONS TO THE COMPREHENSIVE PLAN

ADDITIONS & DELETIONS TO THE COMPREHENSIVE PLAN LGCP/EAR-2008 Section One: Summary of SubElement Comprehensive Plan Amendments. The following table summarizes additions and deletions made to the Comprehensive Plan as a result of processing the EAR-

More information

DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS THROUGH

DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS THROUGH RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS 2017-18 THROUGH 2021-22 Project Number Stg No. Project

More information

What is a stormwater utility fee?

What is a stormwater utility fee? What is a stormwater utility fee? A stormwater utility fee is similar to a water or sewer utility fee. In essence, customers pay a fee to convey stormwater from their properties. The City of Goodlettsville

More information

Development in the City of Toronto

Development in the City of Toronto Development in the City of Toronto Water Infrastructure Challenges and Opportunities Graham Harding, P.Eng. Toronto Water, City of Toronto Urban Land Institute Leadership Program February 16, 2017 Toronto

More information

SECTION 7.0 STEGE SANITARY DISTRICT WASTEWATER SERVICE

SECTION 7.0 STEGE SANITARY DISTRICT WASTEWATER SERVICE SECTION 7.0 STEGE SANITARY DISTRICT WASTEWATER SERVICE 7.1 Overview The Stege Sanitary District (SSD) provides wastewater collection services for the City of El Cerrito, the unincorporated community of

More information

Storm Water and Sanitary Sewer

Storm Water and Sanitary Sewer Public Works Department Summary Report on Planned Capital Improvements Storm Water and Sanitary Sewer Introduction Public Works has assembled this summary report to highlight major capital improvements

More information

SECTION 7. Public Infrastructure, Facilities and Services. 8Chapter 8 INFRASTRUCTURE ELEMENT

SECTION 7. Public Infrastructure, Facilities and Services. 8Chapter 8 INFRASTRUCTURE ELEMENT SECTION 7 Public Infrastructure, Facilities and Services 8Chapter 8 INFRASTRUCTURE ELEMENT INF-2 CHAPTER 8 Infrastructure Element INTRODUCTION Cupertino s public infrastructure works in tandem with the

More information

Anne Arundel County Programmatic Two-Year Milestones January 2018 December 2019

Anne Arundel County Programmatic Two-Year Milestones January 2018 December 2019 Anne Arundel County 2018 2019 Programmatic Two-Year Milestones January 2018 December 2019 (Note: New Milestones are highlighted in green) Target Urban Stormwater 12/2016 Implement the County s Watershed

More information

Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017

Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017 Attachment 1 Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017 Sanitary Sewer System Master Plan Summary Points - City s sanitary system

More information

Municipal Separate Storm Sewer System (MS4) Permit and Program Ordinance Update. City of Fairmont March, 2018

Municipal Separate Storm Sewer System (MS4) Permit and Program Ordinance Update. City of Fairmont March, 2018 Municipal Separate Storm Sewer System (MS4) Permit and Program Ordinance Update City of Fairmont March, 2018 What is a MS4 Program? A program developed by the EPA to help manage stormwater within cities

More information

Workshop #2 Agenda March 30, :30pm to 7:30pm Introductions (5 minutes) Overview of Workshop #1 (10 minutes) The Cost of a Stormwater Program (30

Workshop #2 Agenda March 30, :30pm to 7:30pm Introductions (5 minutes) Overview of Workshop #1 (10 minutes) The Cost of a Stormwater Program (30 Workshop #2 Stormwater Utility Study City of Hays, Kansas March 30, 2010 Workshop #2 Agenda March 30, 2010 5:30pm to 7:30pm Introductions (5 minutes) Overview of Workshop #1 (10 minutes) The Cost of a

More information

City of Madison: 2017 Capital Budget Capital Improvement Plan

City of Madison: 2017 Capital Budget Capital Improvement Plan City of Madison: 2017 Capital Budget Capital Improvement Plan Agency: Stormwater Utility Project Summary Backyard Drainage Problems 25,000 25,000 25,000 25,000 25,000 25,000 CIPP Lining Storm Sewer 100,000

More information

Project Summary

Project Summary Stormwater Utility Capital Improvement Plan Project Summary 2017 2018 2019 2020 2021 2022 Backyard Drainage Problems 25,000 25,000 25,000 25,000 25,000 25,000 CIPP Lining Storm Sewer 100,000 100,000 100,000

More information

Stormwater Utility Feasibility Study. City of Geneva City Council Presentation: October 16, 2017

Stormwater Utility Feasibility Study. City of Geneva City Council Presentation: October 16, 2017 Stormwater Utility Feasibility Study City of Geneva City Council Presentation: October 16, 2017 Stormwater Feasibility Study Overview Overview of Current Program Stormwater System Needs Stormwater Utility

More information

City Of Elyria Stormwater Utility Program Frequently Asked Questions

City Of Elyria Stormwater Utility Program Frequently Asked Questions City Of Elyria Stormwater Utility Program Frequently Asked Questions Q. Is the stormwater utility fee needed because of EPA regulations? A. Yes, the City of Elyria has implemented a stormwater fee rather

More information

Water Supply and Delivery

Water Supply and Delivery Utilities Water Supply and Delivery Goal U-1 Availability of an adequate, safe, and sustainable water supply and maintenance of an efficient water system for residents and visitors. (Modified Goal 4.B)

More information

The environment Water pollution Flooding, drainage, combined sewers Aging infrastructure New mandated and unfunded EPA regulations General fund

The environment Water pollution Flooding, drainage, combined sewers Aging infrastructure New mandated and unfunded EPA regulations General fund City of Lima, Ohio The environment Water pollution Flooding, drainage, combined sewers Aging infrastructure New mandated and unfunded EPA regulations General fund pressures Funding sources Petitioned/Assessed

More information

Air and Water Quality

Air and Water Quality Air and Water Quality Our Natural Resources Introduction Water and air are essential for humans as well as the animals and plants that inhabit San Rafael. The Air and Water Quality Element is intended

More information

STORM WATER ASSET MANAGEMENT PLAN & PROGRAM

STORM WATER ASSET MANAGEMENT PLAN & PROGRAM STORM WATER ASSET MANAGEMENT PLAN & PROGRAM City of Walker, MI September 2017 System Goals and Action Plan INTRODUCTION About this Document This document is our Storm Water Asset Management Plan & Program

More information

BMP FACT SHEET DF-1 HOA Annual Self-Certification Report

BMP FACT SHEET DF-1 HOA Annual Self-Certification Report PURPOSE: Public and privately owned and maintained stormwater conveyance systems collect and transport urban runoff and storm water that may contain certain pollutants. These pollutants may accumulate

More information

Integrated Planning for Meeting Clean Water Act Requirements

Integrated Planning for Meeting Clean Water Act Requirements Integrated Planning for Meeting Clean Water Act Requirements NAFSMA STORMWATER COMMITTEE Introduction Since the passage of the Federal Clean Water Act (CWA) in 1972, the Environmental Protection Agency

More information

Sanitary Sewer Fees 101. November 27, 2018

Sanitary Sewer Fees 101. November 27, 2018 Sanitary Sewer Fees 101 November 27, 2018 Background The City of Sausalito owns and operates a sewer collection system conveying wastewater to the Sausalito Marin-City Sanitary District (SMCSD) for treatment

More information

Chapter 1: Introduction

Chapter 1: Introduction Chapter 1: Introduction 1.1 Purpose The purpose of this chapter is to describe the contents of the Conveyance Report, which is a component of the Milwaukee Metropolitan Sewerage District (MMSD) 2020 Facilities

More information

Stormwater Regulatory Landscape at Construction Sites

Stormwater Regulatory Landscape at Construction Sites Stormwater Regulatory Landscape at Construction Sites Peter Schultze Allen EOA, Inc. Construction Inspection Workshop May 6, 2015 Outline of Presentation Regulatory Background Current Municipal Regional

More information

2019 Annual Review of Sewer Rates and Environmental Updates Under the Sewer & Watercourse By-law

2019 Annual Review of Sewer Rates and Environmental Updates Under the Sewer & Watercourse By-law ADMINISTRATIVE REPORT Report Date: November 27, 2018 Contact: Daniel Roberge Contact No.: 604.873.7360 RTS No.: 12725 VanRIMS No.: 08-2000-20 Meeting Date: December 11, 2018 TO: FROM: SUBJECT: Vancouver

More information

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Reducing Flood Risk in Toronto David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Institute for Catastrophic Loss Reduction February 19, 2016 1 Agenda Reducing Flood Risk in Toronto 1) Overview

More information

PROPERTY OWNERS MEETING SEWER SERVICE CHARGE RATES

PROPERTY OWNERS MEETING SEWER SERVICE CHARGE RATES PROPERTY OWNERS MEETING SEWER SERVICE CHARGE RATES Burlingame Hills Sewer Maintenance District Burlingame Public Library Lane Community Room 480 Primrose Road Burlingame, CA May 23, 2007 6:30 P.M. County

More information

Stormwater Infrastructure Funding Study Public Education Session May 27, :00 9:00 pm City Hall, Multi-Purpose Room Level 100

Stormwater Infrastructure Funding Study Public Education Session May 27, :00 9:00 pm City Hall, Multi-Purpose Room Level 100 Stormwater Infrastructure Funding Study Public Education Session May 27, 2015 7:00 9:00 pm City Hall, Multi-Purpose Room Level 100 What is the Stormwater Infrastructure funding study? Purpose of the Stormwater

More information

environment Natural Systems

environment Natural Systems environment Natural Systems Wheaton will grow greener through redevelopment by creating a sustainable community that conserves energy and uses roofs and green spaces to filter stormwater and purify air.

More information

Municipal Stormwater Regulation Program

Municipal Stormwater Regulation Program New Jersey Department of Environmental Protection Municipal Stormwater Regulation Program 21 Summary Report New Jersey Department of Environmental Protection Division of Water Quality Bureau of Nonpoint

More information

5 YEAR CAPITAL IMPROVEMENT PROGRAM

5 YEAR CAPITAL IMPROVEMENT PROGRAM 5 YEAR CAPITAL IMPROVEMENT PROGRAM 329 City of Hermosa Beach Department of Public Works Capital Improvement Program For Fiscal Years 2015-16 Thru 2019-20 PROJECT NAME FY15-16 1 FY16-17 FY 17-18 FY 18-19

More information

The City of Lake Forest Stormwater Management Policy Approved by City Council on March 7, 2016

The City of Lake Forest Stormwater Management Policy Approved by City Council on March 7, 2016 The City of Lake Forest Stormwater Management Policy Approved by City Council on March 7, 2016 I. Purpose The purpose of this policy is to address home and property drainage issues relating to stormwater

More information

Stormwater Awareness Training

Stormwater Awareness Training Stormwater Awareness Training 2014 Purpose of Stormwater Awareness Training To educate City of Aurora employees on the importance of identifying non stormwater discharges and reducing pollution through

More information

3F. Hydrology and Water Quality

3F. Hydrology and Water Quality This section provides an analysis of potential hydrological and water quality impacts associated with implementation of the proposed project. The section also evaluates and describes the potential impacts

More information

Stormwater Utility. Frequently Asked Questions. January 2019 CITY OF NORTH RIDGEVILLE Avon Belden Road North Ridgeville, Ohio 44039

Stormwater Utility. Frequently Asked Questions. January 2019 CITY OF NORTH RIDGEVILLE Avon Belden Road North Ridgeville, Ohio 44039 Stormwater Utility Frequently Asked Questions January 2019 CITY OF NORTH RIDGEVILLE 7307 Avon Belden Road North Ridgeville, Ohio 44039 General Stormwater Information/Education 1. What is stormwater runoff?

More information

EXECUTIVE SUMMARY Program Effectiveness Assessment (PEA) Executive Summary

EXECUTIVE SUMMARY Program Effectiveness Assessment (PEA) Executive Summary EXECUTIVE SUMMARY 2011-12 Executive Summary This has been prepared as a joint submittal by the (hereinafter referred to as the County) to meet the requirements of the Fourth Term Municipal Separate Storm

More information

MARCH 2009 TO MARCH 2010 (YEAR 7) REPORTING PERIOD VILLAGE OF PLAINFIELD, ILLINOIS

MARCH 2009 TO MARCH 2010 (YEAR 7) REPORTING PERIOD VILLAGE OF PLAINFIELD, ILLINOIS ILLINOIS ENVIRONMENTAL PROTECTION AGENCY ANNUAL FACILITY INSPECTION REPORT NPDES PERMIT FOR STORM WATER DISCHARGES FROM MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4) MARCH 2009 TO MARCH 2010 (YEAR 7) REPORTING

More information

Water Resources Protection Program Advisory Committee Report November 15, 2012

Water Resources Protection Program Advisory Committee Report November 15, 2012 Water Resources Protection Program Advisory Committee Report November 15, 2012 SUMMARY REPORT In January 2009, the Charlottesville City Council considered a proposal to implement a stormwater user fee

More information

Newport Bay Watershed Executive Committee

Newport Bay Watershed Executive Committee Newport Bay Watershed Executive Committee June 21, 2017 Discussion Calendar AGENDA ITEM 1 ACTION MINUTES OF THE MARCH 15, 2017 MEETING Amanda Carr, County of Orange Recommended Action Approve the action

More information

Wastewater System Environmental Setting Wastewater Conveyance Facilities

Wastewater System Environmental Setting Wastewater Conveyance Facilities February 20, 2017 To: Mr. Ryan Sawyer AICP Analytical Environmental Services 1801 7 th Street Sacramento, CA 95811 Subject: Comments on the Crystal Geyser Draft EIR (DEIR) Dear Mr. Sawyer: This letter

More information

Improvements to the Missouri River Wastewater Treatment Plant- Schedule BProject. Public Meeting June 4, 2013 South Omaha Public Library

Improvements to the Missouri River Wastewater Treatment Plant- Schedule BProject. Public Meeting June 4, 2013 South Omaha Public Library Improvements to the Missouri River Wastewater Treatment Plant- Schedule BProject Public Meeting June 4, 2013 South Omaha Public Library Agenda Welcome and Introductions CSO Program Overview Missouri River

More information

Dry Creek Flood Control Improvement Project

Dry Creek Flood Control Improvement Project Dry Creek Flood Control Improvement Project The following is a brief overview of the planned IRWM Stormwater Flood Management Grant Application from the Fresno Metropolitan Flood Control District (FMFCD)

More information

KATHYBRYNT, CHAIRMAN

KATHYBRYNT, CHAIRMAN 2018/2019-2022/2023 MARION COUNTY STORMW ATER IMPLEMENTATION PROGRAM - MARION COUNTY BOARD OF COUNTY COMMISSIONERS ~~ KATHYBRYNT, CHAIRMAN JUN 0 5 2018 DATE Introduction The 's Stormwater Section addresses

More information

Drainage System Maintenance

Drainage System Maintenance Drainage System Maintenance GH-50 OBJECTIVES Ensure functionality of storm drain system through maintenance and monitoring General Overview Operational Protocols General Practices Limitations Specific

More information

APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT

APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT Downtown Ottawa Transit Tunnel: Tunney s Pasture to Blair Station via a Downtown LRT Tunnel Prepared for: City of Ottawa 110 Laurier Avenue West Ottawa, ON

More information

INFRASTRUCTURE ELEMENT STORMWATER SUB-ELEMENT GOALS, OBJECTIVES & POLICIES

INFRASTRUCTURE ELEMENT STORMWATER SUB-ELEMENT GOALS, OBJECTIVES & POLICIES INFRASTRUCTURE ELEMENT STORMWATER SUB-ELEMENT GOALS, OBJECTIVES & POLICIES GOALS, OBJECTIVES & POLICIES GOAL DR 1: STORMWATER MANAGEMENT/DRAINAGE SYSTEMS. It is the goal of the City of Casselberry to provide

More information

CHAPTER 5. NPDES PHASE II EVALUATION

CHAPTER 5. NPDES PHASE II EVALUATION CHAPTER 5. NPDES PHASE II EVALUATION A Stormwater Management Program for Medford was developed and submitted to the DEQ to meet requirements of the NPDES Phase II program. Phase II regulations require

More information

INFRASTRUCTURE ELEMENT Goal, Objectives and Policies

INFRASTRUCTURE ELEMENT Goal, Objectives and Policies INFRASTRUCTURE ELEMENT Goal, Objectives and Policies City of Bartow Comprehensive Plan Adopted August 5, 1991 Amended August 2, 1993, Amended 1996 & 1999 Adopted Changes January 16, 2001, Amended April

More information

California s New Construction General Permit

California s New Construction General Permit California s New Construction General Permit Thursday, October 01, 2009 Workshop Agenda 1:00 1:05 Introductions 1:05 1:20 FMFCD Storm Drain System 1:20 2:00 Construction General Permit Coverage» Status

More information

Fairfield Corporate Commons

Fairfield Corporate Commons Campus Ln. Kaiser Dr. SACRAMENTO ±30 mi Business Center Dr. Mangels Blvd. NAPA (HWY 12) ±1 mi Suisun Valley Rd. SAN FRANCISCO ±0 mi CONCORD (I-6) ±21 mi Fairfield Corporate Commons ±36.9 Acres of Land

More information

Paying for Stormwater Management: Stormwater Service Charge Proposal OCTOBER 9, 2014

Paying for Stormwater Management: Stormwater Service Charge Proposal OCTOBER 9, 2014 Paying for Stormwater Management: Stormwater Service Charge Proposal OCTOBER 9, 2014 Clean Water Clean Growth Healthier Environment We are reducing polluted runoff and sewer spills into Casco Bay, for

More information

City of Salem Stormwater Utility Answers to Frequently Asked Questions

City of Salem Stormwater Utility Answers to Frequently Asked Questions Answers to Frequently Asked Questions Questions about Urban Stormwater Runoff... 3 1. What is urban stormwater runoff?...3 2. What is impervious surface?...3 3. Why is there a concern about stormwater

More information

Metropolitan St. Louis Sewer District. Rate Proposal Overview

Metropolitan St. Louis Sewer District. Rate Proposal Overview Metropolitan St. Louis Sewer District Rate Proposal Overview MSD Rate Commission First sewers built in the 850s in response to the 849 cholera outbreak Prior to 954, the area was covered by 79 separate

More information

PROJECT BUDGET SUMMARY - ZONE 3

PROJECT BUDGET SUMMARY - ZONE 3 RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT PROJECT BUDGET SUMMARY - ZONE 3 FISCAL YEAR 2017-18 DESCRIPTION FY 2016-17 FY 2016-17 FY 2017-18 FUND BALANCE FORWARD Actual Estimated Zone

More information

Rainy Season Preparation & Storm Channel Maintenance

Rainy Season Preparation & Storm Channel Maintenance Rainy Season Preparation & Storm Channel Maintenance City Efforts Thorough Review of the storm water system Documentation of system conditions Now part of selection criteria or maintenance Full public

More information

LOWER SWEETWATER CREEK

LOWER SWEETWATER CREEK LOWER SWEETWATER CREEK STORMWATER MANAGEMENT MASTER PLAN Prepared for the Hillsborough County Board of County Commissioners By Public Works Department/Engineering Division Stormwater Management Section

More information

Landbase Systems Draft 5/2/2014 Page: 1

Landbase Systems Draft 5/2/2014 Page: 1 Study of the potential Green Stormwater Infrastructure (GSI) strategies and options to reduce localized flooding and combined sewer overflows in conjunction with combined network adjustments along and

More information

Tropical Storm Hermine Pinellas County Legislative Delegation Workshop September 20, 2016

Tropical Storm Hermine Pinellas County Legislative Delegation Workshop September 20, 2016 Tropical Storm Hermine Pinellas County Legislative Delegation Workshop September 20, 2016 Randi M. Kim, P.E., Pinellas County Utilities Director Agenda Pinellas County Wastewater Systems TS Hermine Protective

More information

DC WATER CAPITAL IMPROVEMENT PROGRAM (CIP)

DC WATER CAPITAL IMPROVEMENT PROGRAM (CIP) DC WATER CAPITAL IMPROVEMENT PROGRAM (CIP) District of Columbia Water and Sewer Authority of Maryland Thursday, April 7, 2016 George S. Hawkins, General Manager Presented by: Liliana Maldonado, Director,

More information

History of Stormwater in Peru

History of Stormwater in Peru History of Stormwater in Peru Stormwater has always had a major influence on Peru Indiana. In the early days of the City, the concern was about flooding. Major floods occurred in 1847, 1883, and 1904.

More information

Sanitary Sewer Rates Now and in the Future

Sanitary Sewer Rates Now and in the Future Sanitary Sewer Rates Now and in the Future December 2008 Steve Nielsen, Chief Engineer/Deputy Director Indianapolis Department of Public Works Mark C. Jacob, Program Manager Indianapolis Clean Stream Team

More information

8. BMP SUMMARY TABLE

8. BMP SUMMARY TABLE 8. BMP SUMMARY TABLE 8.1 BMPs and Measurable Goals for Public Education and Outreach 1 Prepare an education plan Prepare education plan in the first two years of the permit. Include in Plan the BMPs, schedule,

More information

COMBINED SEWER OVERFLOWS (CSO) FREQUENTLY ASKED QUESTIONS

COMBINED SEWER OVERFLOWS (CSO) FREQUENTLY ASKED QUESTIONS COMBINED SEWER OVERFLOWS (CSO) FREQUENTLY ASKED QUESTIONS What is a Combined Sewer Overflow (CSO)? In Port Angeles, the sewer system is constructed the same as many older cities in the United States. Our

More information

Funding Stormwater Services

Funding Stormwater Services Funding Stormwater Services Public Works Officers Institute March 10, 2016 By Mitch Avalon Consultant, County Engineers Association of California Pine Creek Flooding, Concord 1958 Overview Ballot Measure

More information

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents Site Description A description of construction activity. The proposed sequence for major activities. Estimates of the total

More information

Potable Water Discharges NPDES Permit Update for Regions 2, 4 and 5

Potable Water Discharges NPDES Permit Update for Regions 2, 4 and 5 Potable Water Discharges NPDES Permit Update for Regions 2, 4 and 5 Francois Rodigari, Director of Water Quality and Environmental Services SFPUC Annual Technology Transfer Workshop 11/13/2013 Originally

More information

Review of Potential Measures to Reduce Urban Runoff Loads of PCBs to San Francisco Bay

Review of Potential Measures to Reduce Urban Runoff Loads of PCBs to San Francisco Bay Review of Potential Measures to Reduce Urban Runoff Loads of PCBs to San Francisco Bay Santa Clara Valley Urban Runoff Pollution Prevention Program Prepared for the Santa Clara Valley Urban Runoff Pollution

More information

S.O.P. No. HMD

S.O.P. No. HMD Page: 1 of 9 PURPOSE: To establish (SOP) for submission requirements, review process and approval of applications for Non-vehicular Access Permits for the purpose of connection or discharge to any MassDOT

More information

Anne Arundel County Programmatic Two-Year Milestones January 2016 December 2017

Anne Arundel County Programmatic Two-Year Milestones January 2016 December 2017 Anne Arundel County 2016 2017 Programmatic Two-Year Milestones January 2016 December 2017 (Note: New Milestones are highlighted in green) Target Urban Stormwater Implement the County s Watershed Protection

More information

EXECUTIVE SUMMARY ES.1 INTRODUCTION

EXECUTIVE SUMMARY ES.1 INTRODUCTION ES.1 INTRODUCTION The purpose of this Wastewater Collection System Master Plan (Master Plan) is to provide the City of Lake Oswego (City) a plan for management and operation of their wastewater collection

More information

March 20, Via electronic mail to RE: Bay Area MS4 Trash Load Reduction Plans (2012) Dear Mr.

March 20, Via electronic mail to RE: Bay Area MS4 Trash Load Reduction Plans (2012) Dear Mr. March 20, 2012 Mr. John Muller, Chair Attn: Mr. Dale Bowyer San Francisco Regional Water Quality Control Board 1515 Clay Street, Suite 1400 Oakland, CA 94590 Via electronic mail to dbowyer@waterboards.ca.gov

More information

SECTION A-4, LEGAL AUTHORITY A-4.0 LEGAL AUTHORITY A-4.1 INTRODUCTION

SECTION A-4, LEGAL AUTHORITY A-4.0 LEGAL AUTHORITY A-4.1 INTRODUCTION A-4.0 LEGAL AUTHORITY A-4.1 INTRODUCTION In 1993, the Orange County Stormwater Permittees prepared a Model Water Quality Ordinance to provide a more uniform, countywide approach and a legal underpinning

More information

This is the title of the proposed project. A CIP contract or project number will be assigned to the projects as funding is established.

This is the title of the proposed project. A CIP contract or project number will be assigned to the projects as funding is established. BUILDING PROJECTS PROJECT DESCRIPTIONS The CIP includes a general list of projects scheduled during each of the five years of the program, followed by detailed project sheets arranged by project category,

More information

STORM WATER and LID SESSION

STORM WATER and LID SESSION STORM WATER and LID SESSION STORM WATER & LID SESSION SESSION LINEUP NEDES Overview Patrick Bryan Environmental Resources Technician, Fresno Metropolitan Flood Control District Local Prospective Gene Matters

More information

City of Charlottesville Water Resources Protection Program

City of Charlottesville Water Resources Protection Program City of Charlottesville Water Resources Protection Program Stormwater Utility Fee Credits Manual Your guide to reducing stormwater utility fees and protecting our City s water resources. City of Charlottesville,

More information

Successful Stormwater Utility Programs

Successful Stormwater Utility Programs Successful Stormwater Utility Programs Roadmap, Lessons Learned and Case Studies David Mason (CDM Smith) Steve Leo (Gwinnett County) SESWA Southeast Regional Stormwater Seminar April 9, 2014 Presentation

More information

Business Plan: Wastewater Removal and Stormwater Management

Business Plan: Wastewater Removal and Stormwater Management Business Plan: Wastewater Removal and Stormwater Management How does this service contribute to the results identified in the City of London Strategic Plan? A Sustainable Infrastructure Compliance with

More information

Monthly Operating Report

Monthly Operating Report Executive Summary Wastewater Treatment Plant Operations staff is working with partners to evaluate 1) a system to automate control of the solids balance aspect of the treatment plant s activated sludge

More information

Infrastructure. 7.1 Overview Goals, Objectives, and Policies A. Stormwater Management B. Sanitary Sewer System...

Infrastructure. 7.1 Overview Goals, Objectives, and Policies A. Stormwater Management B. Sanitary Sewer System... Infrastructure 7 7 Infrastructure 7.1 Overview... 7-1 7.2 Goals, Objectives, and Policies..... 7-3 A. Stormwater Management..... 7-3 B. Sanitary Sewer System... 7-4 7.0 Infrastructure 7.1 OVERVIEW Priority

More information

Our A Team APDS Contracting

Our A Team APDS Contracting 1 Our A Team APDS Contracting 2 Definition of the Problem 3 Canal Importation Basin 4 Existing Floodplain 5 Development by Decades 6 Contributing Factors to Flooding Historic streams obliterated by irrigation

More information

STORMWATER UTILITY ANNUAL REPORT

STORMWATER UTILITY ANNUAL REPORT CITY OF ARVADA 2002 STORMWATER UTILITY ANNUAL REPORT Produced by the City of Arvada Public Works Department March 2003 CALENDAR YEAR 2002 CITY OF ARVADA S STORMWATER UTILITY ANNUAL REPORT As of 2002, the

More information

Plaza and Sidewalk Cleaning

Plaza and Sidewalk Cleaning Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Pollutants on sidewalks and other pedestrian traffic areas and plazas are typically due to littering and vehicle use. This

More information

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing B.5.1 Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing --Greenland Consulting Engineers-- 1 The Study Location (Prices Subdivision) consists of the lots fronting

More information

CARSON CITY STORM WATER MANAGEMENT PROGRAM & CIP

CARSON CITY STORM WATER MANAGEMENT PROGRAM & CIP CARSON CITY STORM WATER MANAGEMENT PROGRAM & CIP Public Works Department March 14, 2013 Activity and Event Timeline Freeway CLOMR Submitted 1997 New Year s Flood Freeway By Pass Project Begins 1997 1998

More information

Stormwater Programs. BIA Meeting June 5, Jason Uhley

Stormwater Programs. BIA Meeting June 5, Jason Uhley Stormwater Programs BIA Meeting June 5, 2014 Jason Uhley Chief of Watershed Protection Riverside County Flood Control and Water Conservation District Presentation Outline Clean Water Act Stormwater Program

More information

Capital Facilities Element

Capital Facilities Element Capital Facilities Element Purpose The Growth Management Act requires cities to prepare a capital facilities element consisting of: 1. An inventory of current capital facilities owned by public entities,

More information