1 Municipal Class Environmental Assessment for Pottersburg Creek Slope Stability Study South of Hamilton Road, Schedule B February 13, 2013

2 Municipal Class EA Process We are here

3 Purpose and Objective of Study Purpose: Develop bank stabilization options To protect properties and servicing infrastructure To protect, maintain and enhance ecological processes, stream function and natural features of the area Objective To develop and evaluate viable options (review agency and public input) Recommend an alternative

4 Study Limits 80 m of channel downstream of Hamilton Road

5 Problem and Opportunity Problem: East bank slope is unstable, and requires remedial action Residences and servicing infrastructure in critical condition Opportunity: Develop remediation options that ensures public safety Protect key services Protect environmental and ecological conditions of Pottersburg Creek

6 Background Natural slope was modified by engineering works in 1989 Portions of slope built steeper than original recommended Residential units and servicing infrastructure located within hazardous slope stability area Focus of this study is on remediation works

7 Environmental Assessment Study The following investigations completed : Geotechnical Soil Chemistry Hydrology and Hydraulics Fluvial Geomorphology Terrestrial Ecology Fisheries Habitat

8 Geotechnical Engineering Inventory of of existing soil conditions (soil and slope stability) Undertaken detailed geotechnical analysis Establish stable top of slope MNR Understanding Natural Hazards

9 Soil Chemistry Elevated levels of PCB s identified in two samples No PCB waste Removal of contaminated material from subject site City of London Ayerswood MCC229

10 Fluvial Geomorphology Evaluated existing fluvial channel behaviour Downstream of Hamilton Road is a natural meander bent (bend in the river) Erosion rate high at the bend Natural channel will erode bank and Natural channel will erode bank and migrate inland

11 Hydrology and Hydraulics Hydrology (watershed flows) Establish watershed runoff by applying a water resources model Range of inputs used according to engineering standards Hydraulics (velocities & depths of flow) Topographic survey completed from Gore Road to Thames River Numerical model to establish water levels under various conditions Used for impact assessment

12 Terrestrial Habitat Seven vegetation communities of low land forests identified Two types of deciduous swamps Plants and wildlife corridor within the river corridor catalogued No species at risk found (confirmed No species at risk found (confirmed with MNR)

13 Fisheries Habitat Aquatic habitat evaluated This reach of creek rated between good and fair Creek is spawning ground for fish Number of species found No species at risk identified Small mouth bass Creek chub

14 Option 1: Do Nothing Slope is unstable and unsafe Residential units located on top of unstable slope (public risk) Key servicing infrastructure at risk (water and sewer) Environmental impacts of potential malfunction or breaks in services Not a viable option

15 Option 2: Buyout of residences Acquire and demolish five residential units Relocate services Remove rock from slope Allow river to erode Creek could freely move and adjust with time No adverse disruption to vegetation and wildlife (no improvement either) Loss of fish habitat with ongoing erosion Cost: High

16 Option 3: New retaining wall 60 m of vertical wall New wall to be owned by individual property p owners Heavy insurance requirements Long term maintenance required Residences and servicing infrastructure to remain Rock berm in front of wall required Elimination of fish spawning grounds Cost: Very High

17 Option 4: Channel Re alignment Residences and services remain To facilitate shift, need new retaining walls near bridge Reshape bank, line with rock Remove contaminated PCB from west bank Design in stream fish habitat improvements Native vegetation planting above rock Minor maintenance required Cost: Moderate

18 Ranking of Options Option 1 Option 2 Option 3 Option 4 Criteria/Option Do Nothing Buyout New Wall Re-alignment Land acquisition Erosion Flooding Stream morphology Aquatic habitat Terrestrial habitat Technical complexity Social Implications Costs Level of Preference c c Low (worst) Medium High (best)

19 Draft Preferred Option Option 4: Channel Re alignment ranked highest Demolition of private property not required No adverse impact of flooding/erosion from re aligned channel Some environmental disruption during construction Fish habitat improvements Loss of riparian vegetation along banks Long term stream health could be improved (new features in channel) Technically feasible Lowest costs

20 Next Steps Public input (this meeting) Review agency comments Finalize the report City council 30 day public review period

21 Public Input Handwritten comments Phone Fax Mail Comments due by: Fb Feb 27, 2013 (two weeks) k) Pat Prodanovic, Ph.D., P.Eng. Water Resources and Marine Engineer Riggs Engineering Ltd Commissioner s Road West Suite 205 London, Ontario N6K 1C7 Phone: Fax: E mail: pprodanovic@riggsengineering.com Billy Haklander, P. Eng. Environmental Services Engineer Stormwater Management Unit Environmental and Engineering Services Department 300 Dufferin St., 9th Floor London, Ontario N6A 4L9 Phone: , ext Fax: E mail: bhakland@london.ca

22 Questions

Public Information Centre September 19 th, 2017

Public Information Centre September 19 th, 2017 Public Information Centre September 19 th, 2017 WELCOME! Public Information Centre for the Maple Hill Creek Rehabilitation Class Environmental Assessment Please take the time to sign our sign in sheet

More information

Flood Mitigation Opportunities Study Fourteen Mile Creek & McCraney Creek Systems

Flood Mitigation Opportunities Study Fourteen Mile Creek & McCraney Creek Systems Town of Oakville Flood Mitigation Opportunities Study Fourteen Mile Creek & McCraney Creek Systems November 14, 2013 Study Area The limits of the study area extend from Lake Ontario to Dundas Street. McCraney

More information

South St. Vrain / Hall Meadows Restoration Planning August 20, 2015

South St. Vrain / Hall Meadows Restoration Planning August 20, 2015 South St. Vrain / Hall Meadows Restoration Planning August 20, 2015 Agenda Introductions Purpose & Goals of Meeting Planning Area Master Plan Restoration Planning: Cost Estimates, Grants, Scope, Timeline

More information

RECOMMENDATION. the financing for the project BE APPROVED in accordance with the Sources of Financing Report attached hereto as Appendix A ;

RECOMMENDATION. the financing for the project BE APPROVED in accordance with the Sources of Financing Report attached hereto as Appendix A ; TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JANUARY 9, 2018 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES & CITY ENGINEER APPOINTMENT

More information

Project Goals and Scoping

Project Goals and Scoping Prepared for: Boulder County, Colorado Flood Planning & Preliminary Design Services for South St. Vrain Creek Restoration at Hall Ranch and Scoping May 24, 2016 Meeting with General Public In association

More information

Public Information Centre # 2 Flood Mitigation Opportunities Study Fourteen Mile Creek & M c Craney Creek Systems Town of Oakville

Public Information Centre # 2 Flood Mitigation Opportunities Study Fourteen Mile Creek & M c Craney Creek Systems Town of Oakville Public Information Centre # 2 Flood Mitigation Opportunities Study Fourteen Mile Creek & M c Craney Creek Systems Town of Oakville Municipal Class Environmental Assessment Study Area The limits of the

More information

WELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session

WELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session WELCOME Eastern Subwatersheds Stormwater Management Retrofit Study Online Information Session July 31 to Septemberember 19, 2014 1 Eastern Subwatersheds Stormwater Management Retrofit Study This study

More information

Table D1: WC-R1 to WC-R3 (Wilket Creek Park)

Table D1: WC-R1 to WC-R3 (Wilket Creek Park) APPENDIX D Table D1: WC-R1 to WC-R3 (Wilket Creek Park) Category of Consideration Criteria Alternative 1 Do Nothing Alternative 2 Local Improvements Alternative 3 Channel Realignment Natural Geomorphic

More information

Fish Passage Culvert Inspection (FPCI)

Fish Passage Culvert Inspection (FPCI) Fish Passage Culvert Inspection (FPCI) Creighton Creek (CR) Watershed FIA Project Number SOTSA 9153004 Prepared for: Tolko Industries Ltd., Okanagan Regional Woodlands Prepared by: Michele Trumbley, RPBio

More information

PUBLIC INFORMATION CENTRE Class Environmental Assessment For. Black Creek Flood Management

PUBLIC INFORMATION CENTRE Class Environmental Assessment For. Black Creek Flood Management PUBLIC INFORMATION CENTRE Class Environmental Assessment For Conservation Ontario Class Environmental Assessment for Remedial Flood and Erosion Control Projects (2002) The Class EA for Remedial Flood and

More information

The Beckett s Run Experience. Fort Wayne, Indiana

The Beckett s Run Experience. Fort Wayne, Indiana The Beckett s Run Experience Fort Wayne, Indiana Introductions Charlie Cochran City of Fort Wayne, Wet Weather Storm & Sewer Engineering Jason Durr, PE Christopher B. Burke Engineering, LLC 2 A Little

More information

Oshawa Creek Watershed Management Plan EXECUTIVE SUMMARY

Oshawa Creek Watershed Management Plan EXECUTIVE SUMMARY Oshawa Creek Watershed Management Plan EXECUTIVE SUMMARY The Central Lake Ontario Conservation Authority (CLOCA) has recognized the need to prepare comprehensive management strategies for all of its watersheds.

More information

Public Information Centre No. 2

Public Information Centre No. 2 Public Information Centre No. 2 Stoney Creek and Battlefield Creek Flood and Erosion Control Project East Escarpment Watershed Restoration Program Conservation Ontario Class Environmental Assessment Date:

More information

WHY ARE STREAM IMPROVEMENTS NEEDED IN TENNESSEE? TENNESSEE STREAMS

WHY ARE STREAM IMPROVEMENTS NEEDED IN TENNESSEE? TENNESSEE STREAMS WHY ARE STREAM IMPROVEMENTS NEEDED IN TENNESSEE? TENNESSEE STREAMS Most diverse aquatic fauna in the country Majority of West TN streams are channelized 36,000 miles of degraded stream are in need of restoration

More information

RIPARIAN AREAS REGULATION

RIPARIAN AREAS REGULATION Definitions and interpretation RIPARIAN AREAS REGULATION 1 (1) In this regulation: Act means the Fish Protection Act; active floodplain means an area of land that supports floodplain plant species and

More information

Public Notice. Public Notice No. Date: April 8, 2016 CENAP-PL-E Comment Period Closes: May 9, 2016

Public Notice. Public Notice No. Date: April 8, 2016 CENAP-PL-E Comment Period Closes: May 9, 2016 Public Notice Public Notice No. Date: April 8, 2016 CENAP-PL-E-16-02 Comment Period Closes: May 9, 2016 USACE Philadelphia District: http://www.nap.usace.army.mil COBBS CREEK FISH PASSAGE PROJECT SECTION

More information

3. SHIRLEY S BROOK / WATTS CREEK SUBWATERSHED STUDY COMMITTEE RECOMMENDATION

3. SHIRLEY S BROOK / WATTS CREEK SUBWATERSHED STUDY COMMITTEE RECOMMENDATION 3. SHIRLEY S BROOK / WATTS CREEK SUBWATERSHED STUDY COMMITTEE RECOMMENDATION That Council endorse the Shirley s Brook/Watts Creek Subwatershed Study (September 1999) as the technical document to guide

More information

CITY OF NEW WESTMINSTER. Bylaw No. 7033, 2005 RIPARIAN AREAS PROTECTION BYLAW

CITY OF NEW WESTMINSTER. Bylaw No. 7033, 2005 RIPARIAN AREAS PROTECTION BYLAW CITY OF NEW WESTMINSTER Bylaw No. 7033, 2005 RIPARIAN AREAS PROTECTION BYLAW WHEREAS the City may preserve, protect, restore and enhance the natural environment near streams that support fish habitat from

More information

Risk = Hazard x Consequence

Risk = Hazard x Consequence Tolko Industries Ltd. Cariboo Woodlands Forest Stewardship Plan Major Amendment 26 Watershed Hydrology 1. Introduction: The Cariboo Chilcotin Land Use Plan (CCLUP) and current Tolko Forest Stewardship

More information

Temporary Watercourse Crossing: Culverts

Temporary Watercourse Crossing: Culverts Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol

More information

Gray s Creek. Gray s Creek

Gray s Creek. Gray s Creek Gray s Creek 1 Grades F + Forest Conditions B Wetland Conditions C - Surface Water Quality This Watershed Report Card outlines the environmental information for the Gray s Creek watershed as of 2017. The

More information

Woodward Avenue Wastewater Treatment Plant Red Hill Creek Outfall Modification Works Joint Stewardship Board City of Hamilton.

Woodward Avenue Wastewater Treatment Plant Red Hill Creek Outfall Modification Works Joint Stewardship Board City of Hamilton. Woodward Avenue Wastewater Treatment Plant Red Hill Creek Outfall Modification Works Joint Stewardship Board City of Hamilton June 30, 2015 Presentation Outline 1. Background 2. Environmental Assessment

More information

Appendix M. Criteria, Measures and Indicators for Effects Assessment

Appendix M. Criteria, Measures and Indicators for Effects Assessment Appendix M Criteria, Measures and Indicators for Effects Assessment Appendix M. Criteria, Measures and Indicators for Effects Assessment Objective 1: Naturalization Changes to Aquatic Habitat Disruption,

More information

S.R. 4007, Section 14B PADEP Environmental Assessment Form. Enclosure C Description of Aquatic Habitat

S.R. 4007, Section 14B PADEP Environmental Assessment Form. Enclosure C Description of Aquatic Habitat S.R. 4007, Section 14B PADEP Environmental Assessment Form Description of Aquatic Habitat Cresheim Creek is the only water resource that exists within the project area. No jurisdictional wetlands were

More information

Plan Rollout Presentation July 31, Michael G. Hahn, P.E., P.H. Chief Environmental Engineer. Southeastern Wisconsin Regional Planning Commission

Plan Rollout Presentation July 31, Michael G. Hahn, P.E., P.H. Chief Environmental Engineer. Southeastern Wisconsin Regional Planning Commission Plan Rollout Presentation July 31, 2014 Michael G. Hahn, P.E., P.H. Chief Environmental Engineer Southeastern Wisconsin Regional Planning Commission # 219703 Racine County Flooding Recommendations and

More information

Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California

Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California Final Report September 2005 Prepared by Center for Ecosystem Management and Restoration, Oakland,

More information

DECISION MEMO. West Fork Blacktail Deer Creek Hardened Crossing

DECISION MEMO. West Fork Blacktail Deer Creek Hardened Crossing Page 1 of 6 Background DECISION MEMO USDA Forest Service Madison Ranger District Madison County T12S, R4W, Section 30 The project is in the Gravelly Landscape, Snowcrest Recommended Wilderness Management

More information

Dr. Paul Villard Toronto and Region International Erosion Control Association March 27, 2012

Dr. Paul Villard Toronto and Region International Erosion Control Association March 27, 2012 Dr. Paul Villard Toronto and Region International Erosion Control Association March 27, 2012 GEOMORPHOLOGICAL CHARACTERIZATION CREEK AND SHORELINE RESTORATION l FLUVIAL AND COASTAL HAZARD ASSESSMENT HYDRAULIC

More information

Stage 1 Technical Memorandum

Stage 1 Technical Memorandum Appendix A Stage 1 Technical Memorandum 2016 Google TECHNICAL MEMORANDUM One River Master Plan Environmental Assessment: Stage 1 Work Plan PREPARED FOR: COPY TO: PREPARED BY: Ashley Rammeloo, City of London

More information

CARP CREEK EMBANKMENT RESTORATION Conservation Ontario Class Environmental Assessment Public Information Centre March 8, 2018 Welcome!

CARP CREEK EMBANKMENT RESTORATION Conservation Ontario Class Environmental Assessment Public Information Centre March 8, 2018 Welcome! CARP CREEK EMBANKMENT RESTORATION Conservation Ontario Class Environmental Assessment Public Information Centre March 8, 2018 Welcome! Conservation Ontario Class Environmental Assessment Approach The Carp

More information

EXHIBIT 9. Supplemental Environmental Projects Plan

EXHIBIT 9. Supplemental Environmental Projects Plan EXHIBIT 9 Supplemental Environmental Projects Plan I. Introduction Defendants shall perform the streambank stabilization, leachate control, greenway creation, and in-stream restoration projects described

More information

Watershed Hydrology: Go with the flow. Greg Jennings, PhD, PE

Watershed Hydrology: Go with the flow. Greg Jennings, PhD, PE Watershed Hydrology: Go with the flow Greg Jennings, PhD, PE jenningsenv@gmail.com Streams What are your CHALLENGES? Hydrology too much water Pollutants upstream and on-site Vegetation wrong plants, wrong

More information

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project IAFSM 2010 Annual Conference City of Rockford Keith Creek Greenway Flood Mitigation Project March 10, 2010 Introduction Problem Overview 1890 s Building of homes along Keith Creek 1920 s Home construction

More information

Public Information Centre No. 2 June 15, :00 8:00 pm. Valley Park Community Centre (GYM B) 970 Paramount Drive Stoney Creek

Public Information Centre No. 2 June 15, :00 8:00 pm. Valley Park Community Centre (GYM B) 970 Paramount Drive Stoney Creek Public Information Centre No. 2 June 15, 2017 6:00 8:00 pm Valley Park Community Centre (GYM B) 970 Paramount Drive Stoney Creek Please complete the sign-in sheet and review display materials. The project

More information

I. Welcome & Introductions WPAC History (Paul Racette, PEC)

I. Welcome & Introductions WPAC History (Paul Racette, PEC) Poquessing Creek Watershed ACT 167 STORM WATER MANAGEMENT PLAN Public Hearing July 10, 2012 I. Welcome & Introductions ---------- WPAC History (Paul Racette, PEC) Primary WPAC Members: Bucks County: Bensalem

More information

Chapter 10 Natural Environment

Chapter 10 Natural Environment Chapter 10 Natural Environment Existing Conditions The Natural Environment Element addresses the protection, conservation, preservation, and restoration of the natural resources the Bayview Ridge Subarea,

More information

PUBLIC INFORMATION CENTRE

PUBLIC INFORMATION CENTRE June 24, 2014 PUBLIC INFORMATION CENTRE MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT SCHEDULE B MUNICIPAL SERVICES FOR THE MARY LAKE ESTATES SUBDIVISION Buildings Municipal Infrastructure Transportation Industrial

More information

Supplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania

Supplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania Supplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania Project Authorization USDA's Small Watershed Program is carried out under the

More information

7.0 WATER-BASED CONTROL MEASURES

7.0 WATER-BASED CONTROL MEASURES 7.0 WATER-BASED CONTROL MEASURES 7.1 IDENTIFICATION AND DESCRIPTION OF CONTROL MEASURES Table 7-1 lists the water-based options being considered for implementation in the initial screening stage. Descriptions

More information

Surface Water. Solutions for a better world

Surface Water. Solutions for a better world 1 Surface Water Solutions for a better world Our Surface Water Services Expertise Growing worldwide awareness of water scarcity has encouraged water preservation programs, better irrigation techniques

More information

Chehalis Basin Strategy Programmatic SEPA Draft EIS

Chehalis Basin Strategy Programmatic SEPA Draft EIS Chehalis Basin Strategy Programmatic SEPA Draft EIS History of Flooding I-5 closed in 1990, 1996, 2007, 2009 Five largest flood events occurred since 1986 2 History of Habitat Degradation Harvest has been

More information

Meacham Creek Restoration Project

Meacham Creek Restoration Project Meacham Creek Restoration Project Meacham Creek Restoration Project Umatilla National Forest Walla Walla Ranger District Michael Rassbach, District Ranger Public Scoping Document Proposal Summary The Walla

More information

Environmental Resource Inventories. What are ERIs? Significance of information How to use them

Environmental Resource Inventories. What are ERIs? Significance of information How to use them Environmental Resource Inventories What are ERIs? Significance of information How to use them Environmental Resource Inventory - ERI Compiled by the environmental commission Information about the natural

More information

Appendix P. U.S. Fish and Wildlife Service Planning Aid Letter

Appendix P. U.S. Fish and Wildlife Service Planning Aid Letter Appendix P U.S. Fish and Wildlife Service Planning Aid Letter This page is intentionally left blank. United States Department of the Interior FISH AND WILDLIFE SERVICE Missouri Ecological Services Field

More information

Transportation Association of Canada Environmental Achievement Award Nomination Submission:

Transportation Association of Canada Environmental Achievement Award Nomination Submission: Transportation Association of Canada Environmental Achievement Award Nomination Submission: Highway 26 New Wildlife Passage and Enhancements Ontario Ministry of Transportation, Central Region Nominees:

More information

OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 3 POLICY AND PROCEDURES

OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 3 POLICY AND PROCEDURES OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 3 POLICY AND PROCEDURES April 28, 2016 Table of Contents 3.1 Introduction... 2 3.1.1 Purpose of Chapter 3... 2 3.1.2 Policy vs. Design

More information

COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY & MANAGEMENT PLAN South Albion Bolton Community Plan Employment Needs & North Hill Commercial Lands Study

COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY & MANAGEMENT PLAN South Albion Bolton Community Plan Employment Needs & North Hill Commercial Lands Study COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY & MANAGEMENT PLAN South Albion Bolton Community Plan Employment Needs & North Hill Commercial Lands Study Part A Study Components Background Information Review

More information

CLEARWATER TOWNSHIP WATER QUALITY ACTION PLAN

CLEARWATER TOWNSHIP WATER QUALITY ACTION PLAN CLEARWATER TOWNSHIP WATER QUALITY ACTION PLAN Elk-River-Chain-of-Lakes Gaps Analysis Project The Watershed Center Grand Traverse Bay Michigan Department of Environmental Quality July 2011 Purpose The Grand

More information

APPENDIX C. Public Consultation Centre (PCC) Displays. Appendix C1 PCC#1 Appendix C2 PCC#2 Appendix C3 PCC#3

APPENDIX C. Public Consultation Centre (PCC) Displays. Appendix C1 PCC#1 Appendix C2 PCC#2 Appendix C3 PCC#3 APPENDIX C Public Consultation Centre (PCC) Displays Appendix C1 PCC#1 Appendix C2 PCC#2 Appendix C3 PCC#3 Appendix C1 PCC#1 Appendix C2 PCC#2 Township of Red Rock Class Environmental

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW Mississippi Dr Coon Rapids, MN SQ FT Residence on 0.64 Acre Lot

COON CREEK WATERSHED DISTRICT PERMIT REVIEW Mississippi Dr Coon Rapids, MN SQ FT Residence on 0.64 Acre Lot 17-082 Van Sloun Residence, Page 1 of 5 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: May 8, 2017 AGENDA NUMBER: 17 FILE NUMBER: 17-082 ITEM: Van Sloun Residence RECOMMENDATION: Approve with

More information

Contents. Section 1 Data Review and Discussion. Section 2 Methodology

Contents. Section 1 Data Review and Discussion. Section 2 Methodology Contents Section 1 Data Review and Discussion 1.1 Introduction and Background... 1-1 1.2 1996 Stormwater Management Plan... 1-3 1.3 2004 Two Mile Branch Watershed Management Plan... 1-5 1.4 NPDES Mapping

More information

Detailed Options Evaluation

Detailed Options Evaluation Appendix F Detailed Options Evaluation 06 Google Category & Criterion Description Measure/Indicator Natural Environment Rating Scale for Measuring Impacts Comparative Evaluation Score Comparative Evaluation

More information

Eco-engineering on the Edge:

Eco-engineering on the Edge: Eco-engineering on the Edge: Decision Making for Stream Restoration and Stabilization in High Profile or Risk Environments Dan Salas, Ecologist Cardno JFNew Types of Risk Physical/Structural = Property

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 NOVEMBER 2012 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS

More information

Issues, Concerns & Constraints

Issues, Concerns & Constraints Identifying Issues, Concerns & Constraints In order to identify the issues and concerns of watershed residents, several methods of gathering public input were employed. The Brodhead Watershed Association

More information

WELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session #2 June 15 to July 13, 2018

WELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session #2 June 15 to July 13, 2018 WELCOME Eastern Subwatersheds Stormwater Management Retrofit Study Online Information Session #2 June 15 to July 13, 2018 1 Eastern Subwatersheds Stormwater Management Retrofit Study This study is one

More information

Request for Proposal Scope Development Guide. Asotin County Geomorphic Assessment. and. Conceptual Restoration Plan

Request for Proposal Scope Development Guide. Asotin County Geomorphic Assessment. and. Conceptual Restoration Plan Request for Proposal Scope Development Guide Asotin County Geomorphic Assessment and Conceptual Restoration Plan Asotin County Conservation District December 3, 2015 1 1.0 INTRODUCTION The Asotin County

More information

CATEGORY a protection of the natural environment, its ecosystems and biodiversity.

CATEGORY a protection of the natural environment, its ecosystems and biodiversity. 29. ENVIRONMENTAL DEVELOPMENT PERMIT AREA CATEGORY a protection of the natural environment, its ecosystems and biodiversity. The requirement to obtain an environmental development permit is cited in Section

More information

THE WATERSHED The watershed is an area of land that drains into a stream. This includes both the surface runoff and groundwater. Because a stream is m

THE WATERSHED The watershed is an area of land that drains into a stream. This includes both the surface runoff and groundwater. Because a stream is m Understanding Streams A stream is the product of its watershed. Good land use in the watershed will be reflected in the stream. MOST PEOPLE enjoy the captivating qualities of flowing water. But streams

More information

Maitland Valley WATERSHED

Maitland Valley WATERSHED Maitland Valley WATERSHED Report Card 2018 Maitland Conservation has prepared this report card as a summary of the state of your forests, wetlands, and water resources. WHERE ARE WE? We are one of 36 Conservation

More information

Wood-Pawcatuck Watershed Flood Resiliency Management Plan

Wood-Pawcatuck Watershed Flood Resiliency Management Plan Wood-Pawcatuck Watershed Flood Resiliency Management Plan Project Steering Committee Kickoff Meeting March 26, 2015 Wood-Pawcatuck Watershed Association Meeting Agenda 10:00 10:05 Welcome and Opening Remarks

More information

Stream Restoration in the Urban Environment Concepts and Considerations

Stream Restoration in the Urban Environment Concepts and Considerations Stream Restoration in the Urban Environment Concepts and Considerations The Restoration of Our Rivers; October 5, 2012 Matthew A. Van Eps, PE & Sandi J. Formica: Watershed Conservation Resource Center

More information

Don t Mow. Let it Grow!

Don t Mow. Let it Grow! Don t Mow. Let it Grow! The Science Behind the Need for Riparian Buffer Protection. Chelsea Walker, WCD Watershed Specialist chelsea@wcdpa.com 724-837-5271 What is a Riparian Buffer? A riparian buffer

More information

CHAPTER 4 WATERSHED PLAN GOALS & OBJECTIVES

CHAPTER 4 WATERSHED PLAN GOALS & OBJECTIVES 4.0 Introduction CHAPTER 4 WATERSHED PLAN GOALS & OBJECTIVES After the watershed analysis had been completed, the next step in the planning process followed by the group was to come up with goals and objectives

More information

COASTAL CONSERVANCY. Staff Recommendation June 16, 2005 ESTERO AMERICANO NATURE PRESERVE ENHANCEMENT PROJECT

COASTAL CONSERVANCY. Staff Recommendation June 16, 2005 ESTERO AMERICANO NATURE PRESERVE ENHANCEMENT PROJECT COASTAL CONSERVANCY Staff Recommendation June 16, 2005 ESTERO AMERICANO NATURE PRESERVE ENHANCEMENT PROJECT File No. 05-017 Project Manager: Richard Retecki RECOMMENDED ACTION: Authorization to disburse

More information

Please complete the sign-in sheet and review display materials.

Please complete the sign-in sheet and review display materials. Municipal Class Environmental Assessment Please complete the sign-in sheet and review display materials. As you move through the information presented today, we encourage you to ask questions and provide

More information

D Olive Watershed. Path Toward Restoration

D Olive Watershed. Path Toward Restoration D Olive Watershed Path Toward Restoration Water is the most critical resource issues of our lifetime and our children s lifetime. The health of our waters is the principal measure of how we live on the

More information

Lower San Joaquin River Feasibility Study PLAN FORMULATION ADDENDUM

Lower San Joaquin River Feasibility Study PLAN FORMULATION ADDENDUM PLAN FORMULATION ADDENDUM Non-Structural Measure Descriptions Elevate Critical Infrastructure This measure would raise at-risk critical structures above the design inundation level. Elevation would be

More information

VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES

VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES The County will: GOALS AND OBJECTIVES 1.1 Conserve, Enhance, Protect, Maintain and Manage Vegetative, Water, Fish and Wildlife Resources Promote

More information

ADDENDUM #1 RFP WOLFTRAP CREEK STREAM RESTORATION

ADDENDUM #1 RFP WOLFTRAP CREEK STREAM RESTORATION ADDENDUM #1 February 6, 2015 RFP 15-03 WOLFTRAP CREEK STREAM RESTORATION ******ATTENTION BIDDERS****** (To be completed and returned with bid response) A request was made that the Stormwater Local Assistance

More information

COLE ENGINEERING GROUP LTD.

COLE ENGINEERING GROUP LTD. CITY OF MARKHAM PROJECT FILE Stormwater Management Facilities Retrofit Municipal Class EA ES12-0316 COLE ENGINEERING GROUP LTD SEPTEMBER 2015 [ Month Year ] HEAD OFFICE 70 Valleywood Drive Markham, ON

More information

COTTON CREEK CULVERT REPLACMENT

COTTON CREEK CULVERT REPLACMENT COTTON CREEK CULVERT REPLACMENT Integrating Mobility with Environmental Innovation Located along a scenic section of Highway 3/95 in British Columbia, Moyie Bluffs, a 6.5 km stretch of inland highway had

More information

RDEK Elk River Priority Flood and Erosion Mitigation Sites. Conceptual Design Report

RDEK Elk River Priority Flood and Erosion Mitigation Sites. Conceptual Design Report RDEK Elk River Priority Flood and Conceptual Design Report May 2016 Lotic Environmental Ltd 2193 Mazur Road Cranbrook BC V1C 6V9 Elk River Watershed Alliance 891-2nd Avenue Fernie BC V0B 1M0 Suggested

More information

Environmental Check List Georgia Environmental Policy Act

Environmental Check List Georgia Environmental Policy Act Environmental Check List Georgia Environmental Policy Act Project No. : Project Name: GEORGIA IS AREA AFFECTED? IF AFFECTED, HOW SEVERELY? AREA/CATEGORY NO YES UNKNOWN MINOR MEDIAN MAJOR UNKNOWN 1. Wetlands

More information

THE RED HILL VALLEY PROJECT STORMWATER MANAGEMENT DESIGN. Ronald B. Scheckenberger, M. Eng., P. Eng. Philips Engineering Ltd.

THE RED HILL VALLEY PROJECT STORMWATER MANAGEMENT DESIGN. Ronald B. Scheckenberger, M. Eng., P. Eng. Philips Engineering Ltd. THE RED HILL VALLEY PROJECT STORMWATER MANAGEMENT DESIGN Ronald B. Scheckenberger, M. Eng., P. Eng. Philips Engineering Ltd. Chris Murray Acting Director, Red Hill Valley Project City of Hamilton Paper

More information

Natural Systems Planning Primer

Natural Systems Planning Primer Natural Systems Planning Primer Lise.Guevremont@ottawa.ca Amy.Macpherson@ottawa.ca Land Use and Natural Systems Unit Planning and Growth Management November 2015 1 Welcome Policy Framework Development

More information

City of Mississauga Environmental Impact Studies Terms of Reference 2002

City of Mississauga Environmental Impact Studies Terms of Reference 2002 City of Mississauga Environmental Impact Studies Terms of Reference 2002 1.0 INTRODUCTION To ensure in so far as possible, both private and public developments are consistent with Natural Heritage and

More information

Watershed. Rigaud River Report Card. Grades: Forest Conditions Wetland Conditions Surface Water Quality

Watershed. Rigaud River Report Card. Grades: Forest Conditions Wetland Conditions Surface Water Quality Watershed Report ard Grades: + onditions Wetland onditions Surface Water Quality This Watershed Report ard outlines the environmental information for the watershed as of 2006. The information provides

More information

Understanding and Restoring Natural Floodplain Function. Gary James CTUIR Fisheries Program Manager

Understanding and Restoring Natural Floodplain Function. Gary James CTUIR Fisheries Program Manager Understanding and Restoring Natural Floodplain Function Gary James Fisheries Program Manager Future of Our Salmon Technical Workshop on Healthy Floodplains Spokane, WA - August 16-18, 2016 Presentation

More information

Welcome South London Wastewater Servicing Study. Municipal Class Environmental Assessment Master Plan Public Information Centre.

Welcome South London Wastewater Servicing Study. Municipal Class Environmental Assessment Master Plan Public Information Centre. Welcome South London Wastewater Servicing Study Municipal Class Environmental Assessment Master Plan Public Information Centre February 26, 2018 The purpose of this Public Information Centre (PIC) is to:

More information

Chapter 3 Dispersion BMPs

Chapter 3 Dispersion BMPs Chapter 3 Dispersion BMPs 3.1 BMP L611 Concentrated Flow Dispersion 3.1.1 Purpose and Definition Dispersion of concentrated flows from driveways or other pavement through a vegetated pervious area attenuates

More information

WATERSHED. Maitland Valley. Report Card 201

WATERSHED. Maitland Valley. Report Card 201 Maitland Valley WATERSHED Report Card 201 The Maitland Valley Conservation Authority has prepared this report card as a summary on the state of our forests, wetlands, surface water, and ground water resources.

More information

Programmatic General Permit Army Corps of Engineers Connecticut Addendum

Programmatic General Permit Army Corps of Engineers Connecticut Addendum Programmatic General Permit Army Corps of Engineers Connecticut Addendum DEP USE ONLY NAE#: DEP #: PGP Screening Date: Determinations: Eligible Category 2 Eligible Category 1 Individual Permit Print or

More information

Otonabee Region WATERSHED

Otonabee Region WATERSHED Otonabee Region WATERSHED Report Card 2018 Otonabee Conservation has prepared this report card as a summary of the state of your forests, wetlands, and water resources using data from 2012 to 2016. WHERE

More information

LAKE CHEMUNG GENOA TOWNSHIP LIVINGSTON COUNTY, MICHIGAN STORM DRAIN AND TRIBUTARY STUDY. Prepared for:

LAKE CHEMUNG GENOA TOWNSHIP LIVINGSTON COUNTY, MICHIGAN STORM DRAIN AND TRIBUTARY STUDY. Prepared for: LAKE CHEMUNG GENOA TOWNSHIP LIVINGSTON COUNTY, MICHIGAN STORM DRAIN AND TRIBUTARY STUDY Prepared for: Lake Chemung Riparian Association c/o 1125 Sunrise Park Drive Howell, MI 48843 Prepared by: Progressive

More information

Town of Aurora Stream Management Master Plan PUBLIC INFORMATION CENTRE May 1 st, 2018

Town of Aurora Stream Management Master Plan PUBLIC INFORMATION CENTRE May 1 st, 2018 Town of Aurora Stream Management Master Plan PUBLIC INFORMATION CENTRE May 1 st, 2018 Your comments are encouraged and appreciated, as this will provide us an opportunity to address project issues and

More information

NATIONAL STREAM AND AQUATIC ECOLOGY CENTER

NATIONAL STREAM AND AQUATIC ECOLOGY CENTER NATIONAL STREAM AND AQUATIC ECOLOGY CENTER The National Stream and Aquatic Ecology Center is a technology transfer unit of the National Forest System (NFS) Watershed, Fish, Wildlife, Air and Rare Plants

More information

BMP 5.4.2: Protect /Conserve/Enhance Riparian Areas

BMP 5.4.2: Protect /Conserve/Enhance Riparian Areas BMP 5.4.2: Protect /Conserve/Enhance Riparian Areas The Executive Council of the Chesapeake Bay Program defines a Riparian Forest Buffer as "an area of trees, usually accompanied by shrubs and other vegetation,

More information

Appendix C Previous Studies

Appendix C Previous Studies Appendix C Previous Studies Overview Valley Creek has been the subject of many studies and watershed assessments over the past four decades, with the scope and breadth of these studies varying significantly

More information

ANCR INDIVIDUAL RESPONSES SUMMARY: 2/11/04 WATER RESOURCES GOALS AND OBJECTIVES

ANCR INDIVIDUAL RESPONSES SUMMARY: 2/11/04 WATER RESOURCES GOALS AND OBJECTIVES ANCR INDIVIDUAL RESPONSES SUMMARY: 2/11/04 WATER RESOURCES GOALS AND OBJECTIVES Goal 1: Protect the health and safety of the Dane County population. a. Prevent development that may have an adverse effect

More information

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: 1338 Thornhill Dr Project ID Number: 1-3 Problem: Creek bank erosion is occurring along from the northern property line at

More information

What is the Terms of Reference?

What is the Terms of Reference? What is the Terms of Reference? Framework for content of the Environmental Assessment Certificate Application Provides the scope of technical studies and consultation processes with the public and First

More information

Climate Smart Resiliency Plans, Policies, and Projects Improvement Plan for: The Town of Caroline

Climate Smart Resiliency Plans, Policies, and Projects Improvement Plan for: The Town of Caroline Climate Smart Resiliency Plans, Policies, and Projects Improvement Plan for: The Town of Caroline Overview This document should serve as a supplement to the Climate Smart Resiliency Planning Evaluation

More information

Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No.

Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No. Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates 2005 VNH File No. 35317-210-21 Table of Contents Introduction... 3 Goals... 3 Storm water Discussion...

More information

DIRECTIONS FOR STRATEGY DEVELOPMENT

DIRECTIONS FOR STRATEGY DEVELOPMENT DIRECTIONS FOR STRATEGY DEVELOPMENT CHAPTER 9 This chapter is designed to identify issues which may be considered during the development of a watershed strategy. In the previous Don, Humber, and Rouge

More information

Welcome to the Boulevard Lake Dam Class Environmental Assessment. Public Information Session #1. June 14, 2016

Welcome to the Boulevard Lake Dam Class Environmental Assessment. Public Information Session #1. June 14, 2016 Welcome to the Boulevard Lake Dam Class Environmental Assessment Public Information Session #1 June 14, 2016 Boulevard Dam - Overview Built approximately 100 years ago Owned and operated by the City of

More information

Toronto and Region Conservation 2017 Progress & 2018 Budget Peel Council

Toronto and Region Conservation 2017 Progress & 2018 Budget Peel Council Toronto and Region Conservation 2017 Progress & 2018 Budget Peel Council November 16, 2017 1 2 Input $4,248,000 44 Projects Activities Watershed 2017 Output Increased coverage of Flood Monitoring and Real

More information

FINDING OF NO SIGNIFICANT IMPACT GOODING FLOOD CONTROL PROJECT REHABILITATION GOODING, IDAHO SEPTEMBER 2016

FINDING OF NO SIGNIFICANT IMPACT GOODING FLOOD CONTROL PROJECT REHABILITATION GOODING, IDAHO SEPTEMBER 2016 FINDING OF NO SIGNIFICANT IMPACT GOODING FLOOD CONTROL PROJECT REHABILITATION GOODING, IDAHO SEPTEMBER 2016 1. INTRODUCTION/PROPOSED ACTION The U.S. Army Corps of Engineers, Walla Walla District (Corps),

More information