1 Discussion Paper DETERMINATION OF TARIFF FOR PROCUREMENT OF POWER BY DISTRIBUTION LICENSEES AND OTHERS FROM BIOMASS BASED POWER PROJECTS AND BAGASSE BASED CO-GENERATION PROJECTS FOR THE STATE OF GUJARAT May 2016 Gujarat Electricity Regulatory Commission 6th Floor, GIFT ONE, Road 5C, Zone 5, GIFT City, Gandhinagar , Gujarat GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 1

2 Executive Summary The Gujarat Electricity Regulatory Commission (GERC) has initiated the tariff determination process for determination of tariff for procurement of power by Distribution Licensees and others, from biomass power and bagasse based co-generation projects to be commissioned from the date of issue of order under the powers conferred to the Commission under Sections 61(h), 62(1)(a), and 86(1)(e) of The Electricity Act, 2003, and National Electricity Policy, 2005, and Tariff Policy, The Commission had issued generic tariff order for procurement of power by distribution licensees and others, from biomass and bagasse based co-generation projects in Gujarat on 8 August The control period of the GERC biomass and bagasse based cogeneration projects tariff order was up to 31 st March The Commission also initiated suomotu proceedings for extension of the existing control period beyond 31 st March 2016 till tariff for new control period is decided by the Commission. Hence the Commission presents this discussion paper to initiate the regulatory process for determination of tariff for procurement of power by distribution licensees and others from biomass power and bagasse based cogeneration projects for the next control period starting from the date of issue of order after receiving comments from stakeholders on this discussion paper. While evolving the benchmark operating and financial parameters for determination of generic tariff for biomass power and bagasse based co-generation projects for the next control period starting from the date of issue of order following aspects were taken into consideration.. In order to arrive at a benchmark capital cost for biomass power and bagasse based cogeneration projects to be commissioned in the next control period starting from the date of issue of order, the Commission has examined the biomass power and bagasse based cogeneration projects capital cost trends during the last control period, along with the change in Wholesale Price Index (WPI) of steel and Electrical & Mechanical (E&M) during last control period and corresponding growth rate thereof. The Commission has examined the approach followed by the Central Electricity Regulatory Commission (CERC) as well as State Electricity Regulatory Commissions (SERCs) while fixing benchmark capital cost. The capital cost data was also obtained from Indian Renewable Energy Development Agency (IREDA) and United Nations Framework Convention on Climate Change (UNFCCC). It is noticed that biomass procurement and transportation are handled by a highly unorganized sector and the prices are greatly influenced by the local factors and are at mercy of middlemen. By recognizing the fact that the Goss Calorific Value (GCV) of fuel and cost of the fuel parameters has direct bearing on the variable component of tariff under the two-part tariff structure, this aspect is studied in detail. While proposing the standard normative operational parameters like the station heat rate, auxiliary consumption, plant load factor, O&M expenses etc. the Commission has examined the approach followed by the CERC as well as SERCs in India. The Commission has also studied the recommendation of GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 2

3 Central Electricity Authority (CEA) under the report on operating norm for biomass based power projects, published during September In case of financial parameters for tariff determination, the Commission has observed that the current SBI base rate (9.3%) is constant from October It is proposed to fix the interest on term loan equal to current SBI base rate plus 300 basis point. Further, based on the prevailing market practices, the tenure of term loan is proposed as 10 years. The interest on the working capital is proposed as 200 basis points above current SBI base rate. Based on the above, following normative operating and financial parameters and two-part tariff is proposed for biomass power and bagasse based co-generation projects to be commissioned duringg the next control period starting from the date of issue of order. Parameters Table A: Benchmark parameters for tariff computation of biomass based power projects Total Project Cost (Land + Plant & Machinery + Erection Cost + Evacuation Infrastructure Cost up to Interconnection Point ) (Rs. Lakh/MW) Normative O&M Cost for first year (% of project cost) Escalation in O&M (per annum from 2nd year) CUF Biomass based Power Projects with Water-Cooled Condensers As per existing Tariff order Proposed for next control period Project Cost and O&M Biomass based Power Projects with Air-Cooled Condensers As per existing Tariff order Proposed for next control period % 5% 5% 5% 5.72% 5.72% 5.72% 5.72% 70% for 1st year & 80% from 2nd year onwards Performance Parameters 70% for 1st year & 80% from 2nd year onwards 70% for 1st year & 80% from 2nd year onwards 70% for 1st year & 80% from 2nd year onwards Auxiliary Consumption 10% 10% 10% 10% Project Life in Years Station Heat Rate kcal/kwh Gross Calorific Value of Fuel kcal/kg Cost of Fuel Biomass 3400 and Coal Rs per MT for biomass and Biomass 3396 and Coal 3969 Rs. 2736per MT for biomass and Rs per Biomass 3400 and Coal Rs per MT for biomass and Biomass 3396 and Coal 3969 Rs per MT for biomass and GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 3

4 Parameters Biomass based Power Projects with Water-Cooled Condensers As per existing Tariff order Rs per MT for coal Proposed for next control period MT for coal Biomass based Power Projects with Air-Cooled Condensers As per existing Tariff order Rs per MT for coal Proposed for next control period Rs per MT for coal Fuel Cost Escalation 5% 5% 5% 5% Financial Parameters Debt-Equity ratio 70:30 70:30 70:30 70:30 Term of Loan in Years Interest on Term Loan 12.86% 12.30% 12.86% 12.30% Interest on Working Capital Depreciation 12.86% 11.30% 12.86% 11.30% 6% ( up to 10 years) 3% (11 to 20 years) 6% ( up to 10 years) 3% (11 to 20 years) 6% ( up to 10 years) 3% (11 to 20 years) 6% (up to 10 years) 3% (11 to 20 years) Minimum Alternate Tax % 21.34% % 21.34% Corporate Income Tax 32.45% 34.61% 32.45% 34.61% Return on Equity 14% 14% 14% 14% Tariff Fixed Cost a. without AD benefit: Rs /kwh b. with AD benefit: Rs /kwh Variable cost FY Rs.3.39/kWh, FY Rs. 3.55/kWh, FY Rs. 3.73/kWh Fixed Cost a. without AD benefit: Rs /kwh b. with AD benefit: Rs /kwh Variable cost FY Rs.3.39/kWh, FY Rs. 3.56/kWh, FY Rs. 3.74/kWh Fixed Cost a. without AD benefit: Rs. 1.89/kWh b. with AD benefit: Rs /kwh Variable cost FY Rs.3.52/kWh, FY Rs. 3.69/kWh, FY Rs. 3.88/kWh Fixed Cost a. without AD benefit: Rs. 1.89/kWh b. with AD benefit: Rs /kwh Variable cost FY Rs.3.52/kWh, FY Rs. 3.70/kWh, FY Rs. 3.89/kWh GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 4

5 Table B : Benchmark parameters for tariff computation of bagasse based co-generation projects Parameters Bagasse based Co-generation Projects Total Project Cost (Land + Plant & Machinery + Erection Cost + Evacuation Infrastructure Cost up to Interconnection Point ) (Rs. Lakh/MW) Normative O&M Cost for First Year (Rs. Lakh/MW) Escalation in O&M (per annum from 2nd year) As per Existing Tariff order Project Cost and O&M Proposed for next control period % of project cost 3% of project cost 5.72% 5.72% Performance Parameters CUF 60% 60% Auxiliary Consumption 8.5% 8.5% Project Life in Years Station Heat Rate kcal/kwh Gross Calorific Value of Fuel kcal/kg Cost of Fuel Bagasse and Coal Bagasse and Coal 3969 Rs per MT for bagasse and Rs per MT for coal Rs per MT for bagasse and Rs per MT for coal Fuel Cost Escalation 5% 5% Financial Parameters Debt-Equity Ratio 70:30 70:30 Term of Loan in Years Interest on Term Loan 12.86% % Interest on Working Capital 12.86% 11.30% Depreciation 6% ( up to 10 years) 3% ( 11 to 20 years) 6% ( up to 10 years) 3% ( 11 to 20 years) Minimum Alternate Tax % 21.34% Corporate Income Tax 32.45% 34.61% Return on Equity 14% 14% Tariff Fixed Cost a. without AD benefit: Rs /kwh b. with AD benefit: Rs /kwh Variable cost FY Rs.3.15/kWh, FY Rs. 3.31/kWh, FY Rs. 3.48/kWh Fixed Cost a. without AD benefit: Rs /kwh b. with AD benefit: Rs. 1.54/kWh Variable cost FY Rs.2.85/kWh, FY Rs. 2.99/kWh, FY Rs. 3.14/kWh GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 5

6 Other Commercial issues Transmission and Wheeling Charges Third Party Sale a. Wheeling of Power for third party sale from biomass and bagasse based co-generation projects shall be allowed on payment of transmission charges, transmission losses, wheeling charges and losses of the energy fed into grid, as applicable to normal open access consumer. b. 25% of the cross subsidy surcharge as applicable to normal open access consumer shall be applicable. Wheeling of power for Captive Use a. Wheeling of power to consumption site at 66 kv voltage level and above Wheeling of electricity generated from biomass and bagasse based co-generation projects to the desired location(s) within the State shall be allowed on payment of transmission charges and transmission losses as applicable to normal open access consumer. b. Wheeling of Power to consumption site below 66 kv voltage level In case the injection of power is at 66 kv or above and drawal is at below 66 kv, wheeling of electricity generated from biomass and bagasse based co-generation projects to the desired location(s) within the State, shall be allowed on payment of transmission charges and transmission losses applicable to normal open access consumers and 50% of wheeling charges and 50% of distribution losses of the energy fed into the grid as applicable to normal open access consumers. c. Wheeling of electricity generated by smaller investors having capacity of below 4 MW Wheeling of electricity generated by smaller investors having capacity of below 4 MW, to the desired location(s), shall be allowed on payment of open access charges applicable to normal open access consumers and transmission and wheeling losses 7% of the energy fed to the grid. The above losses shall be shared between the transmission and distribution licensees in the ratio 4:3 d. Wheeling of electricity for injection at 11 kv and drawl at 11 kv and below voltage level within the same distribution area When the point of injection is at 11 kv and drawl at 11 kv or below voltage level lies within the same distribution area, the user shall pay 50% of wheeling charges and 50% of wheeling losses of the energy fed to the grid as applicable to normal open access consumers. Wheeling of power to more than one locations Biomass and bagasse based co-generation power projects owners, who decide to wheel electricity for captive use / third party sale, to more than one location, shall pay 5 Paisa/kWh on energy fed into the grid to the distribution company concerned in whose GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 6

7 area power is consumed in addition to above mentioned transmission charges and losses, as applicable. State Energy Metering Biomass power and bagasse based co-generation projects shall have to provide availability based tariff (ABT) compliant meters at the interface points and shall conform to the Central Electricity Authority (Installation and Operation of Meters) Regulations, Metering shall be done at interconnection point of the generator bus-bar with the transmission or distribution system concerned. Pricing of Reactive Power 10 paise/kvarh For the drawl of reactive energy at 10% or less of the net energy exported. 25 paise/kvarh For the drawl of reactive energy at more than 10% of the net active energy exported. Sharing of Clean Development Mechanism (CDM) Benefits Sharing of CDM benefits on net basis, starting from 100% to developers in the first year after commissioning, and thereafter reducing by 10% every year till the sharing becomes equal (50:50) between the developers and the consumers, in the sixth year and equal benefits thereafter. Banking of Surplus Energy and Purchase of Surplus Power No banking facility offered to captive or third party sale of electricity generated from biomass power and bagasse based co-generation projects. Purchase of surplus power from biomass power and bagasse based co-generation projects of 4 MW and above capacity opting for captive use and third party sale will be governed as per the provisions under GERC intra-state ABT Regulations. Renewable Energy Certificates for Third party sale and Captive Use Third party sale and captive use of power generated from biomass power and bagasse based co-generation projects will be eligible for availing RECs as per CERC REC Regulations 2010 and its subsequent amendments. Contract Demand for Commissioning/Start-up Power The energy charges shall be as per HT industrial tariff of similar connected load / category for start-up and standby power for the biomass based power projects with exemption from payment of demand charges. Parallel Operation Charges The biomass and bagasse based co-generation projects set up for captive use, are exempted from the payment of parallel operation charges to be levied by the distribution licensee. Security Deposit Security deposit of Rs. 5 Lakh/MW in the form of bank guarantee shall be paid by the project developer to the GETCO in order to assure the GETCO for timely completion of the project. In case of delay in project commissioning beyond the allowed period of 4 years GETCO will forfeit the security deposit. GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 7

8 Intra-State ABT Biomass and bagasse based co-generation projects shall be covered under the ambit of intrastate ABT order. However, smaller capacity biomass based power projects having installed capacities up to 4 MW will be exempted from provision of Intra-state ABT mechanism. GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 8

9 Contents List of Figures 11 List of Tables 11 Abbreviations 12 1 Introduction 14 2 Biomass Power and Bagasse based Co-generation Technology Biomass to Power Conversion Technology Bagasse Based Co-generation Technology 30 3 Computation of Tariff for Biomass Power and Bagasse based Cogeneration 33 Projects 3.1 Approach and Methodology General Principles Benchmarking of Capital Cost and Other Performance Parameters Financial Parameters Computation of Tariff for Biomass based Power Projects Computation of Tariff for Bagasse based Co-generation Projects 50 4 Other Commercial Issues Transmission and Wheeling Charges State Energy Metering Pricing of Reactive Power Sharing of Clean Development Mechanism (CDM) Benefits Banking of Surplus Energy Purchase of Surplus Power from Biomass Power and Bagasse based Cogeneration 55 Projects Opting for Captive Use and Third Party Sale under Open Access 4.7 Renewable Energy Certificates for Third Party Sale and Captive Use of 55 Electricity generated from Biomass Power and Bagasse based Co-generation Project 4.8 Contract Demand for Commissioning/Start-up Power Parallel Operation Charges Security Deposit Applicability of Intra-State ABT Monitoring Mechanism for the Use of Fossil and Non-fossil Fuel Information System for Creation of Database Applicability of the Order 58 Annexure-I - Tariff for biomass based power project with water-cooled 59 condenser Annexure-II - Tariff for biomass based power project with air-cooled 60 condenser Annexure-III - Tariff for bagasse based co-generation projects 61 GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 9

10 List of Figures 2.1 Rankine cycle Biomass gasification process Extraction-cum-condensing steam turbine arrangements in sugar factory 31 List of Tables 1.1 Renewable purchase obligation in Gujarat for FY to Renewable purchase obligation in Gujarat for FY to Comparison of biomass power tariff Comparison of bagasse based co-generation tariff Tariff for biomass based power projects with water-cooled condensers Tariff for biomass based power projects with air-cooled condensers Tariff for bagasse based co-generation projects Biomass based power projects commissioned in Gujarat as on March Bagasse based co-generation projects registered in REC in Gujarat Station heat rate considered by SERCs in biomass tariff orders GCV of representative surplus biomass available in Gujarat Data of GCV of biomass reported by commissioned biomass based power 42 projects 3.4 GCV of representative Biomass used in combination Cost of landed cost of coal in Gujarat SBI base rates from February 2013 to February Comparison of the proposed parameters with those in the biomass tariff order 48 dated 08 August Comparison of the proposed parameters with those in the bagasse based cogeneration tariff order dated 08 August GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 10

11 Abbreviations % Percentage ABT Availability-Based Tariff AC Alternating Current AD Accelerated Depreciation APERC Andhra Pradesh Electricity Regulatory Commission APPC Average Pooled Purchase Cost CDM Clean Development Mechanism CEA Central Electricity Authority CERC Central Electricity Regulatory Commission CFA Central Financial Assistance CPP Captive Power Producer CSS Cross-Subsidy Surcharge EA Electricity Act 2003 FY Financial Year GBI Generation-Based Incentives GCV Gross Calorific Value GEDA Gujarat Energy Development Agency GERC Gujarat Electricity Regulatory Commission GETCO Gujarat Energy Transmission Corporation Ltd. GoG Government of Gujarat GoI Government of India IREDA Indian Renewable Energy Development Agency IRENA International Renewable Energy Agency IRR Internal Rate of Returns KERC Karnataka Electricity Regulatory Commission Kg Kilogram kg/m 3 Kilogram per cubic meter kw Kilo Watt kwh Kilo Watt hours m Meter MAT Minimum Alternate Tax MERC Maharashtra Electricity Regulatory Commission MNRE Ministry of New and Renewable Energy MPERC Madhya Pradesh Electricity Regulatory Commission MT Metric Tonne MW Mega Watt MWh Mega Watt hour MYT Multi Year Tariff NAPCC National Action Plan for Climate Change NEP National Electricity Policy NTP National Tariff Policy O&M Operation and Maintenance PDD Project Design Document GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 11

12 PLR PPA PSERC PU RBI RE REC RERC RoE RPO RPS RRF Rs. SBI SERC SHR SLDC STU TNERC UNFCCC V WACC WDV WPI Prime Lending Rate Power Purchase Agreement Punjab State Electricity Regulatory Commission Per Unit (kwh) Reserve Bank of India Renewable Energy Renewable Energy Certificate Rajasthan Electricity Regulatory Commission Return on Equity Renewable Purchase Obligation Renewable Purchase Standards Renewable Regulatory Fund Rupees State Bank of India State Electricity Regulatory Commission Station Heat Rate State Load Dispatch Centre State Transmission Utility Tamil Nadu Electricity Regulatory Commission United Nations Framework Convention on Climate Change Volt Weighted Average Cost of Capital Written-down Value Wholesale Price Index GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 12

13 1. Introduction 1.1 Background In exercise of the powers conferred under Sections 3 (1), 61 (h), 62 (1) (a), and 86 (1) (e) of the Electricity Act, 2003 the National Electricity Policy (NEP) 2005 and Tariff Policy (TP) 2015 and all other powers enabling it in this behalf, the Gujarat Electricity Regulatory Commission (GERC) presents this Discussion Paper for determination of tariff for procurement of power by Distribution Licensees and others from biomass power and bagasse based co-generation projects to be commissioned in the control period starting from the date of order.. The biomass power and bagasse based co-generation tariff proposed under this discussion paper is based on the broad principles contained under the (i) GERC (Multi Year Tariff) Regulations, 2016, (ii) GERC (Procurement of Energy from Renewable Sources) Regulations, 2010 and (iii) CERC (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2012 and amendments made thereto. The Commission earlier had issued generic tariff order for procurement of power by distribution licensees and others from biomass power and bagasse based co-generation projects in Gujarat on 8 August The control period of the present GERC biomass and bagasse based co-generation tariff order is expired on 31 March The Commission also initiated suomotu proceedings for extension of the existing control period beyond till the order for tariff determination for new control period is issued by the Commission. The Commission has decided to initiate the tariff determination process for procurement of power by Distribution licensees and others from biomass based power projects and bagasse based cogeneration projects to be commissioned during the new control period to be specified in the new tariff order. Since the techno-commercial issues of biomass power and bagasse based cogeneration projects are similar, the Commission has decided to initiate the regulatory process and deal with these technologies together through this discussion paper. 1.2 The Electricity Act, 2003 The following provisions of the Act provide the enabling legal framework for promotion of renewable sources of energy by the State Electricity Regulatory Commissions (SERCs): The Section 86(1)(e) of the Electricity Act, 2003 mandates promotion of co-generation and generation of electricity from renewable sources of energy which reads as under: Promote co-generation and generation of electricity from renewable sources of energy by providing suitable measures for connectivity with the grid and sale of electricity to any person, and also specify, for purchase of electricity from such sources, a percentage of the total consumption of electricity in the area of a distribution licensee; GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 13

14 1.2.2 Section 61(h) of the Act provides that, while specifying the terms and conditions of determination of tariff, the Commission shall be guided by the objective of promotion of cogeneration and generation of electricity from renewable sources of energy The Section 62(1)(a) of the Act provides for determination of tariff for supply of electricity by a generating company to a distribution licensee as under: Supply of electricity by a generating company to a distribution licensee: Provided that the Appropriate Commission may, in case of shortage of supply of electricity, fix the minimum and maximum ceiling of tariff for sale or purchase of electricity in pursuance of an agreement, entered into between a generating company and a licensee or between licensees, for a period not exceeding one year to ensure reasonable prices of electricity Section 3 (1) of the Electricity Act 2003 requires the Central Government to formulate, inter alia, the National Electricity Policy in consultation with the Central Electricity Authority (CEA) and State Governments. The provision is quoted below: "The Central Government shall, from time to time, prepare the National Electricity Policy and tariff policy, in consultation with the State Governments and the Authority for development of the power system based on optimal utilization of resources such as coal, natural gas, nuclear substances or materials, hydro and renewable sources of energy." 1.3 National Electricity Policy (NEP) Clause 5.12 of the NEP stipulates several conditions for promotion and harnessing of renewable energy sources. The salient features of the said provisions of NEP are reproduced below : Non-conventional sources of energy being the most environment friendly, there is an urgent need to promote generation of electricity based on such sources of energy. For this purpose, efforts need to be made to reduce the capital cost of projects based on non-conventional and renewable sources of energy. Cost of energy can also be reduced by promoting competition within such projects. At the same time, adequate promotional measures would also have to be taken for development of technologies and a sustained growth of these sources : The Electricity Act, 2003 provides that co-generation and generation of electricity from non-conventional sources would be promoted by the SERCs by providing suitable measures for connectivity with the grid and sale of electricity to any person and also by specifying, for purchase of electricity from such sources, a percentage of the total consumption of electricity in the area of a distribution licensee. Such percentage for purchase of power from non-conventional sources should be made applicable for the tariffs to be determined by the SERCs at the earliest. Progressively, the share of electricity from non-conventional sources would need to be increased as prescribed by State Electricity Regulatory Commissions. Such purchase by distribution companies shall be GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 14

15 through competitive bidding process. Considering the fact that it will take some time before nonconventional technologies compete, in terms of cost, with conventional sources, the Commission may determine an appropriate differential in prices to promote these technologies. 1.4 Tariff Policy (TP), 2016 In compliance with the Section (3) of the Act, the Central Government has notified the revised tariff policy on 28 January The tariff policy elaborates the role of regulatory commissions, the mechanism for promoting renewable energy, the time-frame for implementation, etc. Clause 6.4 of the tariff policy addresses various aspects associated with promoting and harnessing renewable sources of energy generation including Co-generation from renewable energy sources. The provisions stated under Clause 6.4 of TP are given below. (1) Pursuant to provisions of section 86(1)(e) of the Act, the Appropriate Commission shall fix a minimum percentage of the total consumption of electricity in the area of a distribution licensee for purchase of energy from renewable energy sources, taking into account availability of such resources and its impact on retail tariffs. Cost of purchase of renewable energy shall be taken into account while determining tariff by SERCs. Long term growth trajectory of Renewable Purchase Obligations (RPOs) will be prescribed by the Ministry of Power in consultation with MNRE. Provided that,cogeneration from sources other than renewable sources shall not be excluded from the applicability of RPOs. (i) Within the percentage so made applicable, to start with, the SERCs shall also reserve a minimum percentage for purchase of solar energy from the date of notification of this policy which shall be such that it reaches 8% of total consumption of energy, excluding Hydro Power, by March 2022 or as notified by the Central Government from time to time. (ii) Distribution Licensee(s) shall compulsorily procure 100% power produced from all the Wasteto-Energy plants in the State, in the ratio of their procurement of power from all sources including their own, at the tariff determined by the Appropriate Commission under Section 62 of the Act. (iii) It is desirable that purchase of energy from renewable sources of energy takes place more or less in the same proportion in different States. To achieve this objective in the current scenario of large availability of such resources only in certain parts of the country, an appropriate mechanism such as Renewable Energy Certificate (REC) would need to be promoted. Through such a mechanism, the renewable energy based generation companies can sell the electricity to local distribution licensee at the rates for conventional power and can recover the balance cost by selling certificates to other distribution companies and obligated entities enabling the latter to meet their renewable power purchase obligations. The REC mechanism should also have a solar specific REC. GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 15

16 (iv) Appropriate Commission may also provide for a suitable regulatory framework for encouraging such other emerging renewable energy technologies by prescribing separate technology based REC multiplier (i.e. granting higher or lower number of RECs to such emerging technologies for the same level of generation). Similarly, considering the change in prices of renewable energy technologies with passage of time, the Appropriate Commission may prescribe vintage based REC multiplier (i.e. granting higher or lower number of RECs for the same level of generation based on year of commissioning of plant). (2) States shall endeavor to procure power from renewable energy sources through competitive bidding to keep the tariff low, except from the waste to energy plants. Procurement of power by Distribution Licensee from renewable energy sources from projects above the notified capacity, shall be done through competitive bidding process, from the date to be notified by the Central Government. However, till such notification, any such procurement of power from renewable energy sources projects, may be done under Section 62 of the Electricity Act, While determining the tariff from such sources, the Appropriate Commission shall take into account the solar radiation and wind intensity which may differ from area to area to ensure that the benefits are passed on to the consumers. (3) The Central Commission should lay down guidelines for pricing intermittent power, especially from renewable energy sources, where such procurement is not through competitive bidding. The tariff stipulated by CERC shall act as a ceiling for that category. (4) In order to incentivize the Distribution Companies to procure power from renewable sources of energy, the Central Government may notify, from time to time, an appropriate bid-based tariff framework for renewable energy, allowing the tariff to be increased progressively in a back-loaded or any other manner in the public interest during the period of PPA, over the life cycle of such a generating plant. Correspondingly, the procurer of such bid-based renewable energy shall comply with the obligations for payment of tariff so determined. (5) In order to promote renewable energy sources, any generating company proposing to establish a coal/lignite based thermal generating station after a specified date shall be required to establish such renewable energy generating capacity or procure and supply renewable energy equivalent to such capacity, as may be prescribed by the Central Government from time to time after due consultation with stakeholders. The renewable energy produced by each generator may be bundled with its thermal generation for the purpose of sale. In case an obligated entity procures this renewable power, then the SERCs will consider the obligated entity to have met the Renewable Purchase Obligation (RPO) to the extent of power bought from such renewable energy generating stations. GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 16

17 Provided further that in case any existing coal and lignite based thermal power generating station, with the concurrence of power procurers under the existing Power Purchase Agreements, chooses to set up additional renewable energy generating capacity, the power from such plant shall be allowed to be bundled and tariff of such renewable energy shall be allowed to be pass through by the Appropriate Commission. The Obligated Entities who finally buy such power shall account towards their renewable purchase obligations. Provided also that scheduling and despatch of such conventional and renewable generating plants shall be done separately. (6) In order to further encourage renewable sources of energy, no inter-state transmission charges and losses may be levied till such period as may be notified by the Central Government on transmission of the electricity generated from solar and wind sources of energy through the interstate transmission system for sale. (7) Appropriate Commission may provide regulatory framework to facilitate generation and sale of electricity from renewable energy sources particularly from roof-top solar system by any entity including local authority, Panchayat Institution, user institution, cooperative society, Non- Governmental Organization, franchisee or by Renewable Energy Service Company. The Appropriate Government may also provide complementary policy support for this purpose. 1.5 Renewable Purchase Obligation in Gujarat The Gujarat Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) Regulations, 2010, (Notification No. 3 of 2010) dated 17 April, 2010 has specified the minimum renewable power purchase by the obligated entities for the financial year (FY) to as shown in Table No. 1.1 below. Table No. 1.1 Renewable purchase obligation in Gujarat for FY to Year Total RPO Non Solar RPO Solar RPO Wind Biomass Solar bagasse and other % 4.5% 0.25% 0.25% % 5% 0.5% 0.5% % 5.5% 0.5% 1% (Note: RPO specified for FY shall be continued beyond till any revision) As per this regulation, the obligated entities have the obligation to purchase electricity (in kwh) from specified RE sources. The said purchase shall be at a defined minimum percentage of the total consumption of its consumers including T&D losses during a year. This renewable purchase obligation applies to: GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 17

18 distribution licensees; and any other captive and open-access users consuming electricity (i) generated from conventional captive generating plant having capacity of 5 MW and above for their own use and/or (ii) procured from conventional generation through open access and third party sale. The Regulations recognise the certificates issued within the scope of Central Electricity Regulatory Commission s (CERC) Notification No. L-1/12/2010-CERC dated 14 January 2010 as the valid instruments for the discharge of the mandatory obligations set out in these regulations for the obligated entities to purchase electricity from renewable energy sources termed as Renewable Energy Certificates (RECs). Subsequently, the Commission has amended the Principal GERC (Procurement of Energy from Renewable Sources) Regulations, 2010 on 4 March 2014 as GERC (Procurement of Energy from Renewable Sources) (First Amendment) Regulations, 2014 (Notification No. 2 of 2014) and specified the RPO targets for FY to FY The RPO targets specified under the regulations are given in the Table No. 1.2 below. Table No. 1.2 Renewable purchase obligation in Gujarat for FY to Year Total RPO Non Solar RPO Solar RPO Wind Biomass Solar bagasse and other % 5.5% 0.5% 1.00% % 6.25% 0.5% 1.25% % 7.00% 0.5% 1.50% % 7.75% 0.5% 1.75% Applicability of RPO on Captive power users: Fossil fuel based CPPs Gujarat have approached the Hon ble High Court of Gujarat and filed petition on the issue of applicability of RPO on the CPP and Open Access consumers in Gujarat. Hon ble High court of Gujarat in its judgement (Special Civil Application No. 171 of 2011) dated 13 March 2015 ruled in favour of the GERC and upheld the applicability of RPO on CPPs as well as open access consumers and cogeneration plants with fossil fuel as proposed by the Commission under its RPO Regulations. Subsequently, the Commission vide notification No. 2 of 2015 dated 1 July 2015 notified that Renewable Purchase Obligation as per GERC (Procurement of Energy from Renewable Sources) Regulations, 2010 (Notification No.3 of 2010) and amendments shall become applicable to Captive and Open Access User(s)/Consumer(s) from the date of notification i.e. 1 July 2015, subject to final orders by the Hon ble High Court.. GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 18

19 1.6 Biomass Power Tariffs in Other States The comparison of biomass tariffs in other states with the GERC biomass tariff order 2013 is tabulated in Table No The Central Electricity Regulatory Commission (CERC) under its RE Tariff Regulations 2012 has adopted a two-part tariff for biomass-based power projects. CERC in its tariff order has calculated a two-part tariff for different states by considering the statespecific biomass prices. The Maharashtra Electricity Regulatory Commission (MERC) also provides two part tariff for biomass based power projects set up in the state of Maharashtra. The Rajasthan Electricity Regulatory Commission (RERC), considering the geographical area of the state and water scarcity in some of the regions has specified separate tariffs for biomass based power projects using water-cooled condensers and air-cooled condensers. In case of the biomass based power projects using air-cooled condensers, the RERC has made distinction while benchmarking tariff parameters like project costs, auxiliary consumptions and PLF. The GERC specified generic tariff for biomass based power projects using water-cooled and aircooled condensers vide order dated 8 August It has been noticed that, while determining the two-part tariff for biomass power and bagasse based co-generation projects the SERCs have adopted different approaches. Some SERCs have specified levellized fixed cost component of tariff considering the life of plant; whereas some SERCs have determined year-wise fixed cost component of tariff linked to the year of operation. In case of variable cost component of tariff, some SERCs have preferred to specify the same on yearly basis during the control period by considering appropriate escalation factor on the fuel price of the base year of the control period; whereas some SERCs have determined the year wise variable cost component over the life of the plant by considering appropriate fuel cost escalation factor and such variable component of tariff is linked with the financial year in progress. The GERC after careful study of the tariff setting practices adopted by the CERC and the SERCs had chosen to specify fixed cost on levellized basis over life of the project; whereas to protect the generators from the fuel price escalation risk due to market dynamics, the Commission has specified the variable cost component of tariff for three years of the control period subject to revision after completion of the control period. GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 19

20 Table No 1.3 Comparison of biomass power tariff CERC ( ) for FY Fixed cost tariff I. Project [other than rice straw and juliflora (plantation) based project] with water cooled condenser and travelling grate boiler: Rs 3.09 / kwh. II. Project [other than rice straw and Juliflora(plantation)b ased project] with air cooled condenser and travelling grate boiler: Rs 3.27 / kwh. III. For rice straw and juliflora (plantation) based project with water cooled condenser and travelling grate boiler: Rs 3.23 / kwh. IV. For rice straw and juliflora (plantation) based project with air cooled condenser and travelling grate boiler: Rs 3.41 / kwh MERC ( ) for FY Levellised Fixed Tariff Rs 2.35 / kwh MPERC ( ) RERC ( ) Levellized Fixed Cost 3.00 Rs/kWh TNERC ( ) Fixed cost component of tariff (Year wise) in the range of Rs /kWh to Rs /kWh (from Yr 1 to Yr 20 of Project Life) GERC (Existing Order) Levellized fixed component for 20 years Biomass based Power Projects with Water- Cooled Condensers a. without AD benefit: Rs /kwh b. with AD benefit: Rs /kwh Biomass based Power Projects with Air- Cooled Condensers a. without AD benefit: Rs. 1.89/kWh b. with AD benefit: Rs /kwh Variable cost component of tariff I. Project [other than rice straw and juliflora (plantation) based project] with water cooled condenser and travelling grate boiler: Rs 4.79 / kwh. II. Project [other than rice straw and Juliflora(plantation)b ased project] with air Variable cost component Rs 5.15 / kwh Variable cost component of tariff For plants commissioned during FY : Rs 3.91 /kwh Variable cost component of tariff Rs and Rs 3.188/kWh for FY and FY respectively Variable cost component: Biomass based Power Projects with Water- Cooled Condensers FY Rs.3.39/kWh, FY Rs. 3.55/kWh, FY Rs. 3.73/kWh Biomass based Power Projects with Air- GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 20

21 CERC ( ) for FY cooled condenser and travelling grate boiler: Rs 4.90 / kwh. III. For rice straw and juliflora (plantation) based project with water cooled condenser and travelling grate boiler: Rs 4.79 / kwh. IV. For rice straw and juliflora (plantation) based project with air cooled condenser and travelling grate boiler: Rs 4.90 / kwh Gross tariff (Net tariff) I. Project [other than rice straw and juliflora (plantation) based project] with water cooled condenser and travelling grate boiler: Rs 7.88 (7.70) / kwh. II. Project [other than rice straw and Juliflora(plantation)b ased project] with air cooled condenser and travelling grate boiler: Rs 8.17 (7.97) / kwh. III. For rice straw and juliflora (plantation) based project with water cooled condenser and travelling grate boiler: Rs 8.01 (7.87) / kwh. IV. For rice straw and juliflora (plantation) based project with air cooled condenser and travelling grate MERC ( ) for FY Gross Tariff Rs. 7.50/kWh AD Benefit Rs. 0.16/kWh Net tariff Rs. 7.34/kWh MPERC ( ) Total tariff (fixed + variable) single part a. Projects commissione d during FY : Rs 5.32 to 9.26 / kwh b. Projects commissione d during /FY : Rs 5.64 to 9.88 / kwh RERC ( ) TNERC ( ) GERC (Existing Order) Cooled Condensers FY Rs.3.52/kWh, FY Rs. 3.69/kWh, FY Rs. 3.88/kWh Applicable Tariff: Biomass based Power Projects with Water- Cooled Condensers a. Without AD benefit FY Rs.5.16/kWh, FY Rs. 5.32/kWh, FY Rs. 5.50/kWh b. With AD benefit FY Rs.4.88/kWh, FY Rs. 5.04/kWh, FY Rs. 5.22/kWh Biomass based Power Projects with Air- Cooled Condensers a. Without AD benefit FY Rs.5.41/kWh, FY Rs. GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 21

22 CERC ( ) for FY boiler: Rs 8.31 (8.10) / kwh MERC ( ) for FY MPERC ( ) RERC ( ) TNERC ( ) GERC (Existing Order) 5.58/kWh, FY Rs. 5.77/kWh b. With AD benefit FY Rs.5.10/kWh, FY Rs. 5.27/kWh, FY Rs. 5.46/kWh 1.7 Bagasse based Co-generation Projects Tariff in Other States The comparison of tariffs of bagasse based co-generation projects in other states with the GERC bagasse based co-generation tariff order 2013 is tabulated in Table No The CERC under its RE Tariff Regulations 2012 has adopted two-part tariff for bagasse based co-generation projects. The CERC in its tariff order has calculated two-part tariff for different states by considering the state-specific bagasse prices. The Maharashtra Electricity Regulatory Commission (MERC) also provides two part tariff for bagasse based co-generation projects set up in the state of Maharashtra. The SERCs of Madhya Pradesh and Uttar Pradesh have specified a single part levellized tariff applicable for 20 years for bagasse based co-generation projects in their states. Like biomass based power projects, the SERCs in case of bagasse based co-generation projects also preferred to specify the year-wise variable component of tariff during the control period by considering appropriate escalation factor on the fuel price of the base year of the control period. Whereas, some SERCs have determined the year-wise variable cost component over the life of the plant by considering appropriate fuel cost escalation factor. As such, there is no scope for further revision of variable component of tariff. The GERC had offered two-part tariff with levellized fixed cost considering life of the project as 20 years and specified variable cost for three years of the control period with a scope for revision after the control period. GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 22

23 Table No 1.4 Comparison of bagasse based co-generation tariff CERC ( ) for FY Levellised Fixed Tariff Rs 2.78 /kwh Variable Cost Rs 3.52/kWh Gross tariff Rs. 6.29/kWh AD benefit Rs. 0.21/kWh Net tariff Rs. 6.08/kWh MERC ( ) for FY Levellised Fixed Tariff Rs 2.52 /kwh Variable cost component Rs 4.07 /kwh Gross tariff Rs. 6.59/kWh AD benefit Rs. 0.21/kWh Net tariff Rs. 6.38/kWh MPERC ( ) Levellised total tariff for 20 years (fixed + variable cost): Rs 6.28 / kwh UPERC ( ) Year wise fixed tariff (given upto FY ) depending on year of commissioning: Rs 2.59 / kwh to Rs 3.16 / kwh FY : Rs 2.86 /kwh FY : Rs 3.00 / kwh FY : Rs 3.15 / kwh FY : Rs 3.31 / kwh FY : Rs 3.48 / kwh Total tariff (given upto FY ) depending on year of commissioning: Rs 5.67 / kwh to Rs 6.64 / kwh TNERC ( ) Fixed cost component of tariff Rs. 1.90/kWh to Rs. 1.61/kWh (from Yr 1 to Yr 20 of project life) Variable cost component of tariff Rs. 1.86/kWh for FY and 5% escalation there after GERC (Existing Order ) Levellised fixed component of tariff for 20 years a. without AD benefit: Rs. 1.86/kWh b. with AD benefit: Rs / kwh Variable cost component of FY Rs.3.15/ kwh, FY Rs. 3.31/kWh, FY Rs. 3.48/kWh Applicable Tariff: a. Without AD benefit: FY Rs.5.01/ kwh, FY Rs. 5.17/kWh, FY Rs /kwh b. With AD benefit: FY Rs.4.69/ kwh, FY Rs. 4.85/kWh, FY Rs /kwh GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 23

24 1.8 GERC Biomass Tariff Order 2013 The GERC, in its Order No. 4 of 2013 dated 08 August 2013, determined generic tariff for procurement of power by Distribution Licensees and others from biomass based power projects with water-cooled condensers and air cooled condensers for the state of Gujarat. The fixed cost component of the tariff was levellized over the life of the plant. Whereas, the variable cost component of tariff was worked out for three years of the control period by considering annual escalation of 5% on fuel cost. As the biomass projects were allowed to account for the accelerated depreciation (AD) benefits, the GERC has worked out two separate tariffs with and without AD. The generic tariff specified by the Commission for Biomass based power projects using water-cooled condensers are tabulated in Table No Table No. 1.5 Tariff for biomass based power projects with water-cooled condensers Two-Part tariff for: Fixed levellized tariff without AD benefit Rs 1.77/kWh for 20 yrs Fixed tariff levellized with AD benefit Rs /kwh for 20 years Variable cost tariff FY Rs.3.39/kWh, FY Rs. 3.55/kWh, FY Rs. 3.73/kWh The tariff for biomass based power projects using air-cooled condensers is tabulated in Table No Table No. 1.6 Tariff for biomass based power projects with air-cooled condensers Two-Part tariff for: Fixed levellized tariff Fixed levellized Variable cost tariff without AD benefit tariff with AD Rs 1.89/kWh for 20 yrs benefit Rs /kwh for 20 years FY Rs.3.52/kWh, FY Rs.3.69/kWh, FY Rs. 3.88/kWh 1.9 GERC Bagasse based Co-generation Tariff Order 2013 The GERC, in its Order No. 4 of 2013 dated 08 August 2013, determined the tariff for procurement of power by the Distribution Licensees and others from bagasse based cogeneration projects for the state of Gujarat. After due public consultation and regulatory process, GERC determined two-part tariff for bagasse based co-generation projects to be commissioned during the control period of the order dated 08 August The fixed cost component of the tariff was levellized over the life of the plants, whereas the variable cost component of tariff was worked out for three years of the control period by considering an annual escalation of 5% on fuel cost. As the bagasse based co-generation projects were allowed to account for the AD benefits, the GERC has worked out two separate tariff with and without GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 24

25 AD, for the projects commissioned between FY (after 01 August 2013) to FY as tabulated in Table No The control period of the order is up to 31 March Table No. 1.7 Tariff for bagasse based co-generation projects Two-Part tariff for: Fixed levellizedtariff without AD benefit Rs /kwh for 20 years Fixed levellized tariff with AD benefit Rs /kwh for 20 years Variable cost tariff FY Rs.3.15/kWh, FY Rs. 3.31/kWh, FY Rs. 3.48/kWh 1.10 Biomass Power and Bagasse based Co-generation Project Developments in Gujarat The installed capacity of biomass based power projects in Gujarat is MW as on March The first four biomass based power projects aggregating 31.2 MW capacities as given in Table No 1.8 below were commissioned during the control period of tariff order dated 17 May Only one biomass based project was established by M/s Abellon Clean Energy Ltd during the control period of last tariff order dated 8 August 2013 FY (after 01 August 2013) to FY Sr. No. Table No. 1.8 Biomass based power projects commissioned in Gujarat as on March 2016 Name of biomass power project 1 M/s. Amreli Power Projects Ltd. 2 M/s Junagadh Power Projects (P) Limited. 3 M/s. Bhavnagar Biomass Power Projects Pvt. Ltd. 4 M/s. Ankur Scientific Energy Technologies Pvt. Limited. 5 Abellon Clean Energy Limited. Location Village: Savarsampadar Taluka: Savarkundla Dist.: Amreli Village: Khokharda Taluka: Vanthali Dist.: Junagadh Village: Vavadi (Gajabhai) Taluka: Shihor Dist.: Bhavnagar Village: Sankheda Taluka: Sankheda Dist.: Vadodara Village: Khas, Taluka: Ranpur, Dist: Ahmedabad Type of biomass used Cotton stalk, Groundnut shell & prosopis juliflora. Cotton stalk, Groundnut shell & prosopis juliflora. Cotton Stalk, Groundnut shell & prosopis juliflora. Prosopis juliflora & Woody biomass. Installed capacity in MW Total (Source: Gujarat Energy Development Agency) Date of commissioning (Gasification Route using 100% Producer Gas) GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 25

26 As per the information gathered from the Gujarat Energy Development Agency (GEDA), there are 6 numbers of bagasse based co-generation projects totalling MW capacity exist in six numbers of sugar mills in Gujarat as given under Table No. 1.9 below. However, all above mentioned projects are designed to meet the captive power consumption requirement only without any injection into the grid. All these projects are registered under REC mechanism and the national Agency has allowed them to claim RECs equivalent to their captive consumption. Table No. 1.9 Bagasse based co-generation projects registered in REC in Gujarat Sr. No. Name of bagasse based cogeneration project Installed capacity in MW 1 Shree Narmada Khand Udyog Sahakari Mandli Limited Shree Chalthan Vibhag Khand Udyog Sahakari Mandli Limited Shree Khedut Sahakari Khand Udyog Manadli Ltd,Pandvai Shree Maroli Vibhag Khand Udyog Sahakari Mandli Limited Sahakari Khand Udhyog Mandal Limited Gandevi Shree Ganesh Khand Udyog Sahkari Mandli Limited 3.0 Total 20.8 :: End of Chapter 1:: GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 26

27 2. Biomass Power and Bagasse based Co-generation Technology 2.1 Biomass to Power Conversion Technology Biomass based power projects are those that use biomass as basic source of fuel. Biomass is the waste produced during agricultural and forestry operations (for example straws and stalks) or produced as a by-product of processing operations of agricultural produce (e.g., husks, shells, de-oiled cakes, etc); wood produced in dedicated energy plantations or recovered from wild bushes/weeds; and wood waste produced in some industrial operations. As per the guidelines of MNRE, these projects are allowed to use 15% fossil fuel on annual basis for meeting biomass shortfalls and for extended days of operation. Energy available in biomass is converted for power generation through two basic conversion process as follows: 1) Thermo-chemical conversion process: through direct combustion technology or gasification technology or pyrolysis technology. 2) Bio-chemical conversion process: through bio-degradation of biomass/anaerobic digestion of biomass. Thermo-Chemical Process Combustion The cycle used is the conventional rankine cycle with biomass being burned (oxidised) in a high pressure boiler to generate steam. The net power cycle efficiencies that can be achieved are about 23% to 25%. The exhaust of the steam turbine can be fully condensed to produce power. Gasification Gasification is achieved by the partial combustion of the biomass in a low oxygen environment, leading to the release of a gaseous product (producer gas or syngas). The gasifier can either be of a fixed bed, fluidised bed or entrained flow configuration. The resulting gas is a mixture of carbon monoxide, water, CO 2, char, tar and hydrogen, and it can be used in combustion engines, micro-turbines, or gas turbines. Pyrolysis Pyrolysis is a subset of gasification systems. In pyrolysis, the partial combustion is stopped at a lower temperature (450 C to 600 C), resulting in the creation of a liquid bio-oil, as well as gaseous and solid products. The pyrolysis oil can then be used as a fuel to generate electricity. Bio-Chemical Process Anaerobic Anaerobic digestion is a process which takes place in almost any biological material digestion that is decomposing and is favoured by warm, wet and airless conditions. The resulting gas consists mainly of methane and carbon dioxide and is referred to as biogas. The biogas can be used, after clean-up, in internal combustion engines, microturbines, gas turbines, fuel cells and sterling engines or it can be upgraded to bio methane for distribution. The biomass based power projects based on rankine cycle are well established in India. In the combustion process, biomass is directly combusted by using rankine cycle technology where as in the gasification process, partial combustion of biomass takes place in the absence of air. GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 27

28 Rankine Cycle Technology: In this process, thermal decomposition of organic matter is carried out in the presence of excess air, liberating heat and leaving behind incombustible ash. Fuel + Air Heat + Ash + Inert Gases (Source: website Figure 2.1 Rankine cycle Direct combustion of biomass uses conventional rankine cycle technology. This technology is well proven, indigenised and used in conventional coal-based power plants. The power plant will have one condensing steam turbine-generator unit with a matching boiler of stoker grate/travelling grate/fluidised bed type design capable of firing multi-fuel with one of the largely available agriculture waste as a primary fuel. Fluidized bed combustion (FBC) type boiler has the advantages of high thermal and combustion efficiency reducing quantity of agro waste needed for power production which also reduces need for manpower. The process flow diagram of rankine cycle technology based biomass power project is as shown in the Figure 2.1. Such power projects are generally set up in the range of 5 MW to 20 MW capacities depending on the availability of surplus biomass in the catchment area of power project. Such projects are further bifurcated as per the condenser used in the project. The air-cooled condensers are comparatively expensive as compared to water-cooled condensers. However, the air-cooled condenser requires less recurring water for cooling purpose than the water-cooled condenser. GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 28

29 Figure 2.2 Biomass gasification process (Source: website Gasification Technology: Biomass gasification means a process of incomplete combustion of biomass resulting in production of combustible gases consisting of a mixture of Carbon monoxide (CO), Hydrogen (H2) and traces of Methane (CH4), which is called producer gas. In gasification the thermo-chemical conversion of agro waste/solid fuels (wood/wood-waste, agricultural residues etc.) is done to obtain producer gas. In principle, the process is a thermal decomposition of organic matter in the presence of limited supply of air or oxygen to produce combustible gases thus converting calorific value of organic material into a gaseous energy carrier. The schematic diagram of gasification process is shown in Figure No Bagasse Based Co-generation Technology In sugar mills, the waste or leftover after cane crushing is called bagasse and it is used as a main source of fuel for direct combustion in boiler for generation of process steam as well for generation of power from high pressure steam. In a traditional sugar factory, with backpressure steam turbine, bagasse (fuel) is burned in the boiler furnace to produce steam, which is further supplied to the turbine. The turbine drives an electrical generator and the steam leaving the turbine exhaust flows to the heating equipment for sugar manufacturing. However, using traditional equipment such as low pressure boilers and counter pressure turbo alternators, the level and reliability of electricity production is not sufficient to change the energy balance and to permit exports to the grid. In typical conditions the steam circuit of the plant is generally balanced, i.e. the steam supply sufficiently meets the plant s own requirements. Typically, the processing of one tonne of cane yields about kg of bagasse (with moisture level of 50%), which can generate kg of steam, close to the kg of steam consumed in the processing. On the other hand, the use of more efficient high pressure boilers together with condensing extraction steam turbines can substantially increase the level GERC Discussion Paper on Biomass and Bagasse based Co-gen. Projects Tariff Determination 29

RE Tariff Setting Approach

RE Tariff Setting Approach Satadru Chakraborty Sr Research Associate, WISE Training Programme on the Regulatory and Policy Framework for Market Development for Renewable Energy in India Presentation Outline Policy & Regulatory provisions

More information

Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India 391 RAJASTHAN ELECTRICITY REGULATORY COMMISSION (Terms and Conditions for Determination of Tariff for Renewable Energy Sources Biomass, Biogas and Biomass Gasifier Energy) Regulations- 2015 Notification

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION

CENTRAL ELECTRICITY REGULATORY COMMISSION 106 Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India CENTRAL ELECTRICITY REGULATORY COMMISSION (Terms and Conditions for Tariff determination

More information

Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India 347 NAGALAND ELECTRICITY REGULATORY COMMISSION Terms and Conditions for Determination of

More information

TAMIL NADU ELECTRICITY REGULATORY COMMISSION Comprehensive Tariff Order for Bagasse

TAMIL NADU ELECTRICITY REGULATORY COMMISSION Comprehensive Tariff Order for Bagasse TAMIL NADU ELECTRICITY REGULATORY COMMISSION --------------------------------------------------------------- Comprehensive Tariff Order for Bagasse based Co-generation plants ---------------------------------------------

More information

M.P. Electricity Regulatory Commission

M.P. Electricity Regulatory Commission M.P. Electricity Regulatory Commission Approach paper on Fixation of norms for determination of tariff for procurement of power from Small Hydro Power Projects (SMP- 18 /2018) LEGISLATIVE PROVISIONS 1.1

More information

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Comprehensive Tariff Order for Biomass based Power Plants

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Comprehensive Tariff Order for Biomass based Power Plants TAMIL NADU ELECTRICITY REGULATORY COMMISSION ---------------------------------------------- Comprehensive Tariff Order for Biomass based Power Plants --------------------------------------- Order No.3

More information

Government of Gujarat Energy and Petrochemicals Department G.R. No.EDA B Sachivalaya, Gandhinagar. Dated the 25 July, 2013.

Government of Gujarat Energy and Petrochemicals Department G.R. No.EDA B Sachivalaya, Gandhinagar. Dated the 25 July, 2013. Wind Power Policy 2013 Government of Gujarat Energy and Petrochemicals Department G.R. No.EDA-102001-3054-B Sachivalaya, Gandhinagar. Dated the 25 July, 2013. Preamble Wind Power as an energy source is

More information

(Draft Captive and Renewable Energy Generating Plants) Regulations

(Draft Captive and Renewable Energy Generating Plants) Regulations 307 Sl. No. UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Description (Draft Captive and ) Regulations - 2014 1. Short title, extent and commencement. 2. Scope and extent of application Summary (i) Uttar

More information

Order No. 8 of 2012 dated (effective from )

Order No. 8 of 2012 dated (effective from ) TAMIL NADU ELECTRICITY REGULATORY COMMISSION --------------------------------------------------------------- Comprehensive Tariff Order for Biomass based Power Plants ---------------------------------------------

More information

450 Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

450 Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India 450 Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India WEST BENGAL ELECTRICITY REGULATORY COMMISSION Cogeneration and Generation of Electricity

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Sources) Regulations, 2012 CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI No. : L-1/94/CERC/2011 Dated: 06.02.2012 NOTIFICATION In exercise of powers conferred under Section 61 read with Section 178

More information

Jammu and Kashmir State Electricity Regulatory Commission

Jammu and Kashmir State Electricity Regulatory Commission DRAFT NOTIFICATION INVITING OBJECTIONS / COMMENTS /SUGGESTIONS Jammu and Kashmir State Electricity Regulatory Commission NOTIFICATION (Draft) No: JKSERC/ Dated: Jammu, In exercise of the power conferred

More information

No. CEjPPjNCEj RE Tariff jCommentsj18224 Date:

No. CEjPPjNCEj RE Tariff jCommentsj18224 Date: IVI.AHA..VITARAN Maharashtra State Electricity Distribution Co. Ltd. (A Govt of Maharashtra Undertaking) CIN: U40109MHZ005SGC153645 Maharashtra State Electricity Distribution Co. Ltd. Office of the Chief

More information

2015 Discussion Paper

2015 Discussion Paper [Type text] 2015 Discussion Paper DISCUSSION PAPER ON THE DETERMINATION OF TARIFF FOR PROCUREMENT OF POWER BY DISTRIBUTION LICENSEES AND OTHERS FROM SOLAR ENERGY PROJECTS FOR THE STATE OF GUJARAT June

More information

Comprehensive Tariff Order on WIND ENERGY

Comprehensive Tariff Order on WIND ENERGY TAMIL NADU ELECTRICITY REGULATORY COMMISSION --------------------------------------------- Comprehensive Tariff Order on WIND ENERGY --------------------------------------------- Order No 3 of 2016 dated

More information

Uttar Pradesh Electricity Regulatory Commission

Uttar Pradesh Electricity Regulatory Commission UPERC draft CRE Regulations, 2019 Uttar Pradesh Electricity Regulatory Commission Notification No.: UPERC/Secretary/CRE Regulations/ 2019/ Dated: 04/04/2019 In exercise of powers conferred under section

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. SM/016/2014 (Suo Motu)

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. SM/016/2014 (Suo Motu) CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Petition No. SM/016/2014 (Suo Motu) Date of order: 30 th September, 2014 Coram: Shri Gireesh B. Pradhan, Chairperson Shri M. Deena Dayalan, Member Shri

More information

Staff Paper Determination/Fixation of generic levellised generation tariff for various Renewable Energy Technologies / Projects for the year

Staff Paper Determination/Fixation of generic levellised generation tariff for various Renewable Energy Technologies / Projects for the year Staff Paper Determination/Fixation of generic levellised generation tariff for various Renewable Energy Technologies / Projects for the year 2015-16 1. The Punjab State Electricity Regulatory Commission

More information

Grid Connected SPV Rooftop Systems. Policy and Regulatory Framework in Various States. Policy/ Tariff * Validity upto

Grid Connected SPV Rooftop Systems. Policy and Regulatory Framework in Various States. Policy/ Tariff * Validity upto Grid Connected SPV s Policy and Regulatory Framework in Various States Sl. Present (As on 14.11.2014) 1 Karnataka Karnataka & KERC) 400 MW by 2018 (excess per solar tariff) Rs.9.56 (without subsidy), Rs.7.20

More information

Discussion Paper. Development of Renewable Energy Framework for Maharashtra For New Control Period (FY to FY )

Discussion Paper. Development of Renewable Energy Framework for Maharashtra For New Control Period (FY to FY ) Discussion Paper On Development of Renewable Energy Framework for Maharashtra For New Control Period (FY 2010-11 to FY 2015-16) Maharashtra Electricity Regulatory Commission March 2010 Table of Contents

More information

Renewable Energy Tariffs, RPO and REC Mechanism

Renewable Energy Tariffs, RPO and REC Mechanism Department of Industrial and Management Engineering Indian Institute of Technology Kanpur 4 th Forum of Regulators Capacity Building Programme for Officers of Electricity Regulatory Commissions 18 23 July,

More information

JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION

JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION Draft JSERC (Determination of Tariff for Procurement of Power from Wind, Biogas, Municipal Solid waste and Refuse Derived Fuel based Power Projects) Regulations, 2016 JHARKHAND STATE ELECTRICITY REGULATORY

More information

Chhattisgarh State Electricity Regulatory Commission

Chhattisgarh State Electricity Regulatory Commission Chhattisgarh State Electricity Regulatory Commission Irrigation Colony, Shanti Nagar, Raipur Raipur, Dated September 18, 2013 No. 48/CSERC/2013 - Section 86(1)(e) of the Electricity Act, 2003 (the Act)

More information

SMP-36/2013 M.P. Electricity Regulatory Commission Bhopal

SMP-36/2013 M.P. Electricity Regulatory Commission Bhopal SMP-36/2013 M.P. Electricity Regulatory Commission Bhopal Tariff Order for procurement of power from Municipal Solid Waste based power generating plants in Madhya Pradesh October 2013 1. LEGISLATIVE PROVISIONS

More information

THE JHARKHAND GAZETTE EXTRAORDINARY PUBLISHED BY AUTHORITY

THE JHARKHAND GAZETTE EXTRAORDINARY PUBLISHED BY AUTHORITY THE JHARKHAND GAZETTE EXTRAORDINARY PUBLISHED BY AUTHORITY No. 20 17 Agrhayn, 1938 (S) Ranchi Thursday 8th December, 2016 JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION, RANCHI --------------------

More information

HARYANA GOVERNMENT HARYANA ELECTRICITY REGULATORY COMMISSION. Notification

HARYANA GOVERNMENT HARYANA ELECTRICITY REGULATORY COMMISSION. Notification HARYANA GOVERNMENT HARYANA ELECTRICITY REGULATORY COMMISSION Notification The 3 rd February, 0 Regulation No. HERC/ 3 / 00: In exercise of the powers conferred on it by section 8 of the Electricity Act

More information

GLOSSARY & ABBREVIATIONS

GLOSSARY & ABBREVIATIONS GLOSSARY & ABBREVIATIONS Containing Definitions, Expansion of Abbreviations in CERC/SERCs/ Policies AAD ABT Advance Against Depreciation Availability Based Tariff Act/EA Electricity Act 2003 (ea 2003)

More information

Overview of the Legal Framework. New Policy Initiatives. Renewable Energy Certificate Mechanism

Overview of the Legal Framework. New Policy Initiatives. Renewable Energy Certificate Mechanism 1 Overview of the Legal Framework New Policy Initiatives Renewable Energy Certificate Mechanism 2 3 Tariff regulations of the Regulatory Commissions to be guided by promotion of generation of electricity

More information

THE JHARKHAND GAZETTE

THE JHARKHAND GAZETTE THE JHARKHAND GAZETTE EXTRAORDINARY PUBLISHED BY AUTHORITY No. 48 30 Poush, 1937(S) Ranchi, Wednesday 20 th January, 2016 Jharkhand State Electricity Regulatory Commission, Ranchi JSERC (Determination

More information

November Explanatory memorandum for CERC Regulations for implementation of REC mechanism in India

November Explanatory memorandum for CERC Regulations for implementation of REC mechanism in India Explanatory Memorandum for Central Electricity Regulatory Commission Regulations on Recognition and Issuance of Renewable Energy Certificate (REC) for Renewable Energy Generation November 2009 Explanatory

More information

Before the Karnataka Electricity Regulatory Commission, Bangalore

Before the Karnataka Electricity Regulatory Commission, Bangalore Before the Karnataka Electricity Regulatory Commission, Bangalore Dated 1 st January, 2015 Present: 1. Sri M.R. Sreenivasa Murthy - Chairman 2. Sri H.D. Arun Kumar - Member 3. Sri D.B. Manival Raju - Member

More information

Grid Integration Of RE Challenges, Roadmap And Way Forward

Grid Integration Of RE Challenges, Roadmap And Way Forward Grid Integration Of RE Challenges, Roadmap And Way Forward Context Setting On Indian Experience Pankaj Batra Member (Planning), CEA, Ministry Of Power, GOI Provisions of the Electricity Act 2003 Section

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS FOR DETERMINATION OF RE TARIFF) REGULATIONS, 2010 INDEX 1 Short title, extent and

More information

COMMERCIAL CIRCULAR NO.: 194.

COMMERCIAL CIRCULAR NO.: 194. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD. Commercial Section, 5th Floor, Prakashgad Bandra (East ) MUMBAI- 400 051 Phone No. (P) 26474753 (O) 26474211 / 26472131 Fax - 26472366 ---------------------------------------------------------------------------------------------------------------------------------------------

More information

Before the Karnataka Electricity Regulatory Commission, Bangalore. Dated 14 th May, 2018

Before the Karnataka Electricity Regulatory Commission, Bangalore. Dated 14 th May, 2018 Before the Karnataka Electricity Regulatory Commission, Bangalore Dated 14 th May, 2018 Present: Sri. M.K. Shankaralinge Gowda Sri. H.D. Arun Kumar Sri. D.B. Manival Raju - Chairman - Member - Member In

More information

CE/Comm/CP/NCE/Tariff/6699 Date: COMMERCIAL CIRCULAR No. 260

CE/Comm/CP/NCE/Tariff/6699 Date: COMMERCIAL CIRCULAR No. 260 (A Govt. of Maharashtra Undertaking) CIN: U40109MH2005SGC153645 Maharashtra State Electricity Distribution Co. Ltd. Office of the Chief Engineer (Commercial) Prakashgad, 5th Floor, Station Road, Bandra

More information

Transmission Policy and Wind Energy

Transmission Policy and Wind Energy Transmission Policy and Wind Energy Grid Operational Challenges and Regulatory Measures V Subramanian, CEO and Secretary General Indian Wind Energy Association (InWEA) Present Status and Enabling Provisions/Framework

More information

Comm/CP/NCE/Tariff/28362 Date: COMMERCIAL CIRCULAR No. 228

Comm/CP/NCE/Tariff/28362 Date: COMMERCIAL CIRCULAR No. 228 (A Govt. of Maharashtra Undertaking) CIN: U40109MH2005SGC153645 Maharashtra State Electricity Distribution Co. Ltd. Office of the Chief Engineer (Commercial) Prakashgad, 5th Floor, Station Road, Bandra

More information

CASE No. 328 of Coram. Anand B. Kulkarni, Chairperson I.M. Bohari, Member Mukesh Khullar, Member

CASE No. 328 of Coram. Anand B. Kulkarni, Chairperson I.M. Bohari, Member Mukesh Khullar, Member Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 E-mail: mercindia@merc.gov.in Website:

More information

APSERC (Draft Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2018

APSERC (Draft Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2018 2018 APSERC (Draft Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2018 ARUNACHAL PRADESH STATE ELECTRICITY REGULATORY COMMISSION (APSERC) 2/28/2018 0 Table of

More information

Approach Paper on Methodology for computation of Cross-Subsidy Surcharge for Open Access transactions

Approach Paper on Methodology for computation of Cross-Subsidy Surcharge for Open Access transactions Approach Paper on Methodology for computation of Cross-Subsidy Surcharge for Open Access transactions MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13 th floor, Centre No.1, World Trade Centre, Cuffe Parade,

More information

Chapter 1. General. 1. Short title, commencement, extent of application and interpretation.

Chapter 1. General. 1. Short title, commencement, extent of application and interpretation. HARYANA ELECTRCITY REGULATORY COMMISISON BAYS NO. 33-36, SECTOR 4, PANCHKULA 134112, HARYANA Tel. No. 0172 2572395 (O), Fax No. 0172 2572359 www.herc.nic.in Notification The 24th July, 2018 Regulation

More information

ASSAM ELECTRICITY REGULATORY COMMISSION

ASSAM ELECTRICITY REGULATORY COMMISSION ASSAM ELECTRICITY REGULATORY COMMISSION FILE NO. AERC. 259/2007/Pt-I PETITION NO. 09/2012 ORDER SHEET 13.03.2013 Before the Assam Electricity Regulatory Commission ASEB Campus, Dwarandhar, G. S. Road,

More information

Q2 & H1 FY15 Results. Leading Diversified Renewable Energy Generation Company

Q2 & H1 FY15 Results. Leading Diversified Renewable Energy Generation Company Q2 & H1 FY15 Results Leading Diversified Renewable Energy Generation Company Financial & Operational Highlights Q2 & H1 FY15 Performance Highlights The first half witnessed a sales growth of 38% (Y-o-Y)

More information

MADHU SHARMA University of Petroleum and Energy Studies, Dehradun, India

MADHU SHARMA University of Petroleum and Energy Studies, Dehradun, India ASSESSMENT OF EXISTING RENEWABLE ENERGY REGULATIONS OF UTTARAKHAND AND FINDING OUT THE LOOPHOLES IN THE REGULATIONS ABHISHEK PANDEY, abhilal26@gmail.com MADHU SHARMA madhusharma@ddn.upes.ac.in KN DINESH

More information

WIND POWER TARIFF POLICY INDIAN SCENARIO

WIND POWER TARIFF POLICY INDIAN SCENARIO WIND POWER TARIFF POLICY INDIAN SCENARIO Sulata Bhandari 1, Dr. Tilak Thakur 2, Dr. Jagdish Kumar 3 1,2,3 Associate Professor, Electrical Engineering Department, PEC University of Technology, Chandigarh,

More information

COMPENDIUM REGULATIONS & TARIFF ORDERS ISSUED BY REGULATORY COMMISSIONS FOR RENEWABLE ENERGY SOURCES IN INDIA

COMPENDIUM REGULATIONS & TARIFF ORDERS ISSUED BY REGULATORY COMMISSIONS FOR RENEWABLE ENERGY SOURCES IN INDIA COMPENDIUM OF REGULATIONS & TARIFF ORDERS ISSUED BY REGULATORY COMMISSIONS FOR RENEWABLE ENERGY SOURCES IN INDIA IREDA MINISTRY OF NEW AND RENEWABLE ENERGY INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY LTD.

More information

Market Mechanisms in India s Clean Energy Efforts

Market Mechanisms in India s Clean Energy Efforts Market Mechanisms in India s Clean Energy Efforts Renewable Energy Certificate Mechanism Balawant Joshi Director, ABPS Infrastructure Advisory Pvt. Ltd. ABPS Infrastructure Advisory Advisory Pvt. Ltd October,

More information

Section 86(1)(e): Specify Renewable Purchase Obligation. (RPO), grid connectivity. Section 61(h): Tariff regulations to be guided by promotion

Section 86(1)(e): Specify Renewable Purchase Obligation. (RPO), grid connectivity. Section 61(h): Tariff regulations to be guided by promotion Section 86(1)(e): Specify Renewable Purchase Obligation (RPO), grid connectivity Section 61(h): Tariff regulations to be guided by promotion of renewable energy sources Section 3: National Electricity

More information

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR In the matter of: Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) (First Amendment) Regulations,

More information

Q3 & 9M FY15 Results. Leading Diversified Renewable Energy Generation Company

Q3 & 9M FY15 Results. Leading Diversified Renewable Energy Generation Company Q3 & 9M FY15 Results Leading Diversified Renewable Energy Generation Company Financial & Operational Highlights Q3 & 9M FY15 Performance Highlights Q3 FY15 witnessed a sales growth of 11% on a Y-o-Y basis

More information

State wise analysis of RPO Regulation for Captive users

State wise analysis of RPO Regulation for Captive users State Regulation for Captive Users Definition of renewable Energy as per the commission order Remarks Andhra Pradesh Every consumer owning a captive generating plant of installed capacity of one (1) MW

More information

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO. 220-221, SECTOR 34-A, CHANDIGARH Petition No. 35 of 2012 (Suo Motu) Date of Order: 19.7.2012 In the matter of: Adoption of Central Electricity Regulatory

More information

Impact of Renewable Energy Certificate (REC) Mechanism in India

Impact of Renewable Energy Certificate (REC) Mechanism in India Impact of Renewable Energy Certificate (REC) Mechanism in India Authors: S. K. Soonee, K. V. S. Baba, U. K. Verma, Minaxi Garg, Shailendra Kr. Verma and K. C. Saini Power System Operation Corporation Ltd.

More information

Renewable Policy Framework and Wind Energy Programme in India

Renewable Policy Framework and Wind Energy Programme in India Renewable Policy Framework and Wind Energy Programme in India J. K. Jethani Principal Scientific Officer Ministry of New and Renewable Energy Government of India 22 August 2016 In this Presentation Energy

More information

Jharkhand State Electricity Regulatory Commission. Tariff Order on Determination of Generation Tariff for Rake Power Limited (RPL)

Jharkhand State Electricity Regulatory Commission. Tariff Order on Determination of Generation Tariff for Rake Power Limited (RPL) Tariff Order on Determination of Generation Tariff for Rake Power Limited (RPL) Ranchi October 2011 TABLE OF CONTENTS A1: INTRODUCTION... 4 JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION... 4 RAKE POWER

More information

PROCEDURE FOR GRANT OF DISTRIBUTION OPEN ACCESS PERMISSION AS PER MERC (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2014

PROCEDURE FOR GRANT OF DISTRIBUTION OPEN ACCESS PERMISSION AS PER MERC (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2014 PROCEDURE FOR GRANT OF DISTRIBUTION OPEN ACCESS PERMISSION AS PER MERC (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2014 Page 1 of 13 Contents 1.0 PREAMBLE:... 3 2.0 DURATION OF OPEN ACCESS:... 3 3.0 ELIGIBILITY

More information

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO No , SECTOR 34-A, CHANDIGARH

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO No , SECTOR 34-A, CHANDIGARH PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO No. 220-221, SECTOR 34-A, CHANDIGARH Petition No. 23 of 2018 (Suo-Motu) Date of Order: 09.08.2018 In the matter of: Determination/ fixation of levellised

More information

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR ***** NOTIFICATION Dated the 30 th September, 2010

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR ***** NOTIFICATION Dated the 30 th September, 2010 ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR - 751 012 ***** NOTIFICATION Dated the 30 th September, 2010 No. OERC-Engg-02/2010/ In exercise of powers conferred

More information

A Multi Stakeholder Perspective

A Multi Stakeholder Perspective A Multi Stakeholder Perspective 1 Agenda Wind Vision Initiative Setting up of Wind Vision : 200 GW by 2032 Recommendations Wind Project Development Regulatory Incentives Financing Wind Vision 2032 Grid

More information

SECTOR OVERVIEW. be restructured with commercial banks. In turn, the utilities commit to implement annual tariff increases. 8

SECTOR OVERVIEW. be restructured with commercial banks. In turn, the utilities commit to implement annual tariff increases. 8 Solar and Wind Power Development Project (RRP IND 47920) SECTOR OVERVIEW A. The Energy Sector in India 1. India remains in chronic need of additional power generation capacity. Although, the electrification

More information

Evolution of RPO and REC Mechanisms : Indian Experience

Evolution of RPO and REC Mechanisms : Indian Experience Session-5, Day 2 Evolution of RPO and REC Mechanisms : Indian Experience SAARC Knowledge Sharing Workshop on Modern Techniques including Renewable Energy Auctions for Economizing Renewable Energy Tariff

More information

IMPERATIVE FOR RENEWABLE ENERGY SOURCES AN INSIGHT INTO THE REGULATORY AND POLICY FRAMEWORK

IMPERATIVE FOR RENEWABLE ENERGY SOURCES AN INSIGHT INTO THE REGULATORY AND POLICY FRAMEWORK 2011 International Conference on Environment and BioScience IPCBEE vol.21 (2011) (2011) IACSIT Press, Singapore IMPERATIVE FOR RENEWABLE ENERGY SOURCES AN INSIGHT INTO THE REGULATORY AND POLICY FRAMEWORK

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Smt. Meenakshi Singh, Member Shri I. B. Pandey, Member In the matter of: Petition no. 1013/2015 u/s 33

More information

International Journal of Engineering, Business and Enterprise Applications (IJEBEA)

International Journal of Engineering, Business and Enterprise Applications (IJEBEA) International Association of Scientific Innovation and Research (IASIR) (An Association Unifying the Sciences, Engineering, and Applied Research) ISSN (Print): 2279-0020 ISSN (Online): 2279-0039 International

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13 th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai- 400005 Tel: 22163964/65/69 Fax: 22163976 E-mail: mercindia@merc.gov.in Website:

More information

GOVERNMENT OF INDIA CENTRAL ELECTRICITY AUTHORITY (MINISTRY OF POWER)

GOVERNMENT OF INDIA CENTRAL ELECTRICITY AUTHORITY (MINISTRY OF POWER) GOVERNMENT OF INDIA CENTRAL ELECTRICITY AUTHORITY (MINISTRY OF POWER) 6 th Floor (N), Sewa Bhawan, R. K. Puram, New Delhi-110066 Tel. Fax: 26103246, e.mail: celegal-cea@gov.in, website: www.cea.nic.in

More information

Madhya Pradesh Electricity Regulatory Commission Tariff Order for Procurement of Power by Distribution Licensees from Small Hydro Based Generation

Madhya Pradesh Electricity Regulatory Commission Tariff Order for Procurement of Power by Distribution Licensees from Small Hydro Based Generation Madhya Pradesh Electricity Regulatory Commission Order for Procurement of Power by Distribution Licensees from Small Hydro Based Generation 30 th June 2008 TABLE OF CONTENTS 1: BACKGROUND...2 2: SMALL

More information

New Business Opportunities. Repowering, Offshore, MW scale Wind-Solar hybrids and Small Wind Turbines

New Business Opportunities. Repowering, Offshore, MW scale Wind-Solar hybrids and Small Wind Turbines New Business Opportunities Repowering, Offshore, MW scale Wind-Solar hybrids and Small Wind Turbines 1 Coverage Need for new business models for wind Potential in India Repowering Offshore MW scale Wind-Solar

More information

The Energy Solutions Company OPEN ACCESS

The Energy Solutions Company OPEN ACCESS The Energy Solutions Company OPEN ACCESS Vol 76, Feb 2018 From Team REConnect Dear Reader, Recently the Competition Commission of India (CCI) handed out an important judgement pertaining to denial of open

More information

Development and Financing of Renewable Energy Projects in India

Development and Financing of Renewable Energy Projects in India Development and Financing of Renewable Energy Projects in India A Perspective By K.S. Popli Director (Technical) Indian Renewable Energy Development Agency Limited New Delhi ( India ) World primary energy

More information

Bihar Electricity Regulatory Commission Vidyut Bhawan-II, J.L. Nehru Marg, Patna

Bihar Electricity Regulatory Commission Vidyut Bhawan-II, J.L. Nehru Marg, Patna 1 Bihar Electricity Regulatory Commission Vidyut Bhawan-II, J.L. Nehru Marg, Patna 800 021 Case No. Misc. 36/2014 In the matter of : In the matter of sale of 42 Million Units (MkWh) of electricity to the

More information

Case No. 35 of Shri V.P. Raja, Chairman Shri Vijay L. Sonavane, Member Smt. Chandra Iyengar, Member

Case No. 35 of Shri V.P. Raja, Chairman Shri Vijay L. Sonavane, Member Smt. Chandra Iyengar, Member Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail: mercindia@merc.gov.in

More information

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR-34 A, CHANDIGARH

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR-34 A, CHANDIGARH PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO. 220-21, SECTOR-34 A, CHANDIGARH Petition No. 31 of 2016 Date of Order: 10.06.2016 Present: Shri D.S. Bains, Chairman Shri S.S. Sarna, Member In the

More information

GOVERNMENT RAJASTHAN POLICY FOR PROMOTING GENERATION THROUGH NON-CONVENTIONAL ENERGY SOURCES Sl. No 1 Order Energy Deptt. letter no. F.

GOVERNMENT RAJASTHAN POLICY FOR PROMOTING GENERATION THROUGH NON-CONVENTIONAL ENERGY SOURCES Sl. No 1 Order Energy Deptt. letter no. F. GOVERNMENT RAJASTHAN POLICY FOR PROMOTING GENERATION THROUGH NON-CONVENTIONAL ENERGY SOURCES Sl. No Description Summary 1 Order Energy Deptt. letter no. F.20 (4) Energy/2004 dated 25.10.2004 and amended

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MAHARASHTRA ELECTRICITY REGULATORY COMMISSION DRAFT GUIDELINES FOR OPERATION OF MERIT ORDER DESPATCH The Commission formulated the mechanism for application of the Availability-Based Tariff (ABT) regime

More information

SUPPORT EXISTING FOR AND

SUPPORT EXISTING FOR AND Indian Biomass Power sector 1 FINANCIAL FRAMEWORK TO SUPPORT EXISTING FOR AND NEW BIOMASS POWER PLANTS MNRE Workshop on Biomass Sector - 9 th June 2014 Indian Biomass Power Association Why Biomass Power?

More information

Renewable Energy Sector Profile

Renewable Energy Sector Profile Renewable Energy Sector Profile India Scenario India s Renewable Energy Basket Break up of the 72 GW Installed Renewable Power (GW, % Share) India is giving a strong push to renewable energy in line with

More information

GOVERNMENT OF RAJASTHAN

GOVERNMENT OF RAJASTHAN 237 GOVERNMENT OF RAJASTHAN Policy for Promoting Generation of Electricity from Biomass, 2010 1. Order Energy Deptt. Notification F 20 (10) Energy/09 dated 26.02.2010 2. Title Policy for Promoting Generation

More information

Presentation Title ( Arial, Font size 28 ) Urban Rooftop PV Projects

Presentation Title ( Arial, Font size 28 ) Urban Rooftop PV Projects Presentation Title ( Arial, Font size 28 ) Urban Rooftop PV Projects Date, Venue, etc..( Arial, Font size 18 ) 3 rd April 2012 1 Renewable Energy Portfolio of Tata Power Mithapur 25 MW Samana 50 MW Mulshi

More information

Renewable Energy Market Potential and Policy Overview in India

Renewable Energy Market Potential and Policy Overview in India Renewable Energy Market Potential and Policy Overview in India Ministry of New and Renewable Energy Government of India Hannover, 14 th April,2015 Webpage: www.mnre.nic.in 1 Structure Renewable Energy

More information

Discussion Paper On Harnessing Captive Power Generation in Karnataka

Discussion Paper On Harnessing Captive Power Generation in Karnataka Karnataka Electricity Regulatory Commission Discussion Paper On Harnessing Captive Power Generation in Karnataka I. Preamble: The Electricity Act envisages development of power system based on optimal

More information

GOVERNMENT OF ANDHRA PRADESH ABSTRACT

GOVERNMENT OF ANDHRA PRADESH ABSTRACT GOVERNMENT OF ANDHRA PRADESH ABSTRACT ENERGY, INFRASTRUCTURE & INVESTMENT DEPARTMENT - Introducing Andhra Pradesh Wind-Solar Hybrid Power Policy-2018 to encourage Hybrid Renewable Energy Power - Orders

More information

Amendment to Wind Power Policy Wind Power Policy

Amendment to Wind Power Policy Wind Power Policy Wind Power Policy Wind Energy: Taking Advantage of the Shores Gujarat is blessed with a long coastline and good wind speeds for harnessing power from wind. Gujarat was among the first states in India to

More information

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR *********

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR ********* ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR-751 012 ********* N O T I F I C A T I O N Dated the 6 th June, 2006 No.OERC-JD (EA)-233/2005 In exercise of the powers

More information

Developments in Renewable Energy Sector

Developments in Renewable Energy Sector Developments in Renewable Energy Sector 10 th Capacity Building Program for ERCs October 14, 2016 Ajit Pandit, Director, 1 Presentation Outline Legal and Regulatory Framework for RE Development Evolution

More information

Published byauthority EXTRAORDINARY ISSUE TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION OF

Published byauthority EXTRAORDINARY ISSUE TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION OF No. 210 Registered No. N. E. 930. II TRIPURA GAZE'TTE Published byauthority EXTRAORDINARY ISSUE Agana/a. Friday, Ju/y 15, 2011 A. D. Asadha 24, 1933 S. E. PART--I-- Orders and Notifications by the Government

More information

PUBLISHED IN THE KOLKATA GAZETTE, EXTRA ORDINARY, PT.I DATED AUGUST 10, 2010 VIDE NO. WB (Part-I)/2010/SAR-460

PUBLISHED IN THE KOLKATA GAZETTE, EXTRA ORDINARY, PT.I DATED AUGUST 10, 2010 VIDE NO. WB (Part-I)/2010/SAR-460 1 PUBLISHED IN THE KOLKATA GAZETTE, EXTRA ORDINARY, PT.I DATED AUGUST 10, 2010 VIDE NO. WB (Part-I)/2010/SAR-460 WEST BENGAL ELECTRICITY REGULATORY COMMISSION NOTIFICATION No. 47/WBERC Kolkata, the 10

More information

Clean Energy Regulation and Civil Society in India: Need and challenges to effective participation

Clean Energy Regulation and Civil Society in India: Need and challenges to effective participation Clean Energy Regulation and Civil Society in India: Need and challenges to effective participation Prayas (Energy Group), Pune, India October 2010 Clean Energy Regulation and Civil Society in India 1 Clean

More information

Draft Discussion Paper on Tariff Related Issues for Non Conventional Energy Sources

Draft Discussion Paper on Tariff Related Issues for Non Conventional Energy Sources Draft Discussion Paper on Tariff Related Issues for Non Conventional Energy Sources Tamil Nadu Electricity Regulatory Commission Consultative Paper on Tariff Related Issues of Non-Conventional Sources

More information

Solar Power Policy Uttar Pradesh 2013

Solar Power Policy Uttar Pradesh 2013 Solar Power Policy Uttar Pradesh 2013 1 Table of Contents 1 PREAMBLE 3 2 OBJECTIVES 3 3 OPERATIVE PERIOD 3 4 GRID CONNECTED SOLAR POWER 4 4.1 PROJECT SIZE... 4 4.2 SALE OF ENERGY... 4 4.3 SALE OF ENERGY

More information

HARTEK POWER PVT LTD SOLAR BUSINESS CATALOGUE (Formerly known as Amtek Energy & Power Pvt Ltd)

HARTEK POWER PVT LTD SOLAR BUSINESS CATALOGUE (Formerly known as Amtek Energy & Power Pvt Ltd) (Formerly known as Amtek Energy & Power Pvt Ltd) SOLAR BUSINESS CATALOGUE 2015-16 2 P a g e Contents 1. Introduction 2. Mission SOLAR 3. Why us? 4. Engineering Procurement Construction Services 4.1 Process

More information

Renewable Energy Programmes in India

Renewable Energy Programmes in India Renewable Energy Programmes in India Amit Kumar TERI, India Outline Indian Energy Scenario Renewable Energy in India Grid connected power Distributed generation Sustainable buildings Bio-energy Policy

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM PUBLIC NOTICE Sub : Draft Notification in the matter of Determination of Cross Subsidy Surcharge under Intra State Open Access Pursuant

More information

Request for MNRE assistance for Biomass sector. Presented by: Indian Biomass Power Association

Request for MNRE assistance for Biomass sector. Presented by: Indian Biomass Power Association Request for MNRE assistance for Biomass sector Presented by: Indian Biomass Power Association Indian Power Scenario Renewable Date Total Power Generation Power Generation % 31.03.1990 63636 18 0.03% 31.03.1992

More information

Integrating Renewable Energy

Integrating Renewable Energy Integrating Renewable Energy (Policy & Regulatory support) Ajit Pandit, Director Idam Infrastructure Advisory Pvt Ltd (February 01, 2016) 1 Agenda A. Background to RE Industry in India Growth so far Capacity

More information

Kandla Port Trust (KPT)

Kandla Port Trust (KPT) GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order Truing up for FY 2014-15, Approval of Provisional ARR for FY 2016-17 and Determination of Tariff for FY 2016-17 For (KPT) Case No. 1562 of 2016 22

More information

NEW POLICY FOR POWER GENERATION FROM NON-CONVENTIONAL SOURCES OF ENERGY -2008

NEW POLICY FOR POWER GENERATION FROM NON-CONVENTIONAL SOURCES OF ENERGY -2008 NEW POLICY FOR POWER GENERATION FROM NON-CONVENTIONAL SOURCES OF ENERGY -2008 Government of Maharashtra Industry, Energy & Labour Department Government Resolution No. APAU (NCE)-2007/Pra.Kra.693/Urja-7,

More information

Uttar Pradesh Electricity Regulatory Commission. No. UPERC/Secy/Regulation/ Dated: 23 March, 2006

Uttar Pradesh Electricity Regulatory Commission. No. UPERC/Secy/Regulation/ Dated: 23 March, 2006 Uttar Pradesh Electricity Regulatory Commission No. UPERC/Secy/Regulation/06-1288 Dated: 23 March, 2006 In exercise of powers conferred under section 181 read with section 9, 61, 86 (1) (a), 86 (1) (b)

More information