FINAL SCOPING DOCUMENT

Size: px
Start display at page:

Download "FINAL SCOPING DOCUMENT"

Transcription

1 State Environmental Quality Review Act (SEQR) FINAL SCOPING DOCUMENT HR Ventures Subdivision Town of Shawangunk, Ulster County, NY Draft Environmental Impact Statement SEQR CLASSIFICATION: UNLISTED ACTION LEAD AGENCY: Planning Board, Town of Shawangunk Ms. Kris Pedersen, Chairperson P.O Box 247 Wallkill, NY LIST OF INVOLVED/INTERESTED AGENCIES Involved Agencies Town of Shawangunk Planning Board Town of Shawangunk Town Board Shawangunk Highway Superintendent Ulster County Health Department Ulster County Department of Highways New York State Department of Environmental Conservation U.S. Army Corps of Engineers Interested Agencies New York State Office of Parks, Recreation and Historic Preservation Ulster County Planning Department Wallkill Central School District Wallkill Fire District Wallkill Volunteer Ambulance Corps Shawangunk Police Department Shawangunk Environmental Management Council Shawangunk Historical Society Applicant HR Ventures, LLC June 3, 2008 Page 1

2 INTRODUCTION This draft Scoping Document has been prepared the Town of Shawangunk Planning Board (hereafter Planning Board), as Lead Agency for the SEQRA review of the proposed HR Ventures cluster subdivision. This document is intended to serve as the foundation for the identification of all potentially significant adverse impacts pertinent to the proposed action and appropriate mitigation measures. It is also intended to eliminate consideration of any impacts that are irrelevant or non-significant. DESCRIPTION OF THE PROPOSED ACTION The project is a proposed cluster subdivision consisting of up to 22 lots and associated road system for purposes of developing 20 single-family detached dwellings. The Town Board, in its review of the cluster development, determined that the maximum yield is 20 lots. However, the applicant subsequently submitted a revised conventional layout consisting of 22 lots. A purpose of this SEQRA review is to determine the maximum yield of the project. The project would be served by individual wells and septic systems. The project is located on the west side of the Wallkill River, southwest of the hamlet of Wallkill, east of Roosa Road, and northeast of River Glen Road. The project s proposed access would be from Bruyn Turnpike and River Glen Road. The project would be located in the Town of Shawangunk, Ulster County, NY. The parcel is approximately 121 acres and identified on local tax maps as Map , Block 3, Lot 50. POTENTIAL SIGNIFICANT ENVIRONMENTAL IMPACTS As set forth in the Positive Declaration approved by the Lead Agency, the proposed action was determined to have potential significant environmental impacts, including but not limited to the following: Soil erosion and sedimentation from proposed land disturbances Alteration in existing natural drainage patterns; potential increase in stormwater runoff quantity and decline in water quality Disturbances to freshwater wetlands and on-site watercourses Potential disturbance to historic cemetery and archaeological resources Increase in traffic volumes and effect on intersection safety Demand placed on community services and facilities, including schools, fire, and recreation Alteration and elimination of natural habitat Potential impact on groundwater resources resulting from water supply demand Potential impact to groundwater from introduction of on-site septic systems Potential visibility of project from the scenic Wallkill River GENERAL SCOPING CONSIDERATIONS The applicant will prepare a site-specific Draft Environmental Impact Statement (DEIS) addressing all items described in this Scoping Document. June 3, 2008 Page 2

3 The applicant should closely examine the SEQR regulations for direction on the required content of a DEIS. Unless otherwise directed by this Scoping Document, the provisions of 6 NYCRR 617.9(b) apply to the content of the DEIS and are incorporated herein by reference. The DEIS will assemble relevant and material facts, evaluate reasonable alternatives, and be analytical but not encyclopedic. It will also be clearly and concisely written in plain language that can be easily read and understood by the public. Highly technical material will be summarized and, if it must be included in its entirety, it will be referenced in the DEIS and included in an appendix. Narrative discussions will be accompanied to the greatest extent possible by illustrative tables and graphics. All graphics will clearly identify the project area. The DEIS will group each issue identified into one Existing Setting, Impacts, and Mitigation section to permit more efficient review. Footnotes will be used as the form of citing references. A Full scale Subdivision Plan is to be included with the DEIS as an appendix and reduced copies of pertinent Subdivision Plan sheets may be included in the body of the DEIS. The plans will provide a level of engineering detail sufficient to evaluate the potential impacts of the project, and to assess the appropriateness of mitigation measures, where proposed. The documents shall contain, as attachments, plans, reports, and studies meeting prevailing federal, state and town standards with respect to all disciplines of study. DEIS Contents Cover Sheet listing preparers, title of project, DEIS identification, location, Lead Agency, and relevant dates (i.e. date of acceptance, date of public hearing, final date for acceptance of comments). Table of Contents including listings of tables, figures, maps, charts, and any items that may be submitted under separate cover (and identified as such). I. EXECUTIVE SUMMARY The Executive Summary will include a brief description of the proposed action and a listing of all potential environmental impacts and proposed mitigation measures. A summary will be provided of the approvals and permits required, and of the alternatives to the proposed action that are evaluated in the DEIS. II. DESCRIPTION OF THE PROPOSED ACTION Chapter 2 of the DEIS will describe the project site and its location, the proposed project, the public need and objectives of the project sponsor, and list required approvals, reviews, and permits. A. Site Location and Description 1. A written and graphic description of the location of the project site in the context of the Town of Shawangunk, including tax identification number and list of abutting properties. 2. Description of the environmental setting of the site, and the natural resources identified thereon and in the adjoining area. June 3, 2008 Page 3

4 3. Identification of any easements, rights-of-way, restrictions, special district boundaries or other legal devices affecting the subject properties development potential. 4. Description of the existing infrastructure serving the project site and/or its immediate environs, including existing site access and road network. B. Description of the Proposed Action 1. Written and detailed description of the proposed action, including the proposed use, design, layout, phasing of construction. 2. Identify existing zoning and existing land uses for the project site and adjoining properties. 3. Discuss compliance with zoning and subdivision standards and other criteria set forth in the Town of Shawangunk Code. This demonstration shall clearly indicate the extent to which any modifications or waivers of such standards and other criteria or any variances from such regulations would be required to carry out the project as proposed and an evaluation of why such deviation is needed and would be appropriate. 4. Discuss the compatibility of the proposed land use with the character and development trends in the adjoining area. C. Project Purpose and Need 1. Discuss the purpose or objective of the project sponsor. 2. Identify the public need for the proposed action, including consideration of consistency with adopted policies and/or plans as set forth within adopted local and regional community land use and development plans. D. Approvals, Reviews and Permits 1. List and describe all required approvals, reviews, and permits required, by agency, to implement the proposed action together with the status of each application. 2. List all Involved and Interested Agencies for DEIS distribution. III. ENVIRONMENTAL SETTING, IMPACTS, MITIGATION This section of the DEIS will identify the existing environmental conditions, potential impacts of the action, and proposed mitigation measures as appropriate for each of the major issues identified in this Scoping Document. A. Geology, Soils and Topography 1. Describe bedrock geology of the site. Identify the need for rock removal, if any. Address whether blasting will be required to develop the project. Identify measures to mitigate potential impacts associated with bedrock removal, if proposed. 2. Soils will be mapped in accordance with the Soil Survey for Ulster County, New York. Evaluation of site soils will include the following: June 3, 2008 Page 4

5 a. Identify hydric and non-hydric soils, and agricultural soils as defined by the NYS Land Classification System. b. Erosion impacts and estimated quantities and locations of increased longterm erosion. c. Construction methods and best management practices that will be employed to lessen erosion and to prevent sediment from migrating off-site or into nearby waterbodies and wetlands based on prevailing NYSDEC criteria. d. Submit a soil erosion and sediment control plan that will consist of a text description and plan details of specific designs to be implemented during and post-construction. 3. A topographic survey based on a two-foot contour interval will be prepared at the subdivision scale. Existing and proposed topography will be mapped based on the following slope categories: 1-15%, 15-25%, and 25% and greater. Slope descriptions will include a listing of these slope categories as a percentage of the total site area (pre and post development). A comparison of existing and proposed topography will be evaluated. The following will be described: a. Prominent and/or unique features including stonewalls, large boulders, ledges, and rock outcroppings if present on the site. b. In areas identified for stormwater infiltration and subsurface sewage disposal, percolation tests will be conducted and the results described to confirm the adequacy of the soils for these purposes. B. Surface Water Resources 1. Surface water features will be mapped. Provide water quality classifications of all watercourses. A drainage study, defining existing and post-development (i.e., Proposed Action) peak rates of stormwater runoff and stormwater quality treatment will be submitted that conforms to NYS DEC methodology. A draft Stormwater Pollution Prevention Plan shall be submitted as an appendix to the DEIS. 2. Area residents have expressed concern that the project will contribute to and exacerbate drainage problems in the project vicinity. The drainage study must include a map which illustrates drainage basins both on-site and off-site in the adjoining area. It shall show the project and drainage basins in relation to River Glen Road, Bruyn Turnpike and Beech Lane. The drainage study must specifically address whether the project site would contribute runoff and how any impacts to same will be mitigated. 3. Identify whether the 100-year floodplain is present on the project site. Describe any potential impacts to same, and mitigation measures that may be required to avoid impacts to the 100-year floodplain. 4. A stormwater management plan for the subdivision shall be submitted. All proposed measures and procedures will be selected in accordance with the current NYSDEC Design Standards. 5. Describe any mitigation measures that will be required to eliminate or reduce impacts to surface water resources. June 3, 2008 Page 5

6 6. The subdivision plans for the conventional and cluster layouts must illustrate stormwater management basins designed to meet Town s specifications and that are acceptable to the Town Highway Superintendent. C. Ground Water Resources 1. Ground water from individual well(s) has been identified as the source of water supply for the Proposed Project. An estimate of the water demand and recharge for the proposed subdivision will be included and the location and characteristics of the proposed supply wells (e.g., well type, depth, pumping capacity, etc.) described. Results of well testing required by the Ulster County Department of Health will be described in the DEIS. 2. Describe the potential impacts to adjacent wells that might result from the project. If warranted, additional water quality testing will be performed to adequately determine the scale of the impact. 3. In the event water quality tests reveal that any parameters are present that exceed state drinking water standards, the DEIS shall include appropriate measures to mitigate these parameters to acceptable levels, e.g., water treatment, alternative water supply systems or locations, etc. D. Wastewater / Sewage Disposal 1. Estimate the potential sewage generation from the proposed project. 2. Illustrate on the subdivision plan the proposed location of septic systems and the existing subsurface disposal systems and wells of neighboring properties. 3. Reference prevailing Ulster County Department of Health criteria for subsurface disposal systems. Describe the suitability of soils for subsurface systems and provide field test results demonstrating soils are suitable for septic systems. 4. Discuss mitigation measures. E. Terrestrial and Aquatic Ecology The Shawangunk Habitat Assessment Guidelines shall be used in preparing a habitat assessment which shall be the basis for the data and findings presented in this section of the DEIS. 1. Vegetation a. Contact the NYS DEC and Federal Fish and Wildlife Service to identify and evaluate the possible presence of unique, rare and/or endangered, threatened species. b. Conduct a field survey to determine existing vegetation and provide a description of the findings. Provide an aerial that identifies various on-site habitats. Provide a list of observed vegetative species, and those likely to be present on the site. c. Identify mature trees(18 dbh) within the areas to be disturbed. June 3, 2008 Page 6

7 d. Evaluate the potential impacts on the resources identified, including a quantitative assessment of potential loss and/or reduction of function, and necessary mitigation measures designed to offset, reduce, or eliminate such losses. 2. Fish and Wildlife a. Contact the NYS DEC and Federal Fish and Wildlife Service to identify and evaluate the possible presence of unique, rare and/or endangered, threatened and special concern. Analyze the potential presence of bog turtle and Indiana bat habitat on the project site. b. Conduct a field survey to identify existing species that may utilize the site and provide a description of the findings. c. Evaluate the potential impacts on the resources identified, including a quantitative assessment of potential removal or disturbance of existing wildlife and habitat areas, and necessary mitigation measures designed to offset, reduce, or eliminate such losses. 3. Wetlands a. Delineate all on-site wetlands in accordance with New York State criteria and the methodology provided in the 1987 Army Corps of Engineers Wetlands Delineation Manual. Describe the presence of vernal pools, if any. Describe quantitatively and qualitatively on-site wetlands and waters. b. Calculate the area of proposed wetland disturbance based on grading plans. c. Assess wetland functions and values and potential impacts at the subdivision, project and any other appropriate scales and describe proposed mitigation. Mitigation measures shall include avoidance, replacement, and enhancements. Utilize measures that limit direct impact to the wetland, e.g., open-box culverts for road crossings. d. Specifically assess the quality and quantity of impacts to wetlands located west of the cul-de-sac and east of the Roosa Road dead end. The DEIS shall evaluate road designs, such as limited right-of-way disturbances, bridging wetland, etc., that would limit impacts. Submit comments from the ACOE as evidence that the ACOE would not permit disturbances to these wetlands.the applicant shall include, as an appendix to the DEIS, all correspondence, maps, etc., that have been sent to the ACOE or received from the agency. The Planning Board will use this assessment to determine whether the road connection is feasible, given the presence of wetlands in this location. e. Discuss any special mitigation measures that will be implemented to prevent soil erosion and sedimentation of wetlands during construction. f. Identify permits required from the NYS DEC and Army Corps of Engineers for the proposed project. F. Land Use and Zoning 1. Land Use a. Describe existing land uses of the subject property and adjoining properties. b. Discuss the compatibility of the proposed project with the character of the adjoining area. June 3, 2008 Page 7

8 c. Discuss potential impacts on adjacent land uses including the potential effects of increased traffic on adjoining residential neighborhoods. 2. Zoning a. Describe existing zoning of the project site and adjoining properties. b. Discuss conformance of the proposed action with the Town of Shawangunk Comprehensive Plan. c. Demonstrate compliance with the Subdivision Approval standards and other criteria set forth by the Town of Shawangunk Code. The analysis shall clearly indicate the extent to which any modifications or waivers of such standards and other criteria or any variances from such regulations would be required to carry out the project as proposed, and an evaluation of why such deviation would be appropriate. G. Transportation 1. Roadway analysis -- Existing streets in project vicinity will be inventoried to determine street widths, speed limits, prevailing speeds, number of travel lanes, sight distance measurements at intersections with restrictive conditions, traffic control devices, signs, and markings. 2. Roads to be evaluated shall include: Bruyn Turnpike, Roosa Road, and River Glen Road. Roosa Road is being evaluated, as it presents an alternative road connection to the proposed subdivision. The intersections of River Glen/Dubois Roads, Roosa/Dubois Roads, Knoll Road/River Glen Road, Bernhart Road/Dubois Road, and and proposed access road/bruyn Turnpike, shall be evaluated for sight distance and to determine if they meet applicable design safety standards. 3. Potential exists for the project to impact Roosa Road, Dubois Road up to Roosa Road, Malloy Road and traffic from the Town of Montgomery should be evaluated. The action may create an alternative through road which shall be evaluated. 4. Address potential impacts associated with implementation of the proposed action, and identify proposed traffic and safety improvements or other mitigation measures designed to lessen the impact of the project on the adjacent road network. 5. Using available information, thoroughly evaluate traffic impacts to the Bruyn Turnpike bridge over the Wallkill River before, during, and after bridge replacement. Describe weight limitations before and after replacement, especially during peak traffic AM and PM traffic periods and dismissal of area schools. Describe the timing of subdivision improvements and road opening to Bruyn Turnpike in relation to the timeframes for bridge replacement. 6. Address traffic impacts during the time that the bridge on Bruyn Turnpike may be closed, and address the impacts to emergency access during said time period. 7. Mitigation in the form of recommendations for roadway and intersection improvements, traffic controls. The need for sidewalks within the proposed subdivision will be assessed. H. Aesthetic Resources 1. Describe through the use of narrative text, photographs and photographic simulations, plans, sections, visual sight lines, or other graphic representations, the visual character of the proposed action and its environs. The analysis will describe: a. The existing visual character. June 3, 2008 Page 8

9 b. The change in visual character resulting from implementation of the proposed action. This will include an assessment of the visibility of the project from Bruyn Turnpike, Route 208, and the Wallkill River (refer to Roadside view area presented on p. 38 of the Town of Shawangunk Open Space Inventory and Analysis). c. Mitigation measures proposed to lessen the visual impact of the proposed action including but not limited to such matters as architectural design, earthtone colors, landscaping, preservation of existing vegetation, and preservation of existing topography. d. Discuss the landscaping elements to be integrated into the subdivision plan to mitigate potential visual impacts. Identify trees/tree stands to be preserved and the need for additional screening. Identify and design screening for stormwater management basins that are in keeping with rural surrounds. I. Historic and Archaeological Resources 1. Contact the New York State Office of Parks, Recreation and Historic Preservation (OPRHP) to determine the potential impact on historic and archaeological resources that may be located on the project site. Conduct a Phase IA and Phase IB evaluation. If required by SHPO, perform a Phase II investigation and include the findings in the DEIS. 2. The archaeological investigation must be performed to State Standards by a professional archaeologist. 3. Describe the cemetery located on the project site. Identify the limits of the study. 4. Discuss mitigation measures proposed, or alternatives considered as deemed advisable by the professional archaeologist or OPRHP. Provide mitigation measures to secure the existing cemetery from disturbances. J. Community Facilities and Services 1. The Proposed project will create the need for additional community services including police and fire protection, emergency services, education, and recreation. 2. The impact of the proposed project on each service area will be considered based on interviews conducted with applicable community agencies. 3. Mitigation measures will be discussed. IV. UNAVOIDABLE ADVERSE IMPACTS This section of the DEIS will identify impacts that are likely to occur despite mitigation measures, and will compare the beneficial and adverse implications of these unavoidable impacts. V. ALTERNATIVES This section of the DEIS will evaluate and compare alternatives to the proposed action, which are listed below. The evaluation and comparison will include a conceptual plan and a tabular comparison of quantified impacts. The following alternatives will be studied: A. The No Action Alternative as required under 6 NYCRR b.5. June 3, 2008 Page 9

10 B. Conventional subdivision. The conventional alternative will also be used to determine the maximum yield for the cluster development. C. Cluster Subdivision plan that connects the proposed cul-de-sac to Roosa Road and an evaluation of the advantages and disadvantages of this road connection. The alternative shall specifically describe potential impacts to wetlands and traffic circulation. D. Cluster Subdivision plan that limits the number of lots on which the open space is situated. E. Cluster Subdivision plan that places the open space along the Wallkill River on one lot to be held in conservation ownership. F. An attached dwelling unit arrangement designed in accordance with the zoning and other land use development regulations of the Town. The alternative plans will provide a level of engineering detail to demonstrate the ability of each proposed alternative to comply with the requirements of the Town Code, and to compare the environmental impacts associated with each alternative versus the proposed action. Clearing limits for all alternative plans will be provided, and the proposed levels of disturbance for each alternative quantified. In the case of the stormwater plans for each alternative, the plans will be sufficient to allow the Planning Board to confirm that appropriate stormwater management and treatment facilities could be accommodated on the site, but not at a level of detail that would be required for final approval of a SWPPP. VI. IRREVERSIBLE AND IRRETRIEVABLE COMMITMENT OF RESOURCES Identification of those natural and man-made resources consumed, converted or otherwise made unavailable for future use as a consequence of the proposed action with specific concern for prime agricultural soils and lands. VII. GROWTH INDUCING ASPECTS Potential growth-inducing aspects, including short and long term, and primary, secondary and indirect impacts, generated by the project will be described and mitigation measures discussed, if necessary. VIII. EFFECTS ON THE USE AND CONSERVATION OF ENERGY RESOURCES A description of the effect of the proposed action on the short and long term use and conservation of energy resources will be provided including ways to reduce inefficient or unnecessary consumption during construction and long term operation. XI. APPENDICES The appendices will include a list of all underlying studies and reports relied upon in preparing the DEIS, technical exhibits and studies background information relevant to the proposed action such as this Scoping Document and other relevant SEQR documents, a list of involved and interested agencies, and relevant correspondence with involved agencies and persons. These include but are not limited to: June 3, 2008 Page 10

11 1. Correspondence 2. Cultural Resource Survey 3. Wetland Delineation Report 4. Drainage Calculations 5. Potable Water Pump Tests and Water Quality Test Results 6. Habitat Assessment June 3, 2008 Page 11

State Environmental Quality Review Act (SEQR) SCOPING DOCUMENT

State Environmental Quality Review Act (SEQR) SCOPING DOCUMENT State Environmental Quality Review Act (SEQR) SCOPING DOCUMENT Debra Lasouska Cluster Subdivision Town of Shawangunk, Ulster County, NY Draft Environmental Impact Statement SEQR CLASSIFICATION: LEAD AGENCY:

More information

State Environmental Quality Review Act (SEQR) ADOPTED SCOPING DOCUMENT

State Environmental Quality Review Act (SEQR) ADOPTED SCOPING DOCUMENT State Environmental Quality Review Act (SEQR) ADOPTED SCOPING DOCUMENT WATCHTOWER FARMS IMPROVEMENTS Towns of Shawangunk (Ulster County), NY Draft Environmental Impact Statement (DEIS) SEQR CLASSIFICATION:

More information

State Environmental Quality Review Act (SEQR) DRAFT SCOPING DOCUMENT

State Environmental Quality Review Act (SEQR) DRAFT SCOPING DOCUMENT State Environmental Quality Review Act (SEQR) DRAFT SCOPING DOCUMENT Donner Trust Development Towns of Shawangunk (Ulster County) and Montgomery (Orange County), NY Draft Environmental Impact Statement

More information

August 3, The proposed action thus includes Site Plan approval for the Fire Department and Amended Site Plan approval for the Ambulance Corps.

August 3, The proposed action thus includes Site Plan approval for the Fire Department and Amended Site Plan approval for the Ambulance Corps. Scoping Document For Preparation of a Draft Environmental Impact Statement For the Putnam Valley Volunteer Fire Department Site Plan and Putnam Valley Volunteer Ambulance Corps Amended Site Plan Town of

More information

FINAL SCOPING DOCUMENT

FINAL SCOPING DOCUMENT FINAL SCOPING DOCUMENT State Environmental Quality Review Act (SEQR) Warwick Views Subdivision Town of Warwick, Orange County, New York Lead Agency: Town of Warwick Planning Board ADOPTED: December 6,

More information

DRAFT ENVIRONMENTAL IMPACT STATEMENT

DRAFT ENVIRONMENTAL IMPACT STATEMENT DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR VILLAGE VIEW ESTATES VILLAGE OF WARWICK, ORANGE COUNTY, NEW YORK Garling Associates November 21, 2006 Date of Complete Filing: December 4, 2006 Village View, LLC

More information

REQUIRED REVIEW/APPROVALS

REQUIRED REVIEW/APPROVALS Scoping Document for Draft Environmental Impact Statement for the Proposed Crossroads 312, LLC Project A. PROPOSED PROJECT Crossroads 312, LLC (Crossroads) has petitioned the Town of Southeast for a Zone

More information

52 North Broadway DEIS Scoping Outline

52 North Broadway DEIS Scoping Outline Introduction WP Development NB, LLC (the Applicant ) proposes to redevelop the former Good Counsel site, of which it is the owner, in White Plains, NY with residential uses in a campus-like setting (the

More information

WAL-MART EXPANSION STORE NO , WARSAW, NY

WAL-MART EXPANSION STORE NO , WARSAW, NY DRAFT ENVIRONMENTAL IMPACT STATEMENT WAL-MART EXPANSION STORE NO. 2043-04, WARSAW, NY 2348 NYS Route 19 Town of Warsaw Wyoming County, New York Project Sponsor / Applicant: Wal-Mart Stores, Inc. 2001 S.E.

More information

Site Plan and Subdivision Review

Site Plan and Subdivision Review Site Plan and Subdivision Review Municipal Land Use Framework Environmental Resource Inventory Master Plan Zoning Land Use Regulation Ordinance requirements for each zone Lot size, setbacks parking, cluster

More information

Upper Westchester Muslim Society Masjid and Islamic Center. Upper Westchester Muslim Society, Inc.

Upper Westchester Muslim Society Masjid and Islamic Center. Upper Westchester Muslim Society, Inc. UPPER WESTCHESTER MUSLIM SOCIETY MASJID AND ISLAMIC CENTER DRAFT ENVIRONMENTAL IMPACT STATEMENT (DEIS) FINAL ADOPTED SCOPE (AS AMENDED June 24, 2009) Name of Project: Project Location: Applicant: SEQR

More information

World Headquarters for Jehovah s Witnesses

World Headquarters for Jehovah s Witnesses FINAL SCOPING DOCUMENT Identifying the Potentially Significant Adverse Impacts, Mitigation Measures and Alternatives Pursuant to State Environmental Quality Review Act ( SEQRA ) 6 NYCRR 617.8 Name of Proposed

More information

AMY S KITCHEN, INC. Draft Environmental Impact Statement

AMY S KITCHEN, INC. Draft Environmental Impact Statement SCOPING DOCUMENT REVISED 8/28/14 FOR AMY S KITCHEN, INC. Draft Environmental Impact Statement NYS Route 17M/ Echo Lake Road Town of Goshen Orange County, New York Lead Agency and Contact Person: Lee Bergus,

More information

The Ins and Outs of the SEQRA Short Environmental Assessment Form. Presented by Nan Stolzenburg, AICP CEP Don Meltz, AICP

The Ins and Outs of the SEQRA Short Environmental Assessment Form. Presented by Nan Stolzenburg, AICP CEP Don Meltz, AICP The Ins and Outs of the SEQRA Short Environmental Assessment Form Presented by Nan Stolzenburg, AICP CEP Don Meltz, AICP 1 Community Planning & Environmental Associates/Don Meltz Planning & GIS November

More information

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements This checklist is to be completed and submitted with all Subdivision Applications. The Town reserves

More information

DRAFT SCOPE DRAFT ENVIRONMENTAL IMPACT STATEMENT

DRAFT SCOPE DRAFT ENVIRONMENTAL IMPACT STATEMENT DATE: November 7, 2017 DRAFT SCOPE DRAFT ENVIRONMENTAL IMPACT STATEMENT LIFELONG CYCLES, INC. PROPOSED HARLEY-DAVIDSON DEALERSHIP 1324 JERICHO TURNPIKE, INCORPORATED VILLAGE OF NEW HYDE PARK, NY Overview

More information

FINAL SCOPING DOCUMENT FOR THE PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR REVISED MAPLEWOOD VILLAGE AT GOSHEN

FINAL SCOPING DOCUMENT FOR THE PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR REVISED MAPLEWOOD VILLAGE AT GOSHEN FINAL SCOPING DOCUMENT FOR THE PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR REVISED MAPLEWOOD VILLAGE AT GOSHEN TOWN OF GOSHEN, ORANGE COUNTY, NEW YORK Lead Agency Contact Person Ralph Huddleston,

More information

5. OTHER CEQA CONSIDERATIONS

5. OTHER CEQA CONSIDERATIONS 5. OTHER CEQA CONSIDERATIONS Cumulative Impacts CEQA requires the analysis of impacts due to cumulative development that would occur independent of, but during the same timeframe as, the project under

More information

Appendix A. Correspondence

Appendix A. Correspondence Appendix A Correspondence State Environmental Quality Review POSITIVE DECLARATION Notice of Determination of Non-Significance Draft Date October 26, 2008 This notice is issued pursuant to Part 617 of

More information

Adopted: September 14, 2018

Adopted: September 14, 2018 State Environmental Quality Review Act STATEMENT OF FINDINGS Related to the establishment of zoning to a 164-acre territory By the Village of Kiryas Joel Board of Trustees I. Introduction Adopted: September

More information

APPENDIX M CEQA Initial Study Checklist

APPENDIX M CEQA Initial Study Checklist APPENDIX M CEQA Initial Study Checklist Appendix G ENVIRONMENTAL CHECKLIST FORM (To be Completed by Applicant) 1. Project title: 2. Lead agency name and address: 3. Contact person and phone number: 4.

More information

900 King Street Redevelopment DRAFT DEIS Scoping Outline

900 King Street Redevelopment DRAFT DEIS Scoping Outline 900 King Street Redevelopment DRAFT DEIS Scoping Outline Introduction The Applicant proposes to redevelop the Project Site, located at 900 King Street in the Village of Rye Brook (the Village ) (see Figure

More information

County of Sonoma Agenda Item Summary Report

County of Sonoma Agenda Item Summary Report County of Sonoma Agenda Item Summary Report Agenda Item Number: 55 (This Section for use by Clerk of the Board Only.) Clerk of the Board 575 Administration Drive Santa Rosa, CA 95403 To: Board of Supervisors

More information

DOUGLAS COUNTY ZONING RESOLUTION Section 17 Wildfire Hazard - Overlay District 3/10/99. -Section Contents-

DOUGLAS COUNTY ZONING RESOLUTION Section 17 Wildfire Hazard - Overlay District 3/10/99. -Section Contents- SECTION 17 WILDFIRE HAZARD - OVERLAY DISTRICT -Section Contents- 1701 Intent... 17-2 1702 Definitions... 17-2 1703 Applicability... 17-5 1704 Wildfire Hazard Overlay District Map... 17-6 1705 Wildfire

More information

3.0 Planning and Submittal Requirements

3.0 Planning and Submittal Requirements October 2003, Revised February 2005 Chapter 3.0, Planning and Submittal Requirements Page 1 3.0 Planning and Submittal Requirements 3.1 Drainage Studies and Drawings The City of Greenwood Village (Village)

More information

VILLAGE OF SLOATSBURG COMPREHENSIVE PLAN, CENTRAL BUSINESS DISTRICT STUDY, AND ZONING DRAFT GENERIC ENVIRONMENTAL IMPACT STATEMENT (DGEIS)

VILLAGE OF SLOATSBURG COMPREHENSIVE PLAN, CENTRAL BUSINESS DISTRICT STUDY, AND ZONING DRAFT GENERIC ENVIRONMENTAL IMPACT STATEMENT (DGEIS) VILLAGE OF SLOATSBURG COMPREHENSIVE PLAN, CENTRAL BUSINESS DISTRICT STUDY, AND ZONING DRAFT GENERIC ENVIRONMENTAL IMPACT STATEMENT (DGEIS) VILLAGE OF SLOATSBURG, ROCKLAND COUNTY, NEW YORK Lead Agency and

More information

SUBDIVISION REVIEW CHECKLIST (For Major Applications)

SUBDIVISION REVIEW CHECKLIST (For Major Applications) SUBDIVISION REVIEW CHECKLIST (For Major Applications) PEDD guideline for plan review only. For full requirements refer to applicable regulations, specifications, and standard plans. NAME OF PROPOSED PROJECT:

More information

Chapter 21 Stormwater Management Bylaw

Chapter 21 Stormwater Management Bylaw Chapter 21 Stormwater Management Bylaw SECTION 1. PURPOSE The purpose of this Bylaw is to: implement the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm

More information

Notwithstanding article VII of this chapter, the following conditional uses may be permitted in the planned mixed use development (PMUD) zone:

Notwithstanding article VII of this chapter, the following conditional uses may be permitted in the planned mixed use development (PMUD) zone: DIVISION 14. - PLANNED MIXED USE DEVELOPMENT (PMUD) Sec. 78-1021. - Purpose. The town is a community with a rich tradition of mixed use neighborhoods and a paucity of land area dedicated for large commercial,

More information

(1) The proposed commercial solar energy generation facility is either

(1) The proposed commercial solar energy generation facility is either (2) The design and siting of these facilities shall avoid the placement of turbines on or immediately adjacent to the upwind side of ridge crests; (3) The design may include other design features to minimize

More information

Charter Township of Garfield Grand Traverse County

Charter Township of Garfield Grand Traverse County Charter Township of Garfield Grand Traverse County 3848 VETERANS DRIVE TRAVERSE CITY, MICHIGAN 49684 PH: (231) 941-1620 FAX: (231) 941-1588 SPECIAL USE PERMIT APPLICATION APPLICANT INFORMATION Name: Address:

More information

SCOPING DOCUMENT For Preparation of a Draft Environmental Impact Statement for Lost Lake Resort Town Forestburgh, Sullivan County, New York

SCOPING DOCUMENT For Preparation of a Draft Environmental Impact Statement for Lost Lake Resort Town Forestburgh, Sullivan County, New York SCOPING DOCUMENT For Preparation of a Draft Environmental Impact Statement for Town Forestburgh, Sullivan County, New York Revised - Adopted June 11, 2009 PROJECT NAME: - Planned Development PROJECT LOCATION:

More information

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater

More information

Hamilton Green. Draft Environmental Impact Statement (DEIS)

Hamilton Green. Draft Environmental Impact Statement (DEIS) Hamilton Green Draft Environmental Impact Statement (DEIS) June 2017 HAMILTON GREEN DRAFT ENVIRONMENTAL IMPACT STATEMENT (DEIS) June 14, 2017 Lead Agency: SEQRA Classification: City of White Plains Common

More information

APPENDIX A Final Scope of Work

APPENDIX A Final Scope of Work APPENDIX A Final Scope of Work Final Scope for Draft Environmental Impact Statement For Proposed St. Paul s School Demolition for Additional Open Space Stewart Avenue Incorporated Village of Garden City

More information

New SEQRA Environmental Assessment Forms (EAFs) Catskill Watershed Corporation, November 19, 2013

New SEQRA Environmental Assessment Forms (EAFs) Catskill Watershed Corporation, November 19, 2013 New SEQRA Environmental Assessment Forms (EAFs) Catskill Watershed Corporation, November 19, 2013 Program Overview State Training Requirements Review SEQRA Basics The Revised EAFs (Environmental Assessment

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

UPPER WESTCHESTER MUSLIM SOCIETY MASJID AND ISLAMIC CENTER DRAFT ENVIRONMENTAL IMPACT STATEMENT (DEIS) FINAL ADOPTED SCOPE (AS AMENDED May, 2009)

UPPER WESTCHESTER MUSLIM SOCIETY MASJID AND ISLAMIC CENTER DRAFT ENVIRONMENTAL IMPACT STATEMENT (DEIS) FINAL ADOPTED SCOPE (AS AMENDED May, 2009) UPPER WESTCHESTER MUSLIM SOCIETY MASJID AND ISLAMIC CENTER DRAFT ENVIRONMENTAL IMPACT STATEMENT (DEIS) FINAL ADOPTED SCOPE (AS AMENDED May, 2009) Name of Project: Project Location: Applicant: SEQR Classification

More information

APPENDIX A. NEPA Assessment Checklist

APPENDIX A. NEPA Assessment Checklist APPENDI A NEPA Assessment Checklist NEPA CHECKLIST DATE: January 12, 2009 PREPARER: Frederick Wells, RLA PIN and Project Title: Surplus Property Request Wilder Balter Partners Marketplace Town of Newburgh,

More information

CEQA provides the following guidelines for discussing project alternatives:

CEQA provides the following guidelines for discussing project alternatives: 4.1 GENERAL CEQA REQUIREMENTS CEQA requires that a reasonable range of alternatives to the proposed project be described and considered within an EIR. The alternatives considered should represent scenarios

More information

SECTION 6.0 Alternatives to the Proposed Project

SECTION 6.0 Alternatives to the Proposed Project SECTION 6.0 Alternatives to the Proposed Project 6.0 ALTERNATIVES TO THE PROPOSED PROJECT CEQA requires that an EIR include an analysis of a range of project alternatives that could feasibly attain most

More information

TOWN OF BETHLEHEM SWPPP APPLICATION REVIEW CHECKLIST

TOWN OF BETHLEHEM SWPPP APPLICATION REVIEW CHECKLIST TOWN OF BETHLEHEM SWPPP APPLICATION REVIEW CHECKLIST Instructions: This form must be included with an initial submittal of a Site Plan or Subdivision Application. Use the column to indicate if the SWPPP

More information

Appendix A Stormwater Site Plan Report Short Form

Appendix A Stormwater Site Plan Report Short Form Appendix A Stormwater Site Plan Report Short Form The Stormwater Site Plan Report Short Form may be used for projects that trigger only Minimum Requirements #1-#5. These projects typically fall within

More information

City of Mississauga Environmental Impact Studies Terms of Reference 2002

City of Mississauga Environmental Impact Studies Terms of Reference 2002 City of Mississauga Environmental Impact Studies Terms of Reference 2002 1.0 INTRODUCTION To ensure in so far as possible, both private and public developments are consistent with Natural Heritage and

More information

Objective A: Transportation facilities and services should be designed to conform with other policies contained herein.

Objective A: Transportation facilities and services should be designed to conform with other policies contained herein. CHAPTER ONE GOALS & OBJECTIVES INTRODUCTION KRS 100.193 mandates that a Planning Commission adopt statements of goals and objectives that will act as guides to the preparation of the plan. The update has

More information

Environmental Resource Inventories. What are ERIs? Significance of information How to use them

Environmental Resource Inventories. What are ERIs? Significance of information How to use them Environmental Resource Inventories What are ERIs? Significance of information How to use them Environmental Resource Inventory - ERI Compiled by the environmental commission Information about the natural

More information

1.0 INTRODUCTION 1.1 SUMMARY OF SEQRA PROCESS

1.0 INTRODUCTION 1.1 SUMMARY OF SEQRA PROCESS 1.0 INTRODUCTION This is prepared for the Jericho Rise Wind Farm (hereafter, the Project ) pursuant to the New York State Environmental Quality Review Act (SEQRA) and its implementing regulations, 6 NYCRR

More information

City of Bishop. Environmental Checklist Form

City of Bishop. Environmental Checklist Form City of Bishop Environmental Checklist Form 1. Project title: Environmental Review / 2007 California Building Codes 2. Lead agency name and address: City of Bishop 377 W. Line Street Bishop, Ca 93514 3.

More information

PERMITTED USES: Within the MX Mixed Use District the following uses are permitted:

PERMITTED USES: Within the MX Mixed Use District the following uses are permitted: 6.24 - MX - MIXED USE DISTRICT 6.24.1 INTENT: The purpose of the MX Mixed Use District is to accommodate the development of a wide-range of residential and compatible non-residential uses (including major

More information

Rio Arriba County Planning & Zoning Department

Rio Arriba County Planning & Zoning Department Rio Arriba County Planning & Zoning Department Conditional Use Permit or Special Use Permit GENERAL INFORMATION (please print or type) NAME OF DEVELOPMENT and/or APPLICANT ADDRESS OF APPLICANT TELEPHONE

More information

MacDonnell Heights Town Center Project. Final Scope. Approved by the Poughkeepsie Planning Board on October 20, 2016

MacDonnell Heights Town Center Project. Final Scope. Approved by the Poughkeepsie Planning Board on October 20, 2016 Project Town of Poughkeepsie, New York Draft Environmental Impact Statement (DEIS) Final Scope Approved by the Poughkeepsie Planning Board on October 20, 2016 Project Town of Poughkeepsie, New York Draft

More information

State Environmental Quality Review FULL ENVIRONMENTAL ASSESSMENT FORM

State Environmental Quality Review FULL ENVIRONMENTAL ASSESSMENT FORM 617.20 State Environmental Quality Review FULL ENVIRONMENTAL ASSESSMENT FORM Purpose: The full EAF is designed to help applicants and agencies determine, in an orderly manner, whether a project or action

More information

City of Valdosta Land Development Regulations

City of Valdosta Land Development Regulations Chapter 324 Section 324-1 Environmental Planning Criteria Protection of Groundwater Recharge Areas (A) Purpose and Intent. Pursuant to O.C.G.A. 12-2-8 and the Georgia Department of Natural Resources (DNR),

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION. Coal Refuse Disposal - Site Selection

DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION. Coal Refuse Disposal - Site Selection DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION DOCUMENT NUMBER: 563-2113-660 TITLE: Coal Refuse Disposal - Site Selection EFFECTIVE DATE: February 8, 1999 AUTHORITY: The Coal Refuse

More information

Executive Summary June 24, EXECUTIVE SUMMARY. 1.1 Introduction

Executive Summary June 24, EXECUTIVE SUMMARY. 1.1 Introduction 1.0 EXECUTIVE SUMMARY 1.1 Introduction This Draft Environmental Impact Statement (DEIS) has been prepared in response to a Positive Declaration issued by the Town of Bedford Planning Board in connection

More information

Chapter 10 Natural Environment

Chapter 10 Natural Environment Chapter 10 Natural Environment Existing Conditions The Natural Environment Element addresses the protection, conservation, preservation, and restoration of the natural resources the Bayview Ridge Subarea,

More information

Project: Developer/Designer: Reviewer:

Project: Developer/Designer: Reviewer: City of Charlottesville, Virginia Engineering Plan Review Checklist (Site Plans, Site Plan Amendments, and Major Subdivisions) 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182;

More information

IMPACT ASSESSMENT. Bartow, FL (863) FORM

IMPACT ASSESSMENT. Bartow, FL (863) FORM Growth Management Department Land Development Division 330 W. Church St. IMPACT ASSESSMENT P.O. Box 9005, Drawer GM03 STATEMENT Bartow, FL 33831-9005 (863)534-6792 www.polk-county.net FORM FAX (863) 534-6407

More information

List of Figures... xii. List of Tables... xiii. List of Appendices...xv. Glossary... xvii Project Summary and Facility Overview...

List of Figures... xii. List of Tables... xiii. List of Appendices...xv. Glossary... xvii Project Summary and Facility Overview... BEFORE THE OHIO POWER SITING BOARD Application of a Certificate of Environmental Compatibility and Public Need Blue Creek Wind Farm Amendment Table of Contents Text sections that have been updated for

More information

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Chapter MINERAL EXTRACTION AND MINING OPERATIONS Chapter 17.31 MINERAL EXTRACTION AND MINING OPERATIONS Sections: 17.31.010 Purpose 17.31.020 Procedure for Extraction and Rehabilitation Requests 17.31.030 Operation and Rehabilitation Standards for all

More information

Revised Code of Ordinances of the City of Hallowell (1997) SUBCHAPTER VIIIA SITE PLAN REVIEW

Revised Code of Ordinances of the City of Hallowell (1997) SUBCHAPTER VIIIA SITE PLAN REVIEW SUBCHAPTER VIIIA SITE PLAN REVIEW [Subchapter Derivation: Ord. No. 09-08, effective 7/23/2009] SECTION 9-861 PURPOSE The site plan review provisions set forth in this subchapter are intended to protect

More information

DEIS Scoping Outline. Knolls of Dover. Town of Dover, Dutchess County, New York. Draft: April 4, 2006 Revised: April 12, 2006 Adopted:

DEIS Scoping Outline. Knolls of Dover. Town of Dover, Dutchess County, New York. Draft: April 4, 2006 Revised: April 12, 2006 Adopted: DEIS Scoping Outline Knolls of Dover Town of Dover, Dutchess County, New York Draft: April 4, 2006 Revised: April 12, 2006 Adopted: DESCRIPTION OF THE PROPOSED ACTION The Proposed Action is a comprehensive

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS 1500.01 GENERAL REQUIREMENTS 1500.02 NATURE OF STORM WATER FACILITIES 1500.03 DRAINAGE EASEMENTS 1500.04 STORM WATER MANAGEMENT

More information

DRAFT GENERIC ENVIRONMENTAL IMPACT STATEMENT

DRAFT GENERIC ENVIRONMENTAL IMPACT STATEMENT DRAFT GENERIC ENVIRONMENTAL IMPACT STATEMENT Volume 2 - Appendices ZONING MAP AND TEXT AMENDMENT AND PRELIMINARY CONCEPT PLAN FOR Four Seasons at Orangetown Rockland Psychiatric Center Town of Orangetown

More information

FINAL SCOPE FOR A DRAFT ENVIRONMENTAL IMPACT STATEMENT (DEIS) THE PATTERSON CROSSING INTERSTATE 84 AND NYS ROUTE 311 TOWNS OF PATTERSON AND KENT

FINAL SCOPE FOR A DRAFT ENVIRONMENTAL IMPACT STATEMENT (DEIS) THE PATTERSON CROSSING INTERSTATE 84 AND NYS ROUTE 311 TOWNS OF PATTERSON AND KENT FINAL SCOPE FOR A DRAFT ENVIRONMENTAL IMPACT STATEMENT (DEIS) THE PATTERSON CROSSING INTERSTATE 84 AND NYS ROUTE 311 TOWNS OF PATTERSON AND KENT PUTNAM COUNTY, NY Adopted: April 14, 2005 Lead Agency and

More information

5.0 LONG-TERM CEQA CONSIDERATIONS

5.0 LONG-TERM CEQA CONSIDERATIONS 5.0 LONG-TERM CEQA CONSIDERATIONS Section 15126 of the CEQA Guidelines requires that all phases of a project must be considered when evaluating its impact on the environment, including planning, acquisition,

More information

181 State Road 415, New Smyrna Beach. Railey Harding & Allen, P.A. Barcelo Developments, Inc. Scott Ashley, AICP, Planning Manager

181 State Road 415, New Smyrna Beach. Railey Harding & Allen, P.A. Barcelo Developments, Inc. Scott Ashley, AICP, Planning Manager GROWTH AND RESOURCE MANAGEMENT DEPARTMENT PLANNING AND DEVELOPMENT SERVICES DIVISION CURRENT PLANNING ACTIVITY 123 W. Indiana Avenue, Room 202, DeLand, FL 32720 (386) 943-7059 PUBLIC HEARING: CASE NO:

More information

Table Table 7.2 Potential Environmental Impacts and Mitigation Measures

Table Table 7.2 Potential Environmental Impacts and Mitigation Measures 7.2 Natural Environment/Environmental Planning Executive Summary/Key Points The Environmental Consultation and Mitigation Plan establishes: o A process for consultation with environmental resource agencies

More information

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements 4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for

More information

Medical Oriented District (MOD) Draft Generic Environmental Impact Statement (DGEIS)

Medical Oriented District (MOD) Draft Generic Environmental Impact Statement (DGEIS) Medical Oriented District (MOD) Draft Generic Environmental Impact Statement (DGEIS) & MOD Development Plan Draft Environmental Impact Statement (DEIS) FINAL SCOPE TOWN OF CORTLANDT Last Revised: August

More information

BEFORE THE OHIO POWER SITING BOARD

BEFORE THE OHIO POWER SITING BOARD BEFORE THE OHIO POWER SITING BOARD Application of a Certificate of Environmental Compatibility and Public Need Table of Contents Page No. List of Figures... xii List of Tables... xiii List of Appendices...xv

More information

Understanding and Applying the State Environmental Quality Review Act

Understanding and Applying the State Environmental Quality Review Act Understanding and Applying the State Environmental Quality Review Act Monday, April 23, 2018 Presented by: Donald A. Young, Esq. SEQR Overview What is SEQR? New York State regulations more formally known

More information

KANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION

KANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION KANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION Michael J. Van Mill, AICP Planning Director 189 East Court Street Kankakee, IL 60901

More information

Section 7 Environmental Constraints

Section 7 Environmental Constraints Section 7 Environmental Constraints i Yakima Valley Metropolitan and Regional Transportation Plan Public Comment DRAFT 1/27/2016 Environmental Constraints Analysis A programmatic-level review of potential

More information

GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD ID NO: (605) PIN NO:

GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD ID NO: (605) PIN NO: PERMIT NUMBER: GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD 57701 ID NO: (605) 394-4157 PIN NO: APPLICATION DATE: DATE ISSUED: PROPERTY INFORMATION CONTRACTOR INFORMATION LOT ADDRESS

More information

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below.

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below. CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE EAST CAMPUS STUDENT HOUSING PHASE III DEVELOPMENT PROJECT UNIVERSITY OF CALIFORNIA, IRVINE I. ADOPTION OF THE MITIGATED

More information

VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES

VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES The County will: GOALS AND OBJECTIVES 1.1 Conserve, Enhance, Protect, Maintain and Manage Vegetative, Water, Fish and Wildlife Resources Promote

More information

STREET STANDARDS FOR PRIVATE ROAD/STREET. Number of Travel Lanes Width of Travel Lanes Width of Right-of-Way. Subbase - Bank Run Gravel (6" minus)

STREET STANDARDS FOR PRIVATE ROAD/STREET. Number of Travel Lanes Width of Travel Lanes Width of Right-of-Way. Subbase - Bank Run Gravel (6 minus) L. Road Construction All roads shall be a minimum of 200' in length and shall comply with all applicable provisions of this ordinance. No building permit shall be issued for a property until the road constituting

More information

WQMP AMENDMENT REVIEW CHECKLIST

WQMP AMENDMENT REVIEW CHECKLIST State of New Jersey Highlands Water Protection and Planning Council 100 North Road (Route 513) Chester, New Jersey 07930-2322 (908) 879-6737 (908) 879-4205 (fax) www.highlands.state.nj.us WQMP AMENDMENT

More information

FLOODPLAIN PERMIT APPLICATION SUBMITTAL REQUIREMENTS

FLOODPLAIN PERMIT APPLICATION SUBMITTAL REQUIREMENTS Planning Department 215 South 4 th Street, Suite F Hamilton, MT 59840 Phone 406-375-6530 Fax 406-375-6531 planning@rc.mt.gov FLOODPLAIN PERMIT APPLICATION SUBMITTAL REQUIREMENTS To initiate the permit

More information

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that US ARMY Corps Of Engineers Little Rock District JOINT PUBLIC NOTICE CORPS OF ENGINEERS STATE OF ARKANSAS Application Number: 2014-00083-1 Date: December 22, 2014 Comments Due: January 16, 2015 TO WHOM

More information

SECTION VII TRAFFIC IMPACT ANALYSIS GUIDELINES

SECTION VII TRAFFIC IMPACT ANALYSIS GUIDELINES SECTION VII TRAFFIC IMPACT ANALYSIS GUIDELINES A. GENERAL Traffic Impact Analyses (TIAs) are tools that have historically been utilized to evaluate the interaction between existing transportation infrastructures

More information

The Municipal Land Use Law, at N.J.S.A. 40:55D-89, includes the following statement relative to the periodic examination of a municipal Master Plan:

The Municipal Land Use Law, at N.J.S.A. 40:55D-89, includes the following statement relative to the periodic examination of a municipal Master Plan: 2002 Periodic Reexamination Report of the Master Plan and Development Regulations for Lebanon Township, Hunterdon County, New Jersey May 16, 2002 (Adopted as revised on May 21, 2002) The Municipal Land

More information

STAFF REPORT CHELAN COUNTY PUD DAROGA DOMESTIC WATER SYSTEM

STAFF REPORT CHELAN COUNTY PUD DAROGA DOMESTIC WATER SYSTEM STAFF REPORT CHELAN COUNTY PUD DAROGA DOMESTIC WATER SYSTEM TO: Douglas County Hearing Examiner FROM: Douglas County Land Services Staff RE: Chelan County PUD, SCUP-12-01 DATE: July 5, 2012 I. GENERAL

More information

US ARMY CORPS Reply To: Public Notice No. OF ENGINEERS U.S. Army Corps of Engineers P-3119

US ARMY CORPS Reply To: Public Notice No. OF ENGINEERS U.S. Army Corps of Engineers P-3119 US ARMY CORPS Reply To: Public Notice No. OF ENGINEERS U.S. Army Corps of Engineers P-3119 St. Louis District Attn: CEMVS-OD-F Gateway to Excellence 1222 Spruce Street Public Notice Date: St. Louis, Missouri

More information

Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No.

Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No. Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates 2005 VNH File No. 35317-210-21 Table of Contents Introduction... 3 Goals... 3 Storm water Discussion...

More information

RESOLUTION NO:

RESOLUTION NO: RESOLUTION NO: 11-031 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PASO ROBLES CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE 2011 CIRCULATION ELEMENT OF THE GENERAL PLAN AND ADOPTING FINDINGS,

More information

Will County Site Development Permit Submittal Checklist TAB 1 PROJECT OVERVIEW

Will County Site Development Permit Submittal Checklist TAB 1 PROJECT OVERVIEW Applicant: Reviewer: Permit No.: The following tables contain a checklist of the requirements before a review for a Site Development Permit submittal will be accepted. Not all requirements pertain to every

More information

Final Environmental Impact Statement Volume 1 Cricket Valley Energy Project

Final Environmental Impact Statement Volume 1 Cricket Valley Energy Project Volume 1 Cricket Valley Energy Project Dover, Dutchess County, New York July 2012 Lead Agency: New York State Department of Environmental Conservation 625 Broadway Albany, New York 12233 Applicant: Cricket

More information

APPLICANT: Pinnacle Land Development, L.L.C., Attn: Mr. Steve Gower, Lake Bluff Dr., St. Louis, Missouri

APPLICANT: Pinnacle Land Development, L.L.C., Attn: Mr. Steve Gower, Lake Bluff Dr., St. Louis, Missouri US ARMY CORPS Reply To: Public Notice No. OF ENGINEERS U.S. Army Corps of Engineers P-2855 St. Louis District Attn: CEMVS-OD-F Public Notice Date Gateway to Excellence 1222 Spruce Street December 12, 2013

More information

Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements

Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements JUNE 2016 RONALD REAGAN WASHINGTON NATIONAL AIRPORT Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements PREPARED BY: Ricondo & Associates, Inc. IN

More information

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 NAME SUBDIVISION NAME CC Williams Plant Subdivision CC Williams Plant Subdivision LOCATION CITY COUNCIL DISTRICT

More information

Regional Master Plan Consistency Report 1/8/2010

Regional Master Plan Consistency Report 1/8/2010 of 47 11:31 AM Regional Master Plan Consistency Report Prepared by State of New Jersey Highlands Water Protection and Planning Council 100 North Road (Route 513), Chester, NJ 07930 Telephone: (908) 879-6737

More information

Traffic Impact Study Requirements

Traffic Impact Study Requirements [TYPE THE COMPANY NAME] Traffic Impact Study Requirements County of San Mateo Department of Public Works Roadway Services 9/1/2013 I. Introduction The County of San Mateo (County), Department of Public

More information

SEPA Environmental Checklist

SEPA Environmental Checklist Purpose of the Checklist: The State Environmental Policy Act (SEPA), chapter 43.21 RCW, requires all governmental agencies, including the City of Ferndale to consider the environmental impacts of a proposal

More information

Instructions for Notice of Ground Disturbance Form:

Instructions for Notice of Ground Disturbance Form: Instructions for Notice of Ground Disturbance Form: Prior to beginning any ground disturbance activity or finalizing your storm water plan, submit a completed 2 page Notice of Ground Disturbance Form to

More information

JULY Introduction/Proposed Action

JULY Introduction/Proposed Action DRAFT ADOPTION OF ENVIRONMENTAL ASSESSMENT (EA), ACCEPTANCE OF APPLICANT ENVIRONMENTAL ANALYSIS, AND FINDING OF NO SIGNIFICANT IMPACT (FONSI) WILSON BRIDGE BOAT RAMP IMPROVEMENTS SECTION 408 PERMISSION

More information

ATTACHMENT B FINDINGS PLANNING COMMISSION HEARING JULY 20, 2016

ATTACHMENT B FINDINGS PLANNING COMMISSION HEARING JULY 20, 2016 ATTACHMENT B FINDINGS PLANNING COMMISSION HEARING JULY 20, 2016 MOUNTAIN PEAK WINERY USE PERMIT P13-00320-UP & ROAD & STREET STANDARDS EXCEPTION REQUEST 3265 SODA CANYON ROAD, NAPA, CA 94574 APN #032-500-033

More information

IOWA STATE REVOLVING FUND FINDING OF NO SIGNIFICANT IMPACT. To: All Interested Citizens, Government Agencies, and Public Groups

IOWA STATE REVOLVING FUND FINDING OF NO SIGNIFICANT IMPACT. To: All Interested Citizens, Government Agencies, and Public Groups Why You Should Read This: The document below reviews the environmental impact likely from a project. This project is planned to be federally funded through your tax dollars; therefore, you are entitled

More information