1 CACHE CREEK SETTLING BASIN SYMPOSIUM Managing the Settling Basin Who s Doing What! June 22, 2009 Francis E. Borcalli, P.E.

2 CACHE CREEK SETTLING BASIN SYMPOSIUM Managing the Settling Basin Who s Doing What! June 22, 2009 Francis E. Borcalli, P.E.

3 Arriving to one goal is the starting point of another. Where we started

4 YOLO COUNTY IRWMP WATER MANAGEMENT CATEGORIES: Water Supply and Drought Preparedness Water Quality Flood Management and Storm Drainage Riparian and Aquatic Ecosystem Enhancement Recreation

5

6 FLOOD ADVISORY COMMITTEE Assembled knowledgeable experts to assess situation Convened review and deliberation meetings Conclusions: No silver bullet! Lower Cache Creek & Cache Creek Settling Basin first

7 Well done is better than well said. What we have done

8 We started with Yolo County Flood Management Program now we are the

9 Organizational Structure Program Advisory Committee (PAC) YCFCWCD, City of Woodland, Yolo County YCFCWCD Administrative Lead Water and Aquatic Habitat Element Recreation and Riparian Habitat Element Cache Creek IP Flood Element YBIP PCIP SRWBIP Sloughs, Canals, and Creek IP Management Function Coordination Function CCIP Cache Creek Integrated Project PCIP Putah Creek Integrated Project SCCIP Sloughs, Canals, and Creeks Integrated Project SRWBIP Sacramento River West Bank YBIP Yolo Bypass Integrated Project Integrated Project

10

11 Mission: Minimize the risk from flooding in Yolo County while enhancing water supply, ecosystem functionality, recreation, and community values Program Elements: Public Outreach Flood Emergency Preparedness Watershed Assessment Flood Hazard Mitigation Projects Planning Projects Implementation and Maintenance Program Administration and Funding

12 SOLUTION PRINCIPLES Resilient to events greater than design Low maintenance Minimize structural features Enhance public and environmental values

13 Relationship with FloodSAFE California FloodSAFE California Supporting Projects Central Valley FED Central Valley Flood Protection Plan Urban Levees Program Channel Maintenance Improved Inspection Procedures floodsafe Yolo Pilot Program State Plan of Flood Control Others California Levee Database

14 FLOODED AREA AND 1938

15 FLOOD OF FEBRUARY MARCH 1940

16 EXISTING 100-YEAR FLOODPLAIN (With Levee Overtopping)

17

18

19 Woodland & Yolo County need a no regrets solution to flood risks associated with Cache Creek and the Cache Creek Settling Basin!

20 CRITICAL FEATURE FOR FEASIBLE SOLUTION

21 EXISTING 100-YEAR FLOODPLAIN (With Levee Overtopping)

22 THE COMMUNITY S PERSPECTIVE 2003 feasibility study polarized the community it is now more unified Flooding from Cache Creek is documented it will occur again Woodland flooding is the product of less than adequate projects analysis I-5 and the CCSB

23 CACHE CREEK SETTLING BASIN Feature of the State Plan of Flood Control Dam No. 084 under jurisdiction of the Division of Safety of Dams Authorized and constructed for sediment management Levees being disaccredited by FEMA Outlet weir authorized to be raised 6-feet Deemed critical for Mercury management

24 CACHE CREEK SETTLING BASIN JUSTIFICATION Prevent sediment deposition of Woodland s abandoned waste water oxidation ponds. Avoid raising Bypass levees up to 2.2 feet from I- 5 to Fremont Weir. Avoid raising Ridge Cut levees 1.8 feet. Avoid raising Sacramento River levees up a maximum of 1 foot to the Sacramento Bypass. Decrease dredging Sacramento River and Bay by 88 acre-feet and 7 acre-feet, respectively.

25 CACHE CREEK LEVEES & SETTLING BASIN CHRONOLOGY OF MODIFICATIONS 1938 Construction of Initial Basin completed 1940 West levee moved West 400-feet 1943 C.C. Levees constructed from mouth of Basin to Yolo 1950 Basin modified for design flow of 24,000 cfs with Cobble Weir set at El. 28 (NAVD) 1961 C.C. Levees extended approx. 3 mi. upstream of Yolo & Basin modified for design flow of 30,000 cfs 1973 Cobble Weir raised 2 feet to El. 30 (NAVD) 1992 Basin levees raised to present height; West levee moved west 2,500 feet; and new outlet weir constructed for 30,000 cfs at El. 35 (NAVD) 2017 Outlet weir authorized to be raised to El. 41 (NAVD)

26

27 CHRONOLOGY OF CCSB WEIR MODIFICATIONS SETTLING BASIN YOLO BYPASS

28 WORK PLAN ACTIVITIES Topographic Data Acquisition City/County Drainage Manual Cache Creek Hydrology Update Institutional & Sustainable Funding Options Public Outreach Program Cache Creek / Cache Creek Settling Basin Flood Risk Reduction Alternatives Federal Appropriations FY10 USACE-CVFPB-Local Partnership

29 Progress always involves risk; you can t take second base and keep your foot on first. Where we are headed

30 Cache Creek Flood Risk Reduction Project Recovering flood conveyance through the CSBB is critical it can be implemented as a no-regrets project

31 CRITICAL FEATURE FOR FEASIBLE SOLUTION

32 CRITICAL ITEMS FOR PROJECT IMPLEMENTATION Executing feasibility cost sharing agreement with USACE and CVFPB Funding Federal, State, Local Conducting feasibility study October 1, 2009 target start date Collaborating with FloodSAFE California programs and projects Being a part of the CVFPP Responsible parties addressing long-term management of sediment and mercury while implementing a no-regrets flood solution

33 Questions?

Technical Memorandum No. 8 June 3, 2013 Page 2. FEMA Floodplain Mapping Flood Elevations at WWTP

Technical Memorandum No. 8 June 3, 2013 Page 2. FEMA Floodplain Mapping Flood Elevations at WWTP Page 2 FEMA Floodplain Mapping Flood Elevations at WWTP Existing Flood Control Facilities The City of Davis WWTP is located immediately north of the Willow Slough Bypass and west of the Yolo Bypass (see

More information

Sacramento River General Reevaluation Report

Sacramento River General Reevaluation Report Sacramento River General Reevaluation Report Yolo Bypass Working Group 24 May 2016 US Army Corps of Engineers Guidance Engineer Circular (EC) 1105-2-404 Planning Civil Works Projects under the Environmental

More information

Presentation Overview

Presentation Overview Little Dry Creek Restoration Deep River Flood Risk Management Final Presentation to LCRBDC June 10, 2015 Presentation Overview Project Overview & Background Information Data Collection Model Development

More information

LOWER CACHE CREEK, YOLO COUNTY WOODLAND AREA FEASIBILITY STUDY

LOWER CACHE CREEK, YOLO COUNTY WOODLAND AREA FEASIBILITY STUDY Background LOWER CACHE CREEK, YOLO COUNTY WOODLAND AREA FEASIBILITY STUDY Energy and Water Development Appropriations Act of 1993 Reconnaissance Study completed June 1994 Feasibility Cost Share Agreement

More information

Balancing Life Safety with Ecological Health and Economic Sustainability: Challenging the Status Quo in the Sacramento River Valley and Delta

Balancing Life Safety with Ecological Health and Economic Sustainability: Challenging the Status Quo in the Sacramento River Valley and Delta Balancing Life Safety with Ecological Health and Economic Sustainability: Challenging the Status Quo in the Sacramento River Valley and Delta Sara Schultz Water Resources Planner Sacramento District, USACE

More information

Introduction. Water Resources and Hydrology. Introduction. Chapter 2 Conservation

Introduction. Water Resources and Hydrology. Introduction. Chapter 2 Conservation Chapter 2 Introduction This background report provides base data for development of the Element of the Yolo County General Plan. The Element will address the following issues covered in this report: Water

More information

Lower Sacramento / Delta North Region: CORRIDOR MANAGEMENT FRAMEWORK

Lower Sacramento / Delta North Region: CORRIDOR MANAGEMENT FRAMEWORK Lower Sacramento / Delta North Region: CORRIDOR MANAGEMENT FRAMEWORK WHAT IS THIS? A coalition of local agencies developed this (CMF) for the Lower Sacramento / Delta North Region. For the purposes of

More information

The Yolo County Resource Conservation District (RCD) Strategic Plan

The Yolo County Resource Conservation District (RCD) Strategic Plan Yolo County Resource Conservation District 221 West Court Street, Suite 1 phone (530) 662-2037 Woodland, CA 95695 fax (530) 662-4876 yolorcd@yolorcd.org www.yolorcd.org The Yolo County Resource Conservation

More information

PUBLIC INFORMATION MEETING Rahway River Basin Flood Risk Management Feasibility Study

PUBLIC INFORMATION MEETING Rahway River Basin Flood Risk Management Feasibility Study PUBLIC INFORMATION MEETING Rahway River Basin Flood Risk Management Feasibility Study COL Paul E. Owen District Engineer U.S. Army Corps of Engineers New York District New Jersey Department of Environmental

More information

2017 Central Valley Flood Protection Plan Update: Overview

2017 Central Valley Flood Protection Plan Update: Overview 2017 Central Valley Flood Protection Plan Update: Overview 2015 FMA Conference CVFPP Overview- Mike Mierzwa, DWR Basin-wide Feasibility Study Planning Context- Eric Tsai, DWR Technical Tools/Methodologies-

More information

Napa Watershed Symposium. Factors affecting future water quantity and quality in Napa County, and strategies for adaptation

Napa Watershed Symposium. Factors affecting future water quantity and quality in Napa County, and strategies for adaptation Napa Watershed Symposium Factors affecting future water quantity and quality in Napa County, and strategies for adaptation Pierre Stephens California Department of Water Resources May 21, 2009 Source:

More information

The Nature Conservancy Cosumnes River Preserve Franklin Boulevard Galt CA 95632

The Nature Conservancy Cosumnes River Preserve Franklin Boulevard Galt CA 95632 Study Partners The Nature Conservancy Cosumnes River Preserve 13501 Franklin Boulevard Galt CA 95632 East Bay Municipal Utility District 1 Winemaker Way, Unit K Lodi CA 95240 Sacramento County Water Agency

More information

Multi-Benefit Planning in the San Joaquin River Basin-wide Feasibility Study

Multi-Benefit Planning in the San Joaquin River Basin-wide Feasibility Study Multi-Benefit Planning in the San Joaquin River Basin-wide Feasibility Study September 8 th, 2016 Presented by: Eric Tsai, P.E. California Department of Water Resources Eric.Tsai@water.ca.gov Jeremy Thomas,

More information

Flood Prevention Authority. Agency Presentation. Gilroy Meeting. June 3, Pajaro River Watershed. Flood Prevention Authority

Flood Prevention Authority. Agency Presentation. Gilroy Meeting. June 3, Pajaro River Watershed. Flood Prevention Authority Pajaro River Watershed Flood Prevention Authority Agency Presentation Gilroy Meeting June 3, 2009 Pajaro River Watershed Flood Prevention Authority Presentation Outline Formation and Purpose of the Pajaro

More information

DRAINAGE REPORT. Project Name: PG&E Gas Operations Technical Training Center Winters, CA. Date: February 4, Prepared by: BKF Engineers

DRAINAGE REPORT. Project Name: PG&E Gas Operations Technical Training Center Winters, CA. Date: February 4, Prepared by: BKF Engineers DRAINAGE REPORT Project Name: PG&E Gas Operations Technical Training Center Winters, CA Date: February 4, 2015 Prepared by: BKF Engineers Client: Pacific Gas & Electric Company This report has been prepared

More information

SACRAMENTO SUPPLEMENTAL PROJECTS OVERVIEW

SACRAMENTO SUPPLEMENTAL PROJECTS OVERVIEW 1 SACRAMENTO SUPPLEMENTAL PROJECTS OVERVIEW 131 132 122 8 119 27 252 174.59 11 135 12 112 92 56 CAMERON SESSIONS SUPPLEMENTAL PROGRAM MANAGER 239 65 53 18 October 218 - American River Common Features WRDA

More information

Drainage Criteria Manual Review

Drainage Criteria Manual Review City of Colorado Springs Stormwater Management Assessment and Standards Development Drainage Criteria Manual Review March 8, 2013 Springsgov.com/City Agencies/Stormwater/Stormwater Engineering/ Stormwater

More information

Flood Protection Meets Climate Change

Flood Protection Meets Climate Change Flood Protection Meets Climate Change Robin Grossinger, San Francisco Estuary Institute, robin@sfei.org Scott Dusterhoff, San Francisco Estuary Institute Julie Beagle, San Francisco Estuary Institute Climate

More information

Our A Team APDS Contracting

Our A Team APDS Contracting 1 Our A Team APDS Contracting 2 Definition of the Problem 3 Canal Importation Basin 4 Existing Floodplain 5 Development by Decades 6 Contributing Factors to Flooding Historic streams obliterated by irrigation

More information

There is a reliable, clean water supply for current and future generations.

There is a reliable, clean water supply for current and future generations. E2 There is a reliable, clean water supply for current and future generations. E2.1. Current and future water supply for municipalities, industries, agriculture, and the environment is reliable. 2.1.1.

More information

Hydrology and Flooding

Hydrology and Flooding Hydrology and Flooding Background The 1996 flood Between February 4, 1996 and February 9, 1996 the Nehalem reporting station received 28.9 inches of rain. Approximately 14 inches fell in one 48 hour period.

More information

Bridge Replacement Project. Preliminary Hydraulic Study. Lincoln, California BRLS-5089 (021) BRIDGE 19C Mcbean Park Drive at Auburn Ravine

Bridge Replacement Project. Preliminary Hydraulic Study. Lincoln, California BRLS-5089 (021) BRIDGE 19C Mcbean Park Drive at Auburn Ravine Bridge Replacement Project Preliminary Hydraulic Study Lincoln, California BRLS-5089 (021) BRIDGE 19C 0059 Mcbean Park Drive at Auburn Ravine Prepared By: Prepared By: Date 11/25/2014 Thomas S. Plummer

More information

Jordan River Basin. Planning for the Future. Salt Lake County Watershed Symposium (August 11, 2011) Todd Stonely Utah Division of Water Resources

Jordan River Basin. Planning for the Future. Salt Lake County Watershed Symposium (August 11, 2011) Todd Stonely Utah Division of Water Resources Jordan River Basin Planning for the Future Todd Stonely Utah Division of Water Resources Salt Lake County Watershed Symposium (August 11, 2011) 8/12/2011 Jordan River Basin Planning for the Future Slide

More information

LEVEE DISTRICT NO. 1 OF SUTTER COUNTY

LEVEE DISTRICT NO. 1 OF SUTTER COUNTY LEVEE DISTRICT NO. 1 OF SUTTER COUNTY STAR BEND SETBACK LEVEE AND HABITAT ENHANCEMENT PROJECT BASIS OF DESIGN FEBRUARY 2009 Prepared By: TABLE OF CONTENTS QUALITY CONTROL CERTIFICATION... iv 1.0 INTRODUCTION...

More information

Lower San Joaquin River Feasibility Study PLAN FORMULATION ADDENDUM

Lower San Joaquin River Feasibility Study PLAN FORMULATION ADDENDUM PLAN FORMULATION ADDENDUM Non-Structural Measure Descriptions Elevate Critical Infrastructure This measure would raise at-risk critical structures above the design inundation level. Elevation would be

More information

Plan Rollout Presentation July 31, Michael G. Hahn, P.E., P.H. Chief Environmental Engineer. Southeastern Wisconsin Regional Planning Commission

Plan Rollout Presentation July 31, Michael G. Hahn, P.E., P.H. Chief Environmental Engineer. Southeastern Wisconsin Regional Planning Commission Plan Rollout Presentation July 31, 2014 Michael G. Hahn, P.E., P.H. Chief Environmental Engineer Southeastern Wisconsin Regional Planning Commission # 219703 Racine County Flooding Recommendations and

More information

Little Bear Brook Flood Hazard Assessment and Redevelopment Area Regional Stormwater Management Analysis. Progress Meeting

Little Bear Brook Flood Hazard Assessment and Redevelopment Area Regional Stormwater Management Analysis. Progress Meeting Little Bear Brook Flood Hazard Assessment and Redevelopment Area Regional Stormwater Management Analysis Progress Meeting June 30, 2014 Princeton Hydro, LLC and SWM Consulting, LLC Project Team West Windsor

More information

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project IAFSM 2010 Annual Conference City of Rockford Keith Creek Greenway Flood Mitigation Project March 10, 2010 Introduction Problem Overview 1890 s Building of homes along Keith Creek 1920 s Home construction

More information

Central Valley Integrated Flood. (CVIFMS) Informational Briefing. Rhiannon Kucharski Lead Planner Sacramento District, US Army Corps of Engineers

Central Valley Integrated Flood. (CVIFMS) Informational Briefing. Rhiannon Kucharski Lead Planner Sacramento District, US Army Corps of Engineers Central Valley Integrated Flood Management Watershed Study (CVIFMS) Informational Briefing Rhiannon Kucharski Lead Planner Sacramento District, US Army Corps of Engineers December 16, 2015 US Army Corps

More information

An Evaluation of the Increased Red River Flooding in the Caddo Parish Region of Northwest Louisiana

An Evaluation of the Increased Red River Flooding in the Caddo Parish Region of Northwest Louisiana An Evaluation of the Increased Red River Flooding in the Caddo Parish Region of Northwest Louisiana By: Jordan Christman, KathrynAnn Fields, Steven Hebert, Brandon Kallenbach, Mario Martinez, Shelby Poncik,

More information

Supplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania

Supplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania Supplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania Project Authorization USDA's Small Watershed Program is carried out under the

More information

Draft Environmental Impact Report

Draft Environmental Impact Report Revised Draft Environmental Impact Report San Francisquito Creek Flood Protection, Ecosystem Restoration, and Recreation Project Upstream of Highway 101 This notice announces that a Draft Environmental

More information

Skagit River Flood Damage Reduction Study

Skagit River Flood Damage Reduction Study Skagit River Flood Damage Reduction Study Preliminary Measures Presentation Aug. 18, 2008 Introduction Preliminary measures are required by the Corps planning guidance - ER-1105-2-100. Six-Step Planning

More information

CHAPTER 9 DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS

CHAPTER 9 DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS CHAPTER 9 DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS This chapter summarizes the results of feasibility level investigations undertaken to identify solutions to the water and related land resource problems

More information

DESIGN OF CHANNEL FLOW DIVERSION FACILITIES

DESIGN OF CHANNEL FLOW DIVERSION FACILITIES DESIGN OF CHANNEL FLOW DIVERSION FACILITIES FOR RIPARIAN HABITAT IRRIGATION BRUCE M. PHILLIPS, M.S., P.E. ABSTRACT Increased awareness and concern regarding environmental degradation has resulted in protection

More information

State of California Department of Water Resources

State of California Department of Water Resources Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Presentation for the Yolo Bypass Fisheries Enhancement Planning Team March 20, 2014 (Abridged)

More information

DRAFT Sacramento s Comprehensive Flood Risk Reduction Program

DRAFT Sacramento s Comprehensive Flood Risk Reduction Program DRAFT Sacramento s Comprehensive Flood Risk Reduction Program March 20, 2017 1007 7 th St, 7 th Floor Sacramento, CA 95814 Table of Contents 1. Introduction... 2 2. Flood System Management... 6 American

More information

APPENDIX E SECTION 404 (B) (1) EVALUATION OF DREDGE AND FILL MATERIAL

APPENDIX E SECTION 404 (B) (1) EVALUATION OF DREDGE AND FILL MATERIAL APPENDIX E SECTION 404 (B) (1) EVALUATION OF DREDGE AND FILL MATERIAL SECTION 404 (B) (1) EVALUATION FOR AUGUSTA ROCKY CREEK SECTION 205 FEASIBILITY STUDY, RICHMOND COUNTY, GEORGIA FEBRUARY 2016 TABLE

More information

Sacramento County Board of Supervisors Sacramento County Water Agency. October 21, 2008

Sacramento County Board of Supervisors Sacramento County Water Agency. October 21, 2008 Sacramento County Board of Supervisors Sacramento County Water Agency October 21, 2008 Adopt Resolutions Approving the Sacramento County and the Sacramento County Water Agency Policies With Respect to

More information

CIP-01: Stream Channel Stabilization, Silver Creek

CIP-01: Stream Channel Stabilization, Silver Creek CIP-01 CIP-01: Stream Channel Stabilization, Silver Creek HIGHEST PRIORITY This project consists of stream channel stabilization to address channel incision and the replacement of two cross-culverts. Preferred

More information

Stream Buffers Sharpest Tool in the SWM Toolbox Tom Hegemier, PE, D.WRE, CFM

Stream Buffers Sharpest Tool in the SWM Toolbox Tom Hegemier, PE, D.WRE, CFM Stream Buffers Sharpest Tool in the SWM Toolbox 1 Tom Hegemier, PE, D.WRE, CFM www.apaienv.com Stream Buffers - Overview 2 Why stream buffers? Floodplain management and other benefits Existing regulatory

More information

The Yolo Natural Heritage Program Interface with the Bay Delta Conservation Plan Background, Summary, and Remaining Issues May 23, 2013 Background The Yolo Natural Heritage Program (Yolo HCP/NCCP) and

More information

ENGINEERING ECOSYSTEM RESTORATION

ENGINEERING ECOSYSTEM RESTORATION APPENDIX D ENGINEERING ECOSYSTEM RESTORATION ENGINEERING APPENDIX FOR EXISTING CONDITION ANALYSIS FOR RISK INFORMED DECISION MAKING FOR PROJECT ALTERNATIVE SELECTION DELTA ISLANDS AND LEVEES FEASIBILITY

More information

Pacheco Reservoir Expansion

Pacheco Reservoir Expansion California Water Commission Pacheco Reservoir Expansion Unique Opportunity for Fisheries Recovery, Flood Risk Reduction and Emergency Water Supply December 13, 2017 1 of 33 Project Partners Pacheco Pass

More information

Building Resiliency to Drought through WaterSMART. Presentation for IFC FLOW 2018 Workshop April 25, 2018

Building Resiliency to Drought through WaterSMART. Presentation for IFC FLOW 2018 Workshop April 25, 2018 Building Resiliency to Drought through WaterSMART Presentation for IFC FLOW 2018 Workshop April 25, 2018 Reclamation s Mission The mission of the Bureau of Reclamation is to manage, develop, and protect

More information

4. Present Activities and Roles

4. Present Activities and Roles 4. Present Activities and Roles The present missions, authorities, activities and roles of the various agencies involved with flood protection, floodplain management and flood-damage reduction are identified

More information

GETTING STARTED: LEVERAGING FUNDING SOURCES TO CREATE OPPORTUNITIES KAMM CONFERENCE August 24, 2016 Presented By: Sarah Taylor

GETTING STARTED: LEVERAGING FUNDING SOURCES TO CREATE OPPORTUNITIES KAMM CONFERENCE August 24, 2016 Presented By: Sarah Taylor GETTING STARTED: LEVERAGING FUNDING SOURCES TO CREATE OPPORTUNITIES 2016 KAMM CONFERENCE August 24, 2016 Presented By: Sarah Taylor OVERVIEW Do I really have a problem? Identifying the need Finding the

More information

APPENDIX C. Background Information SB 5 General Plan Amendment for 200-Year Flood Protection

APPENDIX C. Background Information SB 5 General Plan Amendment for 200-Year Flood Protection APPENDIX C Background Information for 200-Year Flood Protection for 200-Year Flood Protection City of Live Oak Background Information Prepared by: 2020 L Street, Suite 400 Sacramento, CA 95811 February

More information

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that US ARMY Corps Of Engineers Little Rock District JOINT PUBLIC NOTICE CORPS OF ENGINEERS STATE OF MISSOURI Application Number: SWL 2013-00260 Date: April 15, 2014 Comments Due: May 6, 2014 TO WHOM IT MAY

More information

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects Appendix J Existing Efforts for Identifying Multi-Benefit Projects Water Purveyor Projects Existing Efforts for Identifying Multi Benefits Projects In-lieu groundwater recharge under RWA planning efforts

More information

SUPERSEDED. BDCP Conservation Measure 1: Water Facilities and Operation. BDCP Bay Delta Conservation Plan

SUPERSEDED. BDCP Conservation Measure 1: Water Facilities and Operation. BDCP Bay Delta Conservation Plan BDCP Bay Delta Conservation Plan March 2013 BDCP Conservation Measure 1: Water Facilities and Operation A cornerstone of the Bay Delta Conservation Plan (BDCP) strategy is to construct and operate a dual-conveyance

More information

SHORELINE INVENTORY AND RESTORATION PLANNING

SHORELINE INVENTORY AND RESTORATION PLANNING CHAPTER 3 SHORELINE INVENTORY AND RESTORATION PLANNING A. PURPOSE OF THE SHORELINE INVENTORY AND CHARACTERIZATION A first step in the comprehensive Master Program update process is development of a shoreline

More information

Tuesday, February 25, 2014 Western Canal Water District Office Nelson, CA. Stakeholder Meeting Notes

Tuesday, February 25, 2014 Western Canal Water District Office Nelson, CA. Stakeholder Meeting Notes Stakeholder Meeting Notes Tuesday, February 25, 2014 Western Canal Water District Office Nelson, CA Meeting Attendees Tom Engler Mike Inamine Mike Mirmazaheri David Miller Kim Floyd Craig Myers Carl Hoff

More information

HAZARD MITIGATION ASSISTANCE

HAZARD MITIGATION ASSISTANCE FEDERAL INSURANCE ANDMITIGATION ADMINISTRATION HAZARD MITIGATION ASSISTANCE New Partners for Smart Growth Conference - February 3, 2018 Jennie Orenstein, FEMA HQ 1 Objectives By the end of this session

More information

Hackensack River Flood Reduction Study Update

Hackensack River Flood Reduction Study Update Township of River Vale Hackensack River Flood Reduction Study Update November 11, 2013 Purpose of Study To Analyze Where Frequent Flooding Is Impacting Property and How It Might Be Reduced Hackensack River

More information

Assessing the Ecological Benefits of River and Floodplain Restoration

Assessing the Ecological Benefits of River and Floodplain Restoration Assessing the Ecological Benefits of River and Floodplain Restoration John Hunter, Ph.D. (HTH), Michael Yun (Anderson Krygier), Craig Williams (DWR), Mary Jo Kealy, Ph.D. (CH2M), Ron Melcer (DWR), and

More information

Sacramento Area Flood Control Agency. May State Clearinghouse No Prepared for: Prepared by: Consulting Engineers and Scientists

Sacramento Area Flood Control Agency. May State Clearinghouse No Prepared for: Prepared by: Consulting Engineers and Scientists Addendum No. 3 (North Sacramento Streams) to the Environmental Impact Report on the North Sacramento Streams, Sacramento River East Levee, Lower American River, and Related Flood Improvements Project Prepared

More information

USACE LEVEE AND DAM SAFETY PROGRAM AND ISSUES

USACE LEVEE AND DAM SAFETY PROGRAM AND ISSUES USACE LEVEE AND DAM SAFETY PROGRAM AND ISSUES 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56 48 130

More information

Regional Feather River Diversion Feasibility Study

Regional Feather River Diversion Feasibility Study Regional Feather River Diversion Feasibility Study I. Project Sponsor Contact Information YCWA-13 Lead Agency/Organization Yuba County Water Agency Name of Primary Contact(s) Curt Aikens Mailing Address

More information

Freight Street Development Strategy

Freight Street Development Strategy Freight Street Development Strategy Appendix B: Naugatuck River Floodplain Analysis Freight Street Development Strategy DECEMBER 2017 Page B-1 1.0 NAUGATUCK RIVER FLOODPLAIN AT FREIGHT STREET 1.1 Watershed

More information

Technical Memorandum Channel Capacity Report 2018 Restoration Year

Technical Memorandum Channel Capacity Report 2018 Restoration Year Technical Memorandum Channel Capacity Report 2018 Restoration Year 1 Table of Contents 2 1.0 Executive Summary... ES-1 3 4 2.0 Introduction... 1 5 2.1 Objective... 2 6 2.2 CCAG Roles and Responsibilities...

More information

Habitat Improvement for Native Fish in the Yolo Bypass

Habitat Improvement for Native Fish in the Yolo Bypass Habitat Improvement for Native Fish in the Yolo Bypass A Project of Natural Heritage Institute California Department of Water Resources California Department of Fish and Game Yolo Basin Foundation Northwest

More information

U.S. ARMY CORPS OF ENGINEERS CHICAGO DISTRICT OVERVIEW & AUTHORITIES

U.S. ARMY CORPS OF ENGINEERS CHICAGO DISTRICT OVERVIEW & AUTHORITIES 1 U.S. ARMY CORPS OF ENGINEERS CHICAGO DISTRICT OVERVIEW & AUTHORITIES 255 255 255 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 239 65 53 80 119 27 252 174.59 110 135 120 112 92 56

More information

Distributed Storage Alternative Screening Analysis February 17, 2015

Distributed Storage Alternative Screening Analysis February 17, 2015 Distributed Storage Alternative Screening Analysis February 17, 2015 Executive Summary The Distributed Storage Alternative (DSA) was conceptualized during the public comment and alternative screening process

More information

U.S. Army Corps of Engineers Los Angeles District. US Army Corps of Engineers BUILDING STRONG

U.S. Army Corps of Engineers Los Angeles District. US Army Corps of Engineers BUILDING STRONG U.S. Army Corps of Engineers Los Angeles District US Army Corps of Engineers BUILDING STRONG 1. Opening Comments; 2. Los Angeles County Drainage Area Project As-Built Condition, Current Condition, and

More information

Chapter 19. Hazards BACKGROUND. Flooding

Chapter 19. Hazards BACKGROUND. Flooding Chapter 19. Hazards BACKGROUND Flooding The Planning Area is drained by Putah Creek, Dry Slough, and the Willow Slough Bypass. The old North Fork of Putah Creek east of Interstate 80 no longer contains

More information

INDIAN CREEK WATERSHED PLAN EXECUTIVE SUMMARY

INDIAN CREEK WATERSHED PLAN EXECUTIVE SUMMARY INDIAN CREEK WATERSHED PLAN EXECUTIVE SUMMARY The Indian Creek Watershed covers a 38 square mile area in southern Lake County, Illinois that drains 24,116 acres before discharging into the Des Plaines

More information

3.3 Acceptable Downstream Conditions

3.3 Acceptable Downstream Conditions iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and

More information

Scoping Study for Upper Petaluma River Watershed Flood Control Project. Frequently Asked Questions

Scoping Study for Upper Petaluma River Watershed Flood Control Project. Frequently Asked Questions Scoping Study for Upper Petaluma River Watershed Flood Control Project Frequently Asked Questions December 8, 2011 1. Why was the public not notified of the April 28 meeting? The April 28 meeting was intended

More information

NEPA Scoping Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study

NEPA Scoping Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study NEPA Scoping Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study U.S. Army Corps of Engineers New York District New Jersey Department of Environmental Protection Non-Federal

More information

Informational Meeting- July 21, Boxelder B-2/B-3 Watershed Planning Study

Informational Meeting- July 21, Boxelder B-2/B-3 Watershed Planning Study Informational Meeting- July 21, 2015 Boxelder B-2/B-3 Watershed Planning Study Agenda Introductions Background & History Purpose & Need NRCS Watershed Planning Program Work Completed to Date Longer term

More information

Pajaro River Watershed Flood Prevention Authority. Phase 3 and 4a. Pajaro River Watershed Study

Pajaro River Watershed Flood Prevention Authority. Phase 3 and 4a. Pajaro River Watershed Study Pajaro River Watershed Flood Prevention Authority Phase 3 and 4a FEBRUARY 2005 Funding for this project has been provided in full or in part through a contract with the SWRCB pursuant to the Costa-Machado

More information

GEOTECHNICAL EVALUATION OF CALIFORNIA S CENTRAL VALLEY LEVEES

GEOTECHNICAL EVALUATION OF CALIFORNIA S CENTRAL VALLEY LEVEES GEOTECHNICAL EVALUATION OF CALIFORNIA S CENTRAL VALLEY LEVEES Steven Mahnke, PE, GE California Department of Water Resources Sujan Punyamurthula, PhD, PE URS Corporation Mark W. Connelly, PMP Kleinfelder

More information

Friant Dam and Millerton Reservoir

Friant Dam and Millerton Reservoir San Joaquin River Restoration Program Floodplain Management Association Presentation SJRRP Update Continued: Impacts from Subsidence April 18, 2013 1 Friant Dam and Millerton Reservoir Completed in 1942

More information

CHAPTER 7. San Dieguito River Flooding Adaptation

CHAPTER 7. San Dieguito River Flooding Adaptation CHAPTER 7 San Dieguito River Flooding Adaptation This chapter includes a range of adaptation measures to address vulnerabilities from flooding along the San Dieguito River, including the river valley,

More information

Chapter 6 Erosion & Stormwater Study Team

Chapter 6 Erosion & Stormwater Study Team Chapter 6 Erosion & Stormwater Study Team Objective How do we stabilize the Las Vegas Wash environment to most effectively reduce erosion and enhance wetlands? Introduction The Las Vegas Wash (Wash) has

More information

Stinson Beach Watershed Program

Stinson Beach Watershed Program Stinson Beach Watershed Program www.marinwatersheds.org Purpose The Board of Supervisors authorized the Department of Public Works to begin implementation of a County-wide Watershed Program on May 13,

More information

Roland Ottolini, P.E. Director, Natural Resources Division. Lee County Board of County Commissioners March 15, 2016

Roland Ottolini, P.E. Director, Natural Resources Division. Lee County Board of County Commissioners March 15, 2016 Roland Ottolini, P.E. Director, Natural Resources Division Lee County Board of County Commissioners March 15, 2016 1 Presentation Overview Lee County Water Quality/Storage Initiatives Regional Initiatives

More information

V. DRAINAGE IMPROVEMENTS

V. DRAINAGE IMPROVEMENTS V. DRAINAGE IMPROVEMENTS 5.1 Formulation of Drainage Improvements As indicated in Chapter 4, following the completion of the hydrologic analysis associated with future land use conditions, drainage improvements

More information

Section 6: Stormwater Improvements

Section 6: Stormwater Improvements Section 6: Stormwater Improvements A major objective of this study was to identify opportunities for improvements to address the widespread water quality impairments caused by stormwater runoff in the

More information

DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS THROUGH

DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS THROUGH RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS 2018-19 THROUGH 2022-23 Project Number Stg No. Project

More information

Title Advanced Hydraulic Modeling to Support Emergency Action Plans

Title Advanced Hydraulic Modeling to Support Emergency Action Plans Title Advanced Hydraulic Modeling to Support Emergency Action Plans Abstract Freese and Nichols, Inc. (FNI) developed an Emergency Action Plan (EAP) for a Levee Improvement District (LID) located in a

More information

APPENDIX A. Hydraulic Investigations: Cascade Mall at Burlington

APPENDIX A. Hydraulic Investigations: Cascade Mall at Burlington APPENDIX A m SUMMARY REPORT FOR E.I.S. Hydraulic Investigations: Cascade Mall at Burlington July 12, 1982 John E. Norman, P.E. 14779 Northeast 32nd, #A201 Bellevue, WA 98007 (206) 882-1767 92 General A

More information

Yuba County IRWMP 2015 UPDATE APPENDIX 10-1 General Plan Relation to IRWMP

Yuba County IRWMP 2015 UPDATE APPENDIX 10-1 General Plan Relation to IRWMP APPENDIX 10-1 General Plan Relation to IRWMP 1 of 13 Community Development Element Goal CD11: Quality of Life and Local Advantages Provide a high quality of life and take advantage of the County s economic

More information

New Castle County, DE. Floodplain Regulations

New Castle County, DE. Floodplain Regulations New Castle County, DE Floodplain Regulations John J. Gysling, PE CFM Department of Land Use New Castle County, DE February 26, 2009 Today s Presentation Floodplain Protection and Uses Terms and Definitions

More information

Farmington Dam Repurpose Project

Farmington Dam Repurpose Project Farmington Dam Repurpose Project 2017 $158,100,000 to re-purpose the Farmington Dam from flood protection only to a long-term water storage facility that increases water supply reliability to the region.

More information

5. RESOURCE MANAGEMENT STRATEGIES

5. RESOURCE MANAGEMENT STRATEGIES Central Orange County Integrated Regional Water Management Plan 5. RESOURCE MANAGEMENT STRATEGIES 5.1 STRATEGIES INAPPLICABLE TO REGION Nearly all types of resource management strategies are applicable

More information

DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS THROUGH

DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS THROUGH RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS 2017-18 THROUGH 2021-22 Project Number Stg No. Project

More information

PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN ANALYSIS

PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN ANALYSIS 1 NEW JERSEY ASSOCIATION FOR FLOODPLAIN MANAGEMENT PRESENTATION FOR THE 10 TH ANNUAL CONFERENCE PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN

More information

Boron, Salinity, Nutrients and Dissolved Oxygen in the Irrigation Water. Water Conservation District

Boron, Salinity, Nutrients and Dissolved Oxygen in the Irrigation Water. Water Conservation District Boron, Salinity, Nutrients and Dissolved Oxygen in the Irrigation Water within the Yolo County Flood Control and Water Conservation District 8/31/06 Max Stevenson Water Resources Associate YCFC&WCD 34274

More information

Technical Memorandum Public Draft Channel Capacity Report 2019 Restoration Year

Technical Memorandum Public Draft Channel Capacity Report 2019 Restoration Year Public Draft Channel Capacity Report 2019 Restoration Year 1 Table of Contents 2 1.0 Executive Summary... 1 3 2.0 Introduction... 1 4 3.0 Study Area... 3 5 4.0 Completed Channel Capacity Studies and Related

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

Appendix B Stormwater Site Plan Submittal Requirements Checklist

Appendix B Stormwater Site Plan Submittal Requirements Checklist Stormwater Site Plan Submittal Requirements Checklist The Submittal Requirements Checklist is intended to aid the design engineer in preparing a Stormwater Site Plan. All items included in the following

More information

LOWER BOISE RIVER INTERIM FEASIBILITY STUDY

LOWER BOISE RIVER INTERIM FEASIBILITY STUDY LOWER BOISE RIVER INTERIM FEASIBILITY STUDY Public Information Meetings June 29, 2010 June 30, 2010 July 1, 2010 US Army Corps of Engineers BUILDING STRONG Agenda Introductions / Meeting Objectives Greg

More information

Estuary Blueprint 2017 and 2018 Task Status Updates May 23, 2018

Estuary Blueprint 2017 and 2018 Task Status Updates May 23, 2018 Attachment 4 Blueprint 2017 and 2018 Status Updates May 23, 2018 9 In progress: 13 Not Started: 2 2017 2018 4 In progress: 20 Not Started: 1 Not Started In Progress Not Started In Progress 2017 s Action

More information

CHAPTER 8 FLOOD CONTROL 8.1 ENVIRONMENTAL SETTING/AFFECTED ENVIRONMENT YUBA REGION

CHAPTER 8 FLOOD CONTROL 8.1 ENVIRONMENTAL SETTING/AFFECTED ENVIRONMENT YUBA REGION CHAPTER 8 FLOOD CONTROL Floods can be damaging and costly, often resulting in loss of life or substantial property damage. Levees, dams, and reservoirs provide flood control throughout most of California.

More information

Mill Slough Water Quality Plan Description

Mill Slough Water Quality Plan Description Mill Slough Water Quality Plan Description Introduction The City of Middleton ( City ) is engaged in a three-phase plan to significantly improve non-point source surface water quality in the Mill Slough

More information

Reservoir Operation Constraints and Opportunities, from the perspective of the Bureau of Reclamation

Reservoir Operation Constraints and Opportunities, from the perspective of the Bureau of Reclamation Reservoir Operation Constraints and Opportunities, from the perspective of the Bureau of Reclamation Presented at: Institutional Constraints to Water Management in New Mexico Albuquerque, New Mexico May

More information

Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California

Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California Final Report September 2005 Prepared by Center for Ecosystem Management and Restoration, Oakland,

More information