1 SUBMISSION OF FORM I & IA TOWARDS GETTING PRIOR ENVIRONMENTAL CLEARANCE (EC) For M/s. SREE BALAJI NIRMAN & ESTATES (Residential Apartment Construction) SY..42/4, KAPAARADA (V), Visakhapatnam Submitted to MINISTRY OF ENVIRONMENT & FORESTS GOVERNMENT OF INDIA PARYAVARAN BHAVAN, LODHI ROAD NEW DELHI Prepared by Enviro House, Block B, B-1, IDA, Auto Nagar, Visakhapatnam Ph: , Telex: , svenviro_labs@yahoo.co.in B.O:2-53, Mahipala St., Yanam , Ph: , Cell: QCI 147 & Recognized by MOE&F, New Delhi.

2 FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project(s) M/s. SREE BALAJI NIRMAN & 2. S.. in the schedule 8 (b) 3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number of wells to be drilled. 4. New/Expansion/Modernization New ESTATES VISAKHAPATNAM DISTRICT. Construction of Residential Housing project in 6 Towers 12,256.67Sq.mts in an area of Construction Project Construction of Residential Building 5. Existing Capacity/Area etc. NIL 6. Category of Project i.e. A or B Category B 7. Does it attract the general condition? If yes, please specify. 8. Does it attract the specific condition? If yes, please specify. 9. Location Plot/ Survey/ Khasra. Village Tehsil District State 10. Nearest Railway Station/Airport along with distance in kms. 11. Nearest Town, City, District Headquarters along with distance in kms. Sy..42/4, Kapparada village, Visakhapatnam, VISAKHAPATNAM DISTRICT. ANDHRA PRADESH. Visakhapatnam Railway Station at 3.90 Kms. Visakhapatnam 12. Village Panchayats, Zilla Parishad, Municipal GVMC Corporation, Local body (complete postal addresses with telephone nos. to be given) 13. Name of the applicant M/s. SREE BALAJI NIRMAN & ESTATES Mr. T.B Gupta MANAGING PARTNER 14. Registered Address M/s. Sree Balajiee Nirman & Estates

3 15. Address for correspondence: Name Designation (Owner/Partner /CEO) Pin code Telephone. Fax. 16. Details of Alternative Sites examined, if any. Location of these sites should be shown on a topo sheet. 17. Interlinked Projects Nil 18. Whether separate application of interlinked project has been submitted? # /1, 1 st floor, Sree Balajee Chambers, Shantipuram, Gurudwara Junction, Visakhapatnam -16 Mr. T. B Gupta Managing Partner admin@sreebalajeenirman.com Village-District-State t Examined NA 19. If yes, date of submission NA 20. If no, reason Construction of Residential apartment 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. i. The Forest (Conservation) Act, 1980? ii. The Wildlife (Protection) Act, 1972? iii. The C.R.Z. tification, 1991? 22. Whether there is any Government Order/Policy relevant /relating to the site? NA NA NA Nil 23. Forest land involved (hectares) Nil 24. Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? a) Name of the Court b) Case. c) Orders/directions of the Court, if any and its relevance with the proposed project. Nil

4 (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.. Information/Checklist confirmation 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? Yes/ Details thereof (with approximate quantities /rates, wherever possible) with source of information data The earmarked for Construction of Residential Building project with an site area of about 12, Sq. mtrs and the total built up area is Sq.mts area. This land is sufficient for construction of Residential and associated other utilities. A total of 12, Sq. mtrs of land is available and is sufficient for the construction activity. Total Built up area = Sq.mts Further the above land is barren land. Therefore no change in land use / land cover / topography. The land is barren and developed land. vegetation or building existing in this land for clearance. 1.3 Creation of new land uses? extra new land will be used. The 1.4 Pre-Construction investigations e.g. bore houses, soil testing? project is having 12, Sq. Mtrs of land and the total built up area is In this land only the proposed project will be constructed. For the total area of 12, Sq. Mtrs already ground water and soil testing carried. 1.5 Construction works? Yes Structures comprises of two & three bed room flats, water storage tanks, DG Set room, Sewage Treatment Plant, etc. The main components of the civil works for the proposed plant include the

5 construction of bed rooms, foundations and structures, Sewage Treatment Plant, 1.6 Demolition works? The site is leveled one and not contains 1.7 Temporary sites used for construction works Or housing of construction workers? 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including mining or tunneling? Yes etc. any temporary / permanent structures. Therefore no demolition work will be carried. Local manpower will be utilized for the construction work. Therefore no temporary site used for construction works. BUILDINGS Residential Building Sewage Treatment Plant Water Storage Tank DG Set Room mining or tunneling activity Reclamation works? reclamation work 1.11 Dredging? t applicable 1.12 Offshore structures? t applicable 1.13 Production and manufacturing processes? 1.14 Facilities for storage of goods or materials? 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Yes Construction of Residential Apartment with two and three bed room flats. Cement storage Building materials storage Liquid effluents The waste water generated from the proposed project will be in the form of sanitary waste water only and which will be routed to sewage treatment plant and thereby reuse and for surplus to network. Solid waste firefighting if local municipal sewerage Municipal waste (during construction) kg/day

6 1.16 Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during Construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? 1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? Municipal waste (during DISPOSAL: operation) kg/day Disposed to local municipal dumping site - Kapulauppada Dumping site which is at 17Kms distance. Majority of manpower will be recruited from local people only. Therefore no housing scheme proposed. The site is well connected to roadway. new road, rail or sea traffic required. t applicable. transport routes will be changed. t required to divert transmission lines / pipelines. t applicable 1.22 Stream crossings? stream crossings are required Abstraction or transfers of water form ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or run-off? Yes Ground water from the existing bore well will be used to meet the water requirements and GVMC water of KLD for drinking purpose. change in water bodies and no changes occur in drainage pattern. As the proposed unit is Construction of Apartments it does not emit any process effluent.

7 1.25 Transport of personnel or materials Yes During construction activity, private for construction, operation or tippers will be used for supply of metal, decommissioning? sand, cement and iron Long-term dismantling or dismantling work will be carried in decommissioning or restoration the project. works? 1.27 Ongoing activity during decommissioning activity proposed. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? Yes There would be a marginal influx of people since the apartment consists of residing flats Introduction of alien species? alien species will be introduced / encouraged Loss of native species or genetic diversity? native species will be destroyed. As the proposed project will be constructed in barren land. Therefore no chance of loss of native species or generic diversity occurs Any other actions? Yes The housing project proposed to develop green belt all along the all sides of boundary wall.

8 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are nonrenewable or in short supply): S.. Information/Checklist confirmation Yes/ 2.1 Land especially undeveloped or agricultural land (ha) 2.2 Water (expected source & competing users) unit: KLD Yes Details thereof (with approximate quantities / rates, wherever possible) with source of information data The present status of land is barren and non-agricultural. During construction Domestic & construction m 3 /day During operation Domestic m 3 /day 2.3 Minerals (MT) t applicable 2.4 Construction material stone, aggregates, sand / soil (expected source MT) Yes Stone aggregates 2500 m 3 (foundation work) Soil - no soil will be lifted or excavated. Sand m Forests and timber (source MT) Yes The timber that is required is procured 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources (use appropriate standard units) from the approved local contractors. Yes Electricity will be supplied by APEPDCL. Diesel for DG Sets 100 Litres/Day other natural sources other than the above mentioned will be used.

9 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.. Information/Checklist confirmation Yes/ 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? 3.3 Affect the welfare of people e.g., by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., Yes Details thereof (with approximate quantities /rates, wherever possible) with source of information data There are no materials that are being utilized in the construction programme which endanger human health or water supply. There is no possibility for occurrence of disease vectors as there are no water bodies or stagnant water. te: as per the studies / literature available, no such diseases were occurred from similar type of units. Living conditions will escalate therefore welfare of the people will be on positive side. 3.5 Any other causes? people will be affected.

10 4. Production of solid wastes during construction or operation or commissioning (MT/month) S.. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities /rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes mine waste / mine activity. 4.2 Municipal waste (domestic and or commercial wastes) 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes overburden soil. The small excavated quantity during the foundation will be used for re-filling. Municipal solid waste 523 kg/day STP Sludge 10 Kgs/day Used Batteries 02s./Year Used Oil 100 LPA Disposal: Garbage to the Local municipal dumping yard Kapuluppada dumping site. There will not be any hazardous waste generation. 4.4 Other industrial process wastes Since it is construction project, no 4.5 Surplus product t applicable. 4.6 Sewage sludge or other sludge from effluent treatment Yes process/industrial activity involved. Sludge (10.0 kgs/day) generated from sewage treatment plant will be disposed locally as manure. 4.7 Construction or demolition wastes There is no demolition and as such the construction debris does not arise. 4.8 Redundant machinery or equipment redundant machinery would be available for disposal. 4.9 Contaminated soils or other materials soil / material will be contaminated Agricultural wastes agricultural waste will be generated Other solid wastes t applicable.

11 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.. Information/Checklist confirmation 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes/ Details thereof (with approximate quantities /rates, wherever possible) with source of information data It is proposed to Construct Residential Apartments and does not involve any manufacturing process. 5.2 Emissions from production processes This is not manufacturing facility 5.3 Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including plant and equipment 5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes The transportation of construction Yes materials will be taken with due care to safeguard against dust emissions by coverage as well as by sprinkling water during construction phase. The only emission from construction activities is of concrete miller. It will run on HSD. Remaining all the equipment like vibrator, etc, will operates on power. Yes Dust will arise from construction materials. Proper care will be taken during handling of material. During unloading of metal, water will be sprayed. Hence, no fugitive emissions will be released. 5.6 Emissions from incineration of waste incinerator proposed. 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources Nil open air burning.

12 6. Generation of ise and Vibration, and Emissions of Light and Heat: S.. Information/Checklist confirmation Yes/ 6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Details thereof (with approximate quantities /rates, wherever possible) with source of information data The DG sets will be established with silencers and the buildings are also being constructed with noise absorbing materials. DG set will be operated only during power interruption and as a stand by unit in emergency. crushers or ventilators are proposed. 6.2 From industrial or similar processes It is proposed to Construct Residential Apartments and does not involve any manufacturing process. 6.3 From construction or demolition There is no demolition is proposed in the complex and is no possibility of noise development. 6.4 From blasting or piling blasting or piling operation required. 6.5 From construction or operational traffic There will not be any traffic during construction stage. As the material is available locally and not requires any stagnation of material or vehicle stagnation. All the major structures will be fabricated at site. Therefore there will not be any traffic. Further it is also proposed to have vehicle sheds and also proposed to have one-way traffic. 6.6 From lighting or cooling systems Yes The lighting and cooling systems are designed as per the notification of the National Building code. 6.7 From any other sources t applicable.

13 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S.. Information/Checklist confirmation Yes/ 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water Yes 7.4 From any other sources? Nil 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? Details thereof (with approximate quantities /rates, wherever possible) with source of information data hazardous materials will be stored. The domestic wastewater will be routed to sewage treatment plant. deposition of pollutant emitted to air into the land or into water is envisaged. pollutants will be built up in the environment. Therefore no risk from any source.

14 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S.. Information/Checklist confirmation Yes/ 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances 8.2 From any other causes Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc) Yes Details thereof (with approximate quantities /rates, wherever possible) with source of information data hazardous substance will be stored. Small quantity of HSD will be stored in the site for running the DG/concrete mixer during construction. The HSD will be stored in a secured place. The project designed under earthquake resistance and other NBC design practices followed for construction activity.

15 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S.. Information/Checklist confirmation Yes/ 9.1 Lead to development of supporting utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, Waste or waste water treatment, etc.) Housing development Extractive industries Supply industries Other 9.2 Lead to after-use of the site, which could have an impact on the environment Details thereof (with approximate quantities /rates, wherever possible) with source of information data supply or ancillary units required for this project. The required material will be purchased directly from vendors. impact will occur. (Based on literature / standby of existing plants) 9.3 Set a precedent for later developments such cases. 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects cumulative effects will occur.

16 (III) Environmental Sensitivity S.. Area Name/ 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground waters Identity Yes Aerial distance (within 15 km.) Proposed project location boundary ne within 15 km Aerial distance from proposed project site. Mudasarlova Reservoir at 4.70 Kms ne within 15 km Aerial distance from proposed project site. ne within 15 km Aerial distance from proposed project site. 5 State, National boundaries ne within 10kms radius 6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes Simhachalam Hills at a distance of 4.0kms Kambalakonda Ecotourism park at 10.0kms 7 Defense installations Yes ne within 15 km Aerial distance from proposed project site. 8 Densely populated or built-up area Yes Murali Nagar 0.50kms 9 Areas occupied by sensitive manmade land uses (Hospitals, schools, places of worship, community facilities) 10 Areas containing important, high quality or scarce resources (Ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) Yes Hospitals and schools are located at a distance of 0.30 kms ne within 15 km aerial distance from proposed project site.

17 11 Areas already subjected to pollution or environmental damage. (Those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems (Earthquakes, subsidence, landslides, erosion, flooding for extreme or adverse climatic conditions) ne within 15 km aerial distance from proposed project site. The areas are not susceptible to natural hazards (data available from past records)

18 (IV).Proposed Terms of Reference for EIA studies: I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost. Date: Place: te: Signature of the applicant with Name and Full Address (Project Proponent /Authorized Signatory) 1. The projects involving clearance under Coastal Regulation Zone tification, 1991 shall submit with the application a C.R.Z map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t. C.R.Z (at the stage of TOR) and the recommendations of the State Coastal Zone Management Authority (at the state of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the C.R.Z tification, 1991 for the activities to be located in the CRZ. 2. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-à-vis the project location and the recommendations or comments of the Chief Wildlife Warden thereon (at the state of EC). 3. All correspondence with the Ministry of Environment & Forests including submission of application for TOR/Environmental Clearance, subsequent clarifications, as may be required from time to time, participation the EAC Meeting on behalf of the project proponent shall be made by the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project.

19 STANDARD TEMPLATE FOR EVALUATION OF PROJECT

20 STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS/ ACTIVITIES:- S. Information required Information to be furnished by the proponents 1 Name of the project or activity M/s. Sree Balajee Nirman & Estates 2 Name of the organization/owner. Mr. T. B Gupta Managing Partner 3 Address for communication M/s. Sree Balajee Nirman & Estates # /1, 1 st Floor, Sree Balajee chambers, Shantipuram, Gurudwara Junction, Visakhapatnam Telephone numbers Ph: ID of the organization or contact person admin@sreebalajeenirman.com 6 Location of the Proposed project or activity Sy.: 42/4, Kapparada villaje, 7 Appraisal Category (B2 or B1) B 2 Kancharapalem, Zone -IV Visakhapatnam 8 Nearest habitation and distance from the project or activity Murali Nagar at 0.50 Kms 9 Installed capacity / Production Capacities Construction of Residential 10 Specify the Fuel (Coal / CNG / biomass/others) and quantity required Towers in 6 s. in 12, Site Area, and the total built up area is sq.mts. Diesel for Generators of capacity 210 KVA 11 Details of Land use/land Cover Enclosed in EMP 12 Occupancy, ownership of the land in which the activity is proposed: (Government land / Private land / Forest land /Revenue land /Temple land /leased land/ land belongs to other Department) 13 If it is a Forest land, the following details shall be furnished: (Whether it is a Reserved forest / Protected forest/demarcated forest/ National Parks/Sanctuaries/any land in possession of Forest Own land forest area covers under the proposed site area.

21 Department.) (The village map with Sy.. indicating nearest forest boundary line from the site shall be enclosed) 14 Total investment of the project/activity. Rs Crores a. Funds allocated for EMP (capital cost and recurring cost per annum) 15 Brief description of the project with special reference to specific pollution and its control measures. 16 Compliance report on the following : i. Status of compliance of the conditions and environmental safeguards stipulated in the earlier clearance letters. Rs Lakhs Enclosed t applicable ii. Details of the court cases, if any, pending in any Court of Law against the project as well as any directions passed by the Court relating to the project directly or indirectly. iii. Details of the notices, if any, given to the project under Section 5 of the Environmental (Protection) Act, 1986 and Section 18 of the Air (Prevention & Control of Pollution) Act, NIL NIL 17 Whether the project attracts the provisions laid under the OM dt issued by the MoE&F, GOI, w.r.t. violation of EIA tification, 2006 and its amendments thereof? (Yes/) Present stage and status of the project: Construction was not yet started 18 Name of the Consultant: SV Enviro Labs & Consultants, Visakahapatnam

22 DECLARATION (a) I/We / M/s. SREE BALAJI NIRMAN & ESTATES hereby declare that I/We/ our organization does not /do not have conflict of interest with the Chairmen and members of SEAC, Delhi. (b) I/We hereby declare that Sri T. B Gupta of our company / organization is/are authorized to submit the application and to do all necessary correspondence for obtaining environmental clearance from State Level Impact Assessment Authority, Hyderabad and to attend the meeting (s) of SEAC, Delhi to present our case and to clarify the points raised by the Members of SEAC, Delhi. (c) I/we here by declare that the information furnished above is true to best of my/our knowledge and I/we shall hold personal liability for any deliberate misrepresentation and or concealment of factual information. If the information furnished is found to be false, the EC issued to our organization can be withdrawn and I/we are liable for action as per rules applicable. Date Place Signature of the Applicant/ project proponent (Name and address of the Applicant)

23 To, The Director, CRZ, Infrastructure & Miscellaneous Projects & New Construction & Industrial Estates, Projects Expert Appraisal Committee, Ministry of Environment & Forests, Delhi. Sir, Sub: Ref: SEAC, Delhi - M/s. Sree Balaji Nirman & Estates., Intimation of the Authorized Signatory- Reg. Amendments to EIA-2006 notification issued vide S.O.3067 (E) dt by MoE&F, GOI. With reference to above, it is to inform that the project proponent M/s. Sree Balaji Nirman & Estates has authorized /me/us/our organization/ viz. Sri T. Ravi Kumar to make all necessary correspondence with the SEAC, Delhi on behalf of the proponent for obtaining the Environmental Clearance for their project proposed at, Sy.. 42/4, Kapparada Village, Visakhapatnam District, Andhra Pradesh. Yours faithfully, (Name & address of the Authorized Signatory) Signature of the proponent

24 FORM IA FOR CONSTRUCTION PROJECTS

25 FORM- 1A 1. LAND ENVIRONMENT S.. ITEM COMPLIANCE 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? (Proposed land use must conform to the approved Master Plan / Development Plan of the area. Change of land use if any and the statutory approval from the competent authority be submitted). Attach Maps of (i) site location, (ii) surrounding features of the proposed site (within 500 meters) and (iii)the site (indicating levels & contours) to appropriate scales. If not available attach only conceptual plans. 1.2 List out all the major project requirements in terms of the land area, built up area, water consumption, power requirement, connectivity, community facilities, parking needs etc. The earmarked for Construction of Residential blocks in an area of about 12, Sq.mts owned by M/s. Sree Balajee Nirman & Estates A total of 12, Sq.mts of land will be sufficient for the construction activity and the built up area of Sq.mts in 6 Towers (Cellar + Ground + 5 upper floors). Further the above land is barren land. Therefore no change in land use / land cover / topography. Area statement Total site Area = 12,256.67Sq.mts Total Built up area Tot Lot area = 1,260.81sq.mts = sq.mts Total Parking area 9, Sq.mts. of flats 209 Flats Utilities 1. Water supply: Required water of about 50KLD during construction activity and about 142.2KLD during operation time will be met from the existing bore well and GVMC. 2. The required power will be met from AP Transco. The connectivity is from nearby transformer. 3. Adequate site has been provided Sewage treatment plant, road network and DG room. 4. Light motor vehicles / car parking will

26 1.3 What are the likely impacts of the proposed activity on the existing facilities adjacent to the proposed site? (Such as open spaces, community facilities, details of the existing land use, disturbance to the local ecology). 1.4 Will there be any significant land disturbance resulting in erosion, subsidence & instability? (Details of soil type, slope analysis, vulnerability to subsidence, seismicity etc may be given). 1.5 Will the proposal involve alteration of natural drainage systems? (Give details on a contour map showing the natural drainage near the proposed project site) 1.6 What are the quantities of earthwork involved in the construction activitycutting, filling, reclamation etc. (Give details of the quantities of earthwork involved, transport of fill materials from outside the site etc.) 1.7 Give details regarding water supply, waste handling etc during the construction period. 1.8 Will the low lying areas & wetlands get altered? (Provide details of how low lying and wetlands are getting modified from the proposed activity) 1.9 Whether construction debris & waste during construction cause health hazard? (Give quantities of various types of wastes generated during construction including the construction labour and the means of disposal) be provided. There is no impact on the various facilities adjacent to the complex. The land is essentially a leveled ground, free from erosion or subsidence. The terrain is highly stable and does not have possibility of erosion, subsidence or instability including vulnerability to city. There is no alteration of natural drainage. Earth work 150 m 3 fill material from out side The excavated earth will be used for filling the basement. The water for construction is being received from existing water sources. The low lying and wetland do not exist. The site is a vacant land and contains no construction waste.

27 2. WATER ENVIRONMENT S.. ITEM COMPLIANCE 2.1 Give the total quantity of water requirement for the proposed project with the breakup of requirements for various uses. How will the water requirement met? State the sources & quantities and furnish a water balance statement. 2.2 What is the capacity (dependable flow or yield) of the proposed source of water? 2.3 What is the quality of water required, in case, the supply is not from a municipal source? (Provide physical, chemical, biological characteristics with class of water quality) 2.4 How much of the water requirement can be met from the recycling of treated wastewater? (Give the details of quantities, sources and usage) 2.5 Will there be diversion of water from other users? (Please assess the impacts of the project on other existing uses and quantities of consumption) 2.6 What is the incremental pollution load from wastewater generated from the proposed activity? (Give details of the quantities and composition of wastewater generated from the proposed activity) During construction Domestic & construction During operation Domestic 142.2m 3 /day - 50 m 3 /day The source is ground water and consists of adequate ground water reserves. The quality of the ground water is good and potable. The physiochemical analysis of the ground water reveals all the parameters are well within the permissible limits. 100% of the waste water will be treated at the Sewage treatment plant and 40% will be used for green belt development and recirculation. Water source: Bore well/municipality There is no diversion of water from other users. The characteristics of the treated sewage will meet the on land for plantation limits as below: Parameter Raw Treated ph BOD < 30 COD < 50 TSS < 0.5 TDS < 1200 All values expressed in mg/l except ph. 2.7 Give details of the water requirements met from water harvesting? Furnish details of the facilities created. Rain water harvesting will be implemented from rooftops, channeled to the harvesting pits through appropriate piping systems. The storm water drains also would have recharging pits along the length of the drains for recharging the ground water. 2.8 What would be the impact of the land use There is no impact of the land use change

28 changes occurring due to the proposed project on the runoff characteristics (quantitative as well as qualitative) of the area in the post construction phase on a long term basis? Would it aggravate the problems of flooding or water logging in any way? 2.9 What are the impacts of the proposal on the ground water? (Will there be tapping of ground water; give the details of ground water table, recharging capacity, and approvals obtained from competent authority, if any) 2.10 What precautions/measures are taken to prevent the run-off from construction activities polluting land & aquifers? (Give details of quantities and the measures taken to avoid the adverse impacts) 2.11 How is the storm water from within the site managed?(state the provisions made to avoid flooding of the area, details of the drainage facilities provided along with a site layout indication contour levels) 2.12 Will the deployment of construction labourers particularly in the peak period lead to unsanitary conditions around the project site (Justify with proper explanation) 2.13 What on-site facilities are provided for the collection, treatment & safe disposal of sewage? (Give details of the quantities of wastewater generation, treatment capacities with technology & facilities for recycling and disposal) 2.14 Give details of dual plumbing system if treated waste used is used for flushing of toilets or any other use. on the runoff characteristics. Care has been taken to ensure that the built up area is as per the specifications of the municipal regulatory authorities and no way has it affected the surface runoff characteristics. There will not be any impact on ground water. The runoff from the construction activities are routed through water drainage network. The runoff from the construction activities are routed through water drainage network and disposed through water disposal system. Local manpower will be utilized for the construction work. Therefore no temporary site used for construction works. The sewage that collected from the flats will be routed to sewage treatment plant and further to municipal sewerage network. A separate line will be installed in the water closet for operating with treated sewage.

29 3. VEGETATION S.. ITEM COMPLIANCE 3.1 Is there any threat of the project to the biodiversity? (Give a description of the local ecosystem with it s unique features, if any) 3.2 Will the construction involve extensive clearing or modification of vegetation? (Provide a detailed account of the trees & vegetation affected by the project) 3.3 What are the measures proposed to be taken to minimize the likely impacts on important site features (Give details of proposal for tree plantation, landscaping, creation of water bodies etc along with a layout plan to an appropriate scale) There is no threat the bio-diversity due to the project as the site is devoid of vegetation. The land is a degraded and unutilized land which does not consists of any specific/unique features of the ecosystem. The proposed site is devoid of vegetation and is a barren land. Hence, there are no such impacts on native species and on genetic diversity. It is proposed to develop plantation along the boundary walls. 4. FAUNA S.. ITEM COMPLIANCE 4.1 Is there likely to be any displacement of fauna- both terrestrial and aquatic or creation of barriers for their movement? Provide the details. 4.2 Any direct or indirect impacts on the avifauna of the area? Provide details. 4.3 Prescribe measures such as corridors, fish ladders etc to mitigate adverse impacts on fauna The project area does not have any fauna both terrestrial and aquatic. There is no reporting of wild life. As such there is no impact on terrestrial & aquatic fauna. There are no water bodies in the site. There is no impact on the avifauna. There is no such activity and as such these are not provided.

30 5. AIR ENVIRONMENT S.. ITEM COMPLIANCE 5.1 Will the project increase atmospheric concentration of gases & result in heat There is no source for emissions as this is not a processing industry. islands? (Give details of background air The emissions expected are from quality levels with predicted values based on dispersion models taking into account the increased traffic generation as a result generators only. The generator will be operated whenever power fails and will be run on HSD. of the proposed constructions) 5.2 What are the impacts on generation of dust, smoke, odorous fumes or other There will not be any generation of hazardous gases. hazardous gases? Give details in relation to all the meteorological parameters. 5.3 Will the proposal create shortage of parking space for vehicles? Furnish details There is no shortage of parking place. Adequate space has been provided for of the present level of transport parking lot exclusively for the usage of infrastructure and measures proposed for the proposed housing project site during improvement including the traffic construction as well as in operation phase. management at the entry & exit to the project site. 5.4 Provide details of the movement patterns The internal roads would have pedestrian with internal roads, bicycle tracks, pathways and footpaths with adequacy to pedestrian pathways, footpaths etc., with areas under each category. meet the requirement of the residential population. 5.5 Will there be significant increase in traffic noise & vibrations? Give details of the sources and the measures proposed for mitigation of the above. There will be a marginal increase of traffic noise, but measures have been proposed for mitigation of this noise through an extensive plantation along the boundary wall. 5.6 What will be the impact of DG sets & other equipment on noise levels & vibration in & ambient air quality around the project site? Provide details. The DG set will be housed in an acoustic enclosed room to reduce the noise levels and it will be mounted on anti-vibration mounting pads to reduce vibration levels.

31 6. AESTHETICS S.. ITEM COMPLIANCE 6.1 Will the proposed constructions in any way result in the obstruction of a view, scenic amenity or landscapes? Are these considerations taken into account by the Care has been taken to improve the Aesthetics, particularly in respect of landscape and there is no obstructions are created. proponents? 6.2 Will there be any adverse impacts from The impact of the proposed construction new constructions on the existing activity on the surroundings will be structures? What are the considerations taken into account? minimum as it away from the existing structures. 6.3 Whether there are any local considerations of urban form & urban design influencing the design criteria? They may be explicitly spelt out. t applicable 6.4 Are there any anthropological or There are no sites of archeological archaeological sites or artefacts nearby? importance within and around the site. State if any other significant features in the vicinity of the proposed site have been considered. 7. SOCIO-ECONOMIC ASPECTS S.. ITEM COMPLIANCE 7.1 Will the proposal result in any changes to the demographic structure of population? Provide the details. local 7.2 Give details of the existing social infrastructure around the proposed project. 7.3 Will the project cause adverse effects on local communities, disturbance to sacred sites or other cultural values? What are the safeguards proposed? There will not be any changes to the demographic structure of local populations, as it is a residential apartment and the socio economic power of the surroundings will increase. Majority of the people are agricultural labour and marginal workers. There are no sacred sites or of cultural value sites within 10 km radius of the proposed apartments.

32 8. BUILDING MATERIALS S.. ITEM COMPLIANCE 8.1 May involve the use of building materials with high-embodied energy. Are the The construction materials like cement, bricks, concrete and sand will be procured construction materials produced with from local authorized vendors. energy efficient processes? (Give details of energy conservation measures in the selection of building materials and their energy efficiency) 8.2 Transport and handling of materials during construction may result in pollution, noise & public nuisance. What measures are taken to minimize the impacts? The material will be transported through covered trucks and water sprinkling will be taken to suppress the dust arise from construction materials. 8.3 Are recycled materials used in roads and structures? State the extent of savings achieved? Usage of fly ash for road development from the local power plants is being envisaged. 8.4 Give details of the methods of collection, segregation & disposal of the garbage generated during the operation phases of the project. The municipal solid waste from the apartment will be disposed to Municipal dumping site - Kapuluppada dumping site regularly. 9. ENERGY CONSERVATION S.. ITEM COMPLIANCE 9.1 Give details of the power requirements, source of supply, backup source etc. What is the energy consumption assumed per square foot of built-up area? How have you tried to minimize energy consumption? 9.2 What type of, and capacity of, power backup to you plan to provide? 9.3 What are the characteristics of the glass you plan to use? Provide specifications of its characteristics related to both short wave and long wave radiation? 9.4 What passive solar architectural features are being used in the building? Illustrate the applications made in the proposed project. The proposed apartment will utilizes about 8660 KWH power for its utilities from APTRANSCO. DG sets will be kept as standby to overcome the power failure if any. Glazing with 2.64 sq.mts Passive features include special glass panels for absorption of solar radiation.

33 9.5 Does the layout of streets & buildings maximise the potential for solar energy devices? Have you considered the use of street lighting, emergency lighting and solar hot water systems for use in the building complex? Substantiate with details. 9.6 Is shading effectively used to reduce cooling/heating loads? What principles have been used to maximize the shading of Walls on the East and the West and the Roof? How much energy saving has been effected? 9.7 Do the structures use energy-efficient space conditioning, lighting and mechanical systems? Provide technical details. Provide details of the transformers and motor efficiencies, lighting intensity and air-conditioning load assumptions? Are you using CFC and HCFC free chillers? Provide specifications. 9.8 What are the likely effects of the building activity in altering the micro-climates? Provide a self assessment on the likely impacts of the proposed construction on creation of heat island & inversion effects? 9.9 What are the thermal characteristics of the building envelope? (a) roof; (b) external walls; and (c) fenestration? Give details of the material used and the U-values or the R values of the individual components What precautions & safety measures are proposed against fire hazards? Furnish details of emergency plans. Solar energy system is considered for street lights. External shading is being provided in the design. ENERGY CONSERVATION Double Glazing It is decided to use double glazing to reduce the heat transmission through the glass. Microclimate betterment would be achieved through proper emission control as well as environmental greening programme. The exposed roots will be insulated with under deck insulation. Cellar areas in the basement and staircase are mechanically ventilated and with fire escape systems. Firefighting equipment Sand buckets Fire alarm Fire escape (Stair case)

34 9.11 If you are using glass as wall material provides details and specifications including emissivity and thermal characteristics What is the rate of air infiltration into the building? Provide details of how you are mitigating the effects of infiltration To what extent the non-conventional energy technologies are utilized in the overall energy consumption? Provide details of the renewable energy technologies used. Smoke detectors Automatic water sprinklers air filtration into the building. Solar energy will be used for street common facility lightings & for hot water. (III) ENVIRONMENTAL MANAGEMENT PLAN S.. ITEM COMPLIANCE 1 The Environment Management Plan would consist of all mitigation measures for each item wise activity to be undertaken during the construction, operation and the entire Environmental Management Plan will be implemented during the construction phase as well as during operational phase. life cycle to minimize adverse environmental impacts as a result of the activities of the project. It would also delineate the environmental monitoring plan for compliance of various environmental regulations. It will state the steps to be taken in case of emergency such as accidents at the site including fire.

APPENDIX I. (See paragraph-6) FORM 1

APPENDIX I. (See paragraph-6) FORM 1 (I) Serial Number Basic Information Item APPENDIX I (See paragraph-6) FORM 1 Details 1. Name of the project/s Soapstone Mining (ML. 15/95) 2. S.. in the schedule B1- Mining of Mineral 3. Proposed capacity/area/length/tonnage

More information

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd & Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 To be submitted By Project Proponent To Madhya Pradesh State Environmental

More information

APPENDIX I. (See paragraph-6) FORM 1

APPENDIX I. (See paragraph-6) FORM 1 (I) Serial Number Basic Information Item APPENDIX I (See paragraph-6) FORM 1 Details 1. Name of the project/s Soapstone, Red Ocher and China Clay (ML. 81/82) 2. S.. in the schedule 1 (a) - Mining of Mineral

More information

APPENDIX I (See paragraph 6) FORM 1

APPENDIX I (See paragraph 6) FORM 1 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information: S.. Item Details 1 Name of the project/s: M/s. Sri Lakshmi Enterprises 2 S.. in the schedule 1 (a) 3. Proposed capacity/area/length/tonnage to

More information

M/s. PRAKRUTHI INFRA & SHELTERSS (INDIA) PVT LTD

M/s. PRAKRUTHI INFRA & SHELTERSS (INDIA) PVT LTD ` SUBMISSION OF FORM I & IA TOWARDS GETTING PRIOR ENVIRONMENTAL CLEARANCE (EC) For M/s. PRAKRUTHI INFRA & SHELTERSS (INDIA) PVT LTD (Residential Apartment Construction Project) Sy.. 298/1 & 2 Vepagunta,

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

M/s. Karthika Mines & Minerals Pvt.Ltd.-Colour Granite Quarry Ha. FORM - I

M/s. Karthika Mines & Minerals Pvt.Ltd.-Colour Granite Quarry Ha. FORM - I FORM - I (I) Basic Information S.. Item Details 1 Name of the project/s M/s.Karthika Mines & Minerals Pvt.Ltd. Colour Granite Quarry, 10.00 Ha. 2 S.. in the schedule 1 (B) 3 Proposed capacity Area-10.00

More information

FORM 1 & 1 A. Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT. Palladium Grand II, S. No. 17/1A/2, Dhanori, Pune, Maharashtra

FORM 1 & 1 A. Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT. Palladium Grand II, S. No. 17/1A/2, Dhanori, Pune, Maharashtra FORM 1 & 1 A Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT At Palladium Grand II, S. 17/1A/2, Dhanori, Pune, Maharashtra By M/s. Raojee Constructions FORM 1 Palladium Grand II RESIDENTIAL & COMMERCIAL

More information

FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY. Asst.Director of Mines and Geology, Rajamahendravaram

FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY. Asst.Director of Mines and Geology, Rajamahendravaram FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY Asst.Director of Mines and Geology, Rajamahendravaram Ordinary Sand Land Details : Govt Land Extent : 3.9634 Ha. VILLAGE

More information

FORM 1 BASIC INFORMATION S.NO.

FORM 1 BASIC INFORMATION S.NO. FORM 1 BASIC INFORMATION S.NO. Item Details 1 Name of the Project M/s AVA Stones (P) Ltd, Director: Sri.Bimal Kumar Agarwal Colour Granite Mine. 2 S.. in the schedule 1(a) 3 Proposed capacity/ area/ length/

More information

FORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik

FORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik FORM-I (I) Basic Information Item Details. 1. Name of the Project Proposal for Sand Quarry in Kas Village, Taluka Trimbakeshwar, District Nasik, State Maharashtra over an area of 1.5400 Ha at Damanganga

More information

APPENDIX I (See paragraph 6) FORM 1

APPENDIX I (See paragraph 6) FORM 1 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. No Item Details 1 Name of the Project/s Sri A. Narasimulu 2 S. No in the Schedule 1(a) 3 Proposed capacity/area/length/tonnage to be handled/command

More information

APPENDIX - I (See paragraph 6) FORM 1

APPENDIX - I (See paragraph 6) FORM 1 APPENDIX - I (See paragraph 6) FORM 1 (I) Basic Information Item Details 1 Name of the project/s M/S Jashnani Constructions Pvt. Ltd. Proposed residential building project at Shahapur, Thane 2 S.. in the

More information

FORM I TERMS OF REFERENCE. For. QUARRY OF ROAD METAL (6.265 Ha) Sri K Kasi Raju. PROP: K.Kasi Raju

FORM I TERMS OF REFERENCE. For. QUARRY OF ROAD METAL (6.265 Ha) Sri K Kasi Raju. PROP: K.Kasi Raju FORM I TERMS OF REFERENCE For QUARRY OF ROAD METAL (6.265 Ha) Of Sri K Kasi Raju PROP: K.Kasi Raju Extent: 6.265 Ha of Budawada (V), Chimskurthy (M), Prakasam (Dt), Andhra Pradesh (I) BASIC INFORMATION

More information

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease

More information

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds-

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds- Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for Form -1 [Vide tification dated 1 st December 2009] FOR PROPOSED COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI

More information

(1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity)

(1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity) [Vide Paragraph - 6 of Notification dated 14 th September 2006, only for construction projects listed under item 8 of the Schedule] (1) LAND ENVIRONMENT (Attach panoramic view of the project site and the

More information

FORM 1. 8 Does it attract the specific condition? It yes, No Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai

FORM 1. 8 Does it attract the specific condition? It yes, No Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai FORM 1 (I) Basic Information Sr. Item Details. 1 Name of the Project WHITE CITY METAL 2 S.. in the Schedule 8 (b) 3 Proposed capacity/area /length/tonnage to Plot area: 45,800.00 sq.mt. be handled/command

More information

APPENDIX I. (See paragraph 6) FORM 1

APPENDIX I. (See paragraph 6) FORM 1 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information Name of the Project Size of the project (in terms of total area) CRZ classification of the area Expected cost of the project Contact Information

More information

APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance)

APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance) (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance) Name of the Project: KRUTI ONELLA Sahyog Rekha Infraproject LLP Location / site alternatives Survey no.

More information

FORM-I for seeking clearance for project attracting CRZ notification

FORM-I for seeking clearance for project attracting CRZ notification AnnexureIV FORM-I for seeking clearance for project attracting CRZ notification Basic information: SEA CLIFF RESORTS TOURISM PROJECT (.1682/A3/15/KCZMA/S&TD) Name of the Project: THE SEACLIFF Location

More information

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1 APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project Sarpanch, Gram Panchayat chando chando Sand Mine 2 S.. in schedule Category B, Project or Activity 1(a)

More information

FORM-I. Environmental Clearance (EC)

FORM-I. Environmental Clearance (EC) FORM-I Environmental Clearance (EC) FOR M/S. Mahanth mica mines (MICA, QUARTZ & FELDSPAR MINES) Léase Area : 47.01 Acres/ 19.05 Ha Sy.. 140/P, 142, 143/P & 139/3 Kalichedu (V), Sydapuram (M), SPSR Nellore

More information

Sri.T.N.Balasubramanya

Sri.T.N.Balasubramanya Sri.T.N.Balasubramanya (Earlier: M/s.Global Golden Rocks) Extent: 5 Ha Colour Granite Quarry Sy.No.65 of Lattigam Village, Nandigam Mandal, Srikalulam District, Andhra Pradesh UPDATED FORM-I FORM 1 (As

More information

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd & Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment tification dtd 14-09-2006 & 01-12-09 To be submitted By SHRI SANJAY SINGH S/O SHRI MAHENDRA SINGH RATHORE To Madhya

More information

APPENDIX- I FORM- 1. (I) Basic Information:

APPENDIX- I FORM- 1. (I) Basic Information: (I) Basic Information: APPENDIX- I FORM- 1 Item Details 1. Name of Project Sand Stone Mining Project, M.L..-08/1987, Area 150.926 Ha., located n/v -Gubrenda, Tehsil -Karauli, District Karauli, (Rajasthan)

More information

FORM 1. APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006

FORM 1. APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006 FORM 1 APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006 (I) Basic Information: S. Item Details 1. Name of the Project/s : Expansion

More information

Submitted To State Expert Appraisal Committee (SEAC), State Environmental Impact Assessment Authority, Andhra Pradesh.

Submitted To State Expert Appraisal Committee (SEAC), State Environmental Impact Assessment Authority, Andhra Pradesh. Application for Prior Environmental Clearance (Form 1) For Proposed Colour Granite Mine over an Extent of 3.000 Hectares, in Sy. : 143 of Bharthupuram village, Nandigam Mandal, Srikakulam District, Andhra

More information

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E)) FORM 1 (As per new tification of MoEF dated 01-12-2009 vide S.O 3067 (E)) (I) BASIC INFORMATION S.. Item Details 1. Name of the project/s M/s. S.L.N.S. Granites Mining of Colour Granite 4.90 Ha 2. S..

More information

M/s. SRI KALIDINDI VENKATA RAMA BADHRAA KUMAR RAJU & OTHERS

M/s. SRI KALIDINDI VENKATA RAMA BADHRAA KUMAR RAJU & OTHERS SUBMISSION OF FORM I & IA TOWARDS GETTING PRIOR ENVIRONMENTAL CLEARANCE (EC) For M/s. SRI KALIDINDI VENKATA RAMA BADHRAA KUMAR RAJU & OTHERS (Construction of Commercial cum Residential Building) Site Address:

More information

Appendix I. Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

Appendix I. Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN Appendix I Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN AREA: 1.0 HECT (NON FOREST LAND) ML 219/1997 PRODUCTION CAPACITY: 50,000 TPA

More information

No 1 Name of the Project/s M/s. Velchal Laterite Mine 2 S. No in the Schedule 1(a)

No 1 Name of the Project/s M/s. Velchal Laterite Mine 2 S. No in the Schedule 1(a) APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. Item Details No 1 Name of the Project/s 2 S. No in the Schedule 1(a) 3 Proposed capacity/area/length/tonnage to Mine lease area is 8.91 Ha,

More information

APPENDIX I (See paragraph 6) Form 1 (I) Basic Information

APPENDIX I (See paragraph 6) Form 1 (I) Basic Information APPENDIX I (See paragraph 6) Form 1 (I) Basic Information Sr.. Item Details 1 Name of the Project/s Proposed expansion in Environment Clearance for Residential and Commercial project by Manikchand Kumar

More information

Ms.Thriveni Earthmovers Private Limited HO.22/110,Greenways Roads,Fairlands,Salem,Tamilnadu

Ms.Thriveni Earthmovers Private Limited HO.22/110,Greenways Roads,Fairlands,Salem,Tamilnadu Application for Prior (Environmental Clearance) Transfer of EC- Form 1 For Transfer of EC from Ms.K.M.Altaf Kouser to Ms.Thriveni Earthmovers Private Limited Over an Extent of 4.838 Hectares of Road Metal

More information

UPDATED FORM I. SUBMISSION To Ministry of Environment & Forests & Climate Change, New Delhi. Prepared by. M/s. VIJAYNAGAR SUGAR PVT. LTD.

UPDATED FORM I. SUBMISSION To Ministry of Environment & Forests & Climate Change, New Delhi. Prepared by. M/s. VIJAYNAGAR SUGAR PVT. LTD. Annexure - III UPDATED FORM I For Amendment to Environmental Clearance (Environmental Clearance issued by MOEF vide. F.. J-11011/366/2007-IA-II (I) Dated, 15.04.2008.) SUBMISSION To Ministry of Environment

More information

(Residential cum Commercial Project) APPENDIX I (See paragraph 6) FORM 1. Plot area: 37,039 m 2 Built up area: 1,11, m 2

(Residential cum Commercial Project) APPENDIX I (See paragraph 6) FORM 1. Plot area: 37,039 m 2 Built up area: 1,11, m 2 (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project 2 S. number in schedule 8(a) 3 Proposed capacity/area/length/tonnage to be handled/command area/lease area/number

More information

A 'N 'E B 'N 'E C 'N 'E D 'N 'E

A 'N 'E B 'N 'E C 'N 'E D 'N 'E Gata. 12, Gata. 164, 352 & 1295/5 Basic Information FORM- 1 S.. Item Details 1. Name of the project/s Sand/Moram Mining 2. S.. in the schedule 1(a)i 3. Proposed capacity/area/length/tonnage to be handled

More information

UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana)

UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana) UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana) Venkateswara Mines & Minerals (Earlier: Sri Bode Vijayasen Reddy), Kannaraopet Village, Nallabelli Mandal, JayashankarBhupalpally

More information

Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S. No. in the schedule 8(a)

Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S. No. in the schedule 8(a) FORM I (I) Basic Information S.. Item Details 1. Name of the project Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S.. in the schedule 8(a) 3. Proposed capacity/area/length/tonnage

More information

M/s. SURYA ENTERPRISES H.No: , Sri Paradise Apartments, New Andhra Bank Colony, Anantapuramu District

M/s. SURYA ENTERPRISES H.No: , Sri Paradise Apartments, New Andhra Bank Colony, Anantapuramu District Application for Prior Environmental Clearance (Form 1) For Proposed Road Metal / Building Stone/ Robo/Manufacture Sand Mine Over An Extent Of 9.712 Hectares, in Sy.. 743 of Somandepalli Village, Somandepalli

More information

FORM 1 (Application for Environment Clearance)

FORM 1 (Application for Environment Clearance) (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance) Name of the Project: Location / site alternatives under consideration: Size of the Project: Shreedhar Sparsh

More information

APPENDIX I (See paragraph 6) FORM 1

APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item Details 1 Name of the Project WHITE LILLIES (Residential Project) 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage

More information

FORM 1. Gownivaripalli Village, Tehsil. Gorantla Mandal, District. Anantapur District, State

FORM 1. Gownivaripalli Village, Tehsil. Gorantla Mandal, District. Anantapur District, State FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project/s M/s. Squadm Mines & Minerals Pvt. Ltd - Road Metal & Building Stone 2. S.. in the schedule Item- 1(a) (Mining of Minerals) 3. Proposed

More information

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT QUERY 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? Attach Maps

More information

FORM 1. No condition? If yes, please specify. 8. Does it attract the specific. No condition? If yes, please specify. 9. Location Geo Coordinates

FORM 1. No condition? If yes, please specify. 8. Does it attract the specific. No condition? If yes, please specify. 9. Location Geo Coordinates FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project/s 9.890 ha. of Proposed Colour Granite Mine of Sri S. Senthil Kumar 2. S.. in the schedule Item- 1(a) (Mining of Minerals) 3. Proposed

More information

APPENDIX I (See paragraph 6) FORM 1. Plot area: 10,439 m 2 Built up area: 50, m 2

APPENDIX I (See paragraph 6) FORM 1. Plot area: 10,439 m 2 Built up area: 50, m 2 (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project Commercial Project 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage to be handled/command area/lease

More information

FORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s.

FORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s. FORM I [Vide M.o.E.F & C.C tification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE At. 100/1, 100/2, 100/3, 100/4, 100/5, 100/6B, 101/1, 101/2, 101/3, 101/4, 101/5B,

More information

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E)) FORM 1 (As per new Notification of MoEF dated 01-12-2009 vide S.O 3067 (E)) I) BASIC INFORMATION Item Details 1 Name of the project/s Sri.Gandi Suryanarayana color Granite 2 S. No. in the schedule Item

More information

FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT ( SQ. M) ANAMOL LIFE STYLE

FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT ( SQ. M) ANAMOL LIFE STYLE FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (22309.63 SQ. M) AT ANAMOL LIFE STYLE RESIDENTIAL CUM COMMERCIAL BUILDING S. No. 206, O.P. NO. 129, F.P. NO. 129 OF D.T.P.S. NO. 241, NANA CHILODA, GANDHINAGAR,

More information

FORM 1. Basic Information Sr. No. 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD.

FORM 1. Basic Information Sr. No. 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD. FORM 1 Basic Information Item Details 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD. located at Survey : 64 ne Lagu, Sabarmati Nadi Patt Village:

More information

FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR

FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR MANUFACTURING MAN MADE FIBER (PARTIALLY ORIENTED YARN (POY), FULLY DRAWN YARM (FDY), TEXUTURISED YARN, TWISTED YARN - OTHER THAN RAYON THROUGH

More information

M/S. JUMBO MINING LIMITED Surya Arcade, 4th Floor /4F & D, Near Indian Oil Petrol Pump, Begumpet,Hyderabad Telangana.

M/S. JUMBO MINING LIMITED Surya Arcade, 4th Floor /4F & D, Near Indian Oil Petrol Pump, Begumpet,Hyderabad Telangana. Application for Prior Environmental Clearance (Form 1) For Proposed Colour Granite Mine over an Extent of 20.0 Hectares, in Sy..1/1 of Chinnagorigedda Village, Madugula Mandal, Visakhapatnam District,

More information

FORM 1 Riverbed Sand Mining Project

FORM 1 Riverbed Sand Mining Project FORM 1 Riverbed Sand Mining Project At Gata. 117ध, 1306म ( Kuda River) Village: Gujarauliya, Beltikar, Tehsil: Naugarh, District: Siddharthnagar, Submitted by M/s Baburam Construction Address-1769 B-5

More information

FORM 1. /area/length/tonnage. No condition? If yes, please specify. 8. Does it attract the specific

FORM 1. /area/length/tonnage. No condition? If yes, please specify. 8. Does it attract the specific FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project/s 6.490 ha. of Proposed Colour Granite Mine of M/s. Alief Exports 2. S.. in the schedule Item- 1(a) (Mining of Minerals) 3. Proposed

More information

APPENDIX I (See paragraph 6) FORM 1. Plot area: 13,114 m 2 Built up area: 81, m 2

APPENDIX I (See paragraph 6) FORM 1. Plot area: 13,114 m 2 Built up area: 81, m 2 (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project Residential Project 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage to be handled/command area/lease

More information

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1 APPENDIX I (See paragraph - 6) FORM 1 (I)Basic Information S. Item Details 1 Name of the project 1.79Acr nakti Limestone Mines (Minor Mineral) 2 S.. in schedule Category B, Project or Activity 1(a) (As

More information

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1 APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project 3.274 Ha Kapsada Limestone Mines (Minor Mineral) of M/s I.V.R.C.L Limited 2 S.. in schedule Category B,

More information

FORM 1. 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a)

FORM 1. 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a) FORM 1 (I) Basic Information Item Details 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a) 3 Proposed capacity/ area/ length/ tonnage to be handled/command area/lease area/number

More information

Haridarshan Residency ( Row Type House & School Building )

Haridarshan Residency ( Row Type House & School Building ) Survey.. 18, Moje: : Shekhpur, Tal: Kamrej, Dist.: Surat, Gujarat 394 130 FORM 1 AND BASIC INFORMATION FOR OBTAINING ENVIRONMENTAL CLEARANCE FOR NEW PROJECT OF Haridarshan Residency Block. 18, Village:

More information

Form I. for. Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens

Form I. for. Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens Form I for Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens at T.P.S. 2, F.P.. 182/P, Sub Plot-A, OP. 43, R.S.. 85/P Vesu-Bhartana-Vesu, Tal: Choryasi Dist: Surat, Gujarat

More information

Submitted To Ministry of Environment and Forest, GOI, New Delhi. Submitted By

Submitted To Ministry of Environment and Forest, GOI, New Delhi. Submitted By Application for Prior Environmental Clearance (Form 1) For Proposed enhancement of production from 0.050 MTPA to 3.042 MTPA of Quartz Mine over an Extent of 149 Hectares, in Sy.. 01 of Thumukunta Village,

More information

FORM 1 Riverbed Sand/Morrum / Mining Project

FORM 1 Riverbed Sand/Morrum / Mining Project FORM 1 Riverbed Sand/Morrum / Mining Project At Khand. 19/3 (River Betwa) Village: Tikapur, Tehsil: Maudaha District:Hamirpur, Uttar Pradesh Submitted by Suresh Chandra Gupta S/o Narayan Das Gupta R/o-60

More information

UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE. Sri Fakir Rohidas

UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE. Sri Fakir Rohidas UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE At: Brahmanipali, Dustrict: Sambalpur, Odisha Sri Fakir Rohidas Prepared By Centre for Envotech and Management Consultancy Pvt. Ltd. Bhubaneswar

More information

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1 APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project Ambey Mahila Swa Sahayata Samuh 2 S.. in schedule Category B, Project or Activity 1(a) (As per EIA tification

More information

Sand, Stone & Bajri Mining Project Applicant: Shri Ashish Kumar, M/s Ashish Stone Crusher. Form-1 FORM-1 SRUSHTI SEWA, NAGPUR 1

Sand, Stone & Bajri Mining Project Applicant: Shri Ashish Kumar, M/s Ashish Stone Crusher. Form-1 FORM-1 SRUSHTI SEWA, NAGPUR 1 FORM-1 SRUSHTI SEWA, NAGPUR 1 FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Sand, Stone and Bajri Mining Project 2. Serial. in the schedule 1(a) Mining of Mineral 3. Proposed capacity

More information

ITHC/PRJ/18-19/EIA/138 1 IND TECH HOUSE CONSULT

ITHC/PRJ/18-19/EIA/138 1 IND TECH HOUSE CONSULT Application for Extension of Environmental Clearance (EC) UPDATED (See Paragraph 6 tification dated14 th September 2006) as amended to EIA tification, 2006 issued vide S.O. 3067(E) on dt. 01.12.2009. Basic

More information

APPENDIX I (See paragraph 6) FORM 1

APPENDIX I (See paragraph 6) FORM 1 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project Limestone Mine 2. S.. in the schedule S.. 1(a) mining of mineral is 3. Proposed capacity/area/length/tonnage

More information

FORM min Village. Chowgund, Tehsil. Doru District. Anantnag State

FORM min Village. Chowgund, Tehsil. Doru District. Anantnag State Khasra.- 1273-min, Area: 4.459 Ha, Basic Information FORM- 1 S.. Item Details 1. Name of the project/s Limestone Mine 2. S.. in the schedule 1(a)i 3. Proposed capacity/area/length/tonnage to be/ handled

More information

Project: Bhidauni Khadar Ordinary Sand Mining Project on Yamuna River FORM 1 Applicant: M/s Satyug Foods Pvt. Ltd. FORM- I

Project: Bhidauni Khadar Ordinary Sand Mining Project on Yamuna River FORM 1 Applicant: M/s Satyug Foods Pvt. Ltd. FORM- I FORM- I Page 0 of 14 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Bhidauni Khadar Ordinary Sand Mining Project 2. S.. in the schedule 1(a) mining

More information

Revised FORM - I & PRE-FEASIBILITY REPORT

Revised FORM - I & PRE-FEASIBILITY REPORT Hind Energy & Coal Beneficiaton (India) Ltd. [Change in Technology from Dry to Wet Type of Coal Washery in EC issued by MoEF letter vide no. J-11015/364/2009-IA-II(M) dated 21st May 2014] at Hindadih Village,

More information

Details required for submitting Fresh EC Application. (Category B2 Projects: Mining of Minor Minerals)

Details required for submitting Fresh EC Application. (Category B2 Projects: Mining of Minor Minerals) Details required for submitting Fresh EC Application (Category B2 Projects: Mining of Minor Minerals) 1. Project Sector (Non-Coal Mining) 2. Project Type (New, Expansion, Modernization) If Project Type

More information

.APPENDIX I (See paragraph 6) FORM 1. Sl. No. Item Details 1. Name of the project/s

.APPENDIX I (See paragraph 6) FORM 1. Sl. No. Item Details 1. Name of the project/s .APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information. Item Details 1. Name of the project/s Peddayekkaluru White Shale Mine M/s. Swathi Mines 2.. in the schedule Proposed capacity/area/length/ tonnage

More information

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects.

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects. (I) Basic Information FORM-1 Item Details 1 Name of the Project Harbour Heights 2 S.. in the Schedule 8(b) Townships and Area Development projects. 3 Proposed capacity/area /length/tonnage to be Total

More information

Form - 1 Appendix- I (See Paragraph-6)

Form - 1 Appendix- I (See Paragraph-6) (I) Basic Information Form - 1 Appendix- I (See Paragraph-6) Item Details 1 Name of the Project/s Construction of Proposed Residential, Commercial & Multiplex Buildings By M/s. Sahiti Infratec Ventures

More information

FORM-1. PROJECT: Sati & Garhi Sand Ghat,Ulai River (Area-22 Ha), Dist:-Jamui. APPLICANT: M/s Westlink Trading Pvt. Ltd. FORM- I.

FORM-1. PROJECT: Sati & Garhi Sand Ghat,Ulai River (Area-22 Ha), Dist:-Jamui. APPLICANT: M/s Westlink Trading Pvt. Ltd. FORM- I. FORM- I Page 0 of 15 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Sati & Garhi Sand Ghat on Ulai River of District- Jamui. 2. S.. in the schedule

More information

(I) Basic Information:

(I) Basic Information: (I) Basic Information: Item Details 1 Name of the project Proposed River Bed Ordinary Sand Mining At River Sharda, Village- Mudi, Gata - 443, Tehsil- Dhaurahra, District-Khiri, State-Uttar Pradesh. (Leased

More information

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (AI) (viii) (ix) (x) Basic Information Name of the Mining Lease

More information

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR Near Village Tehsil District State Capacity Lease Area Category of Project Project Cost KANTBARA BIJOLIYA Bhilwara Rajasthan 36561 TPA of

More information

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (II) (viii) (ix) (x) Basic Information Name of the Mining Lease

More information

Annexure-IV. Form-I for seeking clearance for project attracting CRZ notification. At Thengamputhur Village, Tamil Nadu by

Annexure-IV. Form-I for seeking clearance for project attracting CRZ notification. At Thengamputhur Village, Tamil Nadu by Annexure-IV Form-I for seeking clearance for project attracting CRZ notification Basic Information: Name of the Project :- Location or site alternative under consideration: - Construction of Beach Resort

More information

JAI MAA SHARDA STONE CRUSHING

JAI MAA SHARDA STONE CRUSHING JAI MAA SHARDA STONE CRUSHING Prop. Hukum Singh (M.. 9425585252) Near-Pahunadukan Kedarpur Ambikapur, (C.G.) To, The Member Secretary, SLEIAA(State Level Environment Impact Assessment Authority), Ministry

More information

I) Basic information S. No. Item Details

I) Basic information S. No. Item Details I) Basic information S.. Item Details 1 Name of the project/s M/s. Rajapushpa Properties (P) Limited Residential Complex 2 S.. in the schedule Project Activity 8a Category B(B2) 3 Proposed capacity /area/

More information

UPDATED FORM I 433 TPD CALCINED PETROLEUM COKE PLANT WITH 9 MW COGENERATION OF POWER PROPOSED AT

UPDATED FORM I 433 TPD CALCINED PETROLEUM COKE PLANT WITH 9 MW COGENERATION OF POWER PROPOSED AT UPDATED FORM I Of 433 TPD CALCINED PETROLEUM COKE PLANT WITH 9 MW COGENERATION OF POWER PROPOSED AT APSEZ, Atchutapuram, Visakhapatnam district, Andhra Pradesh By RAIN CALCINER LIMITED Prepared By B.S.

More information

FORM 1 Riverbed Sand Mining Project

FORM 1 Riverbed Sand Mining Project FORM 1 Riverbed Sand Mining Project At Gata. 1255 क Village: Bara Tehsil: Sewrai, District: Ghazipur, Uttar Pradesh. Submitted by M/s Vatsya Infrastructure Private Limited,Lucknow Sh. Rajeev Kumar Pandey

More information

M/S Overseas Min Tech Consultants, Jaipur 1

M/S Overseas Min Tech Consultants, Jaipur 1 (I) Basic Information: APPENDIX I (See paragraph 6) FORM 1 S.. Item Details 1. Name of Project Proposed Soapstone Mining Project, Khasra 60, 61, 63, Area: 11.1830Hect., Production: 17508 TPA, Near Village:

More information

Proposed Multiplex & Commercial Complex FORM I

Proposed Multiplex & Commercial Complex FORM I I. BASIC INFORMATION FORM I. Item Details 1 Name of the project Proposed Construction of Multiplex cum Commercial Complex 2 no. in the schedule 8 (a) 3 Proposed area Area Details: Total land area: 13,218.80

More information

FORM 1. Basic Information. Sl. No.

FORM 1. Basic Information. Sl. No. (I) Basic Information FORM 1 Sl.. Item Details 1. Name of the project/s Dimensional Stone Useful For Cubes & Kerbs Quarry Of M/s. R.R Stones Private Limited 2. S.. in the schedule Item- 1(a) Mining of

More information

Ambey Mahila Swa Sahayata Samuh President. Smt. Tuleshwari Vill- Gangikot Post: Gangikot Teh.- Surajpur Dist: Surajpur (C.G.

Ambey Mahila Swa Sahayata Samuh President. Smt. Tuleshwari Vill- Gangikot Post: Gangikot Teh.- Surajpur Dist: Surajpur (C.G. Ambey Mahila Swa Sahayata Samuh +91-9617439314 President. Smt. Tuleshwari Vill- Gangikot Post: Gangikot Teh.- Surajpur Dist: Surajpur (C.G.) To, The Member Secretary, SLEIAA (State Level Environment Impact

More information

FORM-I. Sector-16-B, GH Greater Noida, U.P.

FORM-I. Sector-16-B, GH Greater Noida, U.P. ida, U.P. APPENDIX I (See paragraph-6) FORM 1 S.. Item Details 1. Name of the project/s Residential Complex entitled Ajnara Homes by M/s APV Reality Ltd. 2. S.. in the schedule 8 (b): Township and Area

More information

9 Plot/Survey/Khasra No S.No: 153/1, 153/2, 171/1, 171/2A, 172/1B1, 172/1B2, 172/C1, 172/1C2, 172/2A, 172/2B, 172/2C & 180/1.

9 Plot/Survey/Khasra No S.No: 153/1, 153/2, 171/1, 171/2A, 172/1B1, 172/1B2, 172/C1, 172/1C2, 172/2A, 172/2B, 172/2C & 180/1. FORM I I. BASIC INFORMATION Item Details 1 Name of the project Proposed construction of residential building by M/s. CASA GRANDE AXIOM PRIVATE LIMITED. 2 no. in the schedule 8 (a) 3 Proposed area Area

More information

FORM 1. Amendment in Environment Clearance Of Redevelopment Project Redevelopment Project

FORM 1. Amendment in Environment Clearance Of Redevelopment Project Redevelopment Project FORM 1 Amendment in Environment Clearance Of Redevelopment Project Redevelopment Project At C.S. 990 situated at 243-G Patthe Bapurao Marg (Falkland Road), at Girgaon, Division D ward, Mumbai 400 004.

More information

APPENDIX I. (See paragraph 6) FORM 1

APPENDIX I. (See paragraph 6) FORM 1 Form-1 & Project Feasibility Report for Mopar Limestone Mine (13.25 hect) APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information Sr. No. Item Details 1. Name of the project Mopar Limestone Mine 2. Sr.

More information

FORM 1 SRI LAKSHMI GAYATRI HOSPITAL (P) LTD.

FORM 1 SRI LAKSHMI GAYATRI HOSPITAL (P) LTD. FORM 1 (Submitted to Ministry of Environment, Forests & Climate Change) BY SRI LAKSHMI GAYATRI HOSPITAL (P) LTD. Proposed at: SY. NO. 306, BACHUPALLY VILLAGE, QUTHABULLAPUR MANDAL, RANGAREDDY DISTRICT,

More information

APPENDIX I. (See paragraph 6) FORM 1

APPENDIX I. (See paragraph 6) FORM 1 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information Sr. Item Details 1. Name of the project Mopar Limestone Mine 2. Sr. in the Schedule 1-A 3. Proposed capacity/area/length/tonnage to be handles/command

More information

FORM I (OPENCAST LATERITE MINE ha)

FORM I (OPENCAST LATERITE MINE ha) SHAIK IMAM SURVEY. 172, 173 & 174, SIDDLOOR VILLAGE, VIKARABAD MANDAL AND DISTRICT, TELANGANA STATE FORM I (OPENCAST LATERITE MINE- 6.176 ha) SUBMITTED BY Sri Shaik Imam R/o 8-2-579/B, Road No. 8, Banjara

More information

Rajarhat-Bishnupur 1 No.Gram Panchayat Tehsil - District

Rajarhat-Bishnupur 1 No.Gram Panchayat Tehsil - District (I) Basic Information FORM-I Sl. Item Details. 1. Name of the projects/s Residential Complex 2. S.. in the schedule 8(a) 3. Proposed capacity / area / length / tonnage to be Proposed project is a development

More information

556/2C2,3B2,4A,5B,6B,7,8,9,10,11A,12A, 12B2,

556/2C2,3B2,4A,5B,6B,7,8,9,10,11A,12A, 12B2, I. BASIC INFORMATION FORM I. Item Details 1 Name of the project Proposed Construction of Residential Development Royal Nesto by K. K. Chandrasekar, Krishna Kishor, B. Paranthaman Sethupathi, Paulvannan,

More information

Renewal of Environmental Clearance for Commercial Complex City Square 2 S. No. in the Schedule 8 (a), Building & Construction project

Renewal of Environmental Clearance for Commercial Complex City Square 2 S. No. in the Schedule 8 (a), Building & Construction project 1 SCOPING 1.1 FORM 1 The scoping for the project has been done based on Form-I, as per EIA tification, dated September 14, 2006 amended as on date. The scoping details are as follows: I. Basic Information

More information

APPENDIX I. (See Paragraph 6) FORM 1

APPENDIX I. (See Paragraph 6) FORM 1 APPENDIX I (See Paragraph 6) FORM 1 (I) Basic Information Item Details 1 Name of the Project Satva Shiva Gold 2 S. in the Schedule 8(a) 3 Proposed capacity/ area/ length/ tonnage to be handled/ command

More information

Application for Prior Environmental Clearance (EC)

Application for Prior Environmental Clearance (EC) Application for Prior Environmental Clearance (EC) (See Paragraph 6 tification dated14 th September 2006) as amended to EIA tification, 2006 issued vide S.O. 3067(E) on dt.01.12.2009. Basic Information

More information